Implementing Agency: NTPC Limited
Segment: Water Supply
Work: The scope of work includes topographic survey, GIS mapping of existing water supply assets and consumer mapping; identification of infrastructure gaps for providing a continuous pressurized water supply network for the next 30 years; assessment and design of clear water pumping and trunk gravity mains; assessment of existing gravity networks from ESRs; preparation of inception report; hydraulic modelling and DPR for transmission and distribution networks; design of pipelines and provision of household service connections; preparation of cost estimates covering civil, electrical and mechanical works, instrumentation, automation and SCADA, smart water management systems and zonal metering; and development of a real-time smart water management system for flow monitoring, leakage reduction and consumer service improvement.
Published Date: September 3, 2026
End Date: September 8, 2026
Implementing Agency: Nagar Panchayat Parseoni
Segment: Water Supply
Work: The scope of work includes topographical and geotechnical surveys, review of existing infrastructure and services, design of the water supply and sewerage schemes, preparation of cost estimates and DPR, assistance in obtaining technical and administrative approvals, preparation of tender documents, bid process management, evaluation and recommendation of bids, and supervision and monitoring of construction, including checking of bills, cost and quantity monitoring, progress reporting and final bill certification. The consultancy will also include supervision and monitoring of O&M and asset management for a maximum period of one year.
Published Date: August 27, 2026
End Date: September 7, 2026
Implementing Agency: Uttarakhand Jal Sansthan
Segment: Water Supply
Work: Narendranagar (ORG) Pumping Kharashrot Water Supply Restoration Project: The scope of work includes restoration of the damaged Narendranagar (ORG) Pumping Kharashrot Water Supply Scheme in Block Narendra Nagar, Tehri Garhwal, due to natural calamity during Deviya Apda Year 2025-26, including restoration of water supply pipelines and associated works.
Ragad Gaon and Toliyakatal Water Supply Restoration Project: The scope of work includes restoration of the damaged Ragad Gaon and Toliyakatal Water Supply Scheme in New Tehri Division, Tehri Garhwal, due to natural calamity, including restoration of water supply pipelines and associated works.
Gwalidanda Pumping Water Supply Restoration Project: The scope of work includes restoration of the damaged Gwalidanda Pumping Water Supply Scheme in New Tehri Division, Tehri Garhwal, due to natural calamity, including restoration of water supply pipelines and associated works.
Narendranagar Gravity Scheme Water Supply Restoration Project: The scope of work includes restoration of the damaged Narendranagar Gravity Water Supply Scheme in New Tehri Division, Tehri Garhwal, due to natural calamity, including restoration of water supply pipelines and associated works.
Published Date: August 27, 2026
End Date: September 9, 2026.
Implementing Agency: Minjur Town Panchayat
Segment: Water Supply
Work: The scope of work includes appointment of consultant for preparation of DPR and bid document for providing improvement of water supply system in Minjur Town Panchayat under General Fund – 2026-2027.
Published Date: August 25, 2026
End Date: September 9, 2026
Implementing Agency: Government of Telangana
Segment: Water Supply
Work: The scope of work includes assessment of Yellore Reservoir, Uddandapur Reservoir and other feasible sources; population and water demand assessment; review of existing Mission Bhagiratha infrastructure; detailed route surveys and GIS mapping; intake, WTP, pumping, transmission, structural, mechanical and electrical designs; hydraulic modelling and pipe diameter optimization; 33 kV power supply and substation planning; land, right-of-way and crossing schedules; preparation of detailed estimates, BOQ, drawings, specifications and tender documentation. The projected raw water requirement is 378.50 MLD (4.88 TMC) by 2048, including 60 MLD demand for Chandenvally and Sitarampur Industrial Areas, for which 20 MLD WTPs are proposed at each location.
Published Date: August 20, 2026
End Date: September 5, 2026
Implementing Agency: Vadodara Municipal Corporation
Segment: Wastewater
Work: The scope of work includes design, engineering, procurement & construction (EPC) of a storm water channel from Siddheshwar Harbour to Kapurai Junction to National Highway, along with detailed topographic and geotechnical surveys, design of the storm water drainage system and associated components, excavation and foundation works, construction of concrete outfall/gabion structures, all-weather approach roads and installation of sluice/open-channel gates. The work also includes construction of a 12 m TP flexible pavement road along the storm water channel, shifting/protection/restoration of existing utilities, approximately 50 Rmt of pushing, 50 Rmt of precast box and a 500 mm DI pipe, along with two 1,500 mm × 1,500 mm and two 2,000 mm × 2,000 mm sluice/open-channel gates.
Published Date: August 20, 2026
End Date: September 7, 2026
Implementing Agency: Vadodara Municipal Corporation
Segment: Wastewater
Work: The scope of work includes design, engineering, procurement & construction (EPC) of a storm water channel from Makarpura Landfill Culvert to Jambuva River parallel to the National Highway, including topographic and geotechnical surveys, design of the storm water drainage system, diversion/dewatering arrangements, excavation and foundation works, integration with existing structures, construction of outfall/gabion structures, all-weather approach roads, and a 12 m TP flexible pavement road along the storm water channel. The work also includes diversion/shifting of existing utilities, installation of four 2,500 mm × 2,500 mm sluice/open-channel gates, and provision of approximately 50 Rmt of pushing, 50 Rmt of precast box, a 500 mm DI pipe and a drainage pipeline, subject to approved survey quantities.
Published Date: August 20, 2026
End Date: September 7, 2026
Implementing Agency: Vadodara Municipal Corporation
Segment: Wastewater
Work: The scope of work includes design, engineering, procurement & construction (EPC) of a storm water channel from Kapurai Railway to Tarsali Ruparel Kaans parallel to the National Highway, including detailed topographic and geotechnical surveys, fixation of L-section and cross-section parameters, design of the storm water drainage system, excavation and foundation works, integration with existing structures, construction of concrete outfall/gabion structures, and all-weather approach roads. The work also includes construction of a 12 m TP flexible pavement road along the storm water channel, diversion/shifting and restoration of existing utilities, and installation of two 1,500 mm × 1,500 mm and two 2,000 mm × 2,000 mm sluice/open-channel gates. The project further includes approximately 50 Rmt of pushing, 50 Rmt of precast box and a 500 mm DI pipe, along with drainage pipeline works.
Published Date: August 20, 2026
End Date: September 7, 2026
Implementing Agency: Vadodara Municipal Corporation
Segment: Wastewater
Work: The scope of the work includes design, engineering, procurement & construction (EPC) of a storm water channel from Tarsali Ruparel Kaans to Makarpura Landfill Culvert, parallel to the National Highway, in Vadodara, Gujarat (Phase 3). It also includes detailed topographic and geotechnical surveys, design and construction of the storm water drainage system and associated components, excavation and foundation works, construction of concrete outfall/gabion structures, all-weather approach roads, and installation of sluice/open-channel gates. The work also includes construction of a 12 m TP flexible pavement road along the storm water channel, shifting/protection/restoration of existing utilities, and associated permissions and coordination with NHAI, Railways and other authorities. Preliminary works include approximately 50 Rmt of pushing, 50 Rmt of precast box, a 500 mm DI pipe and drainage pipeline, along with four 2,500 mm × 2,500 mm sluice/open-channel gates.
Published Date: August 20, 2026
End Date: September 7, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work includes conducting a detailed survey for preparation of a detailed project report (DPR) for providing Underground Drainage (UGD) Scheme to Soraba Town Municipal Council. It also includes conducting topographical GIS survey for the proposed UGD system covering approximately 144 km, block-level survey for proposed wetwells and STP sites, trial pit excavation and trial bores of 75-100 mm diameter with 53.0-88.9 mm core diameter at proposed wetwell sites, hydraulic design and analysis of the UGD network as per CPHEEO norms, preparation of design reports including pipe sizes, lengths, materials, manhole levels and tentative quantities, population forecast, water demand and zonal boundaries, and preparation of DPR with drawings.
Published Date: August 20, 2026
End Date: September 7, 2026
Implementing Agency: Irrigation Department, Uttarakhand
Segment: Wastewater
Work: The scope of work involves construction of storm water drainage infrastructure in Roorkee city under Phase-I.
Published Date: August 17, 2026
End Date: September 11, 2026*
Implementing Agency: Nagar Nigam Jodhpur
Segment: Water Supply
Work: The scope of work involves design, financing, construction, commissioning, operation and maintenance of an integrated treated water distribution network for 50 MLD treated water, including trunk and lateral lines, pumping stations, additional treatment facilities to make the water suitable for reuse, a control room and safety facilities. The network will supply treated water to industries, agricultural areas and other permitted users, along with obtaining necessary approvals and transferring the project assets to Nagar Nigam Jodhpur at the end of the concession period. The project is being implemented under a PPP model on a Design, Build, Finance, Operate and Transfer (DBFOT) basis.
Published Date: August 14, 2026
End Date: September 10, 2026
Implementing Agency: Union Territory of J&K
Segment: Wastewater
Work: The scope of work includes Providing structural and architectural consultancy for Storm water covered drain in different wards of MC Ramnagar, including, preparation of site plan/contouring, soil investigation, structural design, sub soil exploration and detail also includes submission of detailed estimate and BOQ, Soil Investigation and vetting of design from competent authority any IIT/NIT/GCET/DIQC incl. time to time supervision of projects during whole construction period.
Published Date: August 13, 2026
End Date: August 27, 2026
Implementing Agency: Nashik Metropolitan Region Development Authority (NMRDA)
Segment: Water Supply
Work: The scope of work includes assessment of present and future water demand for the Chincholi Industrial Area and preparation of a most feasible water supply scheme, including assessment of available water sources, their availability, capacity and water quality. The work also includes preparation of the DPR covering intake, pumping, rising main, treatment, storage, transmission and distribution systems, along with surveys, designs, drawings, technical specifications, BOQ and detailed cost estimates, obtaining necessary administrative and technical approvals, incorporating required revisions and submission of the final DPR and associated technical documents.
Published Date: August 12, 2026
End Date: August 28, 2026
Implementing Agency: Lanja Nagar Panchayat
Segment: Water Supply
Work: The scope of wonrk involves working survey; development of intake works including intake channel, intake well, jackwell and pump house, approach bridge and bund; raw water pumping machinery and 350 mm dia, 7.65 km raw water rising main; construction of a 9 MLD water treatment plant; recirculation sump and pumping system; pure water pumping machinery and 350 mm dia, 100 m pure water rising main; construction of a cement concrete bandhara; MBR-cum-ESR and seven elevated/ground water service reservoirs; 150 mm dia, 1.22 km pure water rising main; 100–350 mm dia, 18.845 km feeder main; distribution network, solar power plant, road reinstatement, SCADA/automation and associated civil, electrical and mechanical works.
Published Date: August 10, 2026
End Date: August 25, 2026
Implementing Agency: Military Engineer Services (MES)
Segment: Wastewater
Work: The scope of work includes preparation of a detailed project report (DPR), architectural and structural drawings and BOQ for an STP, including a 5 m × 5 m grid survey, contour survey and L-section preparation, collection of population, water consumption, meteorological and existing sewage network data, sewage sampling and testing, preparation and hydraulic design of the proposed sewage network, and design of one STP with tertiary treatment based on MBBR technology. The scope also includes preparation of the treated sewage re-distribution network, electro-mechanical design, architectural and structural designs for the sewage system, pumping station and STP, SCADA and automation provisions, and detailed designs and BOQs for external electrical and water supply works, including treated water reuse.
Published Date: August 7, 2026
End Date: September 10, 2026
Implementing Agency: Water Resources Department, Rajasthan
Segment: Water Supply
Work: The scope of work involves survey, design and construction of the Dhanoti (Reservoir-A) artificial reservoir with a storage capacity of 112 million cubic meters (mcum) under Phase I of the Yamuna Water Project on an EPC turnkey basis. It also includes survey and investigation, topographical and geospatial surveys, soil and foundation investigations, detailed planning, engineering design, preparation and vetting of drawings, quantity estimation, land acquisition support, construction of an earthen reservoir with embankment, HDPE lining, overflow, inlet, outlet, interconnecting and desilting structures, construction of approach roads and ancillary infrastructure, supply and installation of dam instrumentation, quality control and testing, statutory clearances, project management, commissioning, and operation and maintenance of the reservoir system for eight years
Published Date: August 6, 2026
End Date: August 26, 2026.
Implementing Agency: Yeola Municipal Council
Segment: Water Supply
Work: The scope of work includes development of an intake structure at the canal, a 300 ML balancing tank, an 8 m diameter jackwell with overhead pump house, approach bridge and bund, 12.82 km raw water rising main, a 7 mld conventional water treatment plant, 4.39 km pure water rising main, three RCC elevated service reservoirs, and a 97.16 km distribution network comprising HDPE and DI pipelines. The project also includes road reinstatement, shifting of 3,700 existing household service connections, raw and pure water pumping machinery, a 450 kWp solar power plant, automation works and an express feeder.
Published Date: August 6, 2026
End Date: August 26, 2026
Implementing Agency: Malkajgiri Municipal Corporation (MMC)
Segment: Wastewater
Work: The scope of work involves reconnaissance, topographical and geotechnical surveys, hydrological and hydraulic studies, preparation of DPR, detailed designs, drawings, estimates, BOQs and tender documents for construction of an RCC storm water drain from Annarayan Cheruvu to Dammaiguda X Road in Dammaiguda Ward No. 04, Keesara Circle-I. It also includes obtaining statutory approvals, technical assistance during tendering and design supervision during project execution.
Published Date: August 5, 2026
End Date: August 12, 2026
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Wastewater
Work: The scope of work involves preparation of the detailed project report (DPR) for providing sewerage facilities and construction of a sewage treatment plant (STP) at Village Ghasera under the Mahagram Yojna. It includes survey, investigations, engineering designs, drawings, cost estimates, tender documents and other associated consultancy services required for project implementation.
Published Date: August 5, 2026
End Date: August 17, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: The scope of work includes the design, construction, operation and maintenance of a complete water supply system, covering assessment and improvement of existing water supply utilities, field surveys and preparation of maps and drawings, design and construction of new and replacement main pipelines, reservoirs and distribution networks, and supply and installation of pipes, valves, pumping systems, storage facilities, mechanical and electrical equipment, cabling and control panels. The project also includes provision of house service connections, testing and commissioning of the completed works and operation and maintenance of the water supply and distribution system. It will be implemented on design, build, operate and maintain (DBOM) basis.
Published Date: August 5, 2026
End Date: August 28, 2026
Implementing Agency: Municipal Council, Ashoknagar
Segment: Water Supply
Work: Phase 1: It involves conducting topographical, geotechnical, hydrological, and socio-economic surveys and investigations; undertaking hydraulic and structural design, including network hydraulic modelling and design of intake structures, Water Treatment Plants (WTPs), Clear Water Reservoirs (CWRs), and distribution networks; preparing the Detailed Project Report (DPR), Bill of Quantities (BOQ), and EPC tender documents; and assisting in tender preparation, tender evaluation, and pre-bid meetings.
