Implementing Agency: Eastern Rajasthan Canal Project Corporation Limited
Segment: Water Supply
Work: Package ERCP-4: Construction of Mej Barrage, including all components with its O&M for a period of 20 years on Hybrid Annuity Model. The estimated cost of the project is Rs 3179.9 million. The Design Build period is 48 months.
Package ERCP-09-TF-6: Construction of Feeder from Isarda to Ramgarh Dam Jaipur, including all components with its O&M for a period of 20 years on Hybrid Annuity Model. The estimated cost of the project is Rs 19149.5 million. The Design Build period is 48 months.
Package ERCP-11-09-TF-5: Construction of Mor Sagar Artificial Reservoir and feeder from Bisalpur to Mor Sagar Artificial Reservoir, including all components with its O&M for a period of 20 years on Hybrid Annuity Model. The estimated cost of the project is Rs 38651.1 million. The Design Build period is 48 months.
Package ERCP-09-TF-7A: Construction of Feeder System from Khura Chainpura to Jaisamand Alwar, including all components with its O&M for a period of 20 years on Hybrid Annuity Model. The estimated cost of the project is Rs 34460 million. The Design Build period is 48 months.
Package ERCP-09-TF-8: Construction of Feeder from Isarda to Khura Chainpura to Bandh Baretha Bharatpur, including all components with its O&M for a period of 20 years on Hybrid Annuity Model. The estimated cost of the project is Rs 25200 million. The Design Build period is 48 months.
Brahmani Barrage: Construction of Brahmani Barrage across Brahmani River with its O&M for a period of 20 years on Hybrid Annuity Model near Shripura village, tehsil – Rawatbhata, district- Chittorgarh. The estimated cost of the project is Rs 6800 million. The Design Build period is 48 months. Bids for the same were invited on February 10, 2025.
Publish Date: December 30, 2024
End Date: July 9, 2025*
Implementing Agency: Salem City Municipal Corporation
Segment: Water Supply
Work: The scope of work includes laying of distribution network retained /replacement of the existing and proposed pipeline length– 1342.66 km, improvement of distribution system in 67 zones, 2.34 lakh household connections, improvement of headworks, improvement of raw water transmission mains improvement of existing water treatment plant (WTP) and 20 years of Operation and Maintenance (O&M).
Publish Date: December 28, 2024
End Date: May 12, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Wastewater
Work: The scope of the project includes of re-use of treated sewage of Barh STP in Bihar. The construction work on the project is likely to be completed in 18 months. The estimated cost of the project is Rs 747.08 million.
Publish Date: December 5, 2024
End Date: June 19, 2025*
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work involves construction of reinforced cement concrete (RCC) intake well and other allied infrastructure including supervisory control and data acquisition (SCADA) automation and Operation and Maintenance (O&M) of five years at an estimated cost of Rs 1,124.04 million.
Publish Date: November 25, 2024
End Date: December 2, 2024
Implementing Agency: Notified Area Council (NAC), Kuchinda
Segment: Wastewater
Work: The scope of work includes conducting drone aided survey and preparation of orthomosaic drawings for SWD plan of NAC Kuchinda area.
Publish Date: November 25, 2024
End Date: December 2, 2024
Implementing Agency: Power Finance Corporation Limited
Segment: Wastewater
Work: The scope of work includes kick-off meeting/working plan/activities/methodology, due diligence, review and monitoring of project progress (physical & financial)/subsequent drawdowns review/insurance review and operational/financial / insurance review.
Publish Date: November 21, 2024
End Date: December 6, 2024
Implementing Agency: Tamil Nadu Water Supply and Drainage Board
Segment: Water Supply
Work: The scope of project includes providing water from Kollidam river to meet the water supply needs of Perambalur Municipality and Perambalur State Industries Promotion Corporation of Tamil Nadu Limited (SIPCOT) industrial area located at Erayur and Padalaur in Perambalur District. It includes construction of collector well, infiltration well, sump cum pump sets, pumping mains and all other related works including six months trial run and 5 years Operation and Maintenance (O&M).
Publish Date: November 20, 2024
End Date: December 6, 2024
Implementing Agency: Greater Noida Industrial Development Authority (GNIDA)
Segment: Wastewater
Work: The scope of work includes design, survey, engineering, construction, supply, erection, testing and commissioning of 45 mld STP cum water reclamation facility at Sector-1, Greater Noida based on sequential batch reactor (SBR) technology including Operation and Maintenance for 12 years.
Publish Date: November 19, 2024
End Date: December 2, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, construction pf pump house, chlorination treatment system, overhead tanks, supply, laying and jointing of 5.32 km long rising main, 140.419 km long distribution network, house connections, boundary wall, approach road, 12 tubewell and pumping plant, supervisory control and data acquisition (SCADA) automation including three months trial and defect liability period (DLP) of one year for civil works and two years for electrical and mechanical work.
Publish Date: November 14, 2024
End Date: November 29, 2024
Implementing Agency: Uttarakhand Jal Sansthan
Segment: Wastewater
Work: The scope of work includes consultancy services for preparation of DPR including topographical survey, hydraulic design, drawing, bill of quantities (BOQ), index plan, sections and related works.
Publish Date: November 13, 2024
End Date: November 25, 2024
Implementing Agency: Hyderabad Metropolitan Water Supply and Sewerage Board
Segment: Wastewater
Work: The scope of work includes construction of 22 STPs having a collective capacity of 471.5 million litres per day (mld) for urban local bodies (ULBs) in Outer Ring Road (ORR) on hybrid annuity model (HAM) mode including Operation and Maintenance (O&M) for 15 years at an estimated cost of Rs 7,736.7 million. Funds for the project will be contributed by Union, State governments and private investments in a share of 25:35:40.
Publish Date: November 9, 2024
End Date: November 25, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Wastewater
Work: The scope of work includes preparation of IUSWDMP for various municipal corporation area, duly preparing drainage basin maps (duly considering upstream and downstream catchment areas even beyond municipal limits), carrying out all topographic surveys in the project influence area, hydraulic analysis, zoning/ catchments/ sub catchments, simulation model addressing worst scenario of rainfall intensity, mechanism at ultimate disposal point, proposing early warning system to reduce/minimise human and property loss and disturbance to traffic on arterial and sub arterial roads including preparation of hydraulic designs, drawings, estimations, conducting stakeholders meetings, obtaining data for inundation points/areas, prioritisation of projects, collection of data (DPR preparation and certain identified works where DPR is not mandatory) etc.
Publish Date: November 9, 2024
End Date: November 29, 2024
Implementing Agency: Karnataka Industrial Areas Development Board
Segment: Wastewater
Work: The scope of work includes providing consultancy services for preparation of detailed project report (DPR), economic analysis, plan design of estimates, cost structure, etc.
These CETPs will be developed at Bhavanahalli Industrial area covering Narasapura Industrial area, Jakkasandra Industrial area 1st Phase & 2nd Phase, Vemgal Industrial area 1st Phase & 2nd Phase, Shivarpatna Industrial area, Malur Industrial area 1st Phase ,2nd Phase, 3rd Phase & 4th Phase at Kolar district;Sompura Industrial Area (Dobaspet 1st, 2nd, 3rd, 4th, 5th, 6th phases and Machenahalli (7th Phase)) in Bengaluru rural district; Gowribidnur Industrial Area covering 1st, 2nd & 3rd Phase, Chikkaballapur district; Badanaguppe-Kellamballi Industrial Areas 1st & 2nd Phases in Chamarajanagara district; Kadakola, Thandya, Adakanahalli, Immavu Industrial Areas in Mysuru district and Haraluru Muddenahalli Industrial Area Phase-2 in Devanahalli Taluk, Bengaluru Rural district.
Publish Date: November 8, 2024
End Date: November 21, 2024
Implementing Agency: Public Works Department, Delhi
Segment: Wastewater
Work: This includes:
Package 2: It includes laying of SWD network from Kirari Suleman Drain near Nangloi Railway Metro Station to Hiran Kudna Drain (both sides) from Metro Pillar No. 428 to 626.
Package 3: It includes laying of SWD network from Tikri Border to Hiran Kudna Drain (both sides) from Metro Pillar No. 753 to 626 (Package-3) under public works department (PWD) water resource (WR) division -2.
Publish Date: November 6, 2024
End Date: November 27, 2024
Implementing Agency: Hyderabad Metropolitan Water Supply and Sewerage Board
Segment: Wastewater
Work: The scope of work includes construction of 16 STPs having a collective capacity of 493.5 million litres per day (mld) for urban local bodies (ULBs) across Greater Hyderabad Municipal Council (GHMC) and Outer Ring Road (ORR) on hybrid annuity model (HAM) mode including Operation and Maintenance (O&M) for 15 years at an estimated civil cost of Rs 9,093 million and O&M cost of Rs 5,306 million bringing the total Package -1 cost to Rs 18,785.5 million. Funds for the project will be contributed by Union, State governments and private investments in a share of 25:35:40.
Publish Date: November 2, 2024
End Date: November 30, 2024
Implementing Agency: Gorakhpur Industrial Development Authority (GIDA)
Segment: Wastewater
Work: The scope of work includes preparation of feasibility report, DPR, assistance for financial closure, preparation of bid documents, contract management, etc.
Publish Date: October 29, 2024
End Date: November 12, 2024
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of submerged intake structure, all types of water treatment plants (WTP), pumping machinery, pipe line work, reservoirs and over head service reservoirs (OHSR).
Package 3: It includes execution testing and commissioning cluster package of tehsil- Sangod of Kota district and tehsil- Khanpur, Aklera and Manohar Thana of Jhalawar district and adjoining area including supervisory control and data acquisition (SCADA), road crossings, power line, forest clearance, land acquisitions, Cluster pump houses and Operation and Maintenance (O&M) for 10 years at an estimated cost of Rs 4,105 million.
Package 4: It includes execution testing and commissioning of cluster distribution system of tehsils Chhabra, Chhipabarod and Atru of District Baran from Parwan Dam, Districts Jhalawar, Baran and Jhalawar at an estimated cost of Rs 5,045.8 million.
Package 5: It includes execution testing and commissioning cluster package of tehsil- – Anta, Baran, Kishanganj and Shabad of Baran district and adjoining area including SCADA, road crossings, forest clearance, land acquisitions, Cluster pump houses and 10 years O&M at an estimated cost of Rs 5,555.9 million.
Publish Date: October 28, 2024
End Date: December 4, 2024
Implementing Agency: Kolkata Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of SWD pumping station along with improvement of drainage network and pumping mains and other related works.
Publish Date: October 25, 2024
End Date: November 25, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of work includes design, construction, providing, supplying, lowering, laying and jointing various DI/PVC rising main and gravity main pipelines, reinforced cement concrete (RCC) elevated storage reservoir (ESR), RCC sump, pump house, staff quarter, RCC road, compound wall, supplying and erecting pumping machinery at various Villages with Operation and Maintenance (O&M) for 10 years and three months trial run under augmentation of Sonariya regional water supply scheme for water supply to all beneficiary villages and towns of Veraval, Sutrapada, Talala talukas.
Publish Date: October 24, 2024
End Date: November 25, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of work includes design and construction of a WTP at Malgam and providing, supplying, lowering, laying and jointing various DI/PVC rising main and gravity main pipelines, reinforced cement concrete (RCC) elevated service reservoir (ESR), RCC sump, pump house, staff quarter, security cabin, chlorination room, chlorination arrangement, compound wall, repairing to existing structures, supplying and erecting pumping machinery including Operation and Maintenance (O&M) for ten years with trial run of three months.
Publish Date: October 24, 2024
End Date: November 25, 2024
Implementing Agency: Public Health And Municipal Engineering Department, Telangana
Segment: Wastewater
Work: The scope of work includes construction of UGD system including five years of Operation and Maintenance (O&M).
Publish Date: October 23, 2024
End Date: November 6, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour etc. required for construction, erection, completion, testing & commissioning of water supply works such reinforced cement concrete (RCC) over head tank, RCC clear water rising main (CWR), pump house cum chlorinating room, pump house, distribution system, dismantling and reinstatement of all type road, rising main, boundary wall, M.S. Gate, Site development and construction of tube wells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation, electrical and mechanical (E&M) works and other appurtenant works on Turnkey Basis including trial and run of 3 months and defect liability period (DLP) of 12 months for Civil works and 24 months for E&M works after completion of successful Trial Run. All completed and commissioned works of above scheme shall be handed over to Jalkal Vibhag Nagar Nigam Kanpur, after 3 months of successful trial run period.
Publish Date: October 21, 2024
End Date: February 11, 2026*
Implementing Agency: Uttarakhand Peyjal Nigam
Segment: Water Supplyb
Work: The scope of work includes survey, design, construction of Nanakmatta water supply scheme (reorganisation) of district Udham singh nagar consisting of supplying, carting, laying and jointing of rising main (DI K-9), overhead tank (OHT), pump house cum attendant room, staff quarter, distribution system (DI K-7 & HDPE Pipes), construction of deep tubewell, pumping plant, automation of pumping plant, house service connection and all other appurtenance works etc. including Operations and maintenance (O&M) for five years and one year defect liability period (DLP).
Publish Date: October 16, 2024
End Date: November 5, 2024
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Wastewater
Work: The scope of work includes providing authority’s engineer (AE) services for supervision of the construction of sewerage network, pumping station and Operation and Maintenance (O&M) for five years on engineering, procurement & construction (EPC) contract basis.
These include:
Package 1: It includes areas of Nayapalli, Police Colony, Madhusudan Nagar, Nilakanthanagar, Sastri Nagar and zone 7 and 9. The scope of work includes 32.312 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 471 million and O&M cost of Rs 55 million (Rs 526 million).
Package 2: It includes areas of Unit-II,III,IV,V, SahidNagar, Satyanagar, Acharyavihar, Kharvela Nagar, Ashok Nagar, Bomikhal, Gobindaprasad, Rasulgarh. The scope of work includes 32.912 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 468.9 million and O&M cost of Rs 56 million (Rs 524.9 million).
Package 3: It includes areas of Kesura, Bairanginagar, Patitapaban Nagar, Budheswari, Laxisagar, Jharpada & Jagannathnagar. The scope of work includes 36.27 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 541.5 million and O&M cost of Rs 61.7million (Rs 603.2 million).
Package 4: It includes areas of Unit-I,VI,VII, Suryanagar, Ganganagar, Bapuji Nagar, Budhanagar, Nageswar Tangi, Goutamnagar, BJB Nagar, Baragarh, Rajaraniarea, Tankapani, Sisupalagarh (Part). The scope of work includes 36.348 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 592.7 million and O&M cost of Rs 63.3 million (Rs 656 million).
Package 5: It includes areas of Mahaveer Nagar, Mahabhoisasan, Radhkrushnanagar, Nuagaon, Kapileswar area, Lingipur(P), Sunderapada, Azadnagar, Lingaraj Temple area, Kunjapatnasahi, Mahatab Road, Dumduma, Ransinhpur, Sarkantara, Bahadalpur. The scope of work includes 28.61 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 592.8 million and O&M cost of Rs 64.7 million (Rs 594.5 million).
Package 6: It includes areas of Pokhariput, Bhaktamadhunagar, Pokhariput DAV backside area, Baramunda village, Jagamara Road, Krishna Garden. The scope of work includes 36.22 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 503.4 million and O&M cost of Rs 59.4 million (Rs 562.8 million).
Package 7: It includes areas of AIIMS Nagar, Sijua, Patrapada, Kalinga nagar K-9 A, B, Bhagabanpur. The scope of work includes 41.95 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 659 million and O&M cost of Rs 68.7 million (Rs 727.7 million).
Package 8: It includes areas of Bharatpur, Durgamadhabnagar(P), Khandagiribari, Ghatikia, Kalinganagar K-7. The scope of work includes 34.61 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 533.6 million and O&M cost of Rs 56.7 million (Rs 590.3 million).
Package 9: It includes areas of Durganagar, Ganeshnagar, Srikhetravihar. The scope of work includes 67.46 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 723.2 million and O&M cost of Rs 110.4 million (Rs 833.6 million).
Package 10: It includes areas of Durgamadhabnagar(P), Shampur, Sijuput, Kalingavihar K-4 Backside, K-6 B, Tomando . The scope of work includes 37.74 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 563.7 million and O&M cost of Rs 69.6 million (Rs 633.3million).
Package 11: It includes areas of Bhotapada, Manchanathnagar, Sameigadia, Dwarikavihar, Nandanvihar, Golkahbihari Colony, Sailashree vihar. The scope of work includes 20.03 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 505.5 million and O&M cost of Rs 35.8 million (Rs 541.3million).
Package 12: It includes areas of Naharakanta, Pahala, Hansapala, Nakahra, Utkal height area, Jayadev college area in Ward No-4. The scope of work includes 22.58 km long reinforced cement concrete (RCC) sewer network and related works at an estimated construction cost of Rs 568.6 million and O&M cost of Rs 62.7 million (Rs 631.3 million).
The work is likely to be completed in 24 months.
Publish Date: October 15, 2024
End Date: November 2, 2024
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work includes construction of 125 million litres per day (mld) water treatment plant (WTP), compound wall and internal road in WTP premises and raw water premises.
Publish Date: October 15, 2024
End Date: October 28, 2024
Implementing Agency: Nagpur Metropolitan Region Development Authority (NMRDA)
Segment: Water Supply
Work: The scope of project includes construction of transmission mains, feeder main, elevated service reservoir, 74 km long distribution system, retrofitting of pumping machinery and water treatment plant (WTP), supervisory control and data acquisition (SCADA) automation and allied infrastructure with Operation and Maintenance (O&M) of 5 years.
Publish Date: October 15, 2024
End Date: November 6, 2024
Implementing Agency: Kallam Municipal Corporation
Segment: Water Supply
Work: The scope of work includes augmentation of WSS. It includes construction of coffer dam, approach channel, intake well 3 m dia, insp. well 2 m dia (4 nos) connecting main 900 mm dia. length 150 mtr. jack-well and pump house, raw water rising main, 5 million litres per day (mld) water treatment plant (WTP), pure water rising main, reinforced cement concrete (RCC) elevated service reservoir (ESR), 52.473 km long distribution system and other related works at an estimated cost of Rs 543.26 million.
Publish Date: October 14, 2024
End Date: October 29, 2024
Implementing Agency: Kille- Dharur Municipal Council
Segment: Water Supply
Work: The scope of work includes jackwell with overhead pump house, raw and pure water rising main, 2.5 mld WTP, ESR, 48.994 km long distribution network and other related works at an estimated cost of Rs 528.3 million.
Publish Date: October 14, 2024
End Date: October 28, 2024
Implementing Agency: Vasmat Municipal Council
Segment: Water Supply
Work: The scope of work includes working survey (l32.82 km), intake channel (length- 200 m), jackwell(10 m x 10 m & 16.45 m depth) and pump house (12 m x 12 m), reinforced cement concrete (RCC) approch bridge 130 m length & 5 m width), approach bund and road length- 40 m, raw water pumping machinery at head work 180 hp (4 w + 2 s), g) raw water rising main, (400 mm dia. d.i.k-9 pipes- l =13500m) h) raw water gravity main di k-7 dia 450 mm to 500 mm length-29000 m i)repair to existing water treatment plant (WTP) 3.50 million litres per day (mld), water treatment plant having capacity of 20 mld, automation to WTP, staff quarter, pure water pumping machinery at WTP to membrane batch reactor (MBR) 215 hp (1 w + 1s), n) pure water pumping machinery at WTP to Gadhi and existing WTP elevated service reservoir (ESR) 50 hp (1 w + 1s), o) feeder main ( di k-7 200 mm to 350 mm dia l-2580 m p) ESR cum mbr cap-2590000lits. st ht- 25 m q) esr zone -2 cap- 1000000 lits. st. ht-16 m r) esr zone -3 cap- 1400000 lits. st. ht-14 m s) distribution system having total length of 109.460 km and all other related works.
Publish Date: October 14, 2024
End Date: November 4, 2024
Implementing Agency: Latur City Municipal Corporation
Segment: Wastewater
Work: The scope of work includes road restoration in Zone 1 and 2, raising main, sewage pumping station of 53 million litres per day (mld), wet wall with overhead pump house, pumping machinery with supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: October 11, 2024
End Date: November 5, 2024
Implementing Agency: Pandharpur Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of collection system, interception and diversion (I&D), prefab pumping station, rising main, sewage pumping station, transmission line using micro tunnelling with supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: October 11, 2024
End Date: November 4, 2024
Implementing Agency: Majalgaon Municipal Council
Segment: Water Supply
Work: It includes working survey, approach channel, jackwell, approach bridge, raw water rising main, 10 mld WTP, feeder main from various ESRs, 98.154 km long distribution network and other related works at a cost of Rs 819.57 million.
Publish Date: October 11, 2024
End Date: October 28, 2024
Implementing Agency: Deori Nagar Panchayat
Segment: Water Supply
Work: The scope of work includes construction of intake well, raw water rising main, pure water rising main, pure water gravity mains, 76.505 km long distribution network, 3 million litres per day (mld) water treatment plant (WTP), reinforced cement concrete (RCC) elevated service reservoir (ESR) including supervisory control and data acquisition (SCADA) automation.
Publish Date: October 11, 2024
End Date: October 25, 2024
Implementing Agency: Greater Visakhapatnam Municipal Corporation (GVMC)
Segment: Wastewater
Work: The scope of work includes construction of 25 million litres per day (mld) STP based on sequential batch reactor (SBR) technology at Appughar, providing dry weather flow diversion at Pandurangapuram (Drain No.13), Sea Green Hotel (Drain No.15), Opp YMCA (Drain No. 16), Gayatri Vidya Parshad (VUDA Park, Drain No. 17), Peda Jalaripeta (Drain No. 18), Shanthi Ashram (Drain No. 19), Ropeway Toilet (Drain No. 20) with a defect liability period (DLP) of two years and seven years Operations and management (O&M).
Publish Date: October 9, 2024
End Date: October 25, 2024
Implementing Agency: Vadodara Municipal Corporation
Segment: Water Supply
Work: The scope of work includes lowering, laying, jointing of MS pipes, providing and installation of surge control devices as per surge analysis, valve chamber, inspection manhole and other related infrastructure.
Publish Date: October 9, 2024
End Date: November 7, 2024
Implementing Agency: Erandol Municipal Council
Segment: Wastewater
Work: The scope of work includes working survey, 58 km long collection system, sewage pumping station at o1, rising main 1 (200 m long – 350 mm dia.), mechanical works of pumping station – o1, express feeder (3.5 km), solar power plant (300kw), sewage treatment plant (STP) having a capacity 6 million litres per day (mld) based on sequential batch reactor (SBR) technology, compound wall ( length – 500 m), house service connection (6558 nos hh), road restoration (length -49 km a), push through for crossing line under major road and other related works.
Publish Date: October 7, 2024
End Date: October 14, 2024
Implementing Agency: Indore Smart City Development
Segment: Wastewater
Work: The scope of work includes construction of seven decentralised STPs i.e. 40 million litres per day (mld) STP at Choritam, behind regional park, 35 mld STP behind Industry house (Dev Nagar), 35 mld STP at Bada Bangarda, 35 mld STP at Kabutarkhana for central zone line. 20 mld STP at Mayakhedi, 20 mld STP at Kumhedi and 20 mld STP at Mundi talab for Rau Channel. All the STPs will be developed on sequential batch reactor (SBR) technology along with necessary Electrical and ancillary infrastructure including five years Operation and Maintenance (O&M).
Publish Date: October 7, 2024
End Date: November 14, 2024
Implementing Agency: Karnataka Industrial Areas Development Board
Segment: Wastewater
Work: The scope of work includes providing consultancy services for preparation of detailed project report (DPR), economic analysis, plan design of estimates, cost structure, etc.
These CETPs will be developed at Bhavanahalli Industrial area covering Narasapura Industrial area, Jakkasandra Industrial area 1st Phase & 2nd Phase, Vemgal Industrial area 1st Phase & 2nd Phase, Shivarpatna Industrial area, Malur Industrial area 1st Phase ,2nd Phase, 3rd Phase & 4th Phase at Kolar district;Sompura Industrial Area (Dobaspet 1st, 2nd, 3rd, 4th, 5th, 6th phases and Machenahalli (7th Phase)) in Bengaluru rural district; Gowribidnur Industrial Area covering 1st, 2nd & 3rd Phase, Chikkaballapur district; Badanaguppe-Kellamballi Industrial Areas 1st & 2nd Phases in Chamarajanagara district; Kadakola, Thandya, Adakanahalli, Immavu Industrial Areas in Mysuru district and Haraluru Muddenahalli Industrial Area Phase-2 in Devanahalli Taluk, Bengaluru Rural district.
Publish Date: October 4, 2024
End Date: October 21, 2024
Implementing Agency: Kolkata Municipal Corporation
Segment: Wastewater
Work: The scope of work includes improvement of sewerage system by laying underground sewer (UGS) network at different lateral roads within Ward no 124,142,143 and 144 under Borough XVI.
Publish Date: October 4, 2024
End Date: November 18, 2024
Implementing Agency: Public Health Engineering Department, Assam
Segment: Water Supply
Work: Hailakandi: The scope of work includes construction of raw water intake system, river bank protection at intake point, supply, delivery, erection at site with necessary packing, receiving, unloading, shifting, storing, installation, testing and commissioning of centrifugal pumps, raw water pumping main from barge (intake station) to the water treatment plant site (Inlet of Aerator) including suction and delivery piping, 12.66 million litres per day (mld) water treatment plant (WTP), reinforced cement concrete (RCC) elevated service reservoir (ESR), distribution network, providing 7952 nos. functional house service connection inclusive of 7652 domestic and 300 commercial connections and other related works including three months trial run and seven years Operation and Maintenance (O&M) at an estimated cost of Rs 703.15 million.