Phase 2: It involves project management and construction supervision quality assurance: scrutinising contractor designs, monitoring materials, and ensuring quality control during construction per standard guidelines.
Published Date: August 5, 2026
End Date: September 7, 2026
Implementing Agency: Saoner Nagar Parishad
Segment: Water Supply
Work: The scope of work includes construction of headworks comprising a 4 m diameter, 9.0 m deep intake well, 25 m connecting pipe, 8 m diameter × 24.5 m jackwell, pump house and a 250 m long, 4.2 m wide approach bridge; supply, installation, testing and commissioning of 340 HP vertical turbine pumping machinery (200 HP and 140 HP pump sets), a 500 kVA substation, 3.90 km of 400 mm dia DI (K-7/K-9) raw/pure water transmission mains, a 12 MLD conventional water treatment plant (WTP), 13.85 lakh litres of RCC elevated service reservoirs (ESRs)/master balancing reservoirs (MBRs), distribution network comprising 41 km of 110 mm and above HDPE pipelines and 2.4 km of 300 mm and above DI (K-7/K-9) pipelines, a solar power plant, and SCADA/automation system covering headworks, pumping stations, WTP, water quality monitoring and ESR operations.
Published Date: August 4, 2026
End Date: August 18, 2026
Implementing Agency: Tamil Nadu Urban Infrastructure Financial Services Limited (TNUIFSL) has
Segment: Water Supply
Work: Tambaram 24×7 Water Supply Project (Phase I-Sembakkam, Madambakkam, Chittalapakkam, Tiruneermalai, Perungalthur and Peerkarnakranai) : The scope of the work includes updating and redesigning the DPR for the entire Tambaram City Municipal Corporation having 70 wards and 15 Village Panchayats and providing Transaction Advisory Services for the Phase I area- Sembakkam, Madambakkam, Chittalapakkam, Tiruneermalai, Perungalthur and Peerkarnakranai, to implement a 24×7 water supply system. It includes assessment of the existing water supply infrastructure, source gap analysis, surveys, hydraulic and network design, preparation of two DPRs (Phase I and other phases), environmental and social assessments, financial modelling, PPP project structuring, transaction advisory, bid process management, and six months of post-award handholding support.
The project includes construction of two Water Treatment Plants (WTPs) of 86 mld in phase I and 28 mld in phase-III at Manimangalam, four pumping mains, three Clear water reservoir and infiltration wells, 59 OHTs, and laying of 1502 km distribution network.
Erode 24×7 Water Supply Project : The scope of the work includes providing transaction advisory services for the PPP-based water supply project, including capital market and financing risk assessment, financial and economic modelling, project structuring, feasibility studies, value-for-money analysis, legal and regulatory compliance, preparation of bid documents, concession agreements and feasibility reports, bid process management, stakeholder consultations, bid evaluation, developer outreach, coordination with government agencies, obtaining project clearances, and support until contract award, concession agreement signing, and handover of the project to the selected concessionaire.
The project includes construction of four sump and pump house, laying 16.162 km Pumping main, feeder main and branch feeder main, Enhancing the existing WTP capacity from 120 mld to 151 mld , construction of 36 new service reservoirs, laying 436.34 km of Distribution system, 30,420 HSC. The total project cost is Rs 4,064.5 million.
Published Date: August 4, 2026
End Date: September 7, 2026
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Water Supply
Work: The scope of work involves augmentation of water supply including 2.5 mld water treatment plant (WTP), construction of independent canal-based water works No. 2, construction of structures at existing water works No. 1, construction of three boosting stations, strengthening of distribution system, and development of sewerage infrastructure including laying of sewerage network, restoration of streets, construction of 2.5 mld sewage treatment plant (STP), construction of two intermediate pumping stations, main pumping station, treated effluent rising main and other associated works.
Published Date: August 4, 2026
End Date: August 18, 2026
Implementing Agency: Navapur Municipal Council
Segment: Water Supply
Work: The scope of work involves construction of a 12 mld water treatment plant (WTP); a 3 m diameter intake well, 8 m diameter jackwell-cum-pump house; 30 m of 750 mm DI intake pipeline; 418 m of 400 mm DI raw water rising main; 18 km of 400 mm DI raw water gravity main; 2.15 km of 300 mm DI pure water rising main; 130 HP raw water pumping machinery; a 10.45 lakh litre elevated service reservoir (ESR); a 102.21 km HDPE and 2.49 km DI distribution network; a 250 kWp solar power plant; and associated civil, mechanical and electrical works.
Published Date: August 4, 2026
End Date: August 18, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work involves conducting topographical survey, hydraulic design and preparation of design and drawings for the Belagali Water Supply Scheme with Krishna River near Maheshwadagi village as the source. It includes survey and hydraulic design of the 14.20 km raw water rising main, hydraulic design for the proposed water treatment plant (WTP), survey and hydraulic design of the 11.50 km pure water feeder/rising main, comprehensive hydraulic design of the 145 km distribution network, topographical survey of Belagali town, and preparation of engineering drawings for the intake works, WTP and distribution network.
Published Date: August 4, 2026
End Date: August 17, 2026*
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Water Supply
Work: Part-A (Kaimri Water Supply Scheme) involves construction of one new water works, raw water pumping station, boosting stations and upgradation of existing water works comprising two WTPs of 2 mld and 1.5 mld capacity, RCC service reservoirs and sump well tanks, inlet channel, clear water tanks, pump chamber, boundary wall, pumping machinery, DG set, electric transformer, raw water and clear water rising mains, distribution pipelines and house connections.
Part-B (Kaimri Sewerage Scheme) involves construction of a 2 mld STP based on SBR technology with SCADA/PLC controls including one main pumping station and five intermediate pumping stations comprising wet well sump, boundary wall, pump chamber, rising mains, staff quarters, pumping machinery, DG set, electric transformer and laying of sewerage network in the village. Both parts include operation and maintenance during the six-year defect liability-cum-maintenance period after a successful trial run of three months.
Published Date: August 4, 2026
End Date: August 13, 2026
Implementing Agency: Faridabad Metropolitan Development Authority (FMDA) has
Segment: Wastewater
Work: The scope of work involves designing, construction and commissioning of a 20 MLD STP based on SBR technology with tertiary treatment, an elevated equalisation tank, a 600 mm diameter indicative rising main for about 1,000 m from the existing main pumping station to the proposed STP, and associated screening, grit removal, biological treatment, disinfection, sludge treatment and disposal, instrumentation and allied works.
Published Date: August 3, 2026
End Date: August 27, 2026
Implementing Agency: Attur Municipality
Segment: Water Supply
Work: The scope of work involves preparation of the detailed project report (DPR) for improvement of the existing water supply distribution system in Attur Municipality. It includes engineering design, hydraulic modelling, water balancing, NRW/UFW assessment, preparation of technical specifications, structural designs, cost estimates, bill of quantities (BOQ), bid documents and all associated estimation documents required for implementation of the project.
Published Date: August 3, 2026
End Date: August 18, 2026
Implementing Agency: Mettur Municipality
Segment: Water Supply
Work: The scope of work involves preparation of the detailed project report (DPR) for upgrading the existing water supply system to a 24×7 pressurised water supply system. It includes assessment of the existing water supply infrastructure, topographical survey, hydraulic analysis, design of the DMA-based distribution network, review of water treatment plants, transmission mains, reservoirs and pumping systems, preparation of cost estimates, bid documents, five-year operation and maintenance (O&M) plan, climate resilience assessment in accordance with World Bank norms, and all associated studies required for implementation of the project.
Published Date: August 3, 2026
End Date: August 18, 2026
Implementing Agency: Gujarat Urban Development Company Limited (GUDC)
Segment: water supply
Work: The scope of work involves construction of riverfront development works including civil, electrical, water supply, sewerage, stormwater drainage, irrigation and horticulture works for Phase-I along the Thebi and Vadi riverbanks. The project involves development of 0.76 km of the Thebi Riverbank and 0.89 km of the Vadi Riverbank within Amreli town.
Published Date: August 3, 2026
End Date: September 8, 2026
Implementing Agency: Narasingapuram Municipality
Segment: Water Supply
Work: The scope of work involves assessment of the existing water supply distribution system, field investigations, surveys, hydraulic modelling, engineering design, preparation of technical specifications, cost estimates, bid documents and the detailed project report (DPR) for improvement of the water supply distribution system in Narasingapuram Municipality.
Published Date: August 1, 2026
End Date: August 20, 2026
Implementing Agency: Public Health Engineering Department, Meghalaya (PHED)
Segment: Water Supply
Work: The scope of work includes survey, investigation, design, engineering, procurement, construction, supply, erection, testing, commissioning and two years of O&M of the water supply system, including a 70 mld clear water pump house, installation of eight pumps (including two standby pumps) for Mawlynrei and Umsawli to cater to a projected demand of 31.5 mld, clear water and zonal reservoirs, MS pumping mains, feeder and distribution mains, SCADA, electrical and mechanical works, substations, DG sets, water testing laboratory, and associated infrastructure.
Published Date: August 1, 2026
End Date: August 28, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work includes construction of chambers and laying of UPVC pipes for providing house sewer connections in the Zindpur GoC area under the Zindpur wastewater treatment plant (WWTP) catchment area in Delhi.
Published Date: August 1, 2026
End Date: August 31, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Wastewater
Work: The scope of work includes development of the SWD system at an estimated cost of Rs 896.11 million. The work is likely to be completed in 24 months.
Published Date: August 1, 2026
End Date: September 1, 2026
Implementing Agency: Himachal Pradesh State Industrial Development Corporation Limited (HPSIDC)
Segment: Wastewater
Work: The scope of the project includes construction of common effluent treatment plant (CETP) with a combined capacity of 5mld; Phase I – 3 mld (HTDS : 1 mld, LTDS :2 mld); Phase II – 2 mld (High Total Dissolved Solids (HTDS) : 0.5 mld, Low Total Dissolved Solids (LTDS) :1.5 mld) with ZLD (Zero Liquid Discharge) and Effluent Conveyance Network & Recycled Treated Water Network at the Bulk Drug Park including a 2 year defect liability period (DLP) followed by a 25 year operation and maintenance (O&M) period.
Published Date: July 31, 2026
End Date: August 17, 2026.
Implementing Agency: Dharmapuri Municipality
Segment: Water Supply
Work: The scope of work involves providing technical consultancy services for water supply improvement works under the UIDF, including technical assistance related to NHB loan assistance and the implementation of the proposed water supply improvement project.
Published Date: July 31, 2026
End Date: August 19, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work involves conducting topographical GIS survey for the balance left-out areas, designing the underground drainage scheme for the entire Wadi town, preparing the DPR, carrying out hydraulic design of the sewer network, wet well, sewage pumps and SBR-based sewage treatment plant (STP), preparing estimates and DPR booklets, and undertaking trial pit excavation for the proposed underground drainage scheme.
Published Date: July 30, 2026
End Date: August 14, 2026
Implementing Agency: Idappadi Municipality
Segment: Water Supply
Work: The scope of work involves preparation of the detailed project report (DPR) for improvement of the water supply scheme in Idappadi Municipality. It includes field surveys, investigations, engineering design, preparation of drawings, cost estimates, tender specifications and bid documents, evaluation of bids, construction supervision, testing and commissioning support, review of O&M manuals and as-built drawings, and project management support.
Published Date: July 30, 2026
End Date: August 18, 2026
Implementing Agency: Peralam Town Panchayat
Segment: Water Supply
Work: The scope of work involves preparation of the detailed project report (DPR) for upgrading the existing intermittent water supply system into a sustainable, SCADA-enabled 24×7 water supply system. It includes assessment of the existing water supply infrastructure, demand assessment, topographical and geotechnical surveys, hydraulic analysis, redesign of the HDPE distribution network with District Metering Areas (DMAs), source augmentation, design of overhead tanks (OHTs), ground level service reservoirs (GLSRs), pumping systems, SCADA system and house service connections, preparation of engineering designs, cost estimates, operation and maintenance (O&M) plan, implementation strategy, bid documents and stakeholder consultations.
Published Date: July 29, 2026
End Date: August 11, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work involves conducting topographical GIS survey, field investigations, preparation of pre-feasibility report (PFR), detailed project report (DPR), engineering designs and drawings for the proposed water supply scheme. It also includes surveys for transmission mains, rising mains, feeder mains and distribution network, soil investigations, earthwork investigations, and submission of design reports and drawings required for implementation of the project.
Published Date: July 29, 2026
End Date: August 12, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design, supply of materials, construction, testing and commissioning of water supply infrastructure including RCC overhead tanks (OHTs), clear water reservoirs (CWRs), rising mains, distribution network, tube wells, pump houses, boundary walls, site development works, SCADA and automation systems, house connections, and other allied works on a turnkey basis.
Published Date: July 29, 2026
End Date: August 29, 2026*
Implementing Agency: Punjab Agri Export Corporation Limited (PAGREXCO)
Segment: Wastewater
Work: The scope of the project involves design, supply, installation, upgradation, refurbishment, trial run and commissioning of effluent treatment plants (ETPs) on a turnkey basis at the Abohar and Hoshiarpur fruit and vegetable processing plants, including construction of new treatment units and installation of pre-treatment, equalisation, chemical dosing, clarification, UASB and MBBR systems, filtration and sludge dewatering facilities, electrical and SCADA automation systems, along with associated civil, electrical, plumbing, utility, rehabilitation, installation, testing and commissioning works.
Published Date: July 28, 2026
End Date: August 31, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves hydrographic, hydraulic and structural survey, investigation and designing for construction of an RCC drain from Kidwai Nagar Bypass to Pandu River Ramaipur Nala (COD Nala) in Kanpur. It includes supply of all materials, labour and T&P required for construction and completion of the project, along with a 12-month trial run period including manpower, transportation, water supply, power supply and fuel charges.
Published Date: July 29, 2026
End Date: August 11, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves hydrographic, hydraulic and structural survey, investigation and designing for remodelling of the Qila Mohammadi storm water drain in Lucknow. It includes supply of all materials, labour and T&P required for construction and completion of the project, along with a 12-month trial run period including manpower, transportation, water supply, power supply and fuel charges.
Published Date: July 24, 2026
End Date: August 7, 2026
Implementing Agency: Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited (RUDSICO)
Segment: Wastewater
Work: The scope of work involves strengthening the urban drainage system (storm water drainage) in Hindaun City. It includes survey, design, preparation of execution drawings, construction and commissioning of stormwater drainage infrastructure, utility shifting, dewatering, traffic management, testing and submission of as-built drawings. The contractor will also be responsible for quality assurance, structural stability, restoration of affected utilities and roads, and a five-year defect liability period for the completed drainage system.
Published Date: July 24, 2026
End Date: August 10, 2026
Implementing Agency: Panipat Municipal Corporation
Segment: Wastewater
Work: The scope of work involves design, construction, erection, testing and commissioning of facilities for transfer of 60 MLD treated wastewater from the 25 MLD and 35 MLD STPs at Siwah to the existing HSVP tanks in Sector 29, Panipat. It includes construction of a treated wastewater pumping station, treated sewage storage tank with compartments, isolation valves/gates, rising main, associated electromechanical works and allied infrastructure. The contract also includes operation and maintenance for 15 years after the defect liability period.
Published Date: July 24, 2026
End Date: August 14, 2026
Implementing Agency: Kambainallur Town Panchayat
Segment: Water Supply
Work: The scope of work involves preparation of a DPR, including survey, hydraulic design and preparation of a water flow diagram with design for the project.
Published Date: July 23, 2026
End Date: August 4, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves survey, investigation and designing (hydrographic, hydraulic and structural), and construction of an RCC storm water drain for diversion of Geetapalli Nala from Alambagh to Haider Canal in Lucknow. It also includes the supply of all materials, labour, tools and plants (T&P), and all ancillary works required for completion of the project, followed by a 12-month trial run including deployment of manpower, transportation, water supply, power supply and fuel charges.
Published Date: July 23, 2026
End Date: August 7, 2026
Implementing Agency: Punjab Water Supply & Sewerage Board (PWSSB)
Segment: Wastewater
Work: The scope of work involves survey, design, soil investigation, construction, installation and commissioning of a 4 MLD sewage treatment plant (STP) along with a 12 KLD faecal sludge treatment plant (FSTP) based on a suitable sustainable and proven biological technology. It also includes laying, jointing, testing and commissioning of DI K7/K9 rising main, construction of a main pumping station (MPS) and associated sewerage works, process, hydraulic, structural, mechanical, electrical, instrumentation and automation design, civil works and ancillary structures, internal piping, valves and specials, treatment units, sludge handling arrangements, disinfection/chlorination/ozonation system, treated effluent disposal system, supply, erection, testing and commissioning of mechanical, electrical and instrumentation equipment, CCTV system, transformer, DG set, treated water online monitoring system, campus development works, interlocking roads, stormwater drainage, water supply system, hydraulic testing, and 60 months of operation and maintenance after a stabilization period of three months or more.
Published Date: July 23, 2026
End Date: September 11, 2026
Implementing Agency: Gujarat Water Infrastructure Limited (GWIL)
Segment: Wastewater
Work: The scope of work involves designing, constructing, supplying, testing and commissioning of a raw water pumping main from Kaneval Lake in Anand district to Khun Village in Dholera SIR, Ahmedabad district. It includes construction of a water inlet structure, a minimum 2.5 ML raw water sump, pump house, panel room, transformer yard, a 63 km long 1,219 mm OD MS bulk pipeline, electro-mechanical and instrumentation works with vertical turbine pumps, site development works, pipeline bridges of approximately 343 m across the Sabarmati River and 375 m across the Bhogavo River, hydraulic design and surge analysis, river and road crossings, interconnections, testing and commissioning, and land acquisition, crop compensation and right-of-way works. The project will provide a secondary source of industrial water supply to Dholera Special Investment Region (SIR).
Published Date: July 23, 2026.
End Date: September 7, 2026
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design and construction of the regional water supply scheme, including providing, supplying, lowering, laying and jointing of approximately 53.37 km of 110 mm to 350 mm DI and OPVC rising mains and approximately 65.41 km of 80 mm to 500 mm DI, OPVC, UPVC and GI gravity mains, construction of 23 village-level RCC underground sumps, four headworks/boosting RCC underground sumps, two RCC elevated service reservoirs (ESRs), pump houses, compound walls with MS gates and wire fencing, road, railway and river crossings, supplying and erecting pumping machinery, mechanical, electrical and instrumentation works, testing, trial run, commissioning, and 10 years of operation and maintenance (O&M) of civil structures, pipeline network, mechanical and electrical equipment.
Published Date: July 22, 2026
End date: August 27, 2026*
Implementing Agency: Mangalagiri Tadepalli Municipal Corporation (MTMC)
Segment: Wastewater
Work: The scope of work involves design, engineering, construction, testing, commissioning, operation and maintenance of a decentralised underground drainage (UGD) system, including approximately 303.79 km of sewer network, six sewage treatment plants (STPs) with a total proposed capacity of 26.68 mld (against a required capacity of 27.08 mld by 2040, with 0.40 mld met through an existing STP), seven sewage pumping stations with pumping mains totalling approximately 4.22 km in length, gravity sewer pipelines, pumping mains, manholes, inspection chambers, house service connections, mechanical, electrical and instrumentation works, SCADA and real-time monitoring systems, and ancillary infrastructure on Hybrid Annuity Mode (HAM).
Published Date: July 22, 2026
End date: August 5, 2026
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: Naharkanta–Phulnakhara 24×7 Water Supply Project (WTP):
The scope of work involves construction of an 8 m diameter intake well, a 20 MLD water treatment plant (WTP), installation of raw water pumping machinery, laying of a 350 m long, 700 mm DI-K9 raw water rising main, installation of pure water pumping machinery, laying of a 12.703 km long, 200 mm to 450 mm DI-K9 clear water rising main, road and canal crossings, road restoration, external power supply, testing, commissioning.
Naharkanta–Phulnakhara 24×7 Water Supply Project (Distribution System):
The scope of work involves construction of five elevated service reservoirs (ESRs) with capacities ranging from 0.7 ML to 1.5 ML and staging heights of 22 m to 26 m, construction of SCADA rooms, watchman cabins, common toilet blocks and chlorine dose rooms at each ESR site, installation and commissioning of pressure control valves, sluice valves, altitude pilot control valves, electromagnetic flowmeters, level transmitters, pressure transmitters, SCADA and PLC systems, laying of 61.308 km of 100 mm to 450 mm DI K-7 distribution network, provision of 831 house service connections, road crossings by micro-tunnelling, road restoration works, testing, commissioning.
Published Date: July 21, 2026
End date: August 20, 2026*
Implementing Agency: Urban Environment Engineering Department, Jammu & Kashmir
Segment: Wastewater
Work: The scope of work involves survey, design, drawings and execution of the sewerage scheme, including providing, laying, testing and commissioning of sewer pipelines, construction of manholes, sewer connecting chambers, house sewer connections, sewage treatment plant (STP), intermediate pumping stations (IPS), main pumping station (MPS), rising mains, shoring and timbering, road restoration and other appurtenant civil, mechanical and electrical works on an EPC fixed-cost basis.
Published Date: July 21, 2026
End date: September 10, 2026*
Implementing Agency: Narmada and Water Resources, Water Supply and Kalpsar Department
Segment: Wastewater
Work: The scope of work involves survey, sub-soil investigation, preparation of design, plans, maps, estimates and DTP for the construction of a stormwater drainage network for Lolada village in Shankheshwar taluka and Bhadrada village in Sami taluka of Patan district. It includes soil bearing capacity testing through boreholes, statistical survey and investigation, and preparation and submission of detailed design, drawings, estimates and project report.
Published Date: July 20, 2026
End Date: August 4, 2026
Implementing Agency: Uttarakhand Jal Sansthan
Segment: Water Supply
Work: The scope of work involves laying of pipeline from Shri Khadag Singh’s house to Smt. Rajni Devi’s house and from Chillarkhal Tiraha to Lokmanipur via Shri Bahadur Singh’s house under the project. It also includes supply, laying, jointing, testing and commissioning of pipelines and associated works on a turnkey basis.
Published Date: July 18, 2026
End Date: August 1, 2026
Implementing Agency: Narmada and Water Resources, Water Supply and Kalpsar Department
Segment: Water Supply
Work: The scope of work involves providing third party inspection and project management consultancy services for the EPC contract of the project. It includes contract management, progress monitoring, inspection and testing of materials, verification and certification of survey works, review and approval of documents, scrutiny of alignment and revenue records, field verification and finalisation of land acquisition/right of use (RoU) proposals, quality surveillance, supervision of construction, measurement certification, settlement of claims and financial control, reporting and coordination, defect correction supervision and post-contract services.
Published Date: July 17, 2026
End Date: July 31, 2026
Implementing Agency: Greater Visakhapatnam Municipal Corporation
Segment: Wastewater
Work: The scope of work involves investigation, survey, design, construction and commissioning of a sewerage collection and conveyance system in the Gajuwaka area, including integration with the existing sewerage network, construction and completion of sewage pumping stations and lift stations, laying of sewerage and pumping mains, house service connections, road restoration, and 24 months of operation and maintenance (O&M).
Published Date: July 16, 2026
End Date: August 14, 2026
Implementing Agency: Raipur Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of a 150 MLD water treatment plant (WTP), a 16 m diameter intake well with pump house and 50 m RCC approach bridge, laying of 6.5 km of 1,200 mm DI-K9 raw water pumping main and 5.5 km of 1,200 mm DI-K9 clear water pumping main, installation of raw water and clear water pumping machinery, construction of 2,000 kVA and 5,000 kVA electrical substations, installation of bulk flow meters, PLC and IoT-based SCADA system, and allied works including boundary wall, staff quarters, plantation, landscaping and rainwater harvesting. The project also includes a 12 month defects liability period.
Published Date: July 15, 2026
End Date: August 25, 2026*
Implementing Agency: Housing and Urban Development Department, Government of Jammu and Kashmir
Segment: Water Supply
Work: The scope of work involves preparation of a comprehensive, AI-enabled and future-ready master plan up to 2035 along with pre-feasibility reports (PFRs) for water supply, sewerage and stormwater drainage systems in Jammu and Srinagar. It includes DGPS, Total Station, GPR and manual surveys, GIS-based asset mapping, system assessment, hydraulic modelling, preparation of integrated master plans, planning of water supply, sewerage and drainage infrastructure, preparation of PFRs for proposed STPs and WTPs with layouts, drawings and cost abstracts, existing network improvement strategies, IT-enabled monitoring solutions, and submission of inception, survey and investigation, hydraulic model and final master plan reports.
Published Date: July 16, 2026
End Date: August 6, 2026
Implementing Agency: Korba Municipal Corporation
Segment: Wastewater
Work: The scope of work involves design, construction, erection, testing and commissioning of a 20 MLD UF-RO based tertiary treatment plant at Korba with PEB structure and allied tanks and equipment. It includes construction and commissioning of an RCC RO permeate tank of 4,000 KL capacity, installation of pumping machinery of 1,000,000 LPH capacity with 26 m head, providing and commissioning of a 1,500 KVA/33/3.3 KV electrical substation and laying of a 500 mm diameter DI K-9 pumping main of 1.3 km from the RO permeate tank to the NTPC premises. The project also includes operation and maintenance of the entire scheme for 15 years.
Published Date: July 14, 2026
End Date: July 29, 2026*
Implementing Agency: Indian Army, Ministry of Defense
Segment: Wastewater
Work: The scope of the work includes preparation of DPR for STP Network including digital topographical land survey by using DGPS/Electronic Total Station, showing all details like site boundary, NH, Pucca/Kuchthal Roads, road dividers, electric line (LT and HT) like overhead power line, transformers, temples, culvers light post, trees all kind of natural & manmade structures like buildings/walls, wire fence, river, cenal, nala, wells, tube wells, ponds, sever/storm lines, invert levels if possible and whichever exists inside the site.
Published Date: July 14, 2026
End Date: July 27, 2026
Implementing Agency: Khalapur Nagar Panchayat
Segment: Wastewater
Work: The scope of work involves preparation of the detailed project report (DPR) and providing project management support (PMS) for the proposed sewage treatment plant (STP) project within the jurisdiction of Khalapur Nagar Panchayat.
Published Date: July 13, 2026
End Date: July 27, 2026
Implementing Agency: Karur Corporation
Segment: Wastewater
Work: The scope of work involves design, engineering, supply, construction, erection, installation, Testing, commissioning etc complete for the 35.25 mld STP at Arasu colony, and Solar Sludge drying beds (SSD) within STP premises.
Published Date: July 11, 2026
End Date: September 7, 2026
Implementing Agency: Municipal Council, Mau
Segment: Wastewater
Work: The scope of work includes topographical surveys of drains, natural water paths and catchments, hydrological and rainfall pattern analysis, assessment of the existing drainage network and bottlenecks, design of a new drainage network, preparation of cost estimates, DPR and tender documents, assistance during tendering and bid evaluation, and supervision during project execution. The consultant will also ensure compliance with National Mission for Clean Ganga (NMCG) guidelines for drainage, sewerage and pollution abatement projects.
Published Date: July 11, 2026
End Date: July 28, 2026
Implementing Agency: Rural Drinking Water and Sanitation Department (RDW&SD), Karnataka
Segment: Water Supply
Work: The scope of work involves providing project management consultancy (PMC) services for implementation of multi village drinking water supply facilities to Shirali and 30 other villages (244 habitations) in Bhatkal Taluk, Balkoor and 36 other villages (260 habitations) in Honnavara Taluk, along with augmentation of the Ramnagara drinking water supply scheme covering 15 additional villages (39 habitations) in Joida Taluk under the Jal Jeevan Mission. The consultancy includes construction supervision, quality control, monitoring of project progress, contract administration, certification of contractor bills, coordination with stakeholder agencies, review of designs and drawings, preparation of completion documentation and as-built drawings, and supervision during project completion and handover.
Published Date: July 10, 2026
End Date: August 17, 2026*
Implementing Agency: Karur Corporation
Segment: Wastewater
Work: The scope of work involves laying of 105.53 km sewer network, 6038 HSCs and 10.8 km pumping mains.
Published Date: July 10, 2026
End Date: September 7, 2026
Implementing Agency: Sewerage and Drainage Division (West), Jammu
Segment: Wastewater
Work: The scope of work involves survey and investigation, assessment of existing sewerage and used water infrastructure, preparation of feasibility reports and detailed project reports (DPRs) for three sewerage (used water management) projects in Jammu city, including sewage treatment plants (STPs), fecal sludge treatment plants (FSTPs), sewerage networks, interception and diversion works, and associated infrastructure. The consultancy also includes topographical surveys, wastewater generation assessment, hydraulic and process design, preparation of drawings, cost estimates, tender documents, environmental and social assessments, technology selection, and DPR vetting.
Published Date: July 9, 2026
End Date: July 30, 2026
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work involves augmentation and rehabilitation of the urban water supply system (UWSS) in Bharatpur, including construction and commissioning of a 10.8 mld (500 KLH) drinking water treatment plant (WTP), ten overhead service reservoirs (OHSRs), pumping stations and pumping machinery, 19.99 km of 150-600 mm dia DI-K7 rising mains, 323.55 km of 90-400 mm dia HDPE and DI-K7 distribution network, replacement of 15,881 household connections, SCADA automation, road restoration, repair and extension of pump houses and clear water reservoirs (CWRs), and other associated works. The project also includes a one-year defect liability period followed by five years of operation and maintenance (O&M).