Karimganj: The scope of work includes construction of raw water intake system, river bank protection at intake point, Supply, delivery, erection at site with necessary packing, receiving, unloading, shifting, storing, installation, testing and commissioning of centrifugal pumps, raw water pumping main from barge (intake station) to the water treatment plant site (Inlet of Aerator) including suction and delivery piping, 16 million litres per day (mld) water treatment plant (WTP), reinforced cement concrete (RCC) elevated service reservoir (ESR), distribution network, providing 14715 nos. functional house service connection and other related works including three months trial run and seven years Operation and Maintenance (O&M) at an estimated cost of Rs 784.53 million.
Publish Date: October 3, 2024
End Date: October 29, 2024
Implementing Agency: Dharashiv Municipal Council
Segment: Water Supply
Work: The scope of work includes construction of 38.55 km long rising main and water pure water pumping mains, 4.4 km long gravity main, connecting main pipelines, intake well, inspection well, 15.6 million litres per day (mld) water treatment plant (WTP), elevated service reservoir, 219.25 km long distribution network and other related works.
Publish Date: October 1, 2024
End Date: October 22, 2024
Implementing Agency: Shahada Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey, intake well (dia.= 3 m, depth = 8.29 m), inspection well (dia.= 2 m, depth = 11.45 m), connecting pipe (length = 70 m of 1200mm dia), jack well with overhead pump house (10.00 m dia), approach bridge (length=30m) and operator/meter room (4m x 4 m) at jackwell, retaining wall for jackwell, raw water rising main (450mm dia di k-9, l=8800 m), proposed BPT near existing BPT (Capacity 1.35 LL), proposed BPT near existing BPT (Capacity 1.35 LL), raw water gravity main (450mm dia di k-7, l- 5150 m), water treatment plant (WTP) (conventional – 12.5 million litres per day (mld) and allied works, pure water rising main dia (200mm to 350 mm L- 4.16 km and sump interconnection pipe 300 mm l-100m), proposed elevated service reservoir (ESR) (3 nos), distribution system (57.42 km), road reinstatement 30 km, trial run for the scheme, raw water pumping machinery 215 HP (2W+1S), pure water pumping machinery for WTP to Ex.Varndawan, Tulsi and Prop. Saraswati – 75 HP (2 nos Head – 46 m, Q – 79 LPS (1W+1S)), pure water pumping machinery – 120 HP (1W+1S) 2 nos head – 50 m, Q – 110 LPS for WTO to kukdel, Garib Nawaz Colony, char, pure water pumping machinery for WTP to Ex.Sai Gandhi Nagar ESR 40 HP (1 +1), pure water pumping machinery for WTP to Ex .sai Baba Nagar ESR 20 HP (1+1), existing WTP repairing work, dismantling of existing pump at head work and WTP, recycling sump, solar power plant 566 kwp, automation work, express feeder work.
Publish Date: October 1, 2024
End Date: October 7, 2024
Implementing Agency: Shahjahanpur Cantonment Board
Segment: Wastewater
Work: The scope of work includes preliminary survey, design, preparation of detailed project report (DPR) and tender document, project management/supervision for the project.
Publish Date: October 1, 2024
End Date: October 15, 2024
Implementing Agency: Saswad Municipal Council
Segment: Water Supply
Work: The scope of work includes construction of a jack well cum pump house, approach bridge, raw water rising main, pure water gravity main, raw water booster sump, water treatment plant (WTP) having capacity of 18 million litres per day (mld), five elevated service reservoir at Sathe Nagar, 113.553 km long distribution network and other related work including supervisory control and data acquisition (SCADA) automation.
Publish Date: September 27, 2024
End Date: October 17, 2024
Implementing Agency: Hingoli Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey, approach channel (l=100m), jack well (24m x 12m), approach bridge, meter room (length = 60 mtr and width 6.00 mtr), approach bund (l= 30.00 m), approach road-(at head work – 120 m), raw water rising main from head work to water treatment plant (WTP) (450 mm di k-9, l=13.8 km), repairing of existing raw water rising main d.i 450 mm dia (from head work to wtp 13.1 km), repairing to ext. WTP 13.5 million litres per day (mld) at digras (civil works), recirculation sump 2.78 ll, pump house and allied works at WTP, pure water rising main from WTP sump to ground service reservoir (GSR) 450 mm di k-9 (l=3.5 km), repairing to existing membrane batch reac tor (MBR) at limbala (cap-2.7 mld), pure water gravity main mbr to esr di -7 (250 mm, 400mm, 450mm & 500mm diameter l=10.5 km), dismantling of existing aadarsh clg esr-1 (9 ll) & Adarsh College elevated service reservoir (ESR)-2 (9 ll), elevated service reservoirs (prop. Adarsh college ESR 9 ll, prop. Shree Krishna nagar ESR 3.6 ll, prop. tirupati nagar ESR 2.82 ll), distribution system (total length = 64.97 km), road reinstatement (40 km), trial and run, raw water pumping machinery at headworks 350hp (2w+2s) for prop. di k-9 rising main-1 & existing di k-9 rising main-2, repairs to existing 13.5 mld WTP, pure water pumping machinery at (old) WTP 13.5 mld sump to gsr di k-9- 120 hp 3 nos head -64 m, q – 78 lps (2w+1s), pumping machinery for recirculation sump, automation work, solar power plant (784 kwp), express feeder work.
Publish Date: September 26, 2024
End Date: October 10, 2024
Implementing Agency: Jejuri Municipal Council
Segment: Water Supply
Work: The scope of work includes construction of approach channel, jack well, pump house, approach bridge, rising main/gravity main, water treatment plant (WTP) having capacity of 13 million litres per day (mld), two elevated service reservoirs, 35 km long distribution network, pumping machinery and other related infrastructure.
Publish Date: September 26, 2024
End Date: October 10, 2024
Implementing Agency: Mira Bhayandar Municipal Corporation (MBMC)
Segment: Wastewater
Work: The scope of work includes construction of collection system, rising main pipeline, sequential batch reactor (SBR) technology-based sewage treatment plant (STP), pumping machinery, supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: September 26, 2024
End Date: October 10, 2024
Implementing Agency: Akkalkot Municipal Council
Segment: Wastewater
Work: The scope of work includes working survey (86 km), collection system (total length – 67 Km), sewage pumping station (SPS) at sewage treatment plant (STP) 1, sewage pumping station Solapur Road (2), sewage pumping station (3) – Kini Road, sewage pumping station (4) – Hannur Road, express feeder, mechanical works for SPS 1 at STP, mechanical works for SPS 2 at Solapur road, mechanical works for SPS 3 at Kini Road, mechanical works for SPS 4 at Hannur Road “rising main1: SPS1 to STP – 400 mm DI K9 – 100 m, rising main 2: SPS at 2 to MH:2238-200 mm DI K9- 1200 m, rising main3: SPS at 3 to MH:2035-200 mm DI K9- 500 m, Rising Main4: SPS at O4 to MH:1975-200 mm DI K9- 600 m, sewage treatment plant (STP) – 9 million litres per day (mld), solar plant – 295 Kwp, distribution system for reuse of treated water – 5.2 km, compound wall ( BBM Length – 500 m), house service connection (8985 nos HH), road restoration (Length – 60 km and 35 km), utility shifting, trial and run For three months, royalty charges for natural sand, rubble stone above 40mm size and hard murum of public works department (PWD) item, push through for crossing line under major road, PWD permission charges, collection system (total length – 19 km), house service connection (2691 nos hh), road restoration (length – 17 km & hsc – 12 km), utility shifting phase ii, royalty charges for natural sand, rubble stone above 40mm size and hard murum of PWD item.
Publish Date: September 25, 2024
End Date: October 4, 2024
Implementing Agency: Dharmabad Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of Babhali barrage headwork, Aloor Village headwork, approach bridge, raw water rising main, pure water rising main, feeder main, raw water pumping machinery, pure water pumping machinery, 11 million litres per day (mld) water treatment plant (WTP), five elevated service reservoir, 93.971 km long distribution network, solar power plant and supervisory control and data acquisition (SCADA) automation.
Publish Date: September 24, 2024
End Date: October 8, 2024
Implementing Agency: Navi Mumbai Municipal Corporation
Segment: Water Supply
Work: The scope of work includes design, providing, installing and commissioning an automation system as directed by an engineer in charge, which includes valves, construction of valve chambers, actuator, control and signal cables, power cables, software, video wall, computers, PLC, monitoring centre at various ward levels and central monitoring centre.
Publish Date: September 23, 2024
End Date: October 14, 2024
Implementing Agency: Public Health Engineering Department, Jammu and Kashmir (J&K)
Segement: Water Supply
Work: The scope of work involves a) Construction of intake structure (Stage-I) at Ningli Ghat. b) Providing, laying and fixing of raw water mains from Intake at Ningli up to Plant Baghi Islam. c) Providing, laying and fixing of clear water mains from clear water sumps (CWS) up to zonal over head tanks (OHTs). d) Providing, laying and fixing of supply mains and distribution network. e) Providing, laying and fixing of pipeline for connecting of existing storage OHTs. f) Construction of 3.2 million gallons per day (mgd) rapid sand filtration plant with allied works viz, filter house, PST, clarifloculator, flash mixer, backwash tank, aerator and clear water sump, etc. g) Construction of three 1 lac gallons OHTs and two 1.5 lac gallons OHTs. h) Construction of intake chamber (lifting station) at Watlab. i) Construction of clear water sump cum pump house 2 lac gallons capacity at Watlab. j) Construction of water channel for existing lifting station at Watlab and other allied works. k) Electro-mechanical works for (Stage-I) at Ningli lifting station and for (Stage-II) lifting station at Baghi Islam. l) Electro-mechanical works for (Stage-I) lifting station at Wulak lake and for (Stage-II) lifting station at Watlab filtration plant. m) Operation and maintenance (O&M) for five years.
Publish Date: September 23, 2024
End Date: November 14, 2024
Implementing Agency: Chalisgaon Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey (55 KM), approach road – (at head work – 160 m), repairing of compound wall at head work (l=400 m), raw water gravity main break pressure tank (BPT) to water treatment plant (WTP) (800 mm & 700 mm DI K-7 , L=33.87 Km), repairing to existing WTP At Derabardi (civil works), proposed construction of reinforced cement concrete (RCC) drain at WTP (210 m), staff quarter for head work and WTP (2 Nos), repairs to existing derabardi membrane batch reactor (MBR) (2 mld) and existing BPT at head work, compound wall for WTP and elevated service reservoirs (ESRs) 2 nos (l =810 m), pure water gravity main mbr to ESR (di k-7 250mm to 600 mm l=5439 m), dismantling of existing derabardi ESR (10.50 ll) and Bhadgaon Road ESR (12.50 ll), proposed ESR at Bhadgaon Road.- 12.50 ll staging height – 19 m, proposed EST at Derabardi.- 10.50 ll staging height – 14 m, proposed EST at Malegaon road.- 8.00 ll staging height – 15 m, proposed ESR at podar school.- 7.50 ll staging height – 20 m, proposed sump at Malegaon road.- 1.12 ll, overhead pumphouse (3 x 3 x 5.5) for Malegaon esr overhead pumphouse (3 x 3 x 5.5) for Malegaon ESR, distribution system (di k-7 150 mm to 450 mm l= 5267 m & hdpe 110 mm to 250 mm l= 4990 m total l=10.257 km), road reinstatement 5.00 km, amr water meter (27100 nos), house service connection (4300 nos), trial run, raw water pumping machinery at head works 240 hp (2w+1s) q=199 head- 57m, pure water pumping machinery at WTP – 150 hp (2w+1s) head -37 m, q – 178 lps, pure water pumping machinery 15 hp (1w+1s)- for Malegaon sump, repairs to existing 26 mld WTP (mechanical work), automation, express feeder.
Publish Date: September 21, 2024
End Date: October 11, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes design, construction, providing, supplying, lowering, laying and jointing various MS/DI/PVC pipes, rising main, gravity main pipelines, reinforced cement concrete (RCC), elevated storage reservoir (ESR) , RCC sump, pump house, compound wall, water treatment plant (WTP) having capacity of 20 million litres per day (mld), trial run of three months and 10 years of Operation and Maintenance (O&M).
Publish Date: September 21, 2024
End Date: November 7, 2024
Implementing Agency: Thane Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of distribution pipeline, pure water pumping station, transformer substation, reinforced cement concrete (RCC) elevated service reservoir (ESR), RCC ground service reservoir (GSR) and sump.
Publish Date: September 20, 2024
End Date: October 14, 2024
Implementing Agency: Vijayawada Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of intake well, pipelines, pump sets, elevated service reservoirs (ESRs), ground service reservoirs (GSRs) in circle-I area of Vijayawada.
Publish Date: September 20, 2024
End Date: October 9, 2024
Implementing Agency: Vijayawada Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of intake well, pipe lines, pump sets, elevated service reservoirs (ESRs), ground service reservoirs (GSRs) in circle-II area of Vijayawada including two years defect liability period (DLP) and five years Operation and Maintenance (O&M).
Publish Date: September 20, 2024
End Date: October 10, 2024
Implementing Agency: Gujarat International Finance Tec-City Company Limited (GIFTCL)
Segment: Wastewater
Work: The scope of work includes design, supply, erection, testing and commissioning of STP, major civil components i.e., tanks, filters, supply and installation of electro-mechanical works and related piping works including Operation and Maintenance (O&M) for two years.
Publish Date: September 18, 2024
End Date: November 6, 2024
Implementing Agency: Kalyan Dombivli Municipal Corporation
Segment: Wastewater
Work: The scope of work includes repairs to existing 14 million litres per day (mld) sewage treatment plant (STP), sewerage pumping station construction/ repairs, treated sewage and raw water sewage rising main, gravity sewer network, reinforced cement concrete (RCC) ground service reservoir (GSR)/ sump, pumping machinery, transformer substation and supervisory control and data acquisition (SCADA) automation.
Publish Date: September 18, 2024
End Date: October 18, 2024
Implementing Agency: Mahad Municipal Council
Segment: Wastewater
Work: The scope of work includes installation of pumping machinery, construction of 53.75 km long collection system, sewage pumping station, six million litres per day (mld) sewage treatment plant (STP), rising main and and supervisory control and data acquisition (SCADA) automation.
Publish Date: September 18, 2024
End Date: October 3, 2024
Implementing Agency: Kolkata Municipal Corporation
Segment: Wastewater
Work: The scope of work includes designing, drawing and construction of 2 (two) nos. separate 14 m dia (id) rcc well each having a capacity of 1125 cum each (minimum) including superstructure (9.50 m minimum height), 2 nos. inlet channel (5.0 m x5.0 m), 2 nos. Reinforced cement concrete (RCC) screen chamber [minimum 7.0 m x 5.0 m x 5.0 m(inside)] each including gates (minimum 8 nos. ci sluice gates), screens (two nos. screen for each channel totaling to 8 nos.), lifting arrangement for the screen with rope drum arrangement electrically operated with adequate rated gear box and motor complete and supporting ms structure, supplying and laying 12mm thick 240.0 m- 1200 mm dia. ms delivery main as per is specification for swf. electro-mechanical work such as design, drawing, supply, delivery, installation, commissioning with inspection & trial run of 8 nos non-clog tubular casing mixed flow type wet pit vertical pump-motor set with extended power cable with smart controller for swf application (4 nos. pumps for each sump) as per specification having discharge-15000 m3/hr, head-13m, capable of running satisfactorily up to 3 meter sewage water level of the sump along with reflux valve, dismantling joint, carbon steel pipe of 12 mm thick (minimum), diameter conforming to the pump delivery and length as per design for individual delivery line complete with flanged ends/ specials and ss fasteners including electromagnetic type flow meter (insertion type flow meter) suitable for a mild steel pipeline of required diameter. there will be individual discharge line for each pump and the individual delivery main will be from pump end up to the canal for swf application as per specification. moreover, sluice gate, s.s. manual screen with rope drum type motorized lifting arrangement along with required structure and other related works.
Publish Date: September 18, 2024
End Date: November 6, 2024
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work includes laying of water supply pipeline in two parts: from WTP Poynad at Bandhan to BPT at Ambepur as pumping main and further BPT to Shahpur industrial area as a gravity mian having total length of 8.5 km, 0.3 km distribution network, break pressure tank at Ambepur, encasing of 1.2 km from Pezari checkpost to next to Mhasoba Mandir after encasing remaking of PWD is proposed with CC road and other related civil works and material supply, etc.
Publish Date: September 18, 2024
End Date: September 26, 2024
Implementing Agency: Shendurni Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of collection network for double wall corrugated PE pipes, collection network of reinforced cement concrete (RCC) NP- 3 pipes, effluent storage tank and other related works.
Publish Date: September 17, 2024
End Date: October 1, 2024
Implementing Agency: Nagbhid Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of sewerage collection system, 44.451 km long sewerage network, consumer connection, utility shifting, road reinstatement work, wet well with pump house, 3 million litres per day (mld)sewage treatment plant (STP) based on sequential batch reactor (sbr) technology with moving bed biofilm reactor (MBBR), pumping machinery with programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation and Operation and Maintenance (O&M).
Publish Date: September 17, 2024
End Date: October 1, 2024
Implementing Agency: Sewerage and Drainage Division, Jammu and Kashmir
Segment: Sewage
Work: Dal Lake: The scope of work includes survey, design, drawings and execution of sewerage scheme- providing, laying, testing and commissioning of sewer including construction of manholes, intermediate pump station (IPS), sewage treatment plant (STP), laying of sewerage network all appurtenant works with six months Trial Run period, two years defect liability period (DL)) and five years of Operation and Maintenance (O&M) works at an estimated cost of Rs 2,829.9 million construction cost of Rs 145.7 million O&M cost.
Jhelum River: The scope of work includes survey, design, drawings and execution of sewerage scheme- providing, laying, testing and commissioning of sewer including construction of manholes, intermediate pump station (IPS), sewage treatment plant (STP), laying of sewerage network all appurtenant works with six months Trial Run period, two years defect liability period (DL)) and five years of Operation and Maintenance (O&M) works at an estimated cost of Rs 2,730.8 million construction cost of Rs 141 million O&M cost.
Publish Date: September 17, 2024
End Date: October 9, 2024
Implementing Agency: Bhusawal Municipal Council
Segment: Water Supply
Work: The scope of work includes head work which includes construction of intake well 6m dia depth- 6.35m, connecting main 1200 mm dia di k-7 l-150 m, inspection well no.1- 4 m dia d-13.74m, inspection well no. 2- 4 m dia d-20.11m, jackwell with overhead double floored pump house 10m dia d-30m, raw water pumping machinery- 442 HP (VT pump 2+1), raw water rising main 800 mm dia dik-9 l-6388 m, pre-settling tank- 56.30ll, conventional water treatment plant (WTP) having capacity of 45 million litres per day (mld) and recirculation works, pure water pumping machinery VT Pump – 75 HP (1+1), 90 HP (3+2), 100 HP (2+1), pure water rising main from WTP to all elevated service reservoirs (ESR) 250mm to 450 mm Dia DIK-9 L-14710m, reinforced cement concrete (RCC) ESR 19.55 LL-18 m ST and HT and fencing work, 107.28 km long distribution system, consumer service Connection and domestic water meter -25000 nos, approach road for jack well, supervisory control and data acquisition (SCADA) automation , and trial run for three months.
Publish Date: September 14, 2024
End Date: October 4, 2024
Implementing Agency: Vita Municipal Council
Segment: Water Supply
Work: The scope of work includes working survey, construction of reinforced cement concrete (RCC) intake well, connecting pipe, RCC jackwell, RCC approach bridge, raw/pure water rising gravity main pipeline, puming machinery, elevated service reservoir, 10 million litres per day (mld) water treatment plant (WTP), 3.34 km long distribution network and other related works including trial run.
Publish Date: September 14, 2024
End Date: September 30, 2024
Implementing Agency: Ahmedabad Urban Development Authority
Segment: Wastwater
Work: The scope of work includes total station survey along the alignment of sewerage network, laying of sewerage network for remaining work in TP Scheme no. 1 to 5 in the Sanand area including required gravity mains , manhole, refilling, transportation etc. with house connections.
Publish Date: September 13, 2024
End Date: October 9, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes working survey, soil investigation, design, build and operate (DBO) contract basis for providing, supplying, lowering, laying, jointing, testing and commissioning of pipeline network, pumping main and gravity main, providing, supplying and erecting pumping machinery at headwork and sub headwork, designing and construction of intake structure and related infrastructure at Bhiloda, Himmatnagar, Vijaynagar and Idar taluka in Aravalli and Sabarkantha districts including Operation and Maintenance (O&M) of ten years.
Publish Date: September 13, 2024
End Date: October 14, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, design, supply of all materials, labour etc. required for construction, erection, completion, testing and commissioning of water supply works such as overhead tanks (OHTs), pump house, staff quarters, supervisory control and data acquisition (SCADA) room, rising main, feeder main, distribution network, house connection, boundary wall, MS gate, site development work, renovation of OHT boundary wall & pump house, dismantling of existing old oht and construction of tube wells and other appurtenant works including trial and run of three months and defect liability period (DLP) of one year for civil work and two year for electrical and mechanical (E&M) work.
Publish Date: September 13, 2024
End Date: October 14, 2024
Implementing Agency: Maharashtra Jeevan Pradhikaran
Segment: Wastewater
Work: The scope of work includes laying of 85.513 km long distribution network, wet well, pump house, 9.5 million litres per day (mld) sewage treatment plant (STP) based on sequential batch reactor (SBR) technology, pumping machinery, supervisory control and data acquisition (SCADA) automation and sewage pumping main and other related works.
Publish Date: September 13, 2024
End Date: October 4, 2024
Implementing Agency: Cuttack Municipal Corporation
Segment: Wastewater
Work: The scope of work includes preparation of detailed drainage plan covering all 59 wards, stakeholder consultation, design, collection and study of rainfall data, hydrology of region, determination of water sheds and drainage patterns, conducting field survey of existing drainage network, water bodies hydraulic testing of the adequacy of size, identification classification of major and primary storm water drains existing and required and their present condition and all other related works.
Publish Date: September 13, 2024
End Date: September 30, 2024
Implementing Agency: Maharashtra Jeevan Pradhikaran (MJP)
Segment: Water Supply
Work: The scope of work includes construction of jack-well/intake well, raw water rising mains pipelines, pure water rising/gravity main, water treatment plant (WTP), ground service reservoir (GSR), sequential batch reactor (SBR), sump, elevated service reservoir, distribution system and other related infrastructure.
Publish Date: September 13, 2024
End Date: October 4, 2024
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: The scope of work includes construction of a 13.5 million litres per day (mld) water treatment plant (WTP), two elevated service reservoirs, distribution network including three months trial run and Operation and Maintenance (O&M) for five years.
Publish Date: September 13, 2024
End Date: October 16, 2024
Implementing Agency: Wani Municipal Council
Segment: Water Supply
Work: The scope of work includes the construction of rising main, jack well, intake well, distribution system, approach bridge and other related infrastructure.
Publish Date: September 13, 2024
End Date: October 4, 2024
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: Lohardaga: The scope of work includes construction of a water treatment plant (WTP) having capacity of 16.5 million litres per day (mld), 4 km of rising main including three months of trial run and Operation and Maintenance (O&M) of five years at an estimated cost of Rs 1,307.8 million.
Gumla: The scope of work includes construction of a 15 million litres per day (mld) water treatment plant (WTP) in place of old existing WTP, construction of four new elevated service reservoirs (ESR), replacing old distribution network including three months trial run and Operation and Maintenance (O&M) of five years at an estimated cost of Rs 1,001.88 million.
Publish Date: September 13, 2024
End Date: October 16, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour etc. required for construction, erection, completion, testing & commissioning of water supply works such reinforced cement concrete (RCC) over head tank, RCC clear water rising main (CWR), pump house cum chlorinating room, pump house, distribution system, dismantling and reinstatement of all type road, rising main, boundary wall, M.S. Gate, Site development and construction of tube wells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation, electrical and mechanical (E&M) works and other appurtenant works on Turnkey Basis including trial and run of 3 months and defect liability period (DLP) of 12 months for Civil works and 24 months for E&M works after completion of successful Trial Run. All completed and commissioned works of above scheme shall be handed over to Jalkal Vibhag Nagar Nigam Kanpur, after 3 months of successful trial run period.
Publish Date: September 11, 2024
End Date: October 14, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes supply of all materials, labour etc. for construction of overhead tanks, pump houses, staff quarters, boundary wall, gate, site development, supply, laying & jointing of rising main, distribution system and construction of tube well including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation including commissioning, testing, three months trial and run, defect liability period of one year for civil works and two years for electrical and mechanical work and handing over complete works of Bareilly Reorganization Water Supply Scheme (Phase-1) with 100 per cent saturation of household connections & its appurtenant works on turnkey basis.
Publish Date: September 11, 2024
End Date: October 7, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes construction and repairing of overhead tanks, pump house, boundary wall, staff quarter, gate, site development, laying and jointing of rising main, distribution system, construction rebore/news tube wells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation and other appurtenant works on turnkey basis including trial and run of three month and defect liability period of 12 months for civil works and 24 months for electrical and mechanical (E&M) works after completion of successful trial and run.
Publish Date: September 11, 2024
End Date: October 7, 2024
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply; Wastewater
Work: The scope of work includes laying of water distribution network, providing and laying of sewerage network with demolition and construction of road for laying network in Asarwa, Dariyapur and Khadiya Wards in Central Zone of AMC area.
Publish Date: September 10, 2024
End Date: September 30, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour etc. required for construction, erection, completion, testing and commissioning of water supply works such as reinforced cement concrete (RCC) over head tank, clear water rising (CWR) cum pump house, rising main, distribution system, pump house, staff quarter, boundary wall, gate, site development, renovation of existing facilities, including laying and jointing of rising main, construction of tube wells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation and other appurtenant works on Turnkey basis including trial and run of three month and defect liability period of 12 months for civil works and 24 months for electrical and mechanical (E&M) works after completion of successful trial and run.
Publish Date: September 9, 2024
End Date: October 14, 2024
Implementing Agency: Andhra Pradesh Industrial Infrastructure Corporation Limited
Segment: Wastewater
Work: The scope of work includes data collection and studies, design, construction, testing and commissioning including all civil, structural and architectural, mechanical, electrical, electromechanical process control and instrumentation and all infrastructural work covering lighting, drains, all preparatory and temporary works of 6 mld CETP and 5.27 mld of marine outfall for establishment of Nakkapalli Bulk Drug Park including three months trial run, six months of Operation and Maintenance (O&M) and two years defect liability period (DLP) on engineering, procurement and construction (EPC) basis.
Publish Date: September 9, 2024
End Date: September 24, 2024
Implementing Agency: Gondia Municipal Council
Segment: Water Supply
Work: The scope of work includes construction intake well, connecting main, jack well and over head pump house, approach bridge, raw water pumping machinery, raw water rising main, break pressure tank, raw water gravity main, 20 million litres per day (mld) water treatment plant (WTP), pure water pumping machinery, pure water rising main, membrane batch reactor (mbr), pure water gravity main, elevated service reservoirs (ESR), distribution system, 24 x 7 zoning, supervisory control and data acquisition (SCADA) automation, push through, trial run and other related works.
Publish Date: September 9, 2024
End Date: September 28, 2024
Implementing Agency: Pathardi Municipal Council
Segment: Wastewater
Work: The scope of work includes working survey (130km), collection system (length – 93.3 km), manhole pumping station outfall 2, over head room (4.5 x 4.5 ), rising main 1 (400 mm- 240m) at sewage treatment plant (STP) , rising main 2 (150 mm-2305 m), sewage pumping station at STP premises, mechanical works of pumping station, express feeder, STP of capacity 7 million litres per day (mld) –sequential batch reactor (SBR), security room (3m x3m), approch road for stp, retaining wall for stp (length – 300 m), compound wall (length – 500 m), house service connection (5360 nos), utility shifting phase I, road restoration (97 km), special purpose vehicle mounted combination of suction cum jetting machine, trial and run for three months, royalty charges for natural sand, rubble stone above 40mm size and hard murrum of pwd item, push through for crossing line under major road phase -I, collection system (length – 36 km), house service connection (1430 nos), utility shifting phase ii, road restoration (37.2 km), royalty charges for natural sand, rubble stone above 40mm size and hard murrum of pwd item, push through for crossing line under major road phase -II.
Publish Date: September 9, 2024
End Date: September 30, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, design and supply of all materials, labour etc. for construction/repairing of overhead tank, pump house, boundary wall, staff quarters, gate, site development, laying and jointing of rising main, distribution system, tube wells, programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation including three months trial run and defect liability period.
Publish Date: September 7, 2024
End Date: October 7, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: Padrauna Water Supply Reorganisation Scheme (Kushinagar): The scope of work includes surveying, soil investigation, design, supply of all materials, labour, construction of overhead tank, pump house, boundary wall, staff quarter, gate, site development, laying and jointing of rising main, 64.9 km long distribution system, new tubewells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation, commissioning, trial run, defect laibility and other related works. The work is likely to be completed in 24 months at an estimated cost of Rs 1,028.8 million.
Siddharthnagar Water Supply Extension Scheme: The scope of work includes surveying, soil investigation, design, supply of all materials, labour, construction of overhead tank, pump house, boundary wall, staff quarter, gate, site development, laying and jointing of rising main, 188.564 km long distribution system for Zone 1-11, new tubewells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation, commissioning, three months trial run, defect laibility of 12 months for civil works and 24 months for electrical and mechanical works and other related works. The work is likely to be completed in 24 months at an estimated cost of Rs 656.66 million.
Publish Date: September 6, 2024
End Date: October 10, 2024
Implementing Agency: Chikhali Municipal Corporation
Segment: Water Supply
Work: The scope of work includes laying of rising main pipelines, construction of jackwell, intake well, elevated service reservoir (ESR), water treatment plant (WTP) having capacity of 5 million litres per day (mld), pumping machinery, distribution system, repair to existing WTP and ESR, installation of meters, ground service reservoir (GSR) and supervisory control and data acquisition (SCADA) automation.
Publish Date: September 6, 2024
End Date: September 13, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The Scope of work includes surveying, soil investigation, design, supply of all materials, labour, construction of overhead tank, clear water rising main (CWR) cum pump house, boundary wall, staff quarters, site development, renovation of existing infrastructure, laying and jointing of rising main, 414.042 km long distribution networks, new tubewells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation, commissioning, trial run, defect liability and other related works.
Publish Date: September 5, 2024
End Date: October 7, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes construction of intake well , pump house, raw water rising main, water treatment plant (WTP) having capacity of 55 million litres per day (mld), distribution network, pumping station, supervisory control and data acquisition (SCADA) automation and related infrastructure with trial run of three months with defect liability period (DLP) of 12 months of civil works and 24 months for electrical and mechanical (E&M) works on turn-key basis.
Publish Date: September 5, 2024
End Date: October 7, 2024*
Implementing Agency: Greater Noida Industrial Development Authority (GNIDA)
Segment: Wastewater
Work: The scope of work includes design, survey, engineering, construction, supply, erection, testing and commissioning of 45 mld STP cum water reclamation facility at Sector-1, Greater Noida based on sequential batch reactor (SBR) technology including Operation and Maintenance for 12 years.
Publish Date: September 5, 2024
End Date: September 18, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, design, supply of all materials, labour etc. required for construction, erection, completion, testing and commissioning of water supply works such as overhead reservoirs (OHTs), clear water reservoirs, pump house, staff quarters, supervisory control and data acquisition (SCADA) room, rising main, feeder main, distribution network, house connection, boundary wall, ms gate, site development work, renovation of OHT boundary wall and pump house, dismantling of existing old OHT and construction of tube wells and other appurtenant works including three months of defect liability period (DLP) for civil works and one-year for electrical and mechanical (E&M) work .
Publish Date: September 5, 2024
End Date: October 10, 2024*
Implementing Agency: Chiplun Municipal Council
Segment: Water Supply
Work: The scope of work includes construction of raw/pure water rising or gravity main pipeline, pumping machinery, ground service reservoir, water treatment plant (WTP), distribution system, supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: September 5, 2024
End Date: September 26, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes supply of all materials, labour etc. for construction of over head tanks, pump houses, staff quarters, boundary wall, gate, site development, supply, laying & jointing of rising main, distribution system and construction of tube well including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation including commissioning, testing, trial and run, defect liability and handing over complete works of Bareilly Reorganization Water Supply Scheme (Phase-1) with 100 per cent saturation of household connections & its appurtenant works on turnkey basis.
Publish Date: September 4, 2024
End Date: October 7, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour, etc. required for construction, erection, completion, testing & commissioning of water supply works such as intake well, water treatment plant (WTP), reinforced cement concrete (RCC) overhead tanks (OHTs), pumping station, rising main, feeder main, distribution system, drinking water house connection, supervisory control and data acquisition (SCADA) room, chlorination room, meter room, panel room, staff quarter, boundary wall site development works etc. and other appurtenant works including SCADA automation including trial run of three months and defect liability period (DLP) of 12 months for civil works and 24 months for electrical and mechanical (E&M) works after completion of successful trial run.
Publish Date: September 3, 2024
End Date: October 29, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour, t&p etc. required for construction, erection, completion, testing and commissioning of water supply works including (but not limited to) reinforced cement concrete (RCC) overhead tanks (OHTs) (3 Nos.), rising main, distribution system, tube wells, pump house, boundary wall and site development works etc. and other appurtenant works including supervisory control and data acquisition (SCADA) and automation including three months trial run, defect liability period of 12 months for civil works and 24 months for electrical and mechanical (E&M) work.
Publish Date: September 3, 2024
End Date: October 2, 2024
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of a water treatment plant (WTP) at Kekri and clear water transmission system from WTP Kekri to Nasirabad of clear water rising main (CWR) including one year defect liability period (DLP) and 10 years Operation and Maintenance (O&M).
Publish Date: September 3, 2024
End Date: October 28, 2024 *
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Water Supply
Work: The scope of work includes construction of a 60 million liters per day (mld) water treatment plant (WTP), retention tank, clear water tank, pump chamber, pumping machinery, rising main from raw water pumping station to proposed water work at village Barodi for Jind city and all other related works.
Publish Date: September 3, 2024
End Date: September 12, 2024
Implementing Agency: Public Health And Municipal Engineering Department, Telangana
Segment: Wastewater
Work: The scope of work includes construction of UGD system including five years Operation and Maintenance (O&M).
Publish Date: August 31, 2024
End Date: September 19, 2024
Implementing Agency: Akola Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of 483.14 km long trunk main and collection system, pumping station, rising main, sequential batch reactor (SBR) based 71 million litres per day (mld) Sewage treatment plant (STP), reinforced cement concrete (RCC) sump, pumping machinery, supervisory control and data acquisition (SCADA) automation and all other related works.
Publish Date: August 31, 2024
End Date: September 21, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of the project includes the construction of the overhead tank, CWR, pump house, laying and jointing rising main, the distribution system and tube-wells including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation. It will also involve commissioning, testing, trial and run, defect liabilities and handling the complete works on a turn-key basis.
Publish Date: August 30, 2024
End Date: October 10, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Wastewater
Work: The scope of work includes survey, design, supply of all materials, labour, etc. required for construction, completion, testing and commissioning of sewer line laying, making sewer house connection, sewer connecting chambers, road reinstatement and other appurtenant works as per specifications in tender document for Bulandshahr nagar palika parishad, extension of sewer network and HSC works including trial run of three months and defect liability period (DLP) of 12 months for civil works and 24 months for Operation and Maintenance (O&M) works after completion of successful trial run.
Publish Date: August 30, 2024
End Date: September 25, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board
Segment: Wastewater
Work: The scope of work includes design, supply, construction, installation, testing and commissioning of sewer collection network, associated gravity and rising main system, pumping stations, pumping machinery works and other ancillary works along with design, supply, construction, installation, testing and commissioning of sewage treatment plant (STP) of 6 million litres per day (mld) capacity based on open technology with biological nutrient removal (BNR) with all civil, electrical, mechanical, piping and instrumentation works with three months trial run and post-completion and operation and maintenance (O&M) of entire system for seven years including three years defect liability period at Ekta Nagar.
Publish Date: August 30, 2024
End Date: September 20, 2024
Implementing Agency: Bhavnagar Municipal Corporation (BMC)
Segment: Wastewater
Work: The scope of work includes construction of sewerage network on Gadhechi River banks and rejuvenation works including storm water guiding concrete banks, drop structures, rain water harvesting structures, service road and pipe railing for Bhavnagar Municipal Corporation, Bhavnagar including Operation and Maintenance for five years and defect liability period.
Publish Date: August 29, 2024
End Date: September 27, 2024
Implementing Agency: Maharashtra Jeevan Pradhikaran (MJP)
Segment: Water Supply
Work: The scope of work includes construction of jack-well/intake well, raw water rising mains pipelines, pure water rising/gravity main, water treatment plant (WTP), ground service reservoir (GSR), sequential batch reactor (SBR), sump, elevated service reservoir, distribution system and other related infrastructure.
Publish Date: August 29, 2024
End Date: September 19, 2024
Implementing Agency: Nilanga Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of 5.367 km long reinforced cement concrete (RCC) network, 103.73 km long collection network of structured wall piping system, sewage pumping station (SPS), sewage pumping machinery, rising main from SPS to STP inlet chamber, recycle and reuse of treated water sump, supervisory control and data acquisition (SCADA) automation and related infrastructure including trial run.
Publish Date: August 29, 2024
End Date: September 12, 2024
Implementing Agency: Public Works Department, Puducherry
Segment: Water Supply
Work: The scope of work includes site selection, physical suitability for construction, acceptability from an environmental point of view including all engineering parameters, marine ecology, bathymetry, water quality and sea bed geology, preparation of process package including basic design of plant, intake and brine reject outfall system and conveyance of water, conducting environmental impact assessment (EIA) study and other relevant studies, preparation of feasibility report and obtaining all clearances including coastal regulation zone (CRZ) clearance, preparation of detailed project report (DPR) including designs, drawings, detailed cost estimates for all the unit operations of desalination plant, and financial viability in terms of capital and Operation and Maintenance (O&M) cost, preparation of contract document, finalising tender documents, evaluation of technical and financial offers and other related works.
Publish Date: August 29, 2024
End Date: September 12, 2024
Implementing Agency: Karnataka Urban Water Supply And Drainage Board
Segment: Water Supply
Work: Harugeri and Mugalkod: The scope of work includes study, survey, investigation, assessment, design and construction of head works including Intake well, connecting pipeline, inspection chambers, Jack well cum pump house, approach bridge etc, operation of water treatment plant (WTP), construction of associated buildings/facilities, treated water storage tank and pumping station with pumping machinery at WTP premises, treated water pumping mains / feeder mains / bulk water transmission mains / bulk gravity mains from WTP existing or new overhead tank (OHT) of urban local bodies (ULBs) including the distribution network to all the households, construction of new OHTs to meet the storage requirement and distribution network, installation of bulk water meters OHT’s and household meters (HSC) at all the outlet points in the water supply system to measure the water supplied, installation of required appurtenances to supply and ensure the equitable water supply all outlets, electromechanical works as per required at all the location of pumping stations, all other works as detailed in this document and as per system design criteria including one year defect liability period and Operation and Maintenance (O&M) for five years.
Sindagi, Muddebihal, Basavan Bagewadi, Talikote and Kustagi Towns: The scope of work includes construction of headworks including intake well, connection pipeline, inspection chambers , jack well cum pump house, approach bridge, water treatment plant (WTP), treated water storage tank, treated water pumping main, over head tanks (OHTs), gravity main from WTP to OHTs and all other related works including Operation and Maintenance (O&M) for five years. The work is likely to be completed in 36 months at an estimated cost of Rs 825.51 million.
Jamakhandi, Konnur, Nippani And Bailhongal towns: The scope of work includes Pumping and transmitting the abstracted raw water to the water treatment works, transmitting the potable treated water from the water works through the transmission and feeder networks via the treated water pumping stations to various reservoirs and the distribution network up to the consumer water connection points, operating potable water transmission pipe system to existing and proposed overhead tanks (OHTs) in urban local bodies (ULBs) and all other related works including one-year defect liability period (DLP) and five years Operation and Maintenance (O&M). The estimated cost of the project is Rs 926.28 million.
Publish Date: August 28, 2024
End Date: September 24, 2024
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work involves construction of reinforced cement concrete (RCC) intake well and other allied infrastructure including supervisory control and data acquisition (SCADA) automation and Operation and Maintenance (O&M) of five years in
Yaragatti, Ramdurga, Boragoan, Kabbur, Kagwad-shedbal-ugarkhurd, Naganoor- Kalloli – Mallapur Pg Ghatprabha – Arambhavi – Mudalgi, Sindagi, Gajendragad and Kumta.
Publish Date: August 28, 2024
End Date: September 24, 2024
Implementing Agency: Karad Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of pure water gravity main, reinfoirced cement concrete (RCC), elevated service reservoir (ESR), dismantling of existing ESR, distribution system, utility shifting, ultrasonic flow meter, repair and replacement of old existing raw & pure water pumping machinery , repairing of existing water treatment plant (WTP).
Publish Date: August 27, 2024
End Date: September 10, 2024
Implementing Agency: Karad Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of DI/CI rising main pipelines, gravity main, sump well, pumpingg machinery, transfer sub station, 5.25 million litres per day (mld) sewage treatment plant (STP), 10.74 km long distribution network, supervisory control and data acquisition (SCADA) automation and all other related works.
Publish Date: August 27, 2024
End Date: September 10, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work includes construction of a 430.56 km long sewerage network and six pumping stations having capacities of 8.22, 6.39, 9.90, 18.20, 19.12 and 8.73 million litres per day (mld), 5.7 km long rising main including 12 months trial and run.
Publish Date: August 26, 2024
End Date: October 9, 2024*
Implementing Agency: Amalner Municipal Council
Segment: Water Supply
Work: The scope of work includes working survey, construction of intake well, jackwell, pump house, raw water rising main, 28 million litres per day (mld) water treatment plant (WTP), 211.52 km distribution network, supervisory control and data acquisition (SCADA) automation and all other related works including trial run.
Publish Date: August 26, 2024
End Date: September 16, 2024
Implementing Agency: Shahjahanpur Cantonment Board
Segment: Wastewater
Work: The scope of work includes preliminary survey, design, preparation of detailed project report (DPR) and tender document, project management/supervision for the project.
Publish Date: August 23, 2024
End Date: September 9, 2024
Implementing Agency: Gujarat Industrial Development Corporation (GIDC)
Segment: Water Supply
Work: The scope of work includes engineering, procurement and construction (EPC) contract for construction and commissioning of 65 million litres per day (mld) WSS for GIDC Vansi, (Navsari) based on intake well near Kakrapar weir through M.S pipeline of 1150 mm (ID) dia, 10 mm thick 98.46 km length with all allied work including defect liability period (DLP) for three years and comprehensive Operation and Maintenance (O&M) for five years.
Publish Date: August 23, 2024
End Date: September 17, 2024
Implementing Agency: Chopda Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of sewerage collection and conveyance system zone 5, nallah interception and diversion including screening, gravity trunk sewer main along either bank of the river Ratnawati, sewage sump and pump house for intermediate pumping station (IPS) – 3, sewage pumping main, pumping machinery at sewage sump 3 and allied electrical work, programmable logic controller (PLC) supervisory control and data acquisition (SCADA) system, construction of compound wall, construction of substation room for transformer at proposed sewage pumping station (SPS), construction of sewage treatment plant having design capacity 15 million litres per day (mld) on moving bed biofilm reactor (MMBR) technology, compound wall, construction of substation room for transformer, and trial run for 3 months after satisfactory commissioning including Operation and Maintenance (O&M) for one year and other related works.
Publish Date: August 22, 2024
End Date: September 6, 2024
Implementing Agency: Odisha Industrial Infrastructure Development Corporation (IDCO)
Segment: Water Supply
Work: The scope of work includes procurement, supply, laying, jointing of 900 mm diameter ductile Iron(DI)S/S pipes for a length of about 22 km with required gaskets along with sluice valves/butterfly valves, air valves, scour valves, zero velocity valves, air cushion valves, Steel structure pipe carrying bridges for canal crossings and all required DI. Fittings and specials, MS pipes and fittings including specials as required, laying the pipe line in alignment, providing thrust blocks, valve chambers and required civil works & testing and commissioning of the pipe line.
Publish Date: August 22, 2024
End Date: October 17, 2024*
Implementing Agency: Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam
Segment: Water Supply
Work: The scope of work includes household survey, collection water related data, verifying structural locations, water main alignments, land availability, stakeholder consultation, preparation of environment management plan (EMP) and social management plan (SMP), safety studies, assisting in finalisation of final subprojects, assisting in clearnce of forest proposal for land acquisition, collection of no objection certificates (NOCs), conducting gender studies and all other related works.
Publish Date: August 22, 2024
End Date: September 9, 2024
Implementing Agency: Sindewahi-Lonwahi Nagar Panchayat
Segment: Water Supply
Work: The scope of work includes head works, raw and pure water pumping machinery, raw and pure water rising main, raw and pure water gravity main, conventional water treatment plant (WTP) having capacity of 6.5 million litres per day (mld), service reservoirs, automation, 63.51 km long distribution network including trial run and Operation and Maintenance (O&M).
Publish Date: August 22, 2024
End Date: September 9, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour, t&p etc. required for construction, erection, completion, testing & commissioning of water supply works such as reinforced cement concrete (RCC), over head tanks (OHTs), pumping station, rising main, feeder main, distribution system, supervisory control and data acquisition (SCADA) room, chlorination room, meter room, panel room, staff quarter, boundary wall & site development works etc. and other appurtenant works including three months trial run and two years Operation and Maintenance (O&M).
Publish Date: August 22, 2024
End Date: September 20, 2024
Implementing Agency: Achalpur Nagar Parishad
Segment: Water Supply
Work: The scope of work includes carrying out reconnaissance surveys and preparation of feasibility report (PFR), carrying out detailed survey, preparing proposal for getting requisite permissions from various concern authority including preparation of DPR of the projects and assisting for getting approvals from appraisal consultant , preparation of base map, hydraulic design, providing services for preparation of tender documents and bid process management including preparing proposal for getting requisite permissions from various concern authority , PMC services and other related works.
Publish Date: August 21, 2024
End Date: September 4, 2024
Implementing Agency: Hyderabad Metropolitan Water Supply And Sewerage Board
Segment: Wastewater
Work: The scope of work includes cutting open BT road surface for pipeline trenches, earthwork excavation in all soils / hard rock for trenches of pipeline along the sewer alignment, bailing out water from trenches for laying of pipeline, concrete bedding etc., providing shoring and strutting for excavation of trenches for laying sewer lines, providing barricading lighting and diversion of traffic, providing caution boards etc, manufacturing, supply, lowering, laying, jointing, testing and commissioning of 100mm HSC, 150mm to 300 mm SWG and 400mm to 1800 mm dia reinforced cement concrete (RCC) NP4 Class pipes for laterals, sub-mains and mains (400mm to 500mm RCC pipes lined with high alumina cement and 600mm and above RCC pipes lined with poly urea), construction of sewer conical manholes with cement bricks manufactured with using SR cement and construction in SR cement, plastering using sand, heavy duty manholes frames and covers and fibre encapsulated steps etc, supply of HBG stone chips for filling the trenches and road restoration including watering, ramming etc, providing PCC in M20 grade concrete for bedding, providing RCC M20 prop for floor slabs, side walls etc, supply and filling of gravel for filling the pipeline trenches etc., carting of surplus excavation soil / rock away from the work site and carting & re-carting of useful soil for refilling, refilling of pipeline trenches with useful excavated soil, supply, delivery and fixing of HYSD bars for reinforcement etc., field testing of pipe line.,road restoration in M10 & M20 concrete and other related works.
Publish Date: August 21, 2024
End Date: September 5, 2024
Implementing Agency: Gujarat Industrial Development Corporation
Segment: Wastewater
Work: The scope of work includes engineering, procurement, construction (EPC) with commissioning including testing, trial run and comprehensive Operation and Maintenance (O&M) for three years of CETP with capacity of 12.5 million litres per day (mld) at Bulk Drug Park Industrial Estate in Jambusar.
Publish Date: August 21, 2024
End Date: October 10, 2024*
Implementing Agency: Navi Mumbai Municipal Corporation
Segment: Water Supply
Work: The scope of work includes finding new sources of drinking water for the Navi Mumbai Municipal Corporation and preparing conceptual documents, preparing detailed reports and acting as a project management consultant for water supply and sewage projects.
Publish Date: August 21, 2024
End Date: September 12, 2024
Implementing Agency: Public Health Engineering Department, Nagaland
Segment: Water Supply
Work: The scope of work includes technical, financial, and economic analysis of the project, detailed cost estimation and procurement arrangements assessment of the project, preliminary designs and engineering of the project including details on source of water, environmental analysis, social impact assessment and identification of initial benchmark indicators, institutional arrangements and implementation schedule; and analysis of major risks and its mitigation measures and all other related works.
Publish Date: August 20, 2024
End Date: September 30, 2024
Implementing Agency: Dhule Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of 685.98 km long sewer network, receiving chamber, screening chamber, pumping stations, rising main, sewerage treatment plant (STP) of 40 million litres day (mld), treated water sump and related infrastructure.
Publish Date: August 20, 2024
End Date: September 3, 2024
Implementing Agency: Kolkata Municipal Corporation
Segment: Wastewater
Work: The scope of work includes improvement of sewerage system by laying underground sewer (UGS) network at different lateral roads within Ward no 124,142,143 and 144 under Borough XVI.
Publish Date: August 20, 2024
End Date: September 21, 2024
Implementing Agency: Namakkal Municipal Corporation
Segment: Wastewater
Work: The scope of work involves providing PMC services which entails monitoring and supervising various activities.
Publish Date: August 19, 2024
End Date: August 30, 2024
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work includes laying and replacement of various water mains and allied works due to the proposed improvement of roads in cement concrete in Zone III of western suburbs section of Mumbai.
Publish Date: August 19, 2024
End Date: September 9, 2024
Implementing Agency: Bramhapuri Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of collection network for double wall corrugated PE pipes, collection networks of reinforced cement concrete (RCC) NP-3 pipes, sewage pumping station, three wet wells, rising mian, pumping machinery and sewage treatment plant (STP).