Published Date: July 9, 2026
End Date: September 7, 2026*
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work involves survey, investigation and preparation of a detailed project report (DPR) for a water supply project in the RICCO area at Shreenagar, Todaraisingh in Tonk district. The consultancy includes assessment of water demand, preparation of designs, drawings, estimates, technical specifications and other documents required for implementation of the water supply project.
Published Date: July 9, 2026
End Date: July 16, 2026
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work involves augmentation and rehabilitation of the urban water supply system (UWSS) in Dhaulpur, including construction and commissioning of water supply infrastructure comprising pipelines, pumping machinery, drinking water treatment plant, clear water reservoirs (CWR/GLSR/GLR), overhead service reservoirs (OHSRs) and associated works. The project also includes one-year defect liability period followed by five years of operation and maintenance (O&M).
Published Date: July 9, 2026
End Date: September 7, 2026*
Implementing Agency: Karur City Municipal Corporation
Segment: Wastewater
Work: The scope of work involves providing an underground sewerage scheme (UGSS) to the leftout and added areas of Karur Corporation, including laying of sewer networks, pumping mains, house service connections (HSCs), pumping stations and all associated works. The project also includes operation and maintenance (O&M) of the sewerage system for a period of five years.
Published Date: July 9, 2026
End Date: September 7, 2026
Implementing Agency: Dholera Industrial City Development Limited (DICDL)
Segment: Desalination
Work: The scope of the include identification and evaluation of suitable intake and outfall arrangements, selection of appropriate desalination technology, assessment of raw water and product water quality, estimation of capital and operating costs, demand assessment, financial and economic analysis, environmental impact studies, risk assessment, stakeholder consultations, obtaining requisite statutory approvals, and preparation of a bankable DPR with implementation strategy, project phasing, procurement methodology, and bid documents for execution of the project.
Published Date: July 8, 2026
End Date: August 13, 2026*
Implementing Agency: Thirumurugan Poondi Municipality
Segment: Water Supply
Work: The scope of work involves preparation of drawings, fixing of levelling points using DGPS survey, preparation of detailed estimate, abstract estimate and tender schedule, structural design, soil investigation report, bid documents and rate analysis (DATA), assistance in obtaining administrative and technical approvals, and addressing remarks and queries from the competent authorities for improvement of the water supply scheme in Thirumurugan Poondi Municipality.
Published Date: July 7, 2026
End Date: July 22, 2026
Implementing Agency: Raipur Municipal Corporation
Segment: Wastewater
Work: The scope of work involves providing technical assistance to Raipur Municipal Corporation (RMC) for DPR preparation and project management covering all aspects of urban flood risk management including development and upgradation of storm water network (Cost Rs 1,110 million), blue-green infrastructure (cost Rs 430 million) and interlinking of ponds (Rs 300 million) and water bodies, and institutionalization of capacities for effective operationalization of such schemes.
Published Date: July 7, 2026
End Date: July 22, 2026
Implementing Agency: Uttarakhand Peyjal Nigam
Segment: Water Supply
Work: The scope of work involves survey, design and construction of an intake chamber, an 18 mld SCADA-based water treatment plant (WTP), a 1,500 KL sump-cum-clear water reservoir, pump houses, one 2,250 KL master balancing reservoir (MBR) and three overhead tanks of 300 KL, 350 KL and 950 KL capacities. It also includes laying of 0.3 km of 550 mm dia MS raw water gravity main, 4.40 km of 550 mm dia MS clear water rising main, 4.21 km of 125-200 mm dia MS booster pumping rising main, 22.69 km of 100-350 mm dia DI feeder mains (total main pipelines: 31.6 km), 38.78 km of HDPE and DI distribution network, SITC of pumping plants, automation works, road reinstatement and associated civil and electro-mechanical works. The project also includes operation and maintenance (O&M) for five years.
Published Date: July 6, 2026
End Date: July 21, 2026
Implementing Agency: Vijayawada Municipal Corporation (VMC)
Segment: Wastewater
Work: The scope of work involves recycling and reuse of treated wastewater from the 20 mld Auto Nagar STPs and other STPs through construction of a tertiary treatment plant (TTP), laying pipelines for supply to Auto Nagar Industrial Area, other industries and thermal power plants, and operation and maintenance of the system under a design, build, operate and transfer (DBOT) model on a public private partnership (PPP) basis. The project also includes supply of treated wastewater meeting APPCB and CPCB standards, installation of SCADA-based monitoring systems, and operation and maintenance for 25 years.
Published Date: July 4, 2026
End Date: August 1, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work involves conducting topographical GIS survey for the balance left-out areas, designing the underground drainage scheme for the entire Wadi town, preparing the DPR, carrying out hydraulic design of the sewer network, wet well, sewage pumps and SBR-based sewage treatment plant (STP), preparing estimates and DPR booklets, and undertaking trial pit excavation for the proposed underground drainage scheme.
Published Date: July 4, 2026
End Date: July 25, 2026*
Implementing Agency: Cyberabad Municipal Corporation (CMC)
Segment: Wastewater
Work: The scope of work involves construction of a storm water drain (SWD) from Kukatpally Depot to Gautham Nagar, including PCC, RCC and HYSD works.
Published Date: July 4, 2026
End Date: July 18, 2026.
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Wastewater
Work: The scope of work involves survey, investigation and preparation of a detailed project report (DPR) for interception and diversion (I&D) works and a sewage treatment plant (STP) to tap the remaining nala under Bhagalpur Nagar Nigam. The consultancy also includes feasibility studies, topographical survey, hydraulic design, preparation of drawings, estimates, bid documents and the final DPR for the project.
Published Date: July 4, 2026
End Date: July 13, 2026
Implementing Agency: Jal Shakti Vibhag, Himachal Pradesh
Segment: Wastewater
Work: The scope of work involves survey, investigation and preparation of a detailed project report (DPR) for providing a sewerage system to Paplog, Bakarta, Barchhwar, Rakhoh and the surrounding areas in Dharampur tehsil of Mandi district, Himachal Pradesh.
Published Date: July 4, 2026
End Date: July 13, 2026
Implementing Agency: Visvesvaraya Jala Nigam Limited (VJNL)
Segment: Wastewater
Work: The scope of work involves survey and investigation, preparation of designs, drawings, estimates and DTPs for the proposed Vaderahalli Storage Reservoir near Vaderahalli village in Koratagere Taluk, Tumakuru district, design of allied structures for conveying water from Vaderahalli to Lakkenahalli Balancing Reservoir or the intake forebay of Kolar Package-I pump house, and preparation of land acquisition and rehabilitation and resettlement (R&R) proposals under the Yettinahole Project.
Published Date: July 4 2026
End Date: July 13, 2026
Implementing Agency: Hosur City Municipal Corporation (HCMC)
Segment: Wastewater
Work: Hosur City Integrated Stormwater Drain Project (Package 1)
The scope of work involves improvement of 3.75 km of natural nallahs and primary drains through random rubble masonry retaining walls and earthen bund strengthening. It also includes rejuvenation of two water bodies and desilting of lake beds with a total quantity of 19,200 cubic metres to restore storage capacity and improve groundwater recharge.
The estimated cost of Package 1 is Rs 149.10 million.
Hosur City Integrated Stormwater Drain Project (Package 2)
The scope of work involves improvement of 7.50 km of natural nallahs and primary drains through RCC retaining walls, random rubble masonry retaining walls, earthen bund strengthening and construction of 1.04 km of RCC secondary closed drains for flood-prone areas. It also includes rejuvenation of three water bodies and desilting of lake beds with a total quantity of 28,900 cubic metres to restore storage capacity and improve groundwater recharge
The estimated cost of Package 2 is Rs 414.90 million.
Hosur City Integrated Stormwater Drain Project (Package 3)
The scope of work involves improvement of 12.49 km of natural nallahs and primary drains and construction of 1.07 km of RCC secondary closed drains for flood hotspots. It also includes rejuvenation of two water bodies and desilting of lake beds with a total quantity of 1.28 lakh cubic metres to restore storage capacity and improve groundwater recharge.
The estimated cost of Package 3 is Rs 491.90 million.
Hosur City Integrated Stormwater Drain Project (Package 4)
The scope of work involves improvement of 5.66 km of natural nallahs and primary drains through RCC retaining walls, random rubble masonry retaining walls, earthen bund strengthening and construction of 1.34 km of RCC secondary closed drains for flood-prone areas. It also includes development of 10 open space reservation (OSR) sites.
The estimated cost of Package 4 is Rs 226.90 million.
Hosur City Integrated Stormwater Drain Project (Package 5)
The scope of work involves improvement of 9.47 km of natural nallahs and primary drains, construction of 11.36 km of RCC secondary closed drains for flood hotspots and rejuvenation of three water bodies through interlinking with major nallahs, primary drains and secondary drains. It also includes desilting of lake beds with a total quantity of 10,700 cubic metres to restore storage capacity and improve groundwater recharge.
The estimated cost of Package 5 is Rs 751.60 million.
Hosur City Integrated Stormwater Drain Project (Package 6)
The scope of work involves improvement of 7.86 km of natural nallahs and primary drains, construction of 1.20 km of RCC secondary closed drains for flood-prone areas and rejuvenation of two water bodies. It also includes desilting of lake beds with a total quantity of 9,400 cubic metres to restore storage capacity and improve groundwater recharge and development of six open space reservation (OSR) sites.
The estimated cost of Package 6 is Rs 370.70 million.
Hosur City Integrated Stormwater Drain Project (Package 7)
The scope of work includes improvement of 11.16 km of natural nallahs and primary drains through earthen bund strengthening and rejuvenation of four water bodies, including desilting, de-weeding, recharge pits, bund strengthening, stone pitching, turfing, walkway development, plantation works, chain-link fencing, LED lighting, installation of benches and rehabilitation of inlet and outlet weirs.
Published Date: June 4, 2026
End Date: August 11, 2026
Implementing Agency: Bengaluru Solid Waste Management Limited (BSWML)
Segment: Wastewater
Work: The consultancy includes quality control and monitoring of construction works, review of drawings and site modifications, contract administration, certification of contractor bills, progress monitoring, coordination with various stakeholder agencies, preparation of completion documentation and as-built drawings, and supervision during project completion and handover.
Published Date: July 3, 2026
End Date: July 17, 2026
Implementing Agency: Kallidaikurichi Special Grade Town Panchayat
Segment: Wastewater
Work: The scope of work involves survey and data collection, hydrological and hydraulic studies, and preparation of a detailed project report (DPR) for renovation and construction of the storm water drainage network in Kallidaikurichi Special Grade Town Panchayat, Tirunelveli district. The consultancy includes topographical and GIS surveys, drainage network mapping, hydraulic design of drains and drainage structures, preparation of drawings, bill of quantities (BOQ), technical specifications, cost estimates, implementation schedule, operation and maintenance (O&M) plan, and the DPR for project appraisal and funding.
Published Date: July 2, 2026
End Date: July 15, 2026
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Water Supply
Work: The scope of work involves augmentation of the water supply system and implementation of the sewerage system in Kharak Kalan and Kharak Khurd, including construction of 3.5 mld and 1 mld SCADA-based water treatment plants (WTPs), a 4 mld sewage treatment plant (STP), a 4 mld main pumping station (MPS), two intermediate pumping stations (IPSs), RCC sand and silt tanks, clear water tanks, pumping machinery and electrical works. It also includes laying of 4.65 km of clear water rising mains, 0.40 km of raw water rising main, 46.73 km of DI water supply pipelines, 51.57 km of sewer pipelines, construction of oxidation pond, manholes, inspection chambers, boundary walls, roads and allied works, along with functional household tap connections (FHTCs).
Published Date: July 2, 2026
End Date: July 28, 2026
Implementing Agency: Indian Army, Ministry of Defence
Segment: Wastewater
Work: The scope of work involves survey and investigation, preparation of a detailed project report (DPR) for a comprehensive drainage system comprising a network of storm drains and sumps at Kota Military Station, topographical and contour surveys, preparation of structural designs and drawings, digital 3D modelling and BIM, design of drainage lines, collection chambers, RCC and brick drains, culverts and box-type culverts, preparation of bill of quantities (BOQ), cost estimates, tender documents and bid evaluation report, and consultancy support during the construction stage.
Published Date: July 1, 2026
End Date: July 29, 2026*
Implementing Agency: Haryana State Industrial And Infrastructure Development Corporation Limited (HSIIDC)
Segment: Wastewater
Work: The scope of work includes planning, design, engineering, procurement, construction, installation, testing and commissioning of a 16.10 mld common effluent treatment plant (CETP) with ultimate pumping capacity of 96.6 mld based on physico-chemical, biological (extended aeration process) tertiary treatment works. It also includes inlet and screening arrangements, wet sump and pump house, oil and grease cum grit chambers, equalisation tank and sump, chemical house, clariflocculator, sludge handling units, aeration tanks, secondary clarifiers, tertiary treatment units, chlorination, DG sets, transformers and other allied infrastructure.
Published Date: June 30, 2026
End Date: July 28, 2026
Implementing Agency: Municipal Corporation of Jodhpur
Segment: Wastewater
Work: The scope of the project involves providing, laying, jointing, testing and commissioning of sewer system (lateral, branch and main sewers outfall etc.) for Jodhpur and all ancillary works, including construction of Manholes, Property connections and restoration of roads etc. specified in the BDS with defect liability of 1 year and Operations & Maintenance (O&M) for 10 years.
Published Date: June 30, 2026
End Date: August 5, 2026*
Implementing Agency: Kachchh District Panchayat
Segment: Wastewater
Work: The scope of work includes Preparation of DPR, Estimate, Bid document for bid process management, project management, Construction Supervision and Inspection for all infrastructure work including preparation of Feasibility Report to Describe Existing Facility in village & to provide proposed infrastructure facilities in village for Drainage scheme for disposal of Dry/wet sewage Including preparing presentation for the above DPR to the concerned authority and approval of the DPR from the concerned authority.
Published Date: June 29, 2026
End Date: July 14, 2026
Implementing Agency: Gujarat Water Supply & Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work involves working survey; providing, supplying, lowering, laying, jointing, testing and commissioning of approximately 183 km of PVC, MS, GI and DI rising and gravity main pipelines ranging from 90 mm to 610 mm diameter; design and construction of 30 lakh litre raw water sump and 70 lakh litre clear water sump; construction of pump houses, compound walls, approach roads and store sheds; supply, installation, testing and commissioning of pumping machinery and associated electro-mechanical works required for augmentation of the Vijapur Regional Water Supply Project.
Published Date: July 29, 2026
End Date: September 5, 2026
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: Bhubaneswar Town Planning Scheme (TP 1, 2 & 3) 24×7 Water Supply Project : The scope of the project includes construction of clear water gravity main of length 15.09 km, clear water transmission main, distribution network of length 170.74 km and 5,192 house meters etc., including operation and maintenance (O&M) for five years.
Bhubaneswar Town Planning Scheme (TP 1, 2 & 3) Underground Sewerage Project : The scope of the project includes construction of gravity sewer network of length 78.29 km, pumping main of length 7.35 km, 6 sewage pumping stations, sewage treatment plant (STP) of capacity 20 mld and 4,921 sewer property connections etc., including operation and maintenance (O&M) for five years.