Publish Date: August 17, 2024
End Date: September 6, 2024
Implementing Agency: Deendayal Port Authority
Segment: Water Supply
Work: The scope of work includes preparation of technical feasibility and financial viability report, detailed project report (DPR), assistant in obtaining requisite approval clearance from concern authorities, planning and design cost estimates and draft tender paper, drawings, bid evaluation, assist in the appointment of agency for execution and installation of desalination plant.
Publish Date: August 17, 2024
End Date: September 9, 2024
Implementing Agency: Mohol Municipal Council
Segment: Water Supply
Work: The scope of work includes construction of 109.256 km long branch sewer and trunk main network, sewage pumping station, receiving chamber/screen chamber, pumping machinery, rising main, treated water sump having capacity of 5 lakh litres, on-grid solar power plant.
Publish Date: August 17, 2024
End Date: September 8, 2024
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes:
Package II: It includes construction of raw water rising main system from intake to Kekri water treatment plant (WTP) including electro-mechanical work at intake including Operation and Maintenance (O&M) for 10 years and defect liability period (DLP) of one year at an estimated cost of Rs 2,867.9 million.
Package IV: It includes construction of cluster pumping system, overhead service reservoir (OHSRs), distribution system including functional housetap connection (FHTC) of Kekri Sarwar area including O&M for 10 years DLP of one year at an estimated cost of Rs 1,970.9 million.
Publish Date: August 16, 2024
End Date: October 29, 2024*
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Wastewater
Work: The scope of work includes construction of reinforced cement concrete (RCC) built up gutters along roads in the Dombivli industrial area and residential zone and reconstruction of uncoursed random (UCR) nallas with RCC Nallas in the Dombivli Industrial Area.
Publish Date: August 16, 2024
End Date: September 5, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes soil investigation, engineering (hydraulic, structural design as required), procurement of all labour and material, laying of 93.7 km distribution network, construction of clear water rising main (CWR) of different capacities, water supply house connections, laying of gravity main from existing CDP at Chhijarsi, sector 62, Noida to proposed CWR, supervisory control and data acquisition (SCADA) automation and other related works including three months trial run, one year defect liability period (DLP) and two years Operation and Maintenance (O&M).
Publish Date: August 14, 2024
End Date: September 6, 2024
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes retrofitting work for providing water supply to 108 main habitations and 453 other habitations, construction of new overhead storage reservoirs (OHSRs), connecting these new/existing OHSRs with existing and new rising mains, pipeline from OHSRs to VTCs, internal village habitations of Nagaur, Khinvsar and Mundwa blocks of district Nagaur, Cluster distribution network, providing/replacement of /cluster pumps/ online boosters and functional household tap connections (FHTCs) including all material and labour including one-year defect liability period and Operation and Maintenance (O&M) for 10 years.
Publish Date: August 14, 2024
End Date: September 17, 2024
Implementing Agency: Tamil Nadu Urban Infrastructure Financial Services Limited (TNUIFSL)
Segment: Water Supply
Work: The scope of work includes appointment of consultant for preparation of DPR, process designs, detailed estimates and bid documents for Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB) for rehabilitation and modification works to the existing 270 million litres per day (mld) Kilpauk WTP.
Publish Date: August 13, 2024
End Date: September 11, 2024*
Implementing Agency: Mission Bhagiratha Department, Telangana
Segment: Water Supply
Work: The scope of work includes balance work of construction of intake structure, water treatment plant (WTP) and pipelines for four Hyderabad metropolitan water supply (HMWS) segments (Jangaon, Gajwel, Medchal and Alair-Bhongir), Sri Komuravelly Mallannasagar Reservoir as a source.
Publish Date: August 9, 2024
End Date: August 27, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of work includes design, construction, providing, supplying, lowering, laying and jointing various DI/PVC rising main and gravity main pipelines, reinforced cement concrete (RCC) elevated storage reservoir (ESR), RCC sump, pump house, staff quarter, RCC road, compound wall, supplying and erecting pumping machinery at various Villages with Operation and Maintenance (O&M) for 10 years and three months trial run under augmentation of Sonariya regional water supply scheme for water supply to all beneficiary villages and towns of Veraval, Sutrapada, Talala talukas.
Publish Date: August 9, 2024
End Date: September 9, 2024
Implementing Agency: Haryana State Industrial and Infrastructure Development Corporation Limited (HSIIDC)
Segment: Water supply
Work: The scope of work includes planning, design, engineering, procurement, construction, installation, testing, 03 months trial runs and commissioning of 22 mld capacity WTP with full automation including raw water sump and raw water pump chamber at canal, rising main from canal to wtp site, sedimentation-cum-storage tanks, clear water tank, pump and pump house, WTP, control room, sludge sump, sludge thickener, sludge drying beds, gaseous chlorination, DG set, transformer, rising main from clear water pump chamber, complete electro mechanical and instrumentation items, CCTVs, campus development, street lights, internal roads, landscape etc. along with all others contingent works thereto complete in all respect at IE panipat including Operation and maintenance (O&M) and defect liability period (DLP) for five years including chemicals, staff, lubricants, diesel consumption including power backup, repair and maintenance of plant and machineries, etc. complete in all respect on turnkey basis to achieve treated water as per prescribed under drinking water norms with minimum guaranteed flow of 5.5 mld.
Publish Date: August 9, 2024
End Date: September 16, 2024
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: WastewaterGandhinagar
Work: The scope of work includes development of SWD system at an estimated cost of Rs 773.39 million. The work is likely to be completed in 24 months.
Publish Date: July 23, 2024
End Date: April 8, 2025*
Implementing Agency: Chirmiri Urban Local Body
Segment: Water Supply
Work: The scope of work includes survey, engineering, procurement, construction and testing of raw water pumping main , raw water pumping machinery, clear water pumping machinery, 11 overhead tanks (OHTs) having collective capacity of 7620 kld, functional house tap connections (FHTCs), supervisory control and data acquisition (SCADA) automation and other related infrastructure including Operation and Maintenance (O&M) for five years.
Publish Date: August 8, 2024
End Date: August 27, 2024
Implementing Agency: MCGM
Segment: Wastewater
Work: Design and construction of 8.485 km tunnel from Ghatkopar WWTF to Dharavi WWTF
Publish Date: August 8, 2024
End Date: August 28, 2024
Implementing Agency: Sukma Urban Local Body
Segment: Water Supply
Work: The scope of work includes survey, engineering, procurement and construction of intake well, pump house, raw water pumping main, water treatment plant (WTP) having capacity of 5 million litres per day (mld) and other allied infrastructure including 12 months defect liability period (DLP) and five years Operation and Maintenance (O&M).
Publish Date: August 8, 2024
End Date: August 21, 2024
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work includes designing and construction of new 50 mld Capacity (with 20 per cent overloading) WTP and with allied works and its commissioning which includes soil investigation, contour survey and l-section survey, preparation of general arrangement drawings, layout plan, structural design and drawings and architectural elevations, hydraulic and structural design of entire scheme, constructions of a new inlet chamber with all civil work including raw water intake arrangement to inlet chambers, flash mixer civil work, arrangement & construction of 2 no’s clariflocculators (25 mld each with 20% overloading), civil work, bypass arrangement, filter house with arrangement for full fledge office, toilet blocks, store room, filter beds, interconnecting pipes & valves, civil work (excluding fitter under drain system) and other related works including Operation and Maintenance (O&M) for five years.
Publish Date: August 7, 2024
End Date: August 22, 2024
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work includes laying of water supply pipeline in two parts: from WTP Poynad at Bandhan to BPT at Ambepur as pumping main and further BPT to Shahpur industrial area as a gravity mian having total length of 8.5 km, 0.3 km distribution network, break pressure tank at Ambepur, encasing of 1.2 km from Pezari checkpost to next to Mhasoba Mandir after encasing remaking of PWD is proposed with CC road and other related civil works and material supply, etc.
Publish Date: August 6, 2024
End Date: August 20, 2024
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work includes construction of a desalination plant having a capacity of 200 million litres per day (mld) further expandable to 400 mld based on sea water reverse osmosis technology including Operation and Maintenance (O&M) for 20 years. The bids have been invited under the Swiss challenge method.
Publish Date: August 6, 2024
End Date: August 29, 2024
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Water Supply
Work: The scope of work includes construction of a 60 million liters per day (mld) water treatment plant (WTP), retention tank, clear water tank, pump chamber, pumping machinery, rising main from raw water pumping station to proposed water work at village Barodi for Jind city and all other related works.
Publish Date: August 5, 2024
End Date: August 20, 2024
Implementing Agency: Jharkhand Urban Infrastructure Development Corporation Limited (JUIDCO)
Segment: Water Supply
Work: The scope of work involves survey, geographic information system (GIS) based consumer mapping, design, supply and construction of intake well, pump house, infiltration pipe gallery, vertical turbine pumps, centrifugal pump, RCC approach bridge/gangway, 21 million litres per day (mld) water treatment plant (WTP) and other allied infrastructure with five years of Operation and Maintenance (O&M).
Publish Date: August 5, 2024
End Date: August 27, 2024
Implementing Agency: Ichalkaranji Municipal Corporation
Segment: Wastewater
Work: The scope of work includes working survey, collection system for Zone -I, II and III, road restoration and utility shifting, sewage pumping station, raw water rising main 19.5 and 13 million litres per day (mld) sewage treatment plants (STPs), ozone disinfection and other related infrastructure.
Publish Date: August 1, 2024
End Date: August 30, 2024*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Wastewater
Work: The scope of the work includes construction of two sewerage treatment plants (STPs) having capacities of 11 million litres per day (mld) each along with UV disinfection controlled with supervisory control and data acquisition (SCADA) including survey, review, redesign wherever necessary, building 2116 m interception drain tapping of 3 drains, screens and mechanically operated gates facilitating effluent channel disposal of the treated effluent channel of treated effluent through 224 m pipeline and operation and maintenance (O&M) of 15 years.
Publish Date: July 31, 2024
End Date: August 27, 2024
Implementing Agency: Hyderabad Metropolitan Water Supply And Sewerage Board
Segment: Wastewater
Work: The scope of work includes construction of a 4 million litres per day (mld) STP for Bulkapur and Janwada zones at Janwada, 5 mld STP for Himayathnagar and Chilkoor zones at Himayathnagar, 5 mld STP at Aziznagar, Bangallguda and Nagiredyguda zones at Nagireddyguda and 6 mld STP at Kothwalguda, Shamshabad and Kavaguda zones at Kamuni Nala Confluence Point, interception and diversion (I&D) network and laying of diversion Trunk sewers for abatement of sewage pollution at Osmansagar and Himayatsagar reservoirs.
Publish Date: July 31, 2024
End Date: August 27, 2024*
Implementing Agency: Karnataka Urban Infrastructure Development and Finance Corporation Limited (KUIDFC)
Segment: Wastewater
Work: The scope of work includes:
Hubballi: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer Pipeline for construction of main trunk line, reinforced cement concrete (RCC) for minimum length of 5.1 km, hydraulic tests, including restoration works in flexible and rigid pavements, providing, laying, jointing sewer line with dia varying from 250 mm to 1000 for sub trunk main works with RCC NP3, for a minimum length 2.50 km confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test, including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.5m, 1.8m and 2.4m dia cast-in situ/pre-cast with heavy-duty steel fiber reinforced concrete (SFRC) cover and frame, for varying depths (the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and stair case arrangement for the maintenance in screen chamber for the wet well of capacity 80 million litres per day (mld) at Gabbur Village, providing, laying, jointing, testing and commissioning of required diameter of DI K-9 class rising main from wet well to sewage pumping station (STP) minimum of Length: 1.1 km including necessary pipe ancillary works, including restoration works in flexible and rigid pavements, supply, erection, electrification, testing and commissioning of non-clog sewage pump sets of required capacity including panel bords etc along with all accessories at wet well including allied works such as DG room, Chain link fencing etc, providing 11 KV – 3 Phase power supply line from Sub-station to wet well from sub-station at Hubballi road with necessary transformers including approval, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, Construction of internal developments such as roads, street light etc.,
Dharwad: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer pipeline by using 250 mm to 500 mm dia RCC, NP3 class confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 6.35 km including restoration works in flexible and rigid pavements, providing, laying and jointing HDPE sewer pipeline by using 150 mm to 200 mm dia HDPE SN8 pipes IS:16098 and jointing of pipes, cutting of pipes etc along with hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 10 km including restoration works in flexible and rigid pavements, providing, laying and jointing PVC Sewer Pipeline by using 200 mm dia as per IS:16098 and jointing of pipes, cutting of pipes etc along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 3.7 km including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.2 and 1.5 dia cast-insitu/pre-cast with heavy-duty SFRC cover and frame, for varying depths ( the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, providing house service connections (HSC) :3641 Nos. (which shall be laid from inside the customer property to machine hole as per site condition) , construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and staircase arrangement for the maintenance in screen chamber for the wet well of capacity 12 mld and 12 mld viz Wet well -1 near Madihal STP, Wet well 2 near Agriculture Research Center), Construction of rising Main for wet well 1 from wet well -1 to STP and wet well 2 from Agriculture Research centre to proposed wet well -1 at Madihal, with DI K-9 pipe having diameters varies from 300 mm to 350 mm, minimum length of 2.85 km, supply, erection, electrification, testing and commissioning of required capacity of non-clog sewage pump sets along with all accessories at Wet well – 1 and Wet well -2 including allied works such as DG room, chain link fencing etc, providing 11 KV – 3 phase power supply Line from sub-station to wet well from nearest substation with necessary transformers for Wet well -1 and Wet well -2, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, construction of internal developments such as roads, street light etc.
Publish Date: July 30, 2024
End Date: September 4, 2024*
Implementing Agency: Ahmedabad Urban Development Authority (AUDA)
Segment: Water Supply
Work: The scope of work involves construction of remaining rising main from CWPH to four existing ESR & two existing underground sump, distribution network in 5 TP schemes, Sanand Gamtal, Bhavanipura, Liapura and Vadnagar area, mechanical , electrical, instrumentation work and refurbishment of existing 19.20 million litre per day (mld) water treatment plant (WTP) and P/M, existing raw water sump and pump house and existing CWPH.
Publish Date: July 30, 2024
End Date: August 21, 2024
Implementing Agency: Indian Oil Corporation Limited (IOCL)
Segment: Wastewater
Work: The EPCC-02 package comprises of development of Demineralization + Reverse Osmosis plant (DM+RO), Condensate Polishing Unit (CPU), ETP+ZLD Effluent Treatment Plant + Zero Liquid.
Publish Date: May 23, 2024
End Date: November 7, 2024*
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of various works for augmentation of water supply system which includes construction of an intake of 1650 million litres per day (mld) capacity with raw water pump house, water treatment plant having capacity of 400 mld with clear water booster pumping stations, pumping main and Electric substation including Operation and Maintenance (O&M) for 10 years.
End Date: September 25, 2024*
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of various works for augmentation of water supply system including providing, laying, jointing, testing and commissioning of clear water gravity pipeline of diameter having length of 38.850 km and boring machine tunnel construction of total 2.870 km with operation and maintenance (O&M) 10 years operation and maintenance.
End Date: September 25, 2024*
Implementing Agency: Chikhali Municipal Corporation
Segment: Water Supply
Work: The scope of work includes laying of rising main pipelines, construction of jackwell, intake well, elevated service reservoir (ESR), water treatment plant (WTP) having capacity of 5 million litres per day (mld), pumping machinery, distribution system, repair to existing WTP and ESR, installation of meters, ground service reservoir (GSR) and supervisory control and data acquisition (SCADA) automation.
Publish Date: August 16, 2024
End Date: August 30, 2024
Implementing Agency: Kolhapur Municipal Corporation (KMC)
Segment: Wastewater
Work: The scope of project involves laying drainage lines in the eastern suburbs of Kolhapur city to collect sewage at Bapat Camp and then it will get diverted to a sewage treatment plant (STP) in Kasba Bawada, construction of substations and related infrastructure to treat about 15 million litres per day (mld) of sewage to reduce pollution in the Panchganga river. The drainage lines will be constructed from Tararani Chowk to Market Yard, Temblaiwadi, Vikramnagar, Kadamwadi, Bhosalewadi and adjoining areas.
Publish Date: July 26, 2024
End Date: August 15, 2024
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply; Wastewater
Work: These include:
Water Supply: It includes design, build and operate (DBO) contract for providing, lowering, laying, jointing, supply of pipeline network (gravity, rising main and distribution network) and supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipments, instruments and accessories with construction of 19 million litres per day (mld) water treatment plant (WTP), compound wall, house connection with Operation and Maintenance (O&M) for one year of all type civil structures and mechanical instruments. It will be carried out under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Sewage: It includes design and construction of sewer collecting system, house service connection, pumping station, pumping machinery, electrical work, pumping main, 10.91 mld sewage treatment plant (STP) and compound wall with seven years O&M of STP and two years O&M for underground sewerage system. It will be carried out under the Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY).
Publish Date: July 26, 2024
End Date: August 16, 2024
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Wastewater
Work: The scope of work preparation of DPR for sewage containing industrial wastewater of Jagadhri and Yamuna Nagar town at Jagadhri and Yamuna Nagar in Yamuna Nagar district and construction of 77 mld STP at Radaur Road and all other related works.
Publish Date: July 26, 2024
End Date: August 16, 2024
Implementing Agency: Chikhali Municipal Corporation
Segment: Water Supply
Work: The scope of work includes laying of rising main pipelines, construction of jackwell, intake well, elevated service reservoir (ESR), water treatment plant (WTP) having capacity of 5 million litres per day (mls), pumping machinery, distribution system, repair to existing WTP and ESR, installation of meters, ground service reservoir (GSR) and supervisory control and data acquisition (SCADA) automation.
Publish Date: June 20, 2024
End Date: July 19, 2024
Implementing Agency: Atpadi Nagar Panchayat
Segment: Water Supply
Work: The scope of work includes working survey, 650 m raw water rising main jack well to water treatment plant (WTP), raw water pumping, 3 million per day (mld) WTP, pure water rising main, pure water pumping machinery, reinforced cement concrete (RCC) master balancing reservoir (MBR), 284.83 km long distribution network, and supervisory control and data acquisition (SCADA) automation and trial run for 12 months.
Publish Date: July 26, 2024
End Date: August 9, 2024
Implementing Agency: Uttarakhand Project Development and Construction Corporation Limited (UPDCCL)
Segment: Water Supply
Work: The scope of work includes providing PMC services for dam contract, construction and quality control of Song Dam drinking water project.
Publish Date: July 24, 2024
End Date: August 7, 2024
Implementing Agency: Andhra Pradesh Environment Management Corporation Limited (APEMCL)
Segment: Wastewater
Work: The scope of work includes diagnostic study, data collection, risk assessment, site suitability analysis, preparation of feasibility reports/ detailed project report (DPR)/outline business case for implementation of work on design, build, finance, operate and transfer (DBFOT) basis with revenue sharing model, identifying project management consultants (PMC) as designated representative of APEMCL and selection of developers.
Publish Date: July 24, 2024
End Date: August 5, 2024
Implementing Agency: Water Resources Department, Bihar
Segment: Water Supply
Work: The scope of work includes development of surface WSS on turnkey basis. The work is likely to be completed in 12 months at an estimated cost of Rs 1,985.8 million.
Publish Date: July 15, 2024
End Date: July 29, 2024
Implementing Agency: Gangakhed Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of approach channel, repair of existing jackwell, construction of panel room ,raw water pumping machinery at Masoli jackwell, pumps, discharging cap. 419300 litres per hour (LPH) for head 83 m – total 3 nos. 2+1 nos with automation of pumps, desilting pump at Masoli jackwell, raw water rising main from head works to BPT, (500 mm dia. d.i.k-9 pipes- l =700 m) g)repairs to existing BPT (total cap. 2,25,000 ltr), raw water gravity main from BPT to water treatment plant (WTP) 350 mm dia. di k 7 pipes,l =1500 m , 400 mm dia. di k-7 pipe l = 6500m. It will use Masoli as Source. Using Godavari as a source it includes repair of intake well at Godavari – dia 6 m & depth 18 m, repair of existing jackwell dia- 6 m ht-8 m at Godavari river, raw water pumping machinery at Godavari jackwell, 34200 LPH head, 81m 20.0 hp submersible monoblock pump, desilting pump at Godavari river, raw water rising main from jackwell at Godavari river to WTP di k-9 dia- 200mm length – 4500 m and combined subworks include proposed conventional WTP having capacity of 19 million litres per day (mld), recirculation sump cap- 3,57,000 lit, raw water pumping machinery at recirculation sump, 66640 LPH, head h:-12 m 7.5 hp submersible pump (2+1), rising main from recirculation sump to WTP di k-9, dia-200 mm length -100m, pure water pumping machinery q 403400 lph head h:-33 m 90 hp vt pump (2+1), pure water rising main from WTP to master balancing reservoir (MBR) di k-9, dia-500 mm length – 1200 m, and MBR for Gangakhed (total cap:- 15,34,000 lit), u) pure water gravity main from MBR to various elevated service reservoirs (ESRs) dia 200mm to 700mm length-6467m, provision for repairs to existing reinforced cement concrete (RCC) elevated storage reservoir at gangakhed (total cap:- 13,00,000 lit), w) RCC elevated storage reservoir at gangakhed (total cap:- 25,14,000 lit), distribution system hdpe pe- 6kg/cm^2 dia 110 mm to 225 mm & di k-9 dia 250 mm to 500 mm total length 125.00 km, running the scheme on trial basis, miscellaneous works, solar power plant 510 kwp and supervisory control and data acquisition (SCADA) automation.
Publish Date: July 18, 2024
End Date: August 1, 2024
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: The scope of work includes upgradation of existing 70 million litres per day (mld) and 240 mld activated sludge process (ASP) based STPs at Vinzol and Vasna respectively to achieve sewage parameters as per National Green Tribunal (NGT) norms, replacement of all electrical, mechanical and instruments of the entire plant including five years Operation and Maintenance (O&M).
Publish Date: July 11, 2024
End Date: July 23, 2024
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work involves designing, drawing and construction of RCC Jack well under the submergence of Wadgaon Dam, providing, laying, joining and commissioning 1,200 mm diameter M.S. raw water pipeline of 13 km length and 1,200 mm diameter DI K-9 class raw water pipeline of 3 km length from proposed jackwell at Wadgaon Dam to proposed water treatment plant (WTP) and WTPs of capacity 30 mld each. The work is likely to be completed in 18 months at an estimated cost of Rs 1,772.04 million.
Publish Date: July 10, 2025
End Date: September 29, 2025*
Implementing Agency: Shevgaon Municipal Council
Segment: Water Supply
Work: The scope of the project includes working survey, head works-approach channel of 1080 m, jackwell and overhead pump house of 9 m diametre, approach bridge of 25 m, raw water pumping machinery of 120 HP, P/L/L/J and hyd.testing of RWRM 450 mm dia DIK-9 pipes L- 19.800 km, conventional water treatment plant (WTP) Cap – 12 million litre per day (mld) with automation, pure water pumping machinery- 150 HP, P/L/L/J and hyd. testing of PWRM 400 mm dia DIK-9 pipes L- 4.00 km, P/L/L/J and hyd. testing of 200 to 500 mm DI K-7 pipe PWGM L6.334 km, master balancing reservoir (MBR) CUM elevated service reservoir (ESR)- cap- 11.85 lakh ltr st. ht-25m, ESR – 8.70 lakh ltr st. ht-15m, ESR cum wash water tank cap-5 lakh ltr st. ht-20m, ESR cap-1.60 lakh ltr st.ht-17m, distribution system L113.63 km and other miscellaneous work.
Publish Date: July 9, 2024
End Date: July 23, 2024
Implementing Agency: Municipal Engineering Directorate, West Bengal
Segment: Water Supply
Work: The scope of work includes sinking of river bed tube wells with electro-mechanical works, supplying and laying of DI K9 rising main, construction of overhead reservoirs (OHRs) with geotechnical investigation and design of sub-structure, construction of concrete water recycling (CWR) with geotechnical investigation & design & electro-mechanical works, supplying & laying of distribution pipelines (DI-k7 and HDPE) with temporary road restoration, jack pushing works for nh/rail crossing, pipe carrying bridges, pump houses, sub-station building, staff quarter and all other allied works complete in all respect, commissioning, trial run and Operation and Maintenance (O&M) for five years.
Publish Date: July 9, 2024
End Date: August 17, 2024
Implementing Agency: Alibag Municipal Corporation
Segment: Wastewater
Work: The scope of work includes working survey, construction of 7.17 km long collection network, pumping station, rising main, sewage pumping station (STS) having capacity of 4.5 million litres per day (mld) and all other related infrastructure.
Publish Date: July 9, 2024
End Date: July 25, 2024
Implementing Agency: Gujarat Water Supply And Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes project management consultancy (PMC) services, detailed project report (DPR) preparation,bid process management, construction supervision services through a quality, cost based selection (QCBS) process and other related works for water supply projects in various villages/ Urban Local Bodies (ULBs) across five water supply zones in Gujarat.
The state is divided into six zones. These are:
Zone-I (Vadodara): It includes districts of Vadodara, Panchmahal, Dahod, Mahisagar and Chhotaudepur;
Zone -II (Ahmedabad): It includes districts of Anand, Kheda, Ahmedabad, Gandhinagar, Mehsana, Banaskantha, Patan, Arvalli, and Sabarkantha;
Zone -III (Rajkot): It includes districts of Morbi, Surendranagar, Rajkot and Jamnagar;
Zone – IV (Kutch): It includes Kutch district;
Zone -V (Junagadh): It includes districts of Bhavnagar, Amreli, Junagadh, Porbandar, Botad, Gir Somnath and Dev Bhoomi Dwarka.