Published Date: June 29, 2026
End Date: July 27, 2026*
Implementing Agency: Gujarat Water Supply & Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design, construction, supply, laying, jointing, testing and commissioning of rising, gravity and distribution pipelines; construction of three 50 lakh litre RCC sumps, five ESRs comprising one 10 lakh litre ESR, one 8 lakh litre ESR, two 6 lakh litre ESRs and one 5 lakh litre ESR; construction of a pump house, administrative building, compound wall and RCC approach roads; supply, installation, testing and commissioning of pumps, chlorination system and associated electro-mechanical works; repair of the existing filter plant; and construction of valve chambers, thrust blocks and other associated civil works for augmentation of the Kadi Regional Water Supply Scheme covering 132 villages and seven hamlets.
Published Date: July 28, 2026
End Date: September 5, 2026
Implementing Agency: Uttarakhand Peyjal Sansadhan Vikas Evam Nirman Nigam
Segment: Wastewater
Work: The scope of the project includes preparation of DPR of sewerage work including conducting topographical survey by Total station. Preparation of contour drawings, discharge measurement of existing drains/ Nallah, preparation of Technical note, design of sewerage network, preparation of L-section layout drawing, household survey, cost estimate considering existing sewer network SPS & STP for Khatima Town of District Udham Singh Nagar, Uttarakhand.
Published Date: June 25, 2025
End Date: July 15, 2026
Implementing Agency: Madurai City Municipal Corporation (MCMC)
Segment: Water Supply
Work: The scope of work involves riverfront development at identified stretches along the Vaigai River in Madurai City Municipal Corporation, including interception and diversion (I&D) works, riverbank protection, jungle clearance, riparian plantation, retaining walls, promenades and public amenities, landscaping, paving works, lighting, CCTV surveillance, electrical and plumbing works, waste management facilities and other associated infrastructure works.
Published Date: June 25, 2026
End date: July 28, 2026
Implementing Agency: Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB)
Segment: Wastewater
Work: The scope of work involves survey, investigation, planning, design, engineering, procurement, construction, testing, commissioning, operation and maintenance of secondary water reuse and tertiary treatment facilities on a Design, Build, Finance, Operate and Transfer (DBFOT) basis. It includes development of infrastructure for reuse of treated wastewater along the Attapur STP-Chandan Valley corridor (233 MLD) and the Nagole STP-Future City corridor (290 MLD), comprising treated wastewater conveyance systems, tertiary treatment facilities, pumping stations, storage facilities, transmission and distribution networks, SCADA and automation systems, and associated infrastructure.
Published Date: June 25, 2026
End date: August 17, 2026*
Implementing Agency: Greater Hyderabad Municipal Corporation (GHMC)
Segment: Wastewater
Work: The scope of the project includes assessment and analysis of existing hydraulic, hydrodynamic and hydrological structures; data collection, acquisition and validation for hydrodynamic modelling; development of an integrated geo-referenced and resilient storm water drainage master plan; preparation of hydraulic, hydrologic and hydrodynamic 1D and 2D models to mitigaThe work is likely to be completed in 24 months te flood risks; promotion of sustainable urban planning and water resource management; and development of an operation and maintenance plan for the entire drainage network including inspection protocols, periodic desilting schedules and SOPs for pre-monsoon preparedness.
Published Date: June 24, 2026
End Date: July 21, 2026*
Implementing Agency: Korba Municipal Corporation
Segment: Wastewater
Work: The scope of work involves design, construction, erection, testing and commissioning of a 20 mld UF-RO based tertiary treatment plant at Korba with PEB structure and allied tanks and equipment. It includes construction and commissioning of an RCC RO permeate tank of 4,000 KL capacity, installation of pumping machinery of 1,000,000 LPH capacity with 26 m head, providing and commissioning of a 1,500 KVA/33/3.3 KV electric sub-station and laying of 500 mm dia DI K-9 pumping main of 1.3 km from the RO permeate tank to NTPC premises. The project also includes operation and maintenance of the entire scheme for 15 years.
Published Date: June 23, 2026
End Date: July 9, 2026*
Implementing Agency:Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work:The scope of work involves construction of a 100 mld Main Pumping Station (MPS), 100 mld Sewage Treatment Plant (STP) based on SBR technology along with sludge treatment and Bio-CBG generation facilities. It includes design, construction, testing, commissioning and trial run of the project components and sale of compressed biogas (CBG).
Published Date: June 22, 2026
End Date: July 27, 2026*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Water Supply
Work: Begusarai Sewerage Network and STP: The work is likely to be completed in 12 months.
Published Date: June 22, 2026
End Date: August 31, 2026*
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Wastewater
Work: The scope of work involves conversion of five sub-drains of Main Drain-1 (MD-1) into closed RCC box drains, including Drain 3R (1,305 m), Drain 4R (2,797 m), Drain 3L (716 m), Drain 5R (2,422 m) and Drain 6R (1,300 m), covering a total length of about 8.54 km. The work includes ancillary works for flood mitigation, sanitation improvement and traffic enhancement in Cuttack, along with survey, design, geotechnical investigations, site clearance and utility shifting, construction, supply, installation, testing, trial run and commissioning of the box drain system and associated facilities on an EPC basis. The project also includes operation and maintenance requirements and training of employer’s personnel.
Published Date: June 22, 2026
End date: July 31, 2026
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work involves design and construction of a 90 mld main pumping station and a 40 mld STP on SBR technology including civil works, erection and commissioning of mechanical, electrical, instrumentation and automation systems, PLC/SCADA-based automation, procurement and supply of all electrical and mechanical equipment, site development, landscaping and all associated and contingent works. It also includes a defect liability-cum-maintenance period of six years following a three-month trial run period.
Published Date: June 22, 2026
End Date: July 20, 2026
Implementing Agency: Seoni Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing, laying, jointing, testing and commissioning of sewer pipelines including construction of manholes and sewer appurtenances, provision of house sewer chambers and lateral connections for 18,683 households to integrate consumer sewer lines with the main sewer network, design and construction of sewage treatment plants (STPs) with capacities of 5.9 mld, 5.2 mld and 3.6 mld, providing and laying of HT feeder line connection up to sewage treatment plants, preparation of maps of proposed sewerage network and property connections with GIS mapping, installation of PLC-SCADA and OCEMS systems, provision and installation of transformers and other electrical components for the sewerage system and associated works. The contract also includes operation and maintenance of the sewerage system for 10 years.
Published Date: June 22, 2026
End Date: August 18, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Water Supply
Work: The scope of work involves implementation of three water supply and sewerage projects under Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0. These are:
Saharsa Water Supply Scheme Project: The scope of the work includes construction of 12 tube wells, 12 pump houses with chlorinators, eight iron removal plants, eight water towers and 186.49 km of water distribution network at total cost of Rs 1274.5 million. The work is likely to be completed in 12 months at an estimated tender cost of Rs 1,211.94 million. The work is likely to be completed in 12 months.
Hajipur Water Supply Scheme Project: The scope of the work includes the construction of 1000 watt tube wells, seven pump houses with chlorination systems, six water towers and 212.70 km water distribution network at total cost of Rs 1318.8 million. The work is likely to be completed in 12 months at an estimated tender cost of Rs 1,255.49 million. The work is likely to be completed in 12 months.
Biharsharif I&D and STP: The work is likely to be completed in 12 months .
Published Date: June 22, 2026
End Date: August 11, 2026
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited (JUIDCO)
Segment: Water Supply
Work: The scope of work involves preparation of GIS-based consumer mapping, surveys and hydraulic modelling, design and construction of a 10 mld water treatment plant with associated electrical substation, staff quarters and sludge settling tank, construction of a floating intake well, raw water transmission main of 12.85 km, treated water transmission main of 9.175 km and distribution network of 54.742 km. It also includes construction of elevated service reservoirs of 1,980 kl and 1,840 kl capacities, providing 7,094 house service connections, installation of bulk meters, sensors and SCADA system, and associated railway and NH crossings.
Published Date: June 22, 2026
End Date: July 13, 2026
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves design, supply, installation, testing and commissioning of a Sewage Pumping Station and Sewage Treatment Plant (STP) of 250 mld capacity based on open technology at Vinzol in Hathijan Ward of East Zone, Ahmedabad. It includes detailed design, civil, electrical, mechanical, instrumentation and structural works, SCADA-based automation system, flow meters and online monitoring equipment along with all associated piping, mechanical, electrical and instrumentation components. The contract also includes operation and maintenance of the entire scheme for 10 years after successful commissioning.
Published Date: June 20, 2026
End Date: July 29, 2026
Implementing Agency: Karnataka Industrial Areas Development Board (KIADB)
Segment: Wastewater
Work: The scope of work involves establishment, engineering, design, construction, procurement, commissioning and operation of a 10 MLD sewage treatment plant (STP) followed by a 5 MLD tertiary treatment plant (TTP), along with two modules of 1.50 MLD each common effluent treatment plant (CETP) with a 1.50 MLD reverse osmosis (RO) system and zero liquid discharge (ZLD) facilities at KWIN City Phase-I in Nelamangala Taluk, Bengaluru Rural district. The project will be implemented on a total turnkey basis and also includes civil, mechanical, electrical and instrumentation works, automation and SCADA systems, internal roads, storm water drains, greenbelt development, trial runs, statutory approvals and comprehensive operation and maintenance (O&M) for 10 years after commissioning.
Published Date: July 20, 2026
End Date: September 4, 2026*
Implementing Agency: Tirunelveli City Municipal Corporation
Segment: Wastewater
Work: The scope of work involves riverfront development and pollution abatement through nature-based solutions along the Thamirabarani River in Tirunelveli City Municipal Corporation. The project includes various works including interception and diversion (I&D) works, riverbank protection and embankment works, desilting of channels, promenades, ghats and public realm works, landscaping works, electrical and lighting works, surveillance systems and waste management facilities.
Published Date: June 19, 2026
End Date: August 3, 2026
Implementing Agency: New Tirupur Area Development Corporation Limited (NTADCL)
Segment: water supply
Work: The scope of work involves procurement, construction and commissioning of a combined water supply scheme to provide 3.5 mld to SIPCOT Defence Industrial Park at Varapatti, 2.0 mld to TIDCO Aerospace Industrial Park at Sulur and 3.0 mld to TIDCO Semi-Conductor Industrial Park at Kethanur from NTADCL Water Distribution Station (WDS-24) at Murugampalayam, Tirupur and all associated works. The pipeline capacity is 50.86 km.
Published Date: June 19, 2026
End Date: July 20, 2026*
Implementing Agency: Public Works Department, Delhi (PWD)
Segment: Wastewater
Work: The scope of work involves remodeling of the existing storm water drainage system under the New Drainage Master Plan by replacing old brick and pipe drains from Jhuljhuli More to Pandwala Outfall on Rao Laxmi Chand Marg, New Delhi. The work includes detailed surveys, preparation and vetting of drainage layouts and drawings, construction of storm water drains, utility protection and shifting, excavation and dewatering, traffic management, debris disposal, safety arrangements and associated civil works required to make the drainage system fully functional.
Published Date: June 16, 2026
End Date: July 24, 2026.
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves construction of a 5.5 MGD (25.003 mld) Decentralized Sewage Treatment Plant (DSTP) at Nayabans along with sewage pumping stations and associated allied works on a design-build-operate (DBO) basis. It includes construction of seven sewage pumping stations with rising mains, disposal pipeline of 4.4 km and outfall structure, treated water sump, boundary wall, roads, landscaping, horticulture and road restoration works.
Published Date: June 16, 2026
End Date: September 31, 2026*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of the project includes Construction of 2 Nos. treated and 01 No. untreated Sewage Pumping Stations at Coronation Pillar along with other associated /allied appurtenant works for 15 years Operation & Maintenance including 02 years Defect Liability Period along with Providing, Laying and jointing 2000 mm dia MS effluent rising main from Coronation Pillar STPs to Yamuna River downstream of Wazirabad – Barrage. The project will be implemented on Design, Build & Operate (DBO) basis.
Published Date: June 13, 2026
End Date: September 3, 2026*
Implementing Agency: Haryana State Industrial and Infrastructure Development Corporation (HSIIDC)
Segment: Wastewater
Work: The scope of the project involves planning, design, engineering, procurement, construction, installation, testing, commissioning of 20 mld capacity Common Effluent Treatment Plant (CETP) based on Extended Aeration Technology along with fully automation and all other works contingent thereto including trial run for 3 months. Thereafter, ten years defect liability period including ten years of Operation and Maintenance (O&M), including Chemicals and staff, excluding power but including diesel for DG sets in case of power failure, for testing, trial run and Operation & Maintenance of the CETP.
Published Date: June 15, 2026
End Date: July 30, 2026*
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes sewerage and septage management systems in six Urban Local Bodies (ULBs) namely Anupgarh, Nohar, Taranagar, Raisinghnagar, Rajgarh (Ch.) & Rajaldesar through construction of sewage treatment plants (STPs) based on MBBR technology, laying, jointing, testing and commissioning of sewerage networks, house sewer connections, utilization of Faecal Sludge Treatment Plants (FSTPs) for unsewered areas, road cutting and restoration works, SCADA and OCEMS systems, GLR and OHSR facilities, solar power provisions at STPs and pumping stations, transformer and electrical infrastructure and other allied sewerage infrastructure. The project also includes one year Defect Liability Period (DLP) and ten years Operation & Maintenance (O&M) of the entire sewerage system.
Published Date: June 11, 2026
End Date: July 27, 2026*
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes sewerage and septage management systems in four Urban Local Bodies (ULBs) namely Bhopalgarh, Sadri, Falna & Phalodi through construction of sewage treatment plants (STPs) based on MBBR technology, laying, jointing, testing and commissioning of sewerage networks, house sewer connections, utilization of Faecal Sludge Treatment Plants (FSTPs) for unsewered areas, road cutting and restoration works, SCADA and OCEMS systems, GLR and OHSR facilities, solar power provisions at STPs and pumping stations, transformer and electrical infrastructure and other allied sewerage infrastructure. The project also includes one year Defect Liability Period (DLP) and ten years Operation & Maintenance (O&M) of the entire sewerage system.
Published Date: June 11,2026
End Date: July 27, 2026*
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes sewerage and septage management systems in two Urban Local Bodies (ULBs) namely Sheoganj & Sanchore through construction of sewage treatment plants (STPs) based on MBBR technology, laying, jointing, testing and commissioning of sewerage networks, house sewer connections, utilization of Faecal Sludge Treatment Plants (FSTPs) for unsewered areas, road cutting and restoration works, SCADA and OCEMS systems, GLR and OHSR facilities, solar power provisions at STPs and pumping stations, transformer and electrical infrastructure and other allied sewerage infrastructure. The project also includes one year Defect Liability Period (DLP) and ten years Operation & Maintenance (O&M) of the entire sewerage system.