Zone – VI (Surat): It includes districts of Dang, Surat, Tapi, Valsad, Navsari, Bharuch and Narmada.
Publish Date: July 10, 2024
End Date: July 31, 2024
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: The scope of work includes upgradation and enhancement of an existing 180 mld activated sludge process (ASP) based STP to 200 mld and to achieve sewage parameters as per National Green Tribunal (NGT) norms with digestor retrofication including five years Operation and Maintenance (O&M).
Publish Date: July 9, 2024
End Date: July 18, 2024.
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Wastewater
Work:The scope of work includes preparation of DPR for development of treatment system for sewage containing industrial waste water of Jagadhri and Yamuna Nagar town, District Yamuna Nagar and construction of 19.50 mld STP and all other related works.
Publish Date: July 5, 2024
End Date: July 26, 2024
Implementing Agency: Greater Visakhapatnam Municipal Corporation (GVMC)
Segment: Wastewater
Work: The scope of work includes construction of 25 million litres per day (mld) capacity sewerage treatment plant (STP) based on sequential batch reactor (SBR) technology at Appughar, providing dry weather flow diversion at Pandurangapuram (Drain No.13), Sea Green Hotel (Drain No.15), Opp YMCA (Drain No. 16), Gayatri Vidya Parshad (VUDA Park, Drain No. 17), Peda Jalaripeta (Drain No. 18), Shanthi Ashram (Drain No. 19), Ropeway Toilet (Drain No. 20) including defect liability period (DLP) of two years and seven years Operation and Maintenance (O&M).
Publish Date: July 6, 2024
End Date: July 20, 2024
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Wastewater
Work: The scope of work includes upgradation of existing 40 mld upflow anaerobic sludge blanket (UASB) based STP to 60 mld capacity STP and post-treatment by biological nutrient removal process (BNR) with addition of primary clarifiers, UASB effluent tank, BNR tanks, secondary clarifiers, tertiary treatment by disc filtration and disinfection by chlorination complete in all respect and other related works including Operation and Maintenance (O&M) for five years and one year defect liability period (DLP) at Sunariya, Rohtak, Haryana.
Publish Date: July 4, 2024
End Date: July 25, 2024
Implementing Agency: Karnataka Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes survey, design, drawings, construction, supply, installation, testing and commissioning of WSS on design, build, operate and transfer (DBOT) basis including one year of defect liability period (DLP) and five years of Operation and Maintenance (O&M).
Publish Date: July 2, 2024
End Date: July 16, 2024
Implementing Agency: Ahmedabad Urban Development Authority
Segment: Wastewater
Work: The scope of work includes total station survey along the alignment of sewerage network, laying of sewerage network for remaining work in TP Scheme no. 1 to 5 in the Sanand area including required gravity mains , manhole, refilling, transportation etc. with house connections.
Publish Date: July 6, 2024
End Date: July 31, 2024
Implementing Agency: Chirmiri Urban Local Body
Segment: Water Supply
Work: The scope of work includes survey, engineering, procurement, construction and testing of raw water pumping mian , raw water pumping machinery, clear water pumping machinery, 11 overhead tanks (OHTs) having collective capacity of 7620 kld, functional house tap connections (FHTCs), supervisory control and data acquisition (SCADA) automation and other related infrastructure including Operation and Maintenance (O&M) for five years.
Publish Date: July 1, 2024
End Date: July 24, 2024
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Wastewater
Work: The scope of work includes design, build and testing of STPs having capacities of 5 and 7 million litres per day (mld), UV disinfection, supervisory control and data acquisition (SCADA) automation, online monitoring, three pumping stations with 0.68 Km interception and diversion (I&D) network, 400 m rising main including effluent through pipeline followed by 3 months trial and run and Operation and Maintenance (O&M) for 15 years.
Publish Date: June 28, 2024
End Date: July 23, 2024
Implementing Agency: Kerala Water Authority
Segment: Water Supply
Work: The Scope of work includes design and construction of 14.00 lakh litre (LL) ground level service reservoir (GLSR) at AKriyad, 24 LL GLSR at Kanakamala, supplying and laying gravity main from Kaivelikkal (Puthur post office Junction) to Kanakamala and Kariyad, laying of distribution network and other related works.
Publish Date: July 6, 2024
End Date: July 20, 2024
Implementing Agency: Gujarat Urban Company Limited
Segment: Wastewater; Water Supply
Work: The scope of work includes:
Ode WSS: It includes working survey, soil investigation, design and construction of intake structure with approach bridge on Mahi River near Siddharth Mahadev temple at Shili village, designing constructing and commissioning of conventional water treatment plant (WTP), reinforced cement concrete (RCC) clear water sump at head water works Malav Bhagol, providing, supplying, lowering, laying and jointing di/pvc/distribution pipeline for raw and clear water rising main, providing, pumping machineries, design and construction of pump room, road restoration, transformer, electrification work, house connection etc, including Operation and Maintenance (O&M) for five years at Ode in Anand, Gujarat (based on surface water from Mahi river.)
Padra WSS: It includes designing, constructing, testing and commissioning of RCC clear water sump, RCC elevated service reservoir (ESR), rising main, providing supplying lowering, laying and jointing di/pvc/distribution pipeline and providing supplying and erecting pumping machineries, design and construction of pump room, road restoration, transformer, electrification work, water connection etc, including O&M for five years at Padra in Vadodara, Gujarat.
Dabhoi WSS: It includes designing, providing, lowering, laying, testing and comisioning of RCC ESR, RCC sump, rising main, pump house, distribution network, household connection, compound wall, repair work and pumping machinery with O&M for five years at Dabhoi in Vadodara, Gujarat.
Godhra WSS (SWAP-3): It includes working survey, soil investigation, designing, construction of sump and esr, providing, lowering, laying, testing and commissioning of rising main, distribution network, household connection, pump house, security cabin, compound wall, electromagnetic flow meters, and providing, supplying, installation and testing pumping machinery with O&M for five years at Godhra in Panchmahal, Gujarat.
Godhra UGD: It includes working survey, soil investigation, design, supply, construction, installation, testing and commissioning of lift pumping station and providing, supplying, lowering, laying and jointing di pipeline and RCC np-3 pipes, providing, supplying, erecting and testing of pumping machineries, supply of sewerage cleaning equipments etc. with five years O&M and three years defect liability period at Godhra in Panchmahal, Gujarat.
Godhra WSS (SWAP-2): It includes construction of water collecting chamber with pump house, providing, supplying, installation, testing and commissioning of vt pumping machinery at raw water sump at timba headwork, providing, lowering, laying, testing and commissioning of rising main, for Godhara town mainline water supply project from NMC to Bhamaiya headwork based on Narmada main canal at ch.134.02 km near timba with five years O&M and three years DLP at Godhra in Panchmahal, Gujarat.
Anand UGD: It includes designing, providing, lowering, laying, testing & commissioning of sewer rising main, sewage treatment plant, pure water sump, rectangular pump house, pumping machinery, pure water rising main, compound wall, railway crossing, highway crossing with O&M for five years.
Godhra (Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY)): It includes working survey, soil investigation, design, supply, construction, installation, testing and commissioning of lift pumping station and providing, supplying, lowering, laying and jointing di pipeline and RCC np-3/np-4 pipes, providing, supplying, erecting and testing of pumping machineries, supply of sewerage cleaning equipments and construction of house coection chambers etc. iincluding O&M for five years and three years DLP at Godhra in Panchmahal, Gujarat.
Publish Date: July 4, 2024
End Date: August 3, 2024*
Implementing Agency: Bhopal Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of various works for augmentation of water supply system including construction of an intake well raw water pump house installation of raw/clear water pumps, substation including 33KVH feeder, water treatment plant (WTP), providing, laying, jointing, testing and commissioning of raw/clear water pumping/feeder main and distribution network including excavation, refilling, road cutting /dismantling, restoration to its original condition, providing and fixing required valves (Sluice, Air, Scour, PRV etc.) specials, fittings, flow meters. Construction of valve chambers, thrust blocks and house service connections/ bulk connection and supervisory control and data acquisition (SCADA) automation.
Publish Date: July 3, 2024
End Date: July 25, 2024
Implementing Agency: Nagpur Metropolitan Region Development Authority (NMRDA)
Segment: Water Supply
Work: The scope of project includes construction of transmission mains, feeder main, elevated service reservoir, 74 km long distribution system, retrofitting of pumping machinery an/d water treatment plant (WTP), supervisory control and data acquisition (SCADA) automation and allied infrastructure with Operation and Maintenance (O&M) of 5 years.
Publish Date: July 2, 2024
End Date: July 31, 2024
Implementing Agency: Mukhed Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey, construction of intake well, inspection well. Connection pipe, jackwell with overhead pump house, approach road abd bridge, rawa water rising main, 5 million litres per day (mld) water treatment plant (WTP), pure water gravity main, 73.674 km long distribution system and other related works including trial run for 3 months.
Publish Date: June 26, 2024
End Date: July 11, 2024
Implementing Agency: Sukma Urban Local Body
Segment: Water Supply
Work: The scope of work includes survey, engineering, procurement and construction of intake well, pump house, raw water pumping main, water treatment plant (WTP) having capacity of 5 million litres per day (mld) and other allied infrastructure including 12 months defect liability period (DLP) and five years Operation and Maintenance (O&M).
Publish Date: June 28, 2024
End Date: August 1, 2024*
Implementing Agency: Public Work Department, Jammu and Kashmir
Segment: Water Supply
Work: The scope of work includes providing consultancy services for preparation of DPR including detailed estimation/BOQ structures design with all necessary working drawings (L-section, X-section) etc. for various WSS (fresh/ balance) at different locations falling under the jurisdiction of Public Health Engineering (PHE) Division Gurez.
Publish Date: June 28, 2024
End Date: July 8, 2024
Implementing Agency: Solapur Municipal Corporation
Segment: Wastewater
Work: SWD: The scope of work includes working surveys for whole work, establishing network of temporary benchmarks, preparing the L-sections and cross sections of nallas, preparing requisite Auto CAD drawings superimposing for checking alignment etc, construction of pipe culvert, walls, Reinstatement of approach road abutting to box drain/Culvert, Repair/ Construction of Collapsed walls/Improvement of minor/major nalla in the vicinity, Desilting of existing SWD/nalla throughout the contract period, Carry out Geo-technical survey/sub soil investigation/trial pits/GPR survey and other related works including defect liability period (DLP) of five years. The nallas to be improved/constructed include: Murarji Peth, Umanagari (from Sharadchandraji Prashala to Vasant Vihar to Old Puna Naka Nalla); MIDC Area, Vajreshwari Nagar Nalla D/S From Akkalkot Road to Soniya Nagar Nalla Junction. (Part – 2); Akkalkot Road to Pogool Vihir; Pogool Vihir to Hyderabad Road; Hyderabad Road to Aadarsh Nagar ; Aadarsh Nagar to Shelagi Nalla; Ring Road to Raghoji Transport to Shelagi Nalla (Part Work); MIDC Area, Vajreshwari Nagar to Akkalkot Road. (Part – 1); Aarati Nagar to Jamadar Wasti to Nakka Wasti Nalla; Prabhag No. 6 – Visaranti Chowk to Internal Ring Road To National Highway (via Rupabhavani); Sunil Nagar to Kamagar Vasahat to Kalavati Nagar to Asha nagar to Veetkar Factory to Kalappa Nagar to Navale Nagar to Netaji School in Prabhag No 20; Jai Bhavani School to Visaranti Chowk; Nilam Nagar to Shanti Nagar; Sumayya Nagar to Swagat Nagar to Desai Nagar. (Part – I); Sumayya Nagar to Swagat Nagar to Desai Nagar (Part – II); Vijay Nagar to Dixit Nagar to Shobha Nagar; Left side of Yugandhar Hospital at Hotagi Road; Hotgi Road Crossing near Mulatani Bakery to South Central Railway Culvert and back side of Valsankar Hospital to Ramwadi Area Nalla. The work is likely to be completed in 18 months at an estimated cost of Rs 834.85 million.
Underground Sewerage: The scope of work includes 207.59 km long sewerage network, sewerage rising main, three sewage pumping station, sewerage treatment plant (STP) having capacity of 49 million litres per day (mld), sewage pumping machinery, geo tagging for STP and other related works. The work will be completed in 24 months at an estimated cost of Rs 3,638.8 million under the Maharashtra Suvarna Jayanti Nagrotthan Maha- Abhiyan.
Publish Date: June 28, 2024
End Date: July 27, 2024
Implementing Agency: Angar Nagar Panchayat
Segment: Water Supply
Work: The scope of work includes construction of an intake well. Connecting pipe, inspection well, jack well pump house, approach bridge, raw water pumping machinery, raw water rising main jackwell to BPT, pure gravity main from BPT to water treatment plant (WTP), WTP having capacity of 2.75 million litres per day (mld), elevated service reservoir, 1345.55 km long distribution network and other related works.
Publish Date: June 28, 2024
End Date: July 18, 2024
Implementing Agency: Chakur Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey, approach channel , intake well (dia.= 3 m), inspection well (dia.= 2m), connecting pipe (length = 100.0 m of 600mm dia), jack well with overhead pump house (8.00 m dia. and ht – 16.59 m), approach bridge, retaining wall and meter room (120m), approach bund (length- 90m), coffer dam (l=900 mtr), approach road for jackwell (l-300 m), approach road for water treatment plant (WTP) (l-500mtr), raw water rising main, prop. conventional WTP of 7.5 million litres per day (mld), recirculation sump and pump house at WTP, pure water rising main, pure water gravity main, elevated service reservoirs (6 nos) and 1 MBR, dismantling of Nanded road elevated service reservoir (ESR) 2.00 ll and Sathe Nagar ESR 2.25 ll, repairs to existing ESRs 2 nos., distribution system, rising main for recirculation sump to aeration fountain, house service connection (5928 nos), road reinstatement 55 km, trial and run, raw water pumping machinery from jack well to WTP, pure water pumping machinery from WTP sump to esr-1, pure water pumping machinery from WTP sump to MBR, pure water pumping machinery from WTP sump to esr near MBR, pure water pumping machinery from WTP sump to Saranwadi ESR, recirculation well pumping machinery, supervisory control and data acquisition (SCADA) automation, solar power plant at WTP site.
Publish Date: June 24, 2024
End Date: July 9, 2024
Implementing Agency: Butibori Municipal Council
Segment: Water Supply
Work: The scope of work include construction of raw water rising main/gravity main pipelines, pure water rising mains/ gravity main pipelines, jackwell with overhead pump house, approach bridge, elevated service reservoir in eight zones, water treatment plant (WTP) having capacity of 15.5 million litres per day (mld), pumping machinery, distribution system including supervisory control and data acquisition (SCADA) automation.
Publish Date: June 25, 2024
End Date: August 1, 2024*
Implementing Agency: Karnataka Urban Water Supply And Drainage Board
Segment: Water Supply
Work: The scope of work includes study, survey, investigation, assessment, design and constrcution of head works including Intake well, connecting pipeline, inspection chambers, Jack well cum pump house, approach bridge etc, operation of water treatment plant (WTP), constructon of associated buildings/facilities, treated water storage tank and pumping station with pumping machinery at WTP premises, treated water pumping mains / feeder mains / bulk water transmission mains / bulk gravity mains from WTP existing or new overhead tank (OHT) of urban local bodies (ULBs) including the distribution network to all the households, construction of new OHTs to meet the storage requirement and distribution network, installation of bulk water meters OHT’s and household meters (HSC) at all the outlet points in the water supply system to measure the water supplied, installation of required appurtenances to supply and ensure the equitable water supply all outlets, electromechanical works as per required at all the location of pumping stations, all other works as detailed in this document and as per system design criteria including one year defect liability period and Operation and Maintenance (O&M) for five years.
Publish Date: June 19, 2024
End Date: July 5, 2024
Implementing Agency: Akluj Municipal Corporation
Segment: Water Supply
Work: The scope of work includes connecting main, construction of sump well, pump house, rising main, raw water pumping machinery, construction of raw water gravity main, reinforced cement concrete (RCC) balancing tank, water treatment plant (WTP) having capacity of 11 million litres per day (mld), supervisory control and data acquisition (SCADA) automation for 11 mld WTP and 8.2 mld WTP, pure water feeder main, elevated service reservoir (ESR) at Mahavir Path, solar power plant at 370 KWP and 48.96 km long distribution network.
Publish Date: June 18, 2024
End Date: July 31, 2024*
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: The scope of work includes development survey, design and construction of reinforced cement concrete (RCC) component, infiltration well, intake well cum jack well, approach bridge, water treatment plant (WTP) having capacity of 8 million litres per day (mld), raw water transmission line, distribution network of 30.93 km with supervisory control and data acquisition (SCADA) automation including Operation and Maintenance (O&M) of five years.
Publish Date: June 22, 2024
End Date: July 15, 2024
Implementing Agency: Omerga Municipal Council
Segment: Water Supply
Work: The scope of work includes laying of 17.53 km long rising main pipeline, 23.52 km long gravity main, highway crossing, jackwell, intake well, five elevated service reservoirs, 6 million litres per day (mld) water treatment plant (WTP), pumping machinery and substation and distribution system and other related works.
Publish Date: June 21, 2024
End Date: July 12, 2024
Implementing Agency: Karnataka Urban Infrastructure Development and Finance Corporation Limited (KUIDFC)
Segment: Wastewater
Work: The scope of work includes providing, laying and upgradation of sewer network in Mysuru city; conveying and treatment of sewage coming from various parts of Ainora, Madagalli and Belavadi under Hootagalli Municipal Council; upgradation to sequential batch reactor (SBR) type sewage treatment plant from waste stabilization pond (WSP) type and provisioning missing and outfall sewer lines for improvement of underground drainage (UGD) system in KR Nagar town, conveying and treatment of sewage coming from various parts of KHB Colony, Yalavara Hundi, Muddabeerana Hundi, Algodu And Thirumakudla under T Narasipura Municipal Council.
Publish Date: June 21, 2024
End Date: July 27, 2024
Implementing Agency: Karnataka Urban Infrastructure Development and Finance Corporation Limited (KUIDFC)
Segment: Wastewater
Work: The scope of work includes:
Hubballi: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer Pipeline for construction of main trunk line, reinforced cement concrete (RCC) for minimum length of 5.1 km, hydraulic tests, including restoration works in flexible and rigid pavements, providing, laying, jointing sewer line with dia varying from 250 mm to 1000 for sub trunk main works with RCC NP3, for a minimum length 2.50 km confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test, including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.5m, 1.8m and 2.4m dia cast-in situ/pre-cast with heavy-duty steel fiber reinforced concrete (SFRC) cover and frame, for varying depths (the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and stair case arrangement for the maintenance in screen chamber for the wet well of capacity 80 million litres per day (mld) at Gabbur Village, providing, laying, jointing, testing and commissioning of required diameter of DI K-9 class rising main from wet well to sewage pumping station (STP) minimum of Length: 1.1 km including necessary pipe ancillary works, including restoration works in flexible and rigid pavements, supply, erection, electrification, testing and commissioning of non-clog sewage pump sets of required capacity including panel bords etc along with all accessories at wet well including allied works such as DG room, Chain link fencing etc, providing 11 KV – 3 Phase power supply line from Sub-station to wet well from sub-station at Hubballi road with necessary transformers including approval, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, Construction of internal developments such as roads, street light etc.,
Dharwad: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer pipeline by using 250 mm to 500 mm dia RCC, NP3 class confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 6.35 km including restoration works in flexible and rigid pavements, providing, laying and jointing HDPE sewer pipeline by using 150 mm to 200 mm dia HDPE SN8 pipes IS:16098 and jointing of pipes, cutting of pipes etc along with hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 10 km including restoration works in flexible and rigid pavements, providing, laying and jointing PVC Sewer Pipeline by using 200 mm dia as per IS:16098 and jointing of pipes, cutting of pipes etc along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 3.7 km including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.2 and 1.5 dia cast-insitu/pre-cast with heavy-duty SFRC cover and frame, for varying depths ( the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, providing house service connections (HSC) :3641 Nos. (which shall be laid from inside the customer property to machine hole as per site condition) , construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and staircase arrangement for the maintenance in screen chamber for the wet well of capacity 12 mld and 12 mld viz Wet well -1 near Madihal STP, Wet well 2 near Agriculture Research Center), Construction of rising Main for wet well 1 from wet well -1 to STP and wet well 2 from Agriculture Research centre to proposed wet well -1 at Madihal, with DI K-9 pipe having diameters varies from 300 mm to 350 mm, minimum length of 2.85 km, supply, erection, electrification, testing and commissioning of required capacity of non-clog sewage pump sets along with all accessories at Wet well – 1 and Wet well -2 including allied works such as DG room, chain link fencing etc, providing 11 KV – 3 phase power supply Line from sub-station to wet well from nearest substation with necessary transformers for Wet well -1 and Wet well -2, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, construction of internal developments such as roads, street light etc
Publish Date: June 24, 2024
End Date: July 20, 2024
Implementing Agency: Vijayawada Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of intake well, 45 million litres per day (mld) water treatment plant (WTP), pipelines, pump sets, and elevated level storage reservoir (ELSR), ground level storage reservoir (GLSR) including Operation and Maintenance (O&M) for five years along with defect liability period of two years in circle-III area of Vijayawada.
Publish Date: June 24, 2024
End Date: July 8, 2024
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work includes de-silting the pipe to assess the damage of the pipe, making the sewage flow dead in the particular section of the pipeline for flow diversion where the de-silting is to be carried out including dewatering with required pumps, desilting of existing sewerage line, the lining of sewer line by glass-reinforced plastic (GRP) structural lining method, repairing of all machine holes, commissioning of pipelines, arrangements of by-passes/detours, service roads and other related works.
Publish Date: June 14, 2024
End Date: July 3, 2024
Implementing Agency: Madurai City Municipal Corporation
Segment: Wastewater
Work: North Vaigai (Package I): The scope of work includes development of 215 km long sewerage network and 7305 manholes and related infrastructure along with Operation and Maintenance (O&M) for five years at an estimated cost of Rs 1,637.6 million.
South Vaigai (Package II): The scope of work includes development of 285 km long sewerage network and 9795 manholes and related infrastructure along with Operation and Maintenance (O&M) for five years at an estimated cost of Rs 2,694.6 million.
Publish Date: June 14, 2024
End Date: July 31, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes Construction of six over head tanks (OHTs) of 1600KL/24m staging, 1700KL/20 m staging, 2600KL/22m staging, 2300KL/20m staging, 2400KL/22m staging and 2100KL /22m staging, construction of clear water rising main (CWR) cum pump house of 600 KL and 500 KL, supply laying and jointing of 175.96 km distribution system and rising main including supply of pipes and cost of all required specials & fittings etc. along with carting of pipes from store to site of work, excavation, refilling, watering, ramming, disposal of surplus earth, dismantling and permanent reinstatement of roads, 25543 house connections and construction of boundary wall, staff quarter and approach road including three months trial run , 12 months defect liability period and 24 months evaluation and management (E&M) period.
Publish Date: June 17, 2024
End Date: July 26, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes Construction of six over head tanks (OHTs) of 1600KL/24m staging, 1700KL/20 m staging, 2600KL/22m staging, 2300KL/20m staging, 2400KL/22m staging and 2100KL /22m staging, construction of clear water rising main (CWR) cum pump house of 600 KL and 500 KL, supply laying and jointing of 175.96 km distribution system and rising main including supply of pipes and cost of all required specials & fittings etc. along with carting of pipes from store to site of work, excavation, refilling, watering, ramming, disposal of surplus earth, dismantling and permanent reinstatement of roads, 25543 house connections and construction of boundary wall, staff quarter and approach road including three months trial run , 12 months defect liability period and 24 months evaluation and management (E&M) period.
Publish Date: June 17, 2024
End Date: July 16, 2024
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Wastewater
Work: The scope of work includes development of SWD system at an estimated cost of Rs 773.39 million. The work is likely to be completed in 24 months.
Publish Date: June 12, 2024
End Date: July 8, 2024
Implementing Agency: Karnataka Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes preparation of detailed project report (DPR), detailed scheme report, drawings, cost of production of set of documents, total station survey, soil investigation, including trial pits on design, build, operate and transfer (DBOT) basis including one year of defect liability period (DLP) and five years of Operation and Maintenance (O&M). It includes:
Kamalapur: It includes construction of 4 million litres per day (mld) water treatment plant (WTP), 3240 house connections at Rs 390.1 million construction cost and Rs 33.1 million O&M cost.
Chincholi: It includes construction of 4.25 mld WTP, 3.1 km feeder line, 5424 house connections and other related works at Rs 406.3 million construction cost and Rs 57 million O&M cost.
Wadi town: It includes construction of 6 mld WTP, other related works at Rs 285.2 million construction cost and Rs 14.6 million O&M cost.
Chittapur: It includes construction of 1.98 and 2.38 mld WTPs, other related works at Rs 377.4 million construction cost and Rs 29.8 million O&M cost.
Seam: It includes laying of 47.33 km long distribution network and other related works at Rs 388.5 million construction cost and Rs 39.7 million O&M cost.
Kalagi: It includes laying of 21.349 km long distribution network and other related works at Rs 255.6 million construction cost and Rs 17.6 million O&M cost.
Publish Date: June 12, 2024
End Date: June 27, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of materials for construction, erection, completion, testing and commissioning of reinforced cement concrete (RCC), overhead tanks (OHTs), rising main, distribution system, tubewell, PLC supervisory control and data acquisition (SCADA) automation including three months defect liability period (DLP) and trial and run of three months.
Publish Date: June 12, 2024
End Date: June 27, 2024
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply; Wastewater
Work: The scope of work includes laying of water supply and sewerage network with construction and demolition of road for laying network.
Publish Date: June 14, 2024
End Date: July 9, 2024
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply; Wastewater
Work: The scope of work includes:
-Valsad WSS 1: It includes a working survey, soil investigation, design and construction, testing and
commissioning of reinforced cement concrete (RCC) underground sump, elevated service reservoir (ESR), pump room, providing, supplying, lowering, laying and jointing DI pipeline for rising main and gravity main, providing, supplying, erecting and testing of pumping machineries, electrification work, dismantling existing ESR, road restoration etc. with Operation & Maintenance (O&M) for five years three years defect liability period (DLP).
-Vapi WSS: It includes working survey, soil investigation, design and construction, testing and commissioning of RCC intake structure with approach bridge, conventional water treatment plant (WTP), RCC sump, ESR, providing, supplying, lowering, laying and jointing DI pipeline for rising main, providing, supplying, erecting and testing of pumping machinery, pumping stations, panel room, RCC road, staff quarter cum security room, compound wall, electrification work etc. with O&M for five years including three years DLP.
-Vapi UGD: It includes working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing and commissioning of RCC NP3 pipes for sewer collecting system – gravity mains and di pipes for rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machinery at zone level, construction of inspection chambers etc. with O&M for five years including three years DLP.
-Pardi WSS: It includes working survey, soil investigation, design and construction, testing and commissioning of RCC intake structure with approach bridge, RCC sump, providing, supplying, lowering, laying and jointing di/pvc pipeline, providing, supplying, erecting and testing of pumping machinery, pump room, panel room, RCC road, staff quarter cum security room, compound wall, electrification work with O&M for five years including three years DLP.
-Valsad WSS 2: It includes working survey, soil investigation, design and construction of intake structure with approach bridge, construction of bank protection work at dam, RCC clear water sump, providing, supplying, lowering, laying and jointing di pipeline for raw & clear water rising main, providing, supplying, erecting and testing of pumping machinery,electrical room at intake structure, demolition of existing RCC structure, RCC road, staff quarter cum security room, compound wall, railway crossing & electrification work etc with O&M for five years including three years DLP.
-Valsad UGD: It includes working survey, soil investigation, design of UGD work including providing, supplying, lowering laying, jointing, testing and commissioning of RCC NP3 pipes for sewer collecting system – gravity mains and di pipes for rising main pipeline, construction of sewage pumping station (SPS), supplying of sewer cleaning equipment, supplying, erecting, testing and commissioning of pumping machinery at zone level, construction of inspection chambers, RCC road, compound wall, electrification work etc. with O&M for five years including three years DLP.
Publish Date: June 13, 2024
End Date: June 27, 2024
Implementing Agency: Surat Municipal Corporation
Segment: Wastewater
Work: The scope of work includes modification and upgradation work of an existing 100 mld STP at Bamroli with additional chemical treatment and 0.5 MW Bio-gas based power generation plant with programmable logic controller (PLC) supervisory control and data acquisition (SCADA) including Operation and Maintenance (O&M) of these along with a 152 mld sewage pumping station (SPS) and 115 mld STP.
Publish Date: June 8, 2024
End Date: July 26, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes a detailed survey of the existing water supply, formulation of zones and district metered areas (DMAs). Construction of tube well including supervisory control and data acquisition (SCADA) automation, installation of flow meters, laying or replacements of 142 km of distribution network, replacement of feeder mains and rising main and other related infrastructure.
Publish Date: June 7, 2024
End Date: June 26, 2024
Implementing Agency: Municipal Engineering Directorate, West Bengal (West Circle)
Segment: Water Supply
Work: The scope of work includes sinking of river bank/bed tube wells with electro-mechanical works, supplying and laying of DIK9 rising main, construction of over head reservoirs (OHRs) with geotechnical investigation and design of substructure, construction of clear water reservoir (CWR) with geotechnical investigation, design, electro-mechanical works, supplying and laying of distribution pipelines (DI-K7 and HDPE) with temporary road restoration, jack pushing works for NH/Rail crossing, pipe carrying bridges, pump houses, sub-station building, staff quarter and all other allied works complete in all respect, commissioning, trial run and Operation and Maintenance (O&M) for five years.
Publish Date: June 10, 2024
End Date: July 5, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work includes construction of a 430.56 km long sewerage network and six pumping stations having capacities of 8.22, 6.39, 9.90, 18.20, 19.12 and 8.73 million litres per day (mld), 5.7 km long rising main including 12 months trial and run.
Publish Date: June 12, 2024
End Date: June 24, 2024
Implementing Agency: Municipal Engineering Directorate, West Bengal
Segment: Water Supply
Work: The scope of work includes
-surveying, geo-technical investigation, planning, designing ,construction supply and erection of reinforced cement concrete (RCC), raw water intake structure (fixed type), having the capacity of intake raw water 47.5 mld(ultimate year) ,(1050 kl/hr. pumping time 20 hrs. (2w+1s) containing intake structure with raw water pump house and with 3.00 m width RCC walkway with suitable pile foundation with tolerance of 25 per cent over loading ,construction of jetty at keshpal in river Kangsabati near Kharagpur municipal town with bank protection and other allied works, including all civil, electrical and mechanical works for proper completion of work to draw the requisite water.
-Construction of 40.0 mld capacity WTP (approx. 630 m3/hr .three working + two standby) (21 hours operation) with tolerance of 25 per cent over loading and with necessary civil, electrical (according to i/e rules), construction of inlet well, parshall flume, flash mixer, chemical house, clariflocculators (2 nos for capacity above 15 mld), rapid gravity filters with under drainage system, connecting pipes and channels, clear water reservoir, back-wash water tank, sludge sump-cumpump house, sludge lagoon ,sub-station building (min250 sqm )and clear water pump house (min 250 sqm ) along with land filling, boundary wall, internal road , surface drain, retaining wall and administrative building (for accommodating office, laboratory, supervisory control and data acquisition (SCADA) room, conference room etc., staff quarter, guard room and chemical store room and all other allied works along with 1250 kva substation (civil and electromechanical work and others, if any)(intake power demand will be catered from wtp sub station).
-Laying of clear water rising main (di- k9) of different diameter from wtp to ohr’s location total length 23.26 km and 0.5 km (k9-750mm dia.)raw water rising main from intake to wtp with all other associated works including earth work in excavation in trenches, shoring (if necessary) of adequate width having minimum depth to keep the top surface of pipe 1.10m below of the existing ground level in any kind of soil mixed with boulder, metal crust, concrete pavement, any road subgrade and its flank etc., dewatering the trenches, preparing the bottom surface of the trenches for continuous bedding including sand filling (if necessary) or over ground installation to cross ditches etc. supported with RCC pillars, steel pipe carrying bridge as and when necessary and fitting, fixing, jointing (all types of joints) valves, specials etc. as per requirement, in position, cutting, chamfering of pipes as required, constructing sluice valve chambers including supply and fitting in position sluice valve of different dia. with chamber and supply and fitting in position d.i. specials as per requirement, filling of the trenches with excavated materials, consolidating the same in layers, temporary road restoration but excluding permanent road restoration (bituminous and concrete road restoration) , guarding trenches with temporary bamboo railing for safety where necessary, emergency horizontal auger boring (for roads other than NH and SH), removing the surplus materials from site including all labour charges, tools and plants, hydraulic pressure testing, cleaning and disinfection of pipes etc. complete in all respect as per is 12288-1987 (latest edition) within kharagpur municipality including three months trial and run and five years Operation and Maintenance (O&M).
Publish Date: June 7, 2024
End Date: July 30, 2024*
Implementing Agency: Kerala Institute of Local Administration (KILA)
Segment: Wastewater
Work: The scope of work includes providing consultancy services for Light Detection and Ranging (LiDAR) survey, flood modelling and drainage management plan at Pathanamthitta, Adoor, Harippad, Mavelikkara towns in Kerala
Publish Date: June 7, 2024
End Date: July 4, 2024
Implementing Agency: Municipal Engineering Directorate, West Bengal
Segment: Water Supply
Work: The scope of work includes augmentation and repairing of all the civil and electro-mechanical works with renovation work of alam house, annex building , chlorine house , filter house , alam house no-2 , 2 nosclariflocculator including all electromechanical accessories , high lift room , boundary wall , repair security room and shade of sludge pond , raw water pump house , sub-station building , boundary wall and concrete road , control room etc. under 14 million gallons per day (mgd) water treatment plant (WTP), construction of overhead reservoir (900 cum) staging height 20 m under 15 mgd WTP, renovation of clear water pumping station and substation at Piyala boosting station , renovation of clear water pumping station and substation at Angadpur WTP , renovation of raw water pumping station and substation at Angadpur WTP with all others allied works including Operation and Maintenance (O&M) for five years within Durgapur Municipal Corporation.
Publish Date: June 7, 2024
End Date: July 2, 2024
Implementing Agency: Shahjahanpur Cantonment Board
Segment: Wastewater
Work: The scope of work includes preliminary survey, design, preparation of detailed project report (DPR) and tender document, project management/supervision for the project. The scope of project includes laying of sewerage network, construction of sewage pumping station and sewage treatment plant (STP) in Shahjahanpur Cantt.
Publish Date: June 6, 2024
End Date: July 4, 2024
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply
Work: The scope of work involves design, build and oper ation (DBO) of a 424 mld STP, terminal sewage pump station and allied infrastructure with Operation and Maintenance (O&M) for 10 years at purana under the Ahmedabad City Resilience Project.
Publish Date: March 7, 2024
End Date: June 21, 2024
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes detailed project report (DPR) preparation, detailed scheme report, drawings: cost of production of a set of documents and drawings, total station survey, soil investigations and all civil works including one year of defect liability period (DLP) and five years Operation and Maintenance (O&M) on design, build, operation and transfer (DBOT) mode.
The project involves laying of 86.01 km long distribution network and related works at Rs 252.5 million capex cost and Rs 16 million O&M cost in Hosdurga; construction of a water treatment plant (WTP) and 63.56 km long distribution network at Rs 178.7 million capex cost and Rs 11 million O&M cost in Holalkere and laying of 33.42 km long distribution network and related works at Rs 137.4 million capex cost and Rs 10.6 million O&M cost in Jagaluru.
Publish Date: June 7, 2024
End Date: June 24, 2024
Implementing Agency: Rail India Technical and Economic Service (RITES) Limited
Segment: Water Supply
Work: The scope of work includes providing consultancy services for preparation of preliminary design, drawings, structural design and drawings for conduits, tunnelling, micro-tunnelling, and elevated structures, and tender documents for the project.
Publish Date: June 10, 2024
End Date: June 24, 2024
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Water Supply
Work: The scope of work includes construction of a retention tank, 60 million liters per day (mld) water treatment plant (WTP), clear water tank, pump chamber, pumping machinery, rising main from raw water pumping station to proposed water work at village Barodi for Jind city and all other related works.
Publish Date: June 6, 2024
End Date: June 21, 2024
Implementing Agency: Panchkula Metropolitan Development Authority
Segment: Wastewater
Work: The scope of work includes conducting topographical survey with total stations in 12 merged villages, preparation of detailed project report (DPR), bid document for laying of sewerage network and construction of sewage treatment plant (STP) in the merged villages in Panchkula Municipal Corporation under the Atal Mission for Rejuvenation and Urban Transformation 2.0 (AMRUT 2.0)
Publish Date: June 7, 2024
End Date: June 17, 2024
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Water Supply
Work: The scope of work includes construction of boosting stations, pump chambers, laying of various sizes clear water rising main from proposed water works Barodi to proposed boosting stations, distribution system for Jind city and all other works related works.
Publish Date: June 5, 2024
End Date: June 20, 2024
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes detailed project report (DPR) preparation, detailed scheme report, drawings: cost of production of a set of documents and drawings, total station survey, soil investigations and all civil works including one year of defect liability period (DLP) and five years Operation and Maintenance (O&M) on design, build, operation and transfer (DBOT) mode.
Package 1: Jigani: It includes laying of 47.96 km long distribution network and related work at capex cost of Rs 323.4 million and O&M cost of Rs 10.5 million; Anekal: It includes laying of 69.09 km long distribution network and related work at Rs 445.9 million capex cost and Rs 20.3 million O&M cost; Doddaballapura: It includes laying of about 1 km distribution, household connection and other related work at capex cost of Rs 96.2 million and O&M cost of Rs 7 million; Hoskote: It includes laying of about 10 km distribution network at capital expenditure (capex) cost of Rs 129.6 million and Rs 5.3 million. The work is likely to be completed in 18 months. (Rs 1,038.4 million)
Package 2: Magadi: It includes rejuvenation of 4.54 million litres per day (mld) water treatment plants (WTP), laying of about 9 km long distribution network and related works at capex cost of Rs 113.1 million and O&M cost of Rs 6.1 million; CHANNAPATNA: It includes laying of 61.63 km long distribution network and related works at capex cost of Rs 352.8 million and Rs 20.6 million O&M cost; Kanakapura: It includes laying of 173.5 km long distribution network and related works at capex cost of Rs 989 million and Rs 32 million O&M cost; Harohalli: It includes laying of 57.35 km long distribution network and related work for Rs 293.8 million capex cost and Rs Rs 9.8 million O&M cost. The work is likely to be completed in 24 months. (Rs 1,817.4 million)
Publish Date: May 30, 2024
End Date: June 26, 2024*
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes detailed project report (DPR) preparation, detailed scheme report, drawings: cost of production of a set of documents and drawings, total station survey, soil investigations and all civil works including one year of defect liability period (DLP) and five years Operation and Maintenance (O&M) on design, build, operation and transfer (DBOT) mode.
Chikkaballapur, Chintamani, Gowribidanur and 8 enroute Villages, Bagepalli and Gudibande: Chikaballapur: It includes laying of 39.52 km long distribution line. 14.85 million litres per day (mld) water treatment plant (WTP) and other related works at capital expenditure (Capex) cost of Rs 162.6 million and Operation and Maintenance (O&M) of Rs 60 million); Chintamani City: It includes renovation of STP to increase the capacity from 1.5 mld to 3 mld and related work at Capex cost of Rs 124.8 million and Rs 130 million O&M; Gowribidanbur City: It includes construction of a 20 mld WTP, 21.41 km of distribution network and related infrastructure at Rs 557.5 million capex cost and Rs 28.6 million O&M cost; Bagepalli: It includes renovation of existing 3 mld STP and distribution network of 11.79 km at Rs 119.8 million and Rs 9 million O&M cost; Gudibande: It includes renovation of exiting STP from 1.63 mld to 3 mld at Rs 145.6 million capex cost and Rs 11.7 million O&M cost. The work is likely to be completed in 24 months. (Rs 1,179.7 million)
Hosanagara, Thirthahalli, Shikaripura, Kargal, Hollehonnuru & Anavatti: Hosanagara: It includes laying of 11.3 km distribution network at capex cost of Rs 61.6 million and Rs 4.8 million O&M cost; Thirthahalli: it includes rehabilitation of 4.54 mild WTP at estimated capex cost of Rs 24.9 million and Rs 0.8 million )&M cost; Shikaripura: It includes upgradation of 3.63 mld and 3.8 mld STP at capex cost of Rs 84.8 million and Rs 4 million O&M cost; Kargal: It includes laying of 3.73 km long distribution network at capex cost of Rs 24.7 million and Rs2.4 million; Hollenhunuru: It includes construction of a 5 mld WTP and distribution network of 89.04 km at capex cost of Rs 339.8 million and Rs 12.5 million O&M cost; Anavatti: It includes laying of distribution network in Zone- 1,2, 3 and 4 at capex cost of Rs 382.2 million and Rs 17 million O&M cost. The work is likely to be completed in 24 months. (Rs 959.5 million).
Publish Date: May 22, 2024
End Date: June 26, 2024*
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work includes working survey, soil investigation, design and construction of intake structure with approach bridge on Mahi River, designing constructing and commissioning of conventional water treatment plant (WTP), clear water sump, providing, supplying, lowering, laying and jointing distribution pipeline for raw and clear water rising main, providing, pumping machinery, design and construction of pump room, road restoration, house connection etc, including operation and maintenance (O&M) for five years based on surface water from Mahi river.
Publish Date: May 15, 2024
End Date: June 21, 2024*
Implementing Agency: Andaman Public Works Department
Segment: Water Supply
Work: The scope of work includes conducting environmental Impact Assessment (EIA) study and obtaining forest clearance for the Katla Nallah water supply scheme (WSS) at Kadamtala in Andaman and Nicobar Islands
Publish Date: May 7, 2024
End Date: June 10, 2024
Implementing Agency: Uttarakhand Peyjal Nigam
Segment: Water Supply
Work: The scope of work includes survey, design and construction of works consisting of intake well, supplying, carting, laying and jointing of rising mains, raw water gravity mains, feeder mains, supply mains, distribution mains and raw water sump cum sedimentation tanks, water treatment plants (WTPs) having capacities of 26 million litres per day (mld) at Sheeshmahal upper and 12.5 mld at Sheeshmahal lower, clear water reservoirs, sump-cum pump houses, overhead tanks, pump houses, pumping plants, automation works, water works office building, demolition of existing structures and all other appurtenant works including civil and electro-mechanical works including supply of all materials, labour etc. required for proper completion of work of source and treatment augmentation works of Haldwani – Kathgodam WSS.
Publish Date: April 20, 2024
End Date: June 18, 2024*
Implementing Agency: Jaipur Development Authority
Segment: Wastewater
Work: The scope of work includes construction of a 30 million litres per day (mld) STP based on sequential batch reactor (SBR) technology.
Publish Date: March 28, 2024
End Date: June 18, 2024*
Implementing Agency: Ujjain Municipal Corporation
Segment: Wastewater
Work: The scope of work includes survey, soil investigation, design, laying of sewerage pipelines, construction of manholes, sewer appurtenances, providing house sewer chambers, house sewer connections, sewerage pumping station, pumping main, supervisory control and data acquisition (SCADA) automation and other related infrastructure including Operation and Maintenance (O&M) of 10 years.
Publish Date: March 16, 2024
End Date: July 16, 2024*
Implementing Agency: Bareilly Development Authority
Segment: Wastewater
Work: The scope of project includes engineering, procurement, construction and commissioning (EPC) of 12.5 million litres per day (mld) STP based on sequential batch reactor (SBR) technology with supervisory control and data acquisition (SCADA) automation.
Publish Date: March 15, 2024
End Date: June 10, 2024*
Implementing Agency: Pune Municipal Corporation (PMC)
Segment: Wastewater
Work: The scope of work includes embankment works, gabion works, flooring, RCC works, excavation/dredging from river, disposal of all rubbish/ wastage of dredging from river/ drain, excavation works, earth works, making of earthen bunds of required size by available excavated earth/ silt from river, Carrying of detailed topographic survey, exploration works, etc.
End Date: June 15, 2024
Implementing Agency: Chhatrapati Sambhajinagar Municipal Corporation
Segment: Wastewater
Work: The scope of work includes designing, providing, lowering, laying and of commissioning of sewage collection system, providing house service connection (HSC), construction of two sewage treatment plants (STPs) having capacities of 2.5 million litres per day (mld) and 0.5 mld at Himayatbagh and Harshul Lake respectively, sewage pumping station, sewerage pumping main and other related work.
End Date: July 16, 2024*
Implementing Agency: Ujjain Municipal Corporation
Segment: Wastewater
Work: The scope of work includes survey, soil investigation, design, laying of sewerage pipelines, construction of manholes, sewer appurtenances, providing house sewer chambers, house sewer connections, sewerage pumping station, pumping main, sewage treatment plant (STP) having capacity of 8 million litres per day (mld) near the existing STP at Saurasa, supervisory control and data acquisition (SCADA) automation and other related infrastructure including Operation and Maintenance (O&M) of 10 years.
End Date: June 19, 2024*
Implementing Agency: Chhatrapati Sambhajinagar Municipal Corporation
Segment: Wastewater
Work: The scope of work includes designing, providing, lowering, laying and of commissioning of sewage collection system, providing house service connection, construction of two sewage treatment plants (STPs) having capacities of 3 million litres per day (mld) and 1 mld at Naregaon and Chikalthana market respectively, sewage pumping station, sewerage pumping main and other related work.
End Date: July 16, 2024*
Implementing Agency: Tamil Nadu Water Supply and Drainage Board (TWAD)
Segment: Wastewater
Work: The scope of work includes design, build, operate and commissioning of 12.51 million litres per day (mld) sewage treatment plant (STP) at Santhapuram and 20.13 mld capacity STP at Ramanaikken with sequential batch reactor (SBR) technology, trial run of six months and Operation and Maintenance (O&M) for 10 years.
End Date: July 10, 2024*
Implementing Agency: City and Industrial Development Corporation of Maharashtra Limited
Segment: Wastewater
Work: The work will be carried out under two phases:
Phase 1: Construction of a 50 million litres per day (mld) Kalamboli sewage treatment plant (STP), refurbishment with additional works, 20 mld tertiary treatment plant, 20 mld tertiary treated sewage pumping station with rising main and elevated service reservoir,
Construction of 70 mld Kharghar STP refurbishment with additional works and 20 mld secondary sewage pumping station with rising main.
Phase 2: Construction of 20 mld secondary sewage pumping station, 20 mld tertiary treatment plant and 20 mld tertiary treated sewage pumping station and 10 Years of Operation and Maintenance (O&M).
End Date: June 18, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes construction of intake well , pump house, raw water rising main, water treatment plant (WTP) having capacity of 55 million litres per day (mld), distribution network, pumping station, supervisory control and data acquisition (SCADA) automation and related infrastructure with trial run of three months with defect liability period (DLP) of 12 months on turn-key basis and Operation and Maintenance (O&M).
Publish Date: April 4, 2024
End Date: June 18, 2024*
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes construction of 200 mld MPS, 100 mld STP, internal ans external hydrant system, related piping with all accessories, all types of valves, hose reel, hose pipes, fire hose cabinets and all other related works including one year defect liability period (DLP) and 10 years Operation and Maintenance (O&M).
Publish Date: February 15, 2024
End Date: August 1, 2024*
Implementing Agency: Vijayawada Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of intake well, pipe lines, pump sets, elevated service reservoirs (ESRs), frond service reservoirs (GSRs) in circle-I area of Vijaywada.
Publish Date: June 24, 2024
End Date: July 8, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour, t&p etc. required for construction, erection, completion, testing & commissioning of water supply works such as reinforced cement concrete (RCC), over head tanks (OHTs), pumping station, rising main, feeder main, distribution system, supervisory control and data acquisition (SCADA) room, chlorination room, meter room, panel room, staff quarter, boundary wall & site development works etc. and other appurtenant works including three months trial run and two years Operation and Maintenance (O&M).
Publish Date: June 21, 2024
End Date: July 3, 2024
Implementing Agency: Akluj Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of 130 km long sewer network, sewage pumping station, receiving chamber/ screen chamber, pumping machinery, rising main, 4.5 million litres per day (mld) sewage treatment plant (STP), treated water sump and other related infrastructure.
Publish Date: June 25, 2024
End Date: July 18, 2024
Implementing Agency: Tirora Municipal Council
Segment: Wastewater
Work: The scope of work includes working survey, construction of a 67.3 km long collection system, sewage pumping station, rising main, 4710 house service connections and other related infrastructure.
Publish Date: June 25, 2024
End Date: July 10, 2024
Implementing Agency: Karnataka Urband Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of work includes construction of headworks including intake well, connection pipeline, inspection chambers , jack well cum pump house, approach bridge, water treatment plant (WTP), treated water storage tank, treated water pumping main, over head tanks (OHTs), gravity main from WTP to OHTs and all other related works including Operation and Maintenance (O&M) for five years.
Publish Date: June 19, 2024
End Date: July 5, 2024
Implementing Agency: Gujarat Urban Company Limited
Segment: Water Supply
Work: The scope of work includes:
Chhaya: It includes working survey, soil investigation, design and construction of reinforced cement concrete (RCC) clear water sump, elevated service reservoir (ESR), providing, supplying, lowering, laying and jointing pipeline for raw and clear water rising main, gravity main distribution network, providing, supplying, erecting and testing of pumping machinery, pumping stations pump house cum panel room, road restoration, compound wall, house connection, electrification work etc. including Operation and Maintenance (O&M) for five years.
Ranavav: It includes working survey, soil investigation, design and construction, testing and commissioning of RCC ESR, providing, supplying, lowering, laying and jointing pipeline network, repairing of existing pipeline, providing house connection work etc. with O&M for five years including three years defect liability period (DLP).
Dhoraji: It includes construction of rising main, inlet storage sump connected to Dhoraji canal with gravity main pipeline, panel room, compound wall, coffer dam, machinery and electrification work with O&M for five years.
Publish Date: June 24, 2024
End Date: July 8, 2024
Implementing Agency: Greater Hyderabad Municipal Corporation (GHMC)
Segment: Wastewater
Work: The scope of work includes survey, investigation and preparation of detailed plan, cost estimates, and bid documents.