Published Date: June 11, 2026
End Date: July 27, 2026*
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes sewerage and septage management systems in six Urban Local Bodies (ULBs) namely Bijainagar, Kekri, Degana, Deoli, Bissau & Neem Ka Thana through construction of sewage treatment plants (STPs) based on MBBR technology, laying, jointing, testing and commissioning of sewerage networks, house sewer connections, utilization of Faecal Sludge Treatment Plants (FSTPs) for unsewered areas, road cutting and restoration works, SCADA and OCEMS systems, GLR and OHSR facilities, solar power provisions at STPs and pumping stations, transformer and electrical infrastructure and other allied sewerage infrastructure. The project also includes one year Defect Liability Period (DLP) and ten years Operation & Maintenance (O&M) of the entire sewerage system.
Published Date: June 11, 2026
End Date: July 27, 2026*
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes sewerage and septage management systems in six Urban Local Bodies (ULBs) namely Antah, Chhabra, Ramganj Mandi, Bhawani Mandi, Mangrol and Atru through construction of sewage treatment plants (STPs) based on MBBR technology, laying, jointing, testing and commissioning of sewerage networks, house sewer connections, utilization of Faecal Sludge Treatment Plants (FSTPs) for unsewered areas, road cutting and restoration works, SCADA and OCEMS systems, GLR and OHSR facilities, solar power provisions at STPs and pumping stations, transformer and electrical infrastructure and other allied sewerage infrastructure. The project also includes one year Defect Liability Period (DLP) and ten years Operation & Maintenance (O&M) of the entire sewerage system.
Published Date: June 11, 2026
End Date: July 27, 2026*
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work involves demolition of old pumping station and construction of new raw water pumping station, demolition and safe dismantling of the existing raw-water pumping station, including civil structures, pumps, motors, valves, cables, and other appurtenances, with due environmental and safety measures, design and construction of a new raw-water pumping station of 48 mld capacity, comprising RCC pump-house structure with suction and delivery manifolds, foundations, and access arrangements, providing and laying of new raw – water rising main, design, supply, laying, jointing, and testing of a new raw-water rising main from the intake/pumping station to the WTP, designed for 48 mld capacity.
Published Date: June 10, 2026
End Date: July 06, 2026
Implementing Agency: Ujjain Municipal Corporation
Segment: Water Supply
Work: The scope of the work involves construction of the proposed water supply and sewage network for Block 2 under the Ujjain Simhasth 2028 area. It includes manufacturing, supplying, delivery, lowering, laying, jointing of MS pipelines and execution of associated water supply and sewage network works in accordance to CPHEEO specifications and applicable standards.
Published Date: June 10, 2026
End Date: August 20, 2026*
Implementing Agency: Ujjain Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of a proposed water supply and sewerage network for Block 1A and 1B under the Ujjain Simhasth 2028 area. It includes supply, laying, jointing and testing of ductile iron pipes and execution of associated water supply and sewerage network works in accordance with CPHEEO specifications and applicable standards.
Published Date: June 9, 2026
End Date: August 20, 2026*
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Water Supply
Work: The scope of work is divided into two parts. Part-A (Kaimri Water Supply Scheme) involves construction of one new water works, raw water pumping station, boosting stations and upgradation of existing water works comprising two WTPs of 2.00 mld and 1.50 mld capacity, RCC service reservoirs and sump well tanks, inlet channel, clear water tanks, pump chamber, boundary wall, pumping machinery, DG set, electric transformer, raw water and clear water rising mains, distribution pipelines and house connections. Part-B (Kaimri Sewerage Scheme) involves construction of a 2.00 mld STP based on SBR technology with SCADA/PLC controls including one main pumping station and five intermediate pumping stations comprising wet well sump, boundary wall, pump chamber, rising mains, staff quarters, pumping machinery, DG set, electric transformer and laying of sewerage network in the village. Both parts include operation and maintenance during the six-year defect liability-cum-maintenance period after successful trial run of three months.
Published Date: June 8, 2026
End Date: June 19, 2026
Implementing Agency: Gujarat Urban Development Company Limited (GUDCL)
Segment: Wastewater
Work: The scope of work involves two components. Ambaji UGD and STP works involve working survey, soil investigation, design and construction of underground drainage project with sewage treatment plant, including providing, supplying, lowering, laying, jointing, testing and commissioning of rising main and gravity main pipes for sewer collection system, construction of sewage pumping stations, pumping machinery, house connections, road restoration, electrical works and allied works with operation and maintenance for two years for UGD works and seven years for STP, including a three-year defect liability period. Ambaji WSS works involve working survey, soil investigation, design, construction, testing and commissioning of RCC ESR and GSR, providing, supplying, lowering, laying and jointing of rising main and gravity main pipeline networks, house connections, road restoration, electrical works and allied works with operation and maintenance for two years, including a three-year defect liability period.
Published Date: June 8, 2026
End Date: July 8, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN) has
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, design and construction of overhead tanks of capacities 2,400 kl, 1,600 kl and 3,100 kl with staging heights of 27 m to 29 m, and CWR cum pump houses of capacities ranging from 400 kl to 800 kl. It includes supply, laying and jointing of 300 mm to 400 mm dia DI rising mains of about 350 m length and development of a 94.774 km distribution network using 110 mm to 700 mm dia HDPE and DI pipes along with house connections in Nagwa, Shivala, Baghada, Bengali Tola and Jangambadi wards. The work also includes construction of HT and LT rooms, booster pump houses, staff quarters, boundary walls, approach roads, gate fixing and groundwater recharge units, installation, testing and commissioning of pumping plants, 11 kV substation works and SCADA automation for OHTs, CWRs and local control stations. It also includes geo-tagging, door-to-door survey, collection and uploading of data, commissioning, three-month trial run, defect liability period of one year for civil works and two years for E&M works and handing over of the system.
Published Date: June 4, 2025
End Date: June 19, 2026
Implementing Agency: Panipat Municipal Corporation
Segment: Wastewater
Work: The scope of work involves design, construction, erection, testing and commissioning of facilities for transfer of 60 MLD treated wastewater from the 25 MLD and 35 MLD STPs at Siwah to existing HSVP tanks in Sector 29, Panipat. It includes construction of a treated wastewater pumping station, treated sewage storage tank with compartments, isolation valves/gates, rising main, associated electromechanical works and allied infrastructure. The contract also includes operation and maintenance for 15 years after the defect liability period.
Published Date: June 3, 2026
End Date: July 3, 2026
Implementing Agency: Nagar Palika Parishad Betul
Segment: Wastewater
Work: The scope of work involves providing, laying, jointing, testing and commissioning of about 162 km of sewerage network, construction of manholes and sewer appurtenances, road restoration works, provision of approximately 17,655 house sewer connections with chambers and laterals, design, construction, testing and commissioning of three intermediate sewage pumping stations (IPS-1 of 4.97 MLD, IPS-2 of 5.38 MLD and IPS-3 of 4.03 MLD), and a 16 MLD sewage treatment plant (STP) with main pumping station (MPS). The project also includes supply, installation, testing and commissioning of electromechanical and instrumentation systems, GIS mapping of the sewerage network, PLC-SCADA and OCEMS systems, and operation and maintenance of the sewerage system for five years along with a five-year defect liability period after successful commissioning.
Published Date: June 2, 2026
End Date: July 22, 2026*
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Water Supply
Work: The scope of work includes construction of five RCC sedimentation and sand storage tanks, a 3.50 MLD and 1 MLD water treatment plant, 1st and 2nd water works clear water tanks, pump chambers, 6.1 km long raw water and 2.05 km long clear water rising mains under 1st existing water works; and 1.2 km long clear water rising main under 2nd existing water works, internal distribution system, boundary wall, CC path and pumping machinery. The project also includes laying of sewer lines of various sizes, construction of a 3.00 MLD sewage treatment plant (STP), MPS, IPS, manholes, staff quarters, pump chambers, pumping machinery, rising mains from IPS to MPS, MPS to STP and STP to treated effluent of total length of 16.25 km, along with operation and maintenance and defect liability period of six years after successful completion of a three-month trial run.
Published Date: June 2, 2026
End Date: June 30, 2026
Implementing Agency: Public Works Department (PWD), Delhi
Segment: Wastewater
Work: The scope of work involves construction of a precast RCC box drain from Lado Sarai to RUB Pul Prahladpur, including drain works along M.B. Road from Lado Sarai to Batra Hospital and from Batra Hospital to RUB Pul Prahladpur, detailed survey of the project stretch, preparation and vetting of layout plans and drawings, construction of associated footpaths as per UTTIPEC guidelines, protection and maintenance of existing utilities and services, traffic management and safety arrangements, installation of precast RCC elements, site clearance, restoration works and allied civil works required for improvement of the drainage system.
Published Date: June 1, 2026
End Date: July 14, 2026
Implementing Agency: Madhya Pradesh Urban Development Company Limited
Segment: Water Supply
Work: The scope of work involves detailed engineering design, setting out at site, construction of the anicut and intake well, construction of the water treatment plant, laying of raw water and clear water pipelines, construction of overhead tanks and ground level service reservoirs, development of the distribution network including transmission and feeder mains, provision of pumping arrangements and electromechanical equipment, execution of earthwork, road restoration and other ancillary works as required, together with installation of metered household service connections.
Published Date: May 22, 2026
End Date: July 2, 2026
Implementing Agency: Public Health Engineering Department, Haryana (PHED)
Segment: Water Supply
Work: The scope of work involves construction of an 11 mld water treatment plant at the 1st Water Works Meham Road site and boosting stations at various locations. The project includes construction of RCC service reservoirs, clear water tanks, pump chambers, raw water and clear water suction wells, rising mains and distribution pipelines, installation of pumping machinery, electric transformers, DG sets and SCADA systems, and provision of functional household tap connections (FHTCs). The scope also includes operation and maintenance along with a defect liability period of six years after successful completion of a three-month trial run.
Published Date: May 30, 2026
End Date: June 16, 2026
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of the project includes construction of two sewage treatment plants (STPs); 65 mld STP at Iglas Road in Zone 1 and 48 mld STP at Sonoth Gokulpur village in Zone 2, three I&D structure, I&D network laying of 1.66 km, rising mains of length 4.35 km, one intermediate pumping station, two main pumping stations and septage co-treatment facility of 30 kld capacity at both STPs, including 15 years of operation and maintenance (O&M) period.
Publishing Date: May 30, 2025
End Date: June 24, 2026*
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves augmentation and upgradation of the existing 60 mld sewage treatment plant to 75 mld capacity at Pirana under the Augment, Build, Operate and Transfer (ABOT) model, including design, construction, erection, testing and commissioning of civil, electrical, mechanical and instrumentation works, interconnecting piping, equipment supply and associated infrastructure. The project also includes upgradation of the existing ASP-type sewage treatment plant to achieve NGT norms, replacement of electrical, mechanical and instrumentation systems, operation of the facility during the capital works phase and comprehensive operation and maintenance of the sewage treatment plant.
Published Date: May 30, 2026
End Date: June 16, 2026
Implementing Agency: Thrikkakara Municipality
Segment: Wastewater
Work: The scope of work involves design, build, testing, commissioning and operation of a 3 mld MBBR sewage treatment plant along with a 15 km sewerage network under the Design, Build, Operate and Transfer (DBOT) model. The project includes preparation of DPR with detailed estimates, detailed design, supply, installation, civil, mechanical, electrical and instrumentation works, trial run and performance testing, and associated works.
Published Date: May 29, 2026
End Date: June 15, 2026
Implementing Agency: Public Works Department (PWD), Delhi
Segment: Wastewater
Work: The scope of work involves construction of precast and RCC box type drains in place of existing brick drains from Kapashera Chowk to Bijwasan Flyover on Kapashera-Bijwasan Road, including detailed survey and design validation, demolition of existing drains, construction of associated footpaths, protection and shifting of utilities, traffic management and safety arrangements, installation of precast RCC elements, restoration of affected infrastructure, and allied civil works.
Published Date: May 27, 2026
End Date: June 18, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: water supply
Work:The project involves improvements of Tavermellihalli Lake including allied works to provide drinking water supply to Bankapur town through Design, Build, Operation And Transfer (dbot) Mode.
Published Date: May 26, 2026
End Date: June 10, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: water supply
Work: The scope of project involves improvements of Naganur Lake including allied works to provide drinking water supply to Shiggaon town through Design, Build, Operation And Transfer (dbot) Mode.
Published Date: May 26, 2026
End Date: June 10, 2026
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: water supply
Work: The project involves improvements of Motitalab Lake including allied works to provide drinking water supply to Savanur town through Design, Build, Operation And Transfer (dbot) Mode.
Published Date: May 26, 2026
End Date: June 10, 2026
Implementing Agency: Municipal Council Jhalawar
Segment: Wastewater
Work: The scope of work involves preparation of pre-feasibility report covering study of existing sewerage master plan, population forecasting, condition assessment of existing sewerage treatment facilities, assessment of STP capacities and identification of upgradation requirements as per NGT guidelines, proposal for interception and diversion of nallahs, construction of new STPs and pumping stations, reuse of treated wastewater and tertiary treatment with end-to-end reuse plan; preparation of DPR including detailed engineering design of STP, pumping station and rising main with cost estimates and O&M manual; preparation of tender documents including BOQ, cost estimates and technical specifications; and technical vetting of DPR from recognized institutions such as MNIT Jaipur or BITS Pilani. The estimated cost of the tender is Rs 1.80 million.
Published Date: May 22, 2026
End Date: June 18, 2026*
Implementing Agency: Greater Noida Industrial Development Authority (GNIDA)
Segment: Wastewater
Work: The scope of work includes construction of 80 mld sewage treatment plant with two intermediate pumping stations, one main pumping station, two rising mains (2 km and 5.9 km long) and trunk gravity sewers to convey sewage from the served areas to the STP, soil stabilisation and site improvement of STP site, treated water storage and filling station, sludge digestion with co-digestion using cow dung with biogas production and biogas based electricity generation system, and all associated civil, mechanical, electrical and instrumentation works with PLC/SCADA automation at Sector Functional Green-6, Greater Noida.
Published Date: May 22, 2026
End Date: July 29, 2026
Implementing Agency: Bengaluru Water Supply and Sewerage Board (BWSSB)
Segment: Water Supply
Work: The scope of work involves site visits and data collection; preparation of reservoir layout plan, detailed design and general arrangement drawings for civil, mechanical, electrical and instrumentation works; preparation of cost estimates for civil, electro-mechanical and instrumentation works; preparation of DPR; preparation of digital twin for Stage I and Stage II pumping stations of Harohalli and Tataguni; and assistance for bid evaluation till award of contract. The work is likely to be completed in 10 months at an estimated cost of Rs 4 million.
Published Date: May 21, 2026
End Date: May 29, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves laying of sewer lines in villages of Garhi Rindhala, Jaunti, Sawda, Tatesar, Nizampur, Punjab Khor, Jat Khor, Qutubgarh and Mungeshpur and allied unauthorised colonies in North West Delhi. The work is likely to be completed in 24 months at an estimated cost of Rs 2,166.51 million.