Publish Date: May 23, 2024
End Date: May 30, 2024
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work includes construction of a 7.15 km long water conveyance tunnel from Kasheli in Bhiwandi to Octroi Naka in Mulund having 4.5 m diameter using tunnel boring machine (TBM).
Publish Date: May 21, 2024
End Date: May 30, 2024
Implementing Agency: Gujarat Urban Company Limited
Segment: Water Supply
Work: The scope of work includes:
Chhaya: It includes working survey, soil investigation, design and construction of reinforced cement concrete (RCC) clear water sump, elevated service reservoir (ESR), providing, supplying, lowering, laying and jointing pipeline for raw and clear water rising main, gravity main distribution network, providing, supplying, erecting and testing of pumping machinery, pumping stations pump house cum panel room, road restoration, compound wall, house connection, electrification work etc. including Operation and Maintenance (O&M) for five years.
Ranavav: It includes working survey, soil investigation, design and construction, testing and commissioning of RCC ESR, providing, supplying, lowering, laying and jointing pipeline network, repairing of existing pipeline, providing house connection work etc. with O&M for five years including three years defect liability period (DLP).
Dhoraji: It includes construction of rising main, inlet storage sump connected to Dhoraji canal with gravity main pipeline, panel room, compound wall, coffer dam, machinery and electrification work with O&M for five years.
Publish Date: May 15, 2024
End Date: June 6, 2024
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work includes designing, constructing, testing and commissioning of rising main, gravity main, underground clear water sumps (CWS) and pump house including pumping machinery with electro-mechanical works at various locations with Operation and Maintenance (O&M) for five years at Deesa in Banaskantha, Gujarat.
Publish Date: May 8, 2024
End Date: May 29, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, capital works and Operation and Maintenance (O&M) works, rehabilitation of existing infrastructures, construction of tube wells, laying of new rising main, pump house, supervisory control and data acquisition (SCADA) automation and related infrastructure with trial run of three months with defect liability period (DLP) of 12 months.
Publish Date: April 1, 2024
End Date: May 27, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, capital works and Operation and Maintenance (O&M) works, rehabilitation of existing infrastructures, construction of tube wells, laying of new rising main, pump house, supervisory control and data acquisition (SCADA) automation and related infrastructure with trial run of three months with defect liability period (DLP) of 12 months.
The project will cover ward 39 Mohabbatganj, Prayagraj; Civil Lines ward, Fatehpur; ward No -10 Ambedkar Nagar, Ghazipur; Chandrabhanpur ward, Maunath Bhanjan; Harbanshpur ward, Azamgarh; Bichadi ward and Alinagar ward (Partial), Chandauli; Indra Nagar Colony Ward, Varanasi; Pakka Pokhra ward,Mirzapur; ward no- 20 Acharya Ramchandra Shukla Nagar ward, Deoria; Ward no -23 Awas Vikas Parishad, Basti; Shehzadpur Ward, Ambedkar Nagar and ward no 57 Mohammadipur and Ward no 15 Gowalpur (Partial), Gorakhpur.
Publish Date: April 1, 2024
End Date: May 27, 2024
Implementing Agency: Theni-Allinagaram Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing PMC services for supervision and monitoring the project implementation.
The project includes laying of 53.67 km long sewerage network, 1904 maintenance holes and other related infrastructure.
End Date: May 24, 2024*
Implementing Agency: Gujarat State Electricity Corporation Limited
Segment: Water Supply
Work: The scope of work includes construction of 1 million litres per day (mld) desalination plant including raw water tube well, raw water transmission main, clear water reservoir, pumping and transmission main and reject water disposal system including Operation and Maintenance (O&M) for five years.
End Date: May 20, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work includes construction of 430.56 km long sewerage network and six pumping stations having capacities of 8.22, 6.39, 9.90, 18.20, 19.12 and 8.73 million litres per day (mld), 5.7 km long rising main including 12 months trial and run.
End Date: May 30, 2024*
Implementing Agency: Nanded Waghala City Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey, construction of intake well, connecting main, inspection well, jack well, pump house, reinforced cement concrete (RCC), water treatment plant (WTP) having capacity of 35 million litres per day (mld) and other related infrastructure.
End Date: May 29, 2024
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of 2 reinforced cement concrete (RCC) intake wells of 15 diameter with approach bridge on either bank or river, a 249 km long transmission main network, water treatment plant (WTP) having capacity of 38 million litres per day (mld), supervisory control and data acquisition (SCADA), road crossings, forest clearance, land acquisitions, Intake pumping machinery, WTP pump house and related infrastructures including Operation and Maintenance (O&M) of 10 years in Jhalawar and Kota.
Publish Date: March 7, 2024
End Date: June 5, 2024*
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Wastewater
Work: The scope of work includes construction of tidal dry weather flow interception facilities (DWFIF), transfer sewer networks along with one associated sewage pumping station, training of river (retaining wall and service road), beautification including promenades and allied civil works from CST Bridge Kurla to Mahim Causeway including Vakola River including Operation and Maintenance (O &M) for ten years on design, build and operate (DBO) basis.
Publish Date: February 6, 2024
End Date: May 24, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes construction of intake well , pump house, raw water rising main, water treatment plant (WTP) having capacity of 55 million litres per day (mld), distribution network, pumping station, supervisory control and data acquisition (SCADA) automation and related infrastructure with trial run of three months with defect liability period (DLP) of 12 months on turn-key basis and Operation and Maintenance (O&M).
Publish Date: April 4, 2024
End Date: April 29, 2024
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Wastewater
Work: The scope of work includes providing, supplying, lowering, laying, jointing reinforced cement concrete (RCC) Pipe for sewer collecting system, house connection chamber, pipe for rising main, pumping stations, pumping machinery, reinstatement of roads and related infrastructure including Operation and Maintenance (O & M) for two years.
Publish Date: April 3, 2024
End Date: April 24, 2024
Implementing Agency: GAIL (India) Limited
Segment: Wastewater
Work: The scope of work includes land development, topographical and contour survey works for proposed WWTP AND ZLD Plant at GAIL, Pata.
Publish Date: April 2, 2024
End Date: April 23, 2024
Implementing Agency: Navi Mumbai Municipal Corporation
Segment: Water Supply
Work: The scope of work includes includes design, providing, installing and commissioning of automation system as directed by Engineer incharge, which includes valves, construction of valve chambers, actuator, contol and signal cables, power cables, softwares, vidio wall, ciomputers, PLC, monitoring center at various ward levels and central monitoring centre.
Publish Date: March 15, 2024
End Date: April 30, 2024
Implementing Agency: Jharkhand Urban Infrastructure Development Corporation Limited (JUIDCO)
Segment: Water Supply
Work: The scope of work involves survey, geographic information system (GIS) based consumer mapping, design, supply and construction of intake well, pump house, infiltration pipe gallery, vertical turbine pumps, centrifugal pump, RCC approach bridge/gangway, 21 million litres per day (mld) water treatment plant (WTP) and other allied infrastructure with five years of Operation and Maintenance (O&M).
End Date: May 2, 2024*
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: The scope of work includes construction of a 13.5 million litres per day (mld) water treatment plant (WTP), two elevated service reservoirs, distribution network including three months trial run and Operation and Maintenance (O&M) for five years.
End Date: April 30, 2024*
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: The scope of work includes construction of a water treatment plant (WTP) having capacity of 16.5 million litres per day (mld), 4 km of rising main including three months of trial run and Operation and Maintenance (O&M) of five years.
End Date: April 30, 2024*
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: The scope of work includes construction of a 15 million litres per day (mld) water treatment plant (WTP) in place of old existing WTP, construction of four new elevated service reservoirs (ESR), replacing old distribution network including three months trial run and Operation and Maintenance (O&M) of five years.
End Date: April 30, 2024*
Implementing Agency: Ahmednagar Municipal Corporation
Segment: Water Supply; Wastewater
Work: The scope of work includes preparing DPR for water supply, rejuvenation of lakes, river front development and beautification work in Ahmednagar.
Publish Date: March 15, 2024
End Date: April 5, 2024
Implementing Agency: Public Health Engineering and Water Supply Department, Arunachal Pradesh
Segment: Water Supply
Work: The scope of work includes augmentation of water supply Phase I i.e. from Naga GG to Mandala Top having capacity of 2.3 million litres per day (mld).
End Date: April 25, 2024
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work includes providing consultancy services for detailed survey, front and engineering design, preparation of draft tender and bid phase assistance.
End Date: April 23, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of materials for construction, erection, completion, testing and commissioning of reinforced cement concrete (RCC), overhead tanks (OHTs), rising main, distribution system, tubewell, PLC supervisory control and data acquisition (SCADA) automation including three months defect liability period (DLP) and trial and run of three months.
End Date: April 26, 2024*
Implementing Agency: Nagpur Metropolitan Region Development Authority (NMRDA)
Segment: Water Supply
Work: The scope of project includes construction of transmission mains, feeder main, elevated service reservoir, 74 km long distribution system, retrofitting of pumping machinery and water treatment plant (WTP), supervisory control and data acquisition (SCADA) automation and allied infrastructure with Operation and Maintenance (O&M) of 5 years.
End Date: April 23, 2024*
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work includes design, construction, testing, commissioning of rising main, distribution system, intake well, filter plant, open well, underground sump, elevated service reservoir (ESR), pump house, compound wall and related infrastructure including Operation and Maintenance (O&M) of five years.
Publish Date: March 27, 2024
End Date: April 19, 2024
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work includes design, construction, testing, commissioning of rising main, distribution system, intake well, filter plant, open well, underground sump, elevated service reservoir (ESR), pump house, compound wall and related infrastructure including Operation and Maintenance (O&M) of five years.
Publish Date: March 27, 2024
End Date: April 19, 2024
Implementing Agency: Shrirampur Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of rising main, gravity main, elevated service reservoir, water treatment plant (WTP) having capacity of 28 million litres per day (mld), 133.64 km distribution network with supervisory control and data acquisition (SCADA) automation and other related infrastructure.
Publish Date: March 16, 2024
End Date: April 16, 2024
Implementing Agency: Jaysingpur Municipal Council
Segment: Wastewater
Work: The scope of work includes development of a 51.92 km long sewerage network, wet well, pumping machinery, pumping main, sewerage treatment plant (STP) having a capacity of 10 million litres per day (mld) based on sequential batch reactor (SBR) technology and other related infrastructure.
End Date: April 5, 2024
Implementing Agency: Bhandara Municipal Corporation
Segment: Wastewater
Work: The scope of work includes laying of 2.45 km rising main, construction of wet well, pump house and other related infrastructure.
End Date: April 5, 2024
Implementing Agency: Alibag Municipal Corporation
Segment: Wastewater
Work: The scope of work includes working survey, construction of 7.17 km long collection network, pumping station, rising main, sewage pumping station (STS) having capacity of 4.5 million litres per day (mld) and all other related infrastructure.
End Date: March 30, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, design, supply of all materials, labour, construction of Over Head Tank, concrete water recycling (CWR), booster pumping station, pump house, boundary wall, gate, site development, laying and jointing of feeder main having length of 15.98 km, rising main, distribution system and making house connection, supervisory control and data acquisition (SCADA) automation, testing, trial and run and defect liabilities.
End Date: April 12, 2024*
Implementing Agency: Maharashtra Jeevan Pradhikaran (MJP)
Segment: Water Supply
Work: The scope of work includes providing, lowering, laying, jointing and testing of 19.59 km of distribution system and all other related infrastructure.
End Date: March 20, 2024
Implementing Agency: Wanadongri Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey, jackwell, overhead tanks, water treatment plant (WTP) having capacity of 25 million litres per day (mld), raw water rising and other related infrastructure along with trial and run.
End Date: March 28, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work includes commissioning, testing, trial and run, defect liabilities and handing over the completed work on turn-key basis.
End Date: April 19, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes development of 24×7 WSS in Ward 23 of Indira Nagar in Bareilly district, Ward 5 of Civil Lines in Pilibhit district, Ward 6 of Lodhipiur district in Shahjahapur district and Ward 3 of Nekpur in Buduan district.
End Date: March 21, 2024
Implementing Agency: Maharashtra Jeevan Pradhikaran (MJP)
Segment: Wastewater
Work: The scope of work includes construction of 238.7 km long collection system, 21,800 house service connections (HSCs) and other related work.
End Date: March 26, 2024
Implementing Agency: Ambajogai Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of head works, pump house, raw water pumping machinery, raw water rising main, repairs to existing water main and water treatment plant (WTP), construction of 13 million litres per day (mld) new WTP and related infrastructure with supervisory control and data acquisition (SCADA) automation.
End Date: March 25, 2024
Implementing Agency: Yeole Municipal Corporation
Segment: Wastewater
Work: The scope of work includes working survey, collection system, pumping main, sewage treatment plant (STP) having capacity of 7.5 million litres per day (mld), house service connections and related infrastructure.
End Date: March 20, 2024
Implementing Agency: Tirora Municipal Council
Segment: Wastewater
Work: The scope of work includes working survey, construction of a 67.3 km long collection system, sewage pumping station, rising main, 4710 house service connections and other related infrastructure.
End Date: April 1, 2024
Implementing Agency: Shri Saibaba Sansthan Trust, Shirdi
Segment: Water Supply
Work: The scope of work includes providing comprehensive consultancy service for design, project management, testing and commissioning of the project.
End Date: March 18, 2024
Implementing Agency: Satana Nagar Parishad
Segment: Wastewater
Work: The scope of work includes provisioning consultancy services for project development and management support for implementation of the project.
End Date: March 12, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work includes construction of 430.56 km long sewerage network and six pumping stations.
End Date: April 5, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes detailed survey of existing water supply, formulation of zones and district metered areas (DMAs). Construction of tube well including supervisory control and data acquisition (SCADA) automation, installation of flow meters, laying or replacements of 142 km of distribution network, replacement of feeder mains and rising main and other related infrastructure.
End Date: March 20, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, engineering, design and supply of all materials for construction of intake well, raw water rising main, water treatment plant (WTP) having capacity of 81 million litres per day (mld), water feeder main and other reated infrastructure including three months of trial run.
End Date: April 15, 2024*
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: The scope of work includes development survey, design and construction of reinforced cement concrete (RCC) component, infiltration well, intake well cum jack well, approach bridge, water treatment plant (WTP) having capacity of 10 million litres per day (mld), raw water transmission line, distribution network of 45.869 km with supervisory control and data acquisition (SCADA) automation including Operation and Maintenance (O&M) of five years.
End Date: April 9, 2024*
Implementing Agency: Jharkhand Urban Infrastructure Development Corporation Limited (JUIDCO)
Segment: Water Supply
Work: The scope of work includes GIS-based mapping, surveys, soil testing, design, supply, construction and commissioning of intake jack well, approach bridge, centrifugal pump, 11 million litres per day (mld) water treatment plant (WTP), 9.173 km of raw water transmission main, 6.277 km of treated water transmission main, distribution network of 79.868 km and supervisory control and data acquisition (SCADA) automation and related infrastructure including Operation and Maintenance (O&M) of five years.
End Date: April 9, 2024*
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work includes construction of a desalination plant having a capacity of 200 million liters per day (mld) further expandable to 400 mld based on sea water reverse osmosis technology including Operation and Maintenance (O&M) for 20 years. The bids have been invited under swiss challenge method.
End Date: April 4, 2024*
Implementing Agency: Guwahati Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes preparation of geographic information system (GIS) based comprehensive drainage master plan and detailed project report
End Date: March 18, 2024
Implementing Agency: Maharashtra Jeevan Pradhikaran
Segment: Water Supply
Work: The scope of work includes Providing, Lowering, Laying and Jointing Gravity Main and Rising Main from Simbhora Headworks to water treatment plant (WTP) at Tapovan and WTP having capacity of 70 million litres per day (mld), reinforced cement concrete (RCC) and related infrastructure with supervisory control and data acquisition (SCADA) automation.
End Date: March 24, 2024
Implementing Agency: Urban Improvement Trust, Alwar
Segment: Waste water
Work: The scope of work includes DPR preparation for master drainage plan for Alwar city and disposal of water upto final disposal point. It includes detailed survey of drain and their flood-prone area, condition assessment of the storm water drain of the north zone and south zone of entire town, rehabilitation/remodeling of the existing major drains of the town, estimation of flood discharge and hydraulic design, study and suggesting drainage system for the deficient area of the town and master plan to cater requirement of the year 2031.
End Date: March 20, 2024
Implementing Agency: Ghaziabad Municipal Corporation
Segment: Wastewater
Work: The scope of work includes carrying out all required surveys, preparation of drainage basin maps, contour maps, Mapping of existing drains with width, depth, type and functioning status, making proposals duly integrating with upstream demands and downstream facilities, ground validation of proposals, preparation of destinations, working drawings, tender document etc.
End Date: March 16, 2024
Implementing Agency: V.O.Chidambaranar Port Authority
Segment: Water Supply
Work: The scope of work includes development of a 5 million litres per day (mld) desalination plant based on water reverse osmosis at V.O.C Port Authority, Tuticorin on design, build, finance, operate and transfer (DBFOT) basis.
End Date: March 7, 2024
Implementing Agency: Mahad Nagar Parishad
Segment: Water Supply
Work: The scope of work includes development of raw/pure water rising or gravity main pipeline, elevated service reservoir, two water treatment plant (WTP) having capacities of 8 million litres per day (mld) and 5 mld, pumping machinery, distribution system and supervisory control and data acquisition (SCADA) automation.
End Date: March 18, 2024*
Implementing Agency: Chakan Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of head works at Bhama Askhed Dam, approach channel, Jackwell, pump house, raw water rising main, water treatment plant (WTP) having capacity of 33 million litres per day (mld) and related infrastructure.
End Date: February 28, 2024
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of project includes development of Bogadi Town Panchayat WSS from Mysore WSS with Krishna Raja Sagara (KRS) Backwater as source including Operation and Maintenance (O&M) for five years including one year defect liability period (DLP). The work includes detailed scheme report, drawings, survey, soil investigation, providing and laying MS and DI feeder mains network having length of 13.19 km to different overhead tanks (OHTs), construction of four 10 LL reinforced cement concrete (RCC) at Bogadi TP-Kalyani Nagar, Roopa Nagar, Railway layout and SBM Layout, two 5 LL RCC OHT in Amrutha Krupa Hospital and Ravishankar layout, distribution system of 15.47 km, house service connections and related infrastructure.
End Date: March 4, 2024
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes construction of pure water rising main, gravity main, storage reservoir, overhead tanks (OHTs), renovation of existing ground level service reservoir (GLSR), distribution network, house service connections and related infrastructure including defect liability period (DLP) and Operation and Maintenance (O&M) for five years on design, build, operate and transfer (DBOT) basis.
End Date: March 4, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes carrying out level survey, soil investigation, detailed survey work, designing etc for providing, supplying, lowering, laying and jointing rising /gravity pipeline, designing and constructing intake well of bridge over canal, reinforced cement concrete (RCC), and related infrastructure in Kadana Part-1 (Zone ABC) with Faliya RWSS under WSS-8 Tribal Programmer including Operation and Maintenance (O&M) for 10 years.
End Date: March 1, 2024
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work includes development of 5000 cum capacity reinforced cement concrete (RCC) sumps (5 Nos) and 2000 cum capacity elevated service reservoir (ESR) (5 Nos), one each in R, A, EL, C and D block.
End Date: March 11, 2024
Implementing Agency: Kancheepuram Municipal Corporation
Segment: Water Supply
Work: The scope of work includes providing distribution system including construction of overhead tanks (OHTs) and house service connections and O&M for five years at an estimated cost of Rs 1,492.4 million.
End Date: February 6, 2024
Implementing Agency: Karnataka Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes development of WSS on design, build, operate and transfer (DBOT) basis including one year of defect liability period (DLP) and five years of Operation and Maintenance (O&M).
Kalaburagi: It includes towns of Chincholi, Chittapur, Wadi, Kamalapur, Sedam and Kalagi at an estimated cost of Rs 1,949.1 million.
Raichur: It includes towns of Hutti, Kavithal, Manvi, Maski and Turuvihal at an estimated cost of Rs 1,677 million.
End Date: March 1, 2024
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply; Wastewater
Work: The scope of work includes laying of water supply and sewerage network with construction and demolition of road for laying network.
End Date: March 7, 2024
Implementing Agency: Chhindwara Municipal Corporation
Segment: Water Supply
Work: The scope of the project includes survey, soil investigation, design and construction of raw water gravity main, clear water pumping main having a length of 15.46 km, water treatment plant (WTP), overhead reservoirs, distribution network of 241.65 km, supervisory control and data acquisition (SCADA) automation.
End Date: March 15, 2024
Implementing Agency: Bhopal Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of various works for augmentation of water supply system including construction of an intake well raw water pump house installation of raw/clear water pumps, substation including 33KVH feeder, water treatment plant (WTP), providing, laying, jointing, testing and commissioning of raw/clear water pumping/feeder main and distribution network including excavation, refilling, road cutting /dismantling, restoration to its original condition, providing and fixing required valves (Sluice, Air, Scour, PRV etc.) specials, fittings, flow meters. Construction of valve chambers, thrust blocks and house service connections/ bulk connection and supervisory control and data acquisition (SCADA) automation.
End Date: February 29, 2024
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply; Wastewater
Work: Water Supply: It includes design, build and operate (DBO) contract for providing, lowering, laying, jointing, supply of pipeline network (gravity, rising main and distribution network) and supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment’s, instruments and accessories with construction of 19 million litres per day (mld) water treatment plant (WTP), compound wall, house connection with Operation and Maintenance (O&M) for one year of all type civil structures and mechanical instruments. It will be carried out under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Sewage: It includes design and construction of sewer collecting system, house service connection, pumping station, pumping machinery, electrical work, pumping main, 10.91 mld sewage treatment plant (STP) and compound wall with seven years O&M of STP and two years O&M for underground sewerage system. It will be carried out under the Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY).
End Date: March 7, 2024
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: The scope of work includes development of a sewage treatment plant (STP) having capacities of 240 million litres per day (mld) and a tertiary treatment plant (TTP) having capacity of 160 mld at Pirana to treat secondary treated used water to supply industrial grades water to industrial estate of Ahmedabad and Operation and Maintenance (O&M) for 15 years.
End Date: March 13, 2024
Implementing Agency: Public Health Engineering Directorate (PHED), West Bengal
Segment: Water Supply
Work: The scope of work includes investigation (including hydrological), surveying, designing, construction and commissioning of intake with associated intake structure with raw water pumping station with constructing necessary all allied civil, electrical, mechanical works, including geotechnical investigation ,raw water rising main , conventional water treatment plant (WTP) of capacity 5.4 million litres per day (mld) , clear water reservoir at WTP location , clear water pumps, gaseous chlorination , two clear water reservoir for enroute village, treated water mains, river bank protection work, approach road length , pipe carrying bridge over suitable foundation ,installation of full bore electromagnetic flow meter ,internal illumination, implementation of supervisory control and data acquisition (SCADA), three months trial run followed with three years operation and maintenance (O&M).
End Date: March 30, 2024*
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: WaterSupply
Work: The scope of work includes working survey, design, build and operate (DBO) contract for providing, supplying, laying DI/PVC pipe line, testing and commissioning of reinforced cement concrete (RCC) underground sump, pump houses, compound wall, staff quarters, reinforced cement concrete (RCC) road, flow meter, lighting arrangement, pumping machinery and village level storage sumps and its ancillary work including Operation and Maintenance (O&M) for five years.
End Date: February 20, 2024
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work includes augmentation of existing 120 million litres per day (mld) water treatment plant (WTP) to 240 mld WTP along with expansion of jackwell and additional raw water rising main from Nagothane Jackwell to WTP Poynad.
End Date: March 1, 2024
Implementing Agency: Swachha Andhra Corporation (SAC)
Segment: Wastewater
Work: The scope of work includes investigation, survey, design and construction of STPs with open technology along with three-month trial run and two years of defect liability period (DLP).
Cluster 11: It includes construction of STPs at Macherla (9.9 mld) and Sattenapalli (9.47 mld) in Palandu district, Nandigama (2.77 mld) in NTR district and two STPs at Addanki (7 mld and 2.4 mld) in Bapatla district at an estimated cost of Rs 520.4 million.
Cluster 12: It includes construction of STPs at Markapur (12.4 mld), Chimakurthy (5.9 mld) in Prakasam district, Gudur (7.4 mld) in Tirupati district and Punganur (4.2 mld), Palamaneru (8.7 mld) and Nagari (7 mld) in Chittoor district at an estimated cost of Rs 752.4 million.
End Date: February 22, 2024
Implementing Agency: Sillod Municipal Council
Segment: Water Supply
Work: The scope of work includes working survey, construction of 200 km distribution network, water treatment plant (WTP) having capacity of 3.5 million litres per day (mld), elevated storage reservoir (ESR) gravity main and other related infrastructure including trail run for three months.
End Date: February 24, 2024
Implementing Agency: Public Health Engineering Department, Meghalaya
Segment: Water Supply
Work: The scope of work includes survey, engineering and design for pumping water supply system which comprises of construction of pump house; drawal of powerline; installation of pumping machineries; construction of clariflocculator chamber, rapid gravity filter, clear water reservoir, 4 nos. of zonal reservoirs; installation of microprocessor based control unit system; laying of pumping main & feeder main; construction of boundary wall; construction of staff quarters & chemical store house.