Published Date: May 21, 2026
End Date: June 15, 2026.
Implementing Agency: Public Health Engineering Department, Meghalaya (PHED)
Segment: Water Supply
Work: The scope of work involves survey, engineering and design of the water supply scheme; laying of transmission mains, feeder mains and development of distribution system; construction of reservoirs and zonal tanks of various capacities and staging; providing household connections; and installation of SCADA system for monitoring and control of the water supply network, on EPC turnkey basis. The work is likely to be completed in 24 months at an estimated cost of Rs 1,400.60 million.
Published Date: May 21, 2026
End Date: June 11, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: water supply
Work: The scope of work involves implementation of the Purnea Water Supply Scheme under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
Published Date: May 19, 2026
End Date: June 10, 2026*
Implementing Agency: New Tirupur Area Development Corporation Limited (NTADCL)
Segment: water supply
Work: The scope of work involves procurement, construction and commissioning of a combined water supply scheme to provide 3.5 MLD to SIPCOT Defence Industrial Park at Varapatti, 2.0 MLD to TIDCO Aerospace Industrial Park at Sulur and 3.0 MLD to TIDCO Semi-Conductor Industrial Park at Kethanur from NTADCL Water Distribution Station (WDS-24) at Murugampalayam, Tirupur and all associated works. The pipeline capacity is 50.86 km.
Published Date: May 19, 2026
End Date: June 17, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves design, construction, supply, installation, testing and commissioning of 4.0 MGD DSTP at Jaunti, 3.0 MGD DSTP at Jat Khor and 5.0 MGD DSTP at Bajitpur Thakran along with sewage pumping stations (SPSs) at Punjab Khor, Qutubgarh, Auchandi, Salahpur and Garhi Rindhala including civil, mechanical, electrical, instrumentation and SCADA works, construction of compound wall, internal roads, landscaping, odour control units, effluent pumping station and all associated and allied appurtenant works. It also includes 15 years of operation and maintenance (O&M) including a two-year defect liability period (DLP).
Published Date: May 19, 2026
End Date: June 22, 2026
Implementing Agency: Public Health Engineering Department, Nagaland (PHED)
Segment: water supply
Work: The scope of work involves planning, designing and preparation of DPRs, procurement planning and strategy, tender document preparation, tender management and administration, bid evaluation, contract finalization and award, contract management and supervision up to final completion of the project and providing second tier independent quality monitoring.
Published Date: May 18, 2026
End Date: July 2, 2026*
Implementing Agency: Public Health Engineering Department (PHED),
Segment: Water Supply
Work: The scope of work involves augmentation of water supply including 2.5 mld water treatment plant (WTP), construction of independent canal-based water works No. 2, construction of structures at existing water works No. 1, construction of three boosting stations, strengthening of distribution system, and development of sewerage infrastructure including laying of sewerage network, restoration of streets, construction of 2.50 mld sewage treatment plant (STP), construction of two intermediate pumping stations, main pumping station, treated effluent rising main and other associated works.
Published Date: May 16, 2026
End Date: May 26, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves design, construction, supply, installation, testing and commissioning of 2.5 MGD DSTP, 6 km long disposal line at Sungerpur and 1.5 MGD DSTP, 2.1 km long disposal line at Khera Khurd along with sewage pumping stations (SPSs) and all associated and allied appurtenant works including civil, mechanical, electrical, instrumentation and SCADA works, construction of compound wall, internal roads, landscaping, odour control units, effluent pumping station and analytical laboratory. It also includes 15 years of operation and maintenance (O&M) including a two-year defect liability period (DLP) on a Design, Build and Operate (DBO) basis.
Published Date: May 15, 2026
End Date: June 15, 2026
Implementing Agency: Singareni Collieries Company Limited (SCCL)
Segment: Wastewater
Work: The scope of work involves design, construction, testing and commissioning of 41 STPs comprising 18 new STPs and 23 upgradation works (12 rebuilds and 11 modifications of existing STPs) of various capacities using forced bed aerated wetland technology, supplying, laying and jointing of new sewer network for the 18 new STPs including manholes, dismantling of 254 defunct community septic tanks, and installation of 50 IoT-based online monitoring systems with centralised dashboards for performance monitoring in various SCCL colonies of 12 Areas at 06 (Six) SCCL operating Districts. It also includes comprehensive operation and maintenance (O&M) for a period of 5 years following a two-month trial run period.
Published Date: May 15, 2026
End Date: June 8, 2026*
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work involves design, construction and commissioning of an intake structure at Takali Dam with two pump sets of 470 cum/hr discharge capacity, laying of 23.47 km long raw water rising mains, construction of an 8.0 MLD rapid gravity sand filter-based water treatment plant (WTP) at village Reenchhariya with arrangements for chlorination, alum dosing, flash mixing, flocculation, clarification, filtration, post-chlorination, wash water recirculation and sludge disposal, construction of a 1,300 KL clear water reservoir (CWR), pump house, switchyard, J-2 type staff quarters, boundary wall and campus development works. It also includes laying of treated water supply pipelines to Ramganjmandi city office headworks and RIICO headworks, development of a complete SCADA system for intake, WTP, CWR, pump house and proposed OHSR, and extension of the distribution pipeline network across the project area. The work includes a one-year defect liability period followed by five years of operation and maintenance (O&M).
Published Date: May 14, 2026
End Date: June 30, 2026
Implementing Agency: Thiruverkadu Municipality
Segment: Wastewater
Work: The scope of work involves contract and construction management including supervision of works; review of designs, drawings and technical specifications; development of quality assurance and quality control plan; coordination with stakeholders for timely completion; assistance in contract administration and regulatory compliance; monitoring of financial and physical progress; development of MIS system; supervision of safety and security during project implementation; and capacity building of Thiruverkadu Municipality on environmental and social safeguards. The estimated cost of the consultancy work is Rs 49.70 million.
Thiruverkadu Underground Sewerage Scheme (UGSS): The scope of work includes construction of underground sewerage system of length 193.76 km, a collection system including house service connections, pumping stations, pumping mains, lift stations and other related infrastructure including five years Operation and Maintenance (O&M).
46 MLD Koladi STP Project: The scope of work involves design, engineering, build and commissioning of a 46 MLD capacity STP at Koladi using Sequential Batch Reactor (SBR) technology, including Operation & Maintenance (O&M) for 10 years. The Thiruverkadu Municipality has its own land measuring approximately 7.64 acres at Koladi for implementation of the project.
Published Date: March 14, 2026
End Date: June 19, 2026.
Implementing Agency: Delhi Jal Board (DJB) has
Segment: Wastewater
Work: The scope of work involves design, construction, supply, installation, testing and commissioning of a 2.5 MGD sewage pumping station (SPS) at Sultanpur including inlet chamber, screens, wastewater collection sump, transfer pumps, pumping arrangement, electrical and instrumentation systems and all associated works, and providing and laying of 400 mm dia DI rising main of 3,900 m length and HDPE pipe via horizontal directional drilling (HDD) of 1,300 m length from the proposed pumping station to Ghitorni STP on a Design, Build and Operate (DBO) basis. The total length of rising main is 5.2 km.
Published Date: May 13, 2026
End Date: June 25, 2026
Implementing Agency: Bengaluru Solid Waste Management Limited (BSWML)
Segment: Wastewater
Work: The scope of work involves construction of storm water drain connecting Kannur, Chikkagubbi, Doddagubbi, Rampura Lake and Yelemale Chatty Lake along with culverts and approach roads and all associated works.
Published Date: May 13, 2026
End Date: May 30, 2026
Implementing Agency: Raipur Municipal Corporation
Segment: Wastewater
Work: The scope of work involves providing technical assistance to Raipur Municipal Corporation (RMC) for DPR preparation and project management covering all aspects of urban flood risk management including development and upgradation of storm water network (Cost Rs 1,110 million), blue-green infrastructure (cost Rs 430 million) and interlinking of ponds (Rs 300 million) and water bodies, and institutionalization of capacities for effective operationalization of such schemes.
Published Date: May 12, 2026
End Date: June 15, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (Urban)
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P etc. complete required for construction, erection, completion, testing & commissioning of water supply works such RCC over head tank, CWR, laying of 9.84 km rising main, distribution system, pump house, boundary wall, gate, site development, renovation of existing facilities and construction of tube wells including PLC SCADA automation and other appurtenant works of water supply scheme on turnkey basis under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0 programme
Published Date: May 12, 2026
End Date: May 25, 2026
Implementing Agency: Public Health Engineering Department, Chhattisgarh (PHED)
Segment: Water Supply
Work: The scope of work involves design, drawing, construction, interconnection, testing, and commissioning of a 6 m diameter intake well of 26 m height along with raw water vertical turbine pumps and motors of 2874 LPM capacity and 20 m head (3 Nos.); construction and commissioning of raw and clear water electrical substation of 400 KVA, 33/0.415 kV with all associated works; construction of a 7 mld conventional type WTP; supply, installation, testing, and commissioning of centrifugal pumps including 3 Nos. of 1326 LPM capacity with 165 m head and 3 Nos. of 1437 LPM capacity with 150 m head for clear water pumping; construction of RCC overhead service reservoirs (MBR) comprising 4 Nos. of 150 KL capacity with 30 m staging, 1 No. of 220 KL capacity with 30 m staging, 1 No. of 90 KL capacity with 30 m staging, and construction of a 310 KL Ground Service Reservoir (GSR); providing, laying, jointing, testing, and commissioning of raw water pumping main using 400 mm dia DI K-9 pipes of 0.12 km length and clear water pumping mains using DI K-9 pipes of 300 mm dia (19.28 km), 250 mm dia (12.12 km), 200 mm dia (6.76 km), and 150 mm dia (0.11 km), with a total DI pumping main length of 38.28 km; providing and laying clear water gravity mains using OPVC pipes of 110 mm dia (52.68 km), 160 mm dia (40.19 km), and 250 mm dia (35.35 km) totaling 128.22 km, along with 300 mm dia DI K-7 pipes of 8.6 km, making the total gravity main length 136.82 km, inclusive of all required valves and specials; providing and fixing bulk flow meters; execution of the entire water supply scheme up to village OHTs including all allied civil works such as boundary wall around the WTP campus; followed by 3 months of testing and 9 months of trial run of the complete scheme after completion of all components.
Published Date: May 12, 2026
End Date: May 28, 2026
Implementing Agency: Public Health Engineering Department (PHED), Bihar
Segment: Water Supply
Work: The scope of work involves design, construction, supply, testing and commissioning of piped water supply schemes for habitations left out under Har Ghar Nal Ka Jal Nischay Yojna in areas having no ground water quality issues, with electric driven pumps on a turnkey basis with a three-month trial run period. The project covers 25 schemes across panchayats including Chatia Chintamanpur, Chatia Barharwa, Babhnauli, Mamarkha, Manguraha, Pipra, Radhiya and Nawada in Areraj block (Part-2), East Champaran district under P.H. Division, Motihari.
Published Date: May 11, 2026
End Date: May 21, 2026
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work involves design and construction of a 90 MLD main pumping station and a 40 MLD STP on SBR technology including civil works, erection and commissioning of mechanical, electrical, instrumentation and automation systems, PLC/SCADA-based automation, procurement and supply of all electrical and mechanical equipment, site development, landscaping and all associated and contingent works. It also includes a defect liability-cum-maintenance period of 6 years following a three-month trial run period.
Published Date: May 11, 2026
End Date: June 25, 2026*
Implementing Agency: Karnataka Industrial Areas Development Board (KIADB)
Segment: Wastewater
Work: The scope of work involves design, construction and commissioning of 10 mld STP followed by 5 mld tertiary treatment plant; construction and commissioning of 1,500 KLD CETP comprising two modules of 1.50 mld each with 500 KLD capacity ZLD facility expandable to 1,500 KLD capacity and 1.50 mld RO system, on EPC basis; and comprehensive operation and maintenance of the entire plant for a period of 10 years after commissioning.
Published Date: May 10, 2026
End Date: June 30, 2026*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The project involves 4.5 mgd Tikri Kalan DSTP with 2 km long disposal pipeline to be completed in 21 months; 7 mgd Mohammadpur Majri DSTP with 2.4 km long disposal pipeline to be completed in 24 months; 1.5 mgd Ghewra DSTP with 3 km long disposal pipeline to be completed in 18 months; 10 mgd Kanjhawala DSTP with 1.5 km long disposal pipeline to be completed in 24 months along with 1.5 mgd sewage pumping station (SPS) at Gitanjali Enclave with 4.5 km disposal pipeline.
Published Date: May 8, 2026
End Date: June 15, 2026*
Implementing Agency: Jaipur Nagar Nigam
Segment: Wastewater
Work: Package-1(Mansarovar and Sanganer Zone): The scope of work involves replacement and laying of sewerage network of total length 207.56 km comprising HDPE DWC SN8 pipes of 128.24 km, RCC NP4 pipes of 10.31 km, AC Mazza process pipes of 59.16 km and trenchless method using HDPE PE-100 of 6.27 km and micro-tunneling with RCC NP4 jacking pipes of 3.59 km. The estimated cost is Rs 2,426.60 million.
Package-2 (Malviya Nagar and Jagatpura Zone): The scope of work involves replacement and laying of sewerage network of total length 161.07 km comprising HDPE DWC SN8 pipes of 100.66 km, RCC NP4 pipes of 11.13 km, AC Mazza process pipes of 46.88 km and trenchless method using HDPE PE-100 of 2.34 km. The estimated cost is Rs 1,635.80 million.
Package-3 (Jhotwara, Murlipura and Vidhyadhar Nagar Zone): The scope of work involves replacement and laying of sewerage network of total length 138.98 km comprising HDPE DWC SN8 pipes of 61.23 km, RCC NP4 pipes of 28.21 km, AC Mazza process pipes of 37.87 km and trenchless method using HDPE PE-100 of 11.22 km and micro-tunneling with RCC NP4 jacking pipes of 0.45 km. The estimated cost is Rs 1,937.60 million.
Published Date: May 8, 2026
End Date: June 15, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, design, involves construction of multiple overhead tanks of capacities 2400 kl, 1600 kl and 3100 kl with staging heights of 27 m to 29 m, and clear water reservoir (CWR) cum pump houses of 400 kl to 800 kl capacities. It includes supply, laying and jointing of rising mains (300 mm to 400 mm dia, approx. 350 m length) and development of a 94.774 km distribution network (110 mm to 700 mm dia using HDPE and DI pipes) along with house connections in Nagwa, Shivala, Baghada, Bengali Tola and Jangambadi wards (Cluster-5 of 18 wards). The work also includes construction of HT/LT rooms, booster pump houses, staff quarters, boundary walls, approach roads, groundwater recharge units, permanent road reinstatement and repair of old OHTs. It involves installation, testing and commissioning (SITC) of pumping plants, 11 kV substation, booster systems and SCADA automation for OHTs, CWRs and control stations, along with geo-tagging, door-to-door survey and data integration. The project includes commissioning, trial run of 3 months, defect liability period (1 year for civil works and 2 years for E&M works) and handing over of the system.