End Date: February 22, 2024
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes construction of feeder main, gravity main, distribution main, house service connection, overhead reservoirs, pumping stations and related infrastructure with defect liability period (DLP) of 12 months and Operation and Maintenance (O&M) for five years on design, build, operate and transfer (DBOT) basis.
End Date: February 23, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (Urban)
Segment: Wastewater
Work: The scope of work includes investigation, survey, soil investigation and construction of an 18 million litres per day (mld) sewage treatment plant (STP), pre -treatment unit for sewage flow based on sequential batch reactor (SBR) technology, main pumping station (MPS) on well sinking method, intermediate pumping station (IPS) based on well sinking method, rising main, laying of sewer line and trial and run for 3 months.
End Date: February 22, 2024
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The scope of work includes improvement of WSS in Tarikere, Kadur, Birur and Mudigere towns of Chickmagaluru districts including Operation and Maintenance (O&M) for five years.
End Date: February 20, 2024
Implementing Agency: Cauvery Neeravari Nigam
Segment: Water Supply
Work: The scope of work includes ensuring water supply to Sriranga Tank filling scheme by providing gravity pipe line starting from Ch: 70.00 km of TBC for Drinking water needs to Magadi and Kunigal taluk under Hemavathy Project.
Phase I: From Ch: 0.0 km to 17 km of network will be constructed at an estimated cost of Rs 4,081.4 million.
Phase II: From, 17 km to 34.54 km of network will be constructed at an estimated cost of Rs 4,069.1 million.
End Date: February 15, 2024
Implementing Agency: Karnataka Industrial Areas Development Board (KIADB)
Segment: Water Supply
Work: The scope of work includes implementation of 45 million litres per day (mld) combined WSS from existing jackwell at Krishna river, Kolhar village upstream of Almatti dam, supply and erecting pumping macheniries at pump house, sub station civil structures, supplying, providing, laying, testing and commissioning of mild steel pipe line as raising main of various diameter from the Jackwell to delivery chamber at proposed industrial layouts, to Airport having total length of 71.3 km, river crossing and canal crossing for MS Rising Main, design, supply, installation and commissioning of pumping machinery and electrical works of vertical turbine pumps including Operation and maintenance (O&M) for five years and other related infrastructure.
End Date: February 2, 2024
Implementing Agency: Public Health Circle Rajamahendravaram
Segment: Wastewater
Work: The scope of work includes rejuvenation of 64 water bodies in 15 urban local bodies (ULBs) of Andhra Pradesh under Sponge cities Program. These ULBs are Greater Visakhapatnam Municipal Corporation (GVMC), Rajamahendravaram, Kakinada, Eluru, Bhimavaram, Tadepalligudem, Gudivada, Guntur, Tadepalli-Mangalagiri, Tenali, Chilakaluripeta, Narsaraopeta, Ongole, Kadapa and Adoni
End Date: February 13, 2024
Implementing Agency: Kancheepuram Municipal Corporation
Segment: Water Supply
Work: Package 1: The scope of work includes construction of collector wells, infiltration wells, pump house, foot bridge, control room, generator room, stand post, connecting main, providing pumpsets and replacement of gravity main including construction of pipe carrying bridge and providing feeder mains including complete supervisory controla and data acquisition (SCADA)system for water supply system and Operation and Maintenance (O&M) for five years at an estimated cost of Rs 1,692.8 million.
Package 2: The scope of work includes providing distribution system including construction of overhead tanks (OHTs) and house service connections and O&M for five years at an estimated cost of Rs 1,492.4 million.
End Date: February 28, 2024
Implementing Agency: Thoothukudi City Municipal Corporation
Segment: Wastewater
Work: The scope of work includes contract management and supervisory consultancy services for implementation of SWD project for Packages 1-4 under area-based development (ABD) areas.
End Date: February 15, 2024
Implementing Agency: Tiruppur Municipal Corporation
Segment: Wastewater
Work: The scope of work includes development of collection system including house service connection and machine holes, pumping station, pumping mains and lift stations including Operation and Maintenance (O&M) for five years.
End Date: March 18, 2024
Implementing Agency: Avadi Municipal Corporation
Segment: Water Supply
Work: The scope of work includes development of overhead reservoirs (OHTs), ground level service reservoir (GLSRs), improvement of district metered areas (DMAs) and existing water distribution zones and supervisory control and data acquisition (SCADA) automation.
End Date: March 5, 2024
Implementing Agency: Maharashtra Airport Development Company Limited (MADC)
Segment: Wastewater
Work: The scope of work includes survey, investigation and designing for STP including integration with executed infrastructure for operation, estimation, preparation of BOQ, specification, working drawings for all the components of the project, preparation of comprehensive tender documents, invitation of bids, attending pre-bid meeting and preparing minutes of meeting, assisting MADC in tender evaluation and selection of contractor and project management consultant (PMC) during execution, assistance in processing statutory approvals and other related works.
End Date: February 12, 2024
Implementing Agency: Barshi Municipal Corporation
Segment: Water Supply
Work: The scope of the project includes construction of intake well, jackwell, rising main, water treatment plant (WTP) having capacity of 9.25 million litres per day (mld) along with supervisory control and data acquisition (SCADA) automation and all other related infrastructure.
End Date: March 4, 2024
Implementing Agency: Palani Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of collection system, 107 km long sewerage network, 3960 manholes including 14179 house service connections, pumping stations, pumping mains and lift stations and Operation and Maintenance (O&M) for five years. The completion period of the contract is 36 Months and 6 months for Trial run and commissioning.
End Date: March 22, 2024 *
Implementing Agency: Public Health and Municipal Engineering Department
Segment: Water Supply; Wastewater
Work: Package 1: It includes water supply projects in 30 ULBs and sewerage projects in 3 ULBs of Adilabad, Karimnagar and Warangal divisions at an estimated cost of Rs 11,105.56 million.
Package 2: It includes water supply projects in 26 ULBs and sewerage projects in 4 ULBs of Nalgonda and Khamman divisions at an estimated cost of Rs 11,353.27 million.
Package 3: It includes water supply projects in 42 ULBs and sewerage projects in 2 ULBs under the jurisdiction of Sangareddy, Rangareddy, Nizamabad and Mahabubnagar divisions at an estimated cost of Rs 12,705.92 million.
End Date: February 6, 2024
Implementing Agency: Bhopal Municipal Corporation
Segment: Water
Work: The scope of work includes survey, soil investigation, design and execution of various works for augmentation of water supply system including construction of an intake well raw water pump house installation of waw/clear water pumps, substation including 33KVH feeder, water treatment plant (WTP), providing, laying, jointing, testing and commissioning of raw/clear water pumping/feeder main and distribution network including excavation, refilling, road cutting /dismantling, restoration to its original condition, providing and fixing required valves (Sluice, Air, Scour, PRV etc.) specials, fittings, flow meters. Construction of valve chambers, thrust blocks and house service connections/ bulk connection and supervisory control and data acquisition (SCADA) automation.
End Date: February 8, 2024
Implementing Agency: Bhubaneshwar Development Authority (BDA)
Segment: Wastewater
Work: The scope of work includes providing PMC services at pre-construction phase, construction supervision at later stages.
End Date: February 12, 2024
Implementing Agency: Sangola Municipal Corporation
Segment: Wastewater
Work: The scope of the project includes construction of sewer network and trunk main, pumping machinery, pumping main, sewerage treatment plant (STP) having capacity of 8 million litres per day (mld) based on sequential batch reactor (SBR) technology.
End Date: February 9, 2024
Implementing Agency: Jabalpur Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of intake well cum pump house having capacity of 135 million litres per day (mld), installation and commissioning of raw water pumps, control panels, laying of raw water MS pumping main, construction of a 54 mld water treatment plant (WTP), clear water pump house, raw water pipeline network of 20.751 km, clear water pipeline network of 40,445 km, sump well, 33kv single circuit HT feeder line, repair work of existing WTP at Lalpur, Bhongadwar and Ranjhi along with SCADA automation and all other related infrastructure.
End Date: January 31, 2024
Implementing Agency: Chandigarh Municipal Corporation (CMC)
Segment: Water Supply
Work: The scope of the project includes strengthening of T.T. WSS and laying of T.T. water lines in left out areas to supply tertiary treated water in Chandigarh under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
End Date: February 5, 2024
Implementing Agency: Bhadgaon Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of jackwell with overhead pump house, approach bridge, raw water rising main, pure water rising main, gravity main, water treatment plant (WTP) having capacity of 12 million litres per day (mld), 125.368 km long distribution network and house service connections.
End Date: February 15, 2024
Implementing Agency: Chandrapur Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of sewerage system, house service connections, wet well/sewage pumping station, pumping machinery for sewerage pumping station, pumping main, existing sewer network cleaning, checking and renovation, road reinstating, trial and run and other miscellaneous work.
End Date: February 13, 2024
Implementing Agency: Pudukkottai Municipal Corporation
Segment: Wastewater
Work: The scope of work includes the construction of UGSS in newly added and leftover areas of Pudukottai municipality including Operation and Maintenance (O&M) for five years.
End Date: February 19, 2024*
Implementing Agency: Thoothukudi City Municipal Corporation
Segment: Wastewater
Work: The scope of work includes contract management and supervisory consultancy services for implementation of SWD project for Packages 1-4 under area-based development (ABD) areas.
End Date: January 30, 2024
Implementing Agency: Department of Drinking Water and Sanitation, Uttarakhand
Segment: Wastewater
Work: The scope of work includes supplying, laying, jointing, constructing, testing and commissioning of sewerage networks, house service connections and sewage pump station in Zone PSZ-6 of Rishikesh.
End Date: February 26, 2024
Implementing Agency: Vasai Virar Municipal Corporation (VVMC)
Segment: Wastewater
Work: The scope of work includes construction of sewer collection system, sewage pumping station, sewage pumping main, sewage treatment plant (STP) having capacity of 51.5 million litres per day (mld) with supervisory control and data acquisition (SCADA) automation.
End Date: February 12, 2024
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, construction of intake well cum pump house, raw water rising main, water treatment plant (WTP) having capacity of 100 million litres per day (mld), clear water feeder main, rising main and other related infrastructure.
End Date: February 15, 2024
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: The scope of work includes development survey, design and construction of reinforced cement concrete (RCC) component, infiltration well, intake well cum jack well, approach bridge, water treatment plant (WTP) having capacity of 8 million litres per day (mld), raw water transmission line, distribution network of 30.93 km with supervisory control and data acquisition (SCADA) automation including Operation and Maintenance (O&M) of five years.
End Date: February 12, 2024
Implementing Agency: Latur Municipal Corporation
Segment: Water Supplu; Wastwater
Work: The scope of work includes:
Water Supply: It includes head works, working survey, construction of intake well, inspection well, connecting main, jack well and pump house, approach bund and other related infrastructure at an estimated cost of Rs 2,178.27 million.
Sewerage: It includes working survey, collection and conveyance system of 146.11 km for zone 1 and 185.65 km for zone 2, sewage collection sump, sewage pump house, sewage pumping main, sewerage treatment plant (STP) having capacity of 53 million litres per day (mld) and other related works including trial and run for three months at an estimated cost of Rs 2,504.11 million.
End Date: February 5, 2024
Implementing Agency: Assam Urban Infrastructure Investment Program (AUIIP)
Segment: Water Supply
Work: The scope of work includes topographical survey, geo-technical survey and necessary investigations for preparation of a comprehensive DPR for the projects.
The bids are invited from shortlisted firms: DRA Consultants Limited; MaRS Planning and Engineering Services Private Limited, Samarth Infra Tech Service Private Limited, Stup Consultants Private Limited and Vitya Consultants Private Limited.
End Date: February 24, 2024
Implementing Agency: Dhule Municipal Corporation
Segment: Water Supply; Wastewater
Work: The scope of work includes :
Water Supply: It includes construction of a 8 million litres per day (mld) water treatment plant (WTP), renovation of Hanuman Tekdi and Babhale WTPs, pure water rising main, feeder main, elevated service reservoir (ESR) and ground service reservoir (GSR) and distribution system at an estimated cost of Rs 883.81 million.
Sewerage: It includes construction of 685.98 km long sewer network, receiving chamber, screening chamber, pumping stations, rising main, sewerage treatment plant (STP) of 40 million litres day (mld), treated water sump and related infrastructure at an estimated cost of Rs 5,913.16 million.
End Date: January 30, 2024
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work includes:
Part A: Detailed topographical survey, design and drawings (hydraulic & Structural), providing sewer network with house service connections, construction, supply, installation, testing and commissioning of wet well cum pump houses along with pretreatment unit, DI rising main, DG room, pumping machineries, 11KV express feeder main, sewage treatment plant (STP) , Deodourization for wet well’s and STP’s and allied works which are essential for successful commissioning of the project.
Part B: Operation and Maintenance (O&M) for five years.
Hebbagodi: It includes development of 95.69 km of sewerage network, STP 24 million litres per day (mld) based on sequential batch reactor (SBR) technology and related infrastructure at capital expenditure (capex) cost of Rs 1,139.2 million and operational expenditure (opex) cost of Rs 86.1 million.
Bommasandra: It includes development of 66.54 km of sewerage network, STP having capacity of 10 mld based on SBR technology at capex cost of 717.6 million and opex cost of Rs 82.7 million.
Jigani: It includes development of 73.56 km of sewerage network, STP having capacity of 6 mld based on SBR technology and related infrastructure at capex cost of Rs 707.6 million and opex cost of Rs 77.4 million.
End Date: January 29, 2024
Implementing Agency: Maraimalai Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of collection system including house service connections, pumping stations, pumping mains and lift stations and Operation and Maintenance (O&M) for five years.
End Date: February 7, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes development of 24×7 WSS in Ward 23 of Indira Nagar in Bareilly district, Ward 5 of Civil Lines in Pilibhit district, Ward 6 of Lodhipiur district in Shahjahapur district and Ward 3 of Nekpur in Buduan district.
End Date: January 24, 2024
Implementing Agency: Shirur Municipal Corporation
Segment: Water Supply
Work: The scope of work includes working survey, construction of intake well, inspection well , jack well, overhead pump house, approach bridge, meter room, raw water rising main, water treatment plant (WTP) having capacity of 7.5 million litres per day (mld) and augmentation and repairs to existing WTP, recirculation sump, pump house, inlet for recirculation sump, pure water gravity main, pure water rising main, distribution system having length of 38.613 km and related infrastructure.
End Date: January 23, 2024
Implementing Agency: Cuddalore City Municipal Corporation
Segment: Wastewater
Work: The scope of work includes the construction of UGSS in leftover areas of Cuddalore municipality including Operation and Maintenance (O&M) for five years.
End Date: January 23, 2024*
Implementing Agency: Pandharpur Municipal Corporation
Segment: Water Supply
Work: The scope of work includes the construction of rising main, water treatment plant (WTP) having capacity of 12 million litres per day (mld), distribution system with supervisory control and data acquisition (SCADA) automation.
End Date: January 22, 2024
Implementing Agency: Sabarmati River Front Development Corporation Limited (SRFDCL)
Segment: Water Supply
Work: The scope of project includes design and construction of barrage cum bridge across river Sabarmati between Torrent Power Plant on West and camp Sadar Bazaar on East Ahmedabad to store raw water for drinking purposes.
End Date: January 22, 2024
Implementing Agency: Odisha Industrial Infrastructure Development Corporation (IDCO)
Segment: Water Supply
Work: The scope of work includes preparation of DPR and financial feasibility report with project implementation support for WSS to Haladiapada Industrial Area under Greater Capital Region Industrial Cluster Infrastructure in Khurdha district.
End Date: January 29, 2024
Implementing Agency: Chandwad Municipal Corporation
Segment: Wastewater
Work: The scope of project involves working survey, construction of rising main pipelines, 6.5 million litres per day (mld) sewage treatment plant (STP), sewage pumping station, pumping machinery, collection system and other related infrastructure with three months trial run and Operation and Maintenance (O&M) of one year .
End Date: January 20, 2024
Implementing Agency: Sillod Municipal Council
Segment: Water Supply
Work: The scope of work includes working survey, construction of 200 km distribution network, water treatment plant (WTP) having capacity of 3.5 million litres per day (mld), elevated storage reservoir (ESR) gravity main and other related infrastructure including trail run for three months.
End Date: January 4, 2024
Implementing Agency: Kerala Metro Rail Limited (KMRL)
Segment: Wastewater
Work: The scope of work includes survey, design, redesign wherever required and construction of a fully automated, sequential batch reactor (SBR) technology based STP of 17.5 million litres per day (mld), sewage pumping stations, solar power plant, survey, underground sewerage collection system with sewer grid of about 135 km length, around 5,308 manholes, about 14,651 house sewer connection, seven lifting manholes, four sewage pumping stations and all appurtenant structures and allied works including Operation and Maintenance (O&M) for five years.
End Date: January 20, 2024*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of material and labour, construction of overhead tank (OHT), pump house, repair of existing OHT, laying and jointing of rising main, distribution system, tube-wells, programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation, commissioning, trial and run, defect liability and related infrastructure for Tanda WSS and house connections.
End Date: January 19, 2024
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Wastewater
Work: The scope of work includes construction of a 2000 million litres per day (mld) WTP in place of the existing 1910 mld WTP in Bhandup complex including civil, mechanical, electrical, instrumentation works and Operation and Maintenance (O&M) for 15 years on design, build and operate (DBO) contract basis.
End Date: January 19, 2024*
Implementing Agency: City and Industrial Development Corporation of Maharashtra Limited
Segment: Wastewater
Work: The work will be carried out under two phases:
Phase 1: Construction of a 50 million litres per day (mld) Kalamboli sewage treatment plant (STP), refurbishment with additional works, 20 mld tertiary treatment plant, 20 mld tertiary treated sewage pumping station with rising main and elevated service reservoir,
Construction of 70 mld Kharghar STP refurbishment with additional works and 20 mld secondary sewage pumping station with rising main.
Phase 2: Construction of 20 mld secondary sewage pumping station, 20 mld tertiary treatment plant and 20 mld tertiary treated sewage pumping station and 10 Years of Operation and Maintenance (O&M).
End Date: January 19, 2024*
Implementing Agency: Nashik Municipal Corporation
Segment: Water Supply
Work: The scope of work includes the construction of an elevated reinforced cement concrete (RCC) break pressure tank (BPT) having a capacity of 20,00,000 litres, a raw water transmission line from BPT to Bara Bungalow parallel to the existing raw water transmission main, replacement of old raw water PSC line from Gangapur Dam to Bara Bungalow WTP by MS pipeline and other allied infrastructure.
End Date: January 31, 2024*
Implementing Agency: Sangola Municipal Corporation
Segment: Wastewater
Work: The scope of the project includes construction of sewer network and trunk main, pumping machinery, pumping main, sewerage treatment plant (STP) having capacity of 8 million litres per day (mld) based on sequential batch reactor (SBR) technology.
End Date: January 18, 2024
Implementing Agency: Faridabad Metropolitan Authority (FMDA)
Segment: Water Supply
Work: The scope of work includes preparation of DPR for master WSS under Master Plan -2031 for an area of 343.68 sq.km, environmental impact assessment and social impact analysis.
End Date: January 18, 2024
Implementing Agency: Town and Country Planning (T&CP), Assam
Segment: Wastewater
Work: The scope of work includes preparation of a drainage master plan for Silchar, Nagaon, Tinsukia, Sivasagar, Bongaigaon, Nalbari, Barpeta Road and North Lakhimpur towns in Assam.
End Date: January 18, 2024
Implementing Agency: Vijayawada Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of intake well, 45 million litres per day (mld) water treatment plant (WTP), pipelines, pump sets, and elevated level storage reservoir (ELSR), ground level storage reservoir (GLSR) including Operation and Maintenance (O&M) for five years along with defect liability period of two years in circle-III area of Vijayawada.
End Date: January 17, 2024
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves design, build and operation (DBO) of new 375 mld STP and upgradation of the allied infrastructure including three terminal sewage pump station/s with Operation and Maintenance (O&M) for 15 years under the Ahmedabad City Resilience Project.
End Date: January 29, 2024*
Implementing Agency: Pandharkawada Municipal Corporation
Segment: Water Supply
Work: The scope of work includes development of intake well, jack well, raw water rising main, raw water gravity main, water treatment plant (WTP) having capacity of 3.5 million litres per day (mld), distribution system of 10 km and other related works.
End Date: January 16, 2024
Implementing Agency: Namakkal Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of collection system including house service connections, pumping stations, pumping mains and lift stations and Operation and Maintenance (O&M) for five years.
End Date: January 24, 2024*
Implementing Agency: Mayiladuthurai Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of UGSS and Operation and Maintenance (O&M) for five years.
End Date: January 19, 2024*
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes design and construction of intake well, water treatment plant (WTP) with various sizes reinforced cement concrete (RCC) sumps and RCC elevated storage reservoir (ESR), providing, supplying, lowering laying and jointing of MS, DI & PVC pipeline for rising main/ gravity distribution pipeline network including providing, supplying, erecting and testing and related development works including Operation and Maintenance (O&M) for 10 years.
End Date: January 10, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes working survey, design, build and operate (DBO) contract for providing, supplying, laying DI/PVC pipe line, testing and commissioning of reinforced cement concrete (RCC) undergound sump, pump houses, compound wall, staff quarters, RCC road, flow meter, lighting arrangement, pumping machinery and village level storage sumps and its ancillary work including trial run for three months and Operation and Maintenance (O&M) for five years for 99 villages in Dang district.
End Date: January 22, 2024
Implementing Agency: Water Resources Department, Madhya Pradesh
Segment: Water Supply
Work: The scope of the project includes construction of 67 million cubic meter (mcm) dam on turnkey basis, design, drawings, survey of head work, geological investigations, hydrology approval, preparation, submission of complete land acquisition (LA) cases to competent authority for land acquisition and other related infrastructures works with Operation and Maintenance (O&M) of five years.
End Date: January 8, 2024
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes design, construction, providing, supplying, lowering, laying and jointing various MS/DI/PVC pipes, rising main, gravity main pipelines, reinforced cement concrete (RCC), eelevated storage reservoir (ESR) , RCC sump, pump house, compound wall, water treatment plant (WTP) having capacity of 20 million litres per day (mld), trial run of three months and 10 years of Operation and Maintenance (O&M).
End Date: January 6, 2024
Implementing Agency: Public Health Engineering Department, West Bengal
Segment: Water Supply
Work: The scope of work includes surveying, planning, designing, delivery, erection, construction, commissioning and completion in all respect of all civil, electrical and mechanical works like intake, water treatment plant (WTP), raw water rising main, clear water rising main, ground level reservoirs (GLRs), chlorine cum switch room, boundary wall etc. including all allied related and enabling works followed by three months of trial run and Operation and Maintenance (O&M) for three years.
Pulbazar Pumping -I Spring WSS: The estimated cost of the project is Rs 1,593.68 million.
Pulbazar Pumping -II Spring WSS: The estimated cost of the project is Rs 778 million.
Pulbazar Pumping -III Spring WSS: The estimated cost of the project is Rs 661 million.
Pulbazar Mangarjung and three Villages: The estimated cost of the project is Rs 827 million.
End Date: January 16, 2024*
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes working survey, design, build and operate (DBO) contract for providing, supplying, laying DI/PVC pipe line, testing and commissioning of reinforced cement concrete (RCC) undergound sump, pump houses, compound wall, staff quarters, rcc road, flow meter, lighting arrangement, pumping machinery and village level storage sumps and its ancillary work including Operation and Maintenance (O&M) for five years.
End Date: January 16, 2024*
Implementing Agency: Thiruvannamalai Municipal Corporation
Segment: Water Supply
Work: The scope of work includes improvement of existing water supply scheme (WSS) in Thiruvannamalai, Tamil Nadu.
End Date: January 5, 2024
Implementing Agency: Irrigation Department, Government of Uttarakhand
Segment: Wastewater
Work: The scope of work includes development of review of existing drainage infrastructure, analysis of historical data, flooding incidents, land use changes, hydrological study for rainfall patterns and runoff, detailed technical specifications for drainage improvements, comprehensive documentation of consultancy process including methodologies, findings, and recommendations and all other related work.
End Date: January 4, 2024
Implementing Agency: Umarkhed Municipal Council
Segment: Water Supply
Work: The scope of work includes construction of intake well, jack well, overhead pump house, reinforced cement concrete (RCC) bridge, connecting main, approach bund, pure water rising main, pure water gravity main, RCC BPt, conventional water treatment plant (WTP) of 9.5 million litre per day (mld), elevated service reservoir (ESR) and raw water pumping machinery VT pump.
End Date: January 4, 2024
Implementing Agency: Malegaon City Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of a 21.5 million litres per day (mld) sewage treatment plant (STP) based on moving media bio-reactor (MMB) technology, collection network of reinforced cement concrete (RCC) pipes of 56.63 km length and collection network of 404. 29 km.
End Date: January 2, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work includes survey, investigation, design, supply, laying, commissioning and testing of sewer pipe in lateral/branch sewers and balance house connection & road reinstatement & its appurtenant works in sewerage district 3 Part 1 Phase 1 and District 3 Part 2 of Lucknow city.
End Date: January 2, 2024
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, design, supply of all materials, labour, construction of Over Head Tank, concrete water recycling (CWR), booster pumping station, pump house, boundary wall, gate, site development, laying and jointing of feeder main having length of 15.98 km, rising main, distribution system and making house connection, supervisory control and data acquisition (SCADA) automation, testing, trial and run and defect liabilities.
End Date: January 16, 2024