Published Date: May 7, 2026
End Date: May 20, 2026*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: The scope of the project involves construction of Begusarai Water Supply Scheme (WSS) under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Published Date: May 7, 2026
End Date: June 10, 2026
Implementing Agency: Gwalior Municipal Corporation
Segment: Wastewater
Work: The scope of work involves survey, soil investigation, design, construction and commissioning of sewerage network in Gwalior Municipal Area including laying of sewer lines, construction of manholes and appurtenances, providing 11,919 house sewer connections, GIS mapping of existing and proposed network, and operation and maintenance for 10 years after successful commissioning. The sewer line capacity is 238 km.
Published Date: May 5, 2026
End Date: August 7, 2026*
Implementing Agency: Rural Drinking Water and Sanitation Department, Karnataka
Segment: water supply
Work: The scope of work involves preparation of Preliminary Scheme Report (PSR), concept notes with technical specifications and cost estimates for multi-village drinking water supply schemes under DBOT model to rural habitations of Tumkur District from Yettinahole source.
Published Date: May 5, 2026
End Date: May 20, 2026
Implementing Agency: Public Health Engineering Department, Haryana (PHED)
Segment: Water Supply
Work: The scope of work involves construction of 11 mld water treatment plant at 1st water works Meham Road and boosting stations at various locations including RCC service reservoirs, clear water tanks, pump chambers, raw water and clear water suction wells, rising main lines, electric transformers, DG sets, pumping machinery, SCADA arrangement, functional household tap connections (FHTCs) and laying of distribution pipelines. The project includes operation and maintenance cum defect liability period of 6 years after successful completion of 3 months trial run.
Published Date: May 5, 2026
End Date: May 28, 2026
Implementing Agency: Gujarat Industrial Development Corporation (GIDC)
Segment: Water Supply.
Work: The scope of work involves supply, laying, installation, testing and commissioning including all fittings and crossings for 1500 mm diameter PCCP pipeline as per IS 784:2001 with a design working pressure of 10 kg/cm2 for water supply at GIDC Jhagadia Estate. The total length of the pipeline is 24.5 km.
Published Date: May 4, 2026
End Date: May 25, 2026
Implementing Agency: Irrigation Department, Uttarakhand
Segment: water supply
Work: The scope of work involves construction of a dam across Ramganga River for drinking water supply to Gairsain Town and adjoining population in District Chamoli, Uttarakhand. The work is likely to be completed in 24 months at an estimated cost of Rs 1,071.76 million.
Published Date: May 4, 2026
End Date: May 30, 2026
Implementing Agency: Silvassa Municipal Council
Segment: Wastewater
Work: The scope of work involves design of sewerage network for future development with population projection up to 2046; topographical and contour surveys at various locations; preparation of detailed hydraulic designs and project report; cost estimation of each component as per latest CPWD, GWSSB and R&B Schedule of Rates of Valsad District or market rate analysis; suggesting modifications in the existing system to integrate the new sewerage network; preparation of cost estimates with detailed specifications; and presentation of design schemes to the Government and other relevant authorities for sanction and approval.
Published Date: May 4, 2026
End Date: June 16, 2026*
Implementing Agency: Rural Drinking Water and Sanitation Department, Karnataka
Segment: water supply
Work: The scope of work involves preparation of Preliminary Scheme Report (PSR), concept notes with technical specifications and cost estimates for multi-village drinking water supply schemes under DBOT model to rural habitations of Ramanagara District from Yettinahole source.
Published Date: May 4, 2026
End Date: May 19, 2026
Implementing Agency: Greater Mohali Area Development Authority (GMADA)
Segment: water supply
Work: The scope of work involves demand forecasting for current and projected water demand for SAS Nagar; inventory analysis and preparation of a phased action plan to address supply gaps; source development including identification of new canal water sources and take-off points; hydraulic evaluation and up-gradation of the existing Kajauli scheme pipeline infrastructure with a current carrying capacity of 80 MGD; design of Water Treatment Plant (WTP) Phase-2 at Sinhpur with a minimum capacity of 25 MGD, integrated with existing Phase-1 operations; and design of clear water rising main covering Aerocity, IT City, Sectors 88-90, Aerotropolis City and other areas of District SAS Nagar. The work is likely to be completed in 3 months.
Published Date: May 4, 2026
End Date: May 25, 2026.
Implementing Agency: Rural Drinking Water and Sanitation Department, Karnataka
Segment: Water Supply
Work: The scope of work involves engineering surveys, designing, costing and mapping for preparation of Preliminary Scheme Report (PSR) and concept note with technical specifications, cost estimates and bid documents for DBOT projects of rural drinking water supply to be implemented across Bengaluru Rural District from Yettinahole source in various phases. The work is likely to be completed in 3 months.
Published Date: May 2, 2026
End Date: May 18, 2026
Implementing Agency: Tirumala Tirupati Devasthanams
Segment: Wastewater
Work:The scope of work involves study of existing drains and their capacities; suggesting delinking with underground lines and provision of new or additional drains anticipating moderate to heavy rainfall; forecasting and recommendations on regulation of storm water drains and flood management; detailed design in line with flood management or sponge city concept covering rainwater harvesting, storm water management, drain naturalization, water recharging structures and aquifer recharging; supervision of construction of drainage and flood management system; planning and construction of surface water management system to prevent overflow and flooding; and introduction of advanced technologies including innovative rainwater harvesting systems to strengthen the groundwater table. The scope also includes project management consultancy services during construction for a period of 12 months, followed by daily inspection and monitoring during the defect liability period (DLP) for a further 12 months.
Published Date: May 2, 2026
End Date: May 18, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves hydrographic, hydraulic and structural survey, investigation and designing for construction of RCC drain from Kidwai Nagar Bypass to Pandu River Ramaipur Nala, including supply of all materials, labour and T&P required for proper construction and completion of the project, along with a trial run period of 12 months. The work is likely to be completed in 18 months at an estimated cost of Rs 1,221.02 million.
Published Date: May 2, 2026
End Date: July 22, 2026*
Implementing Agency: Rural Drinking Water and Sanitation Department, Karnataka
Segment: water supply
Work: The scope of work involves preparation of Preliminary Scheme Report (PSR), concept note with technical specifications and cost estimates for multi-village drinking water supply schemes under DBOT model to rural habitations of Kolar District from Yettinahole source. The work is likely to be completed in 3 months.
Published Date: May 1, 2026
End Date: May 16, 2026
Implementing Agency: Jodhpur Development Authority (JDA)
Segment: Wastewater
Work: The scope of work involves identification of end users and development of infrastructure for reuse of treated effluent from existing STPs for agriculture and parks; proposal of sewer network for left out and newly developed areas of JDA jurisdiction including areas along the ring road, Jojari River and various JODA schemes; survey of adjoining areas for augmentation of existing STP functional capacity; survey of all drains carrying sewage and proposal for diversion to nearest sewer lines or laying of new sewerage network; design of sewer network and STP including structural, mechanical, electrical and electromechanical components; preparation of cost estimates, implementation schedule and tender documents; and technical vetting of final DPR from MBM University or IIT Jodhpur.
Published Date: May 1, 2026
End Date: June 10, 2026*
Implementing Agency: Rural Drinking Water and Sanitation Department, Karnataka
Segment: Water Supply
Work: Bhujanganagar Grey Water Management Project – The scope of work involves preparation of DPR for providing sanitation of grey water management to Bhujanganagar and Muraripur villages of Bhujanganagar GP in Sandur Taluk, Ballari District.
Belagallu Grey Water Management Project- The scope of work involves preparation of DPR for providing sanitation of grey water management to Haraginadoni village of Belagallu GP in Ballari Taluk, Ballari District.
Published Date: April 30, 2026
End Date: May 14, 2026
Implementing Agency: Rural Drinking Water and Sanitation Department, Karnataka
Segment: water supply
Work: The scope of work involves engineering surveys, designing, costing and mapping for preparation of Preliminary Scheme Report (PSR) and concept note with technical specifications, cost estimates and bid documents for DBOT projects of rural drinking water supply to be implemented across Chikkaballapura District from Yettinahole source in various phases. The work is likely to be completed in 3 months.
Published Date: April 30, 2026
End Date: May 15, 2026
Implementing Agency: Public Works Department (PWD), Delhi
Segment: Wastewater
Work: The scope of work involves remodelling of the existing main Burari drainage network and construction of new precasted RCC drain, including detailed survey, preparation and approval of layout plans and cross-sectional details, co-relating approved drawings with the Master Drainage Plan prepared by the department’s consultant; construction of footpaths as per UTTIPEC guidelines; protection and maintenance of existing utilities including sewer lines, water supply lines and electric and telephone cables; traffic and pedestrian safety measures; and Operation & Maintenance of all works during construction till handing over to the department. All works are to be executed as per CPWD Specifications Vol. I & II, National Building Code 2016 and IS Codes.
Published Date: April 27, 2026
End Date: May 12, 2026
Implementing Agency: Mangalagiri Tadepalli Municipal Corporation (MTMC)
Segment: Wastewater
Work: The scope of work involves Design, Construction, Commissioning, Operation and Maintenance of decentralized underground drainage (UGD) system including Sewer Network and Sewage Treatment Plants in selected areas within Mangalagiri Tadepalli Municipal Corporation limits (Phase-I) including 10 years Operation and Maintenance (O&M) on Hybrid Annuity Mode (HAM).
Published Date: April 27, 2026
End Date: May 20, 2026*
Implementing Agency: Himachal Pradesh Irrigation and Public Health Department
Segment: Water supply
Work: The scope of work involves construction of 195 km water supply pipeline in Manali adjoining areas, 61 km sewerage pipeline in Palampur, 35 km sewerage pipeline in Karsog and 61 km sewerage pipeline in Nahan.
Published Date: April 27, 2026
End Date: June 22, 2026
Implementing Agency: Punjab Municipal Infrastructure Development Company (PMIDC)
Segment: Water Supply
Work: Amritsar Bulk Water Supply Project: The scope of work includes design and construction of an offtake chamber, raw water sump and pump house, 440 million litres per day (mld) water treatment plant (WTP), 45 water tanks, clear water reservoir and pump house, 112 km long transmission pipelines, overhead service reservoirs, supervisory control and data acquisition (SCADA) system with control room for full operation and control automation of all systems right from raw water drawl to delivery at all over head service reservoirs (OHSR) with Operation and Maintenance (O&M).
24X7 Ludhiana Bulk Water Supply Project: The project involves 580 MLD water treatment plant (WTP) at Bilga village, treated water pumping main, 173 km long transmission line and 137 overhead service reservoirs will be developed.
Published Date: April 25, 2026
End Date: June 15, 2026*
Implementing Agency: Punjab Agro Industries Corporation Limited (PAIC)
Segment: Wastewater
Work: The scope of work includes complete design, engineering, supply and commissioning of 1.25 mld effluent treatment plant (ETP) system at Village Alamgarh, Abohar and Village Jahan Khelan, Hoshiarpur in Punjab.
Published Date: April 23, 2026
End Date: July 24, 2026*
Implementing Agency: Gujarat Industrial Development Corporation (GIDC)
Segment: Wastewater
Work:The scope of work involves engineering, procurement and construction (EPC), design, erection, testing and commissioning of offshore and onshore effluent disposal pipeline from Bulk Drug Park pumping station to deep sea disposal point including civil structures and allied works with 5 years operation and maintenance (O&M)
Published Date: April 20, 2026
End Date: August 29, 2026*
Implementing Agency: Gujarat Industrial Development Corporation (GIDC)
Segment: Wastewater
Work: The scope of work involves engineering, procurement and construction (EPC), design, erection, testing and commissioning of offshore and onshore effluent disposal pipeline including pumping station and electro mechanical works along with all allied infrastructure works with 5 years operation and maintenance (O&M)
Published Date: April 20, 2026
End Date: August 29, 2026*
Implementing Agency: Public Works Department, Delhi
Segment: Wastewater
Work: The scope of work involves construction of precast RCC box drain at MB Road covering the stretch from Batra Hospital to RUB Pul Prahladpur for improvement of drainage system in New Delhi.
Published Date: April 18, 2026
End Date: May 14, 2026*
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work involves assessment and rehabilitation of existing 85.5 km sewer network, supplying, lowering, laying, jointing, testing and commissioning of minimum 56.38 km of SWG/UPVC/RCC sewer lines, construction of minimum 1,939 BBM and 332 RCC manhole chambers, providing minimum 17,000 PVC-U individual UGD house service connections, construction of 4 wetwells with pumping machinery, supplying and laying of DI K7/K9 sewerage pumping mains and design and construction of minimum 11.50 mld SBR technology sewage treatment plant (STP) including SCADA and Online Continuous Effluent Monitoring Systems (OCEMS). The project is being implemented through Design, Build, Operate and Transfer (DBOT) mode including operation and maintenance (O&M) for 5 years including 1 year defect liability period (DLP).
Published Date: April 18, 2026
End Date: May 26, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of the project includes construction of two sewage treatment plants (STPs); 65 mld STP at Iglas Road in Zone 1 and 48 mld STP at Sonoth Gokulpur village in Zone 2, three I&D structures, I&D network laying of 1.66 km, rising mains of length 4.35 km, one intermediate pumping station, two main pumping stations and septage co-treatment facility of 30 kld capacity at both STPs, including 15 years of operation and maintenance (O&M) period.
Published Date: April 17, 2026
End Date: June 24, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design and construction of water supply infrastructure on a turnkey basis. Key components include construction of 11 RCC overhead tanks (OHTs), 5 clear water reservoirs (CWRs) with pump houses, 14 tube wells and associated pumping systems, along with laying of 6.67 km of rising mains and 171.30 km of distribution pipelines and integration with the existing water supply network.
Published Date: April 17, 2026
End Date: May 2, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves laying (open cut and trenchless method), jointing, testing and commissioning of sewer line with minimum 200 mm dia AC Mazza Class 15 pipe and DI-K7 pipe for dia >200 mm, for a total length of about 342.19 km, along with all appurtenant works, including construction of required RCC M.H., H.C.C., S.C.C., and house connections with required pipes and specials, complete in all respects. Construction of an Intermediate Pumping Station (IPS) with civil structure for 27 mld capacity and 37.50 mld peak flow (factor 2.25), and E&M works for 17.80 mld peak flow (factor 2.25) and 24.5 mld peak flow (factor 2.25), including 6 Nos. pumps of capacity as per CPHEEO Manual (4W+2S), with laying and jointing of 450 mm dia and 700 mm dia DI-K9 rising mains of about 200 m and 1200 m length, along with all other appurtenant works.
Published Date: April 16, 2026
End Date: May 2, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves construction of 10 mld STP with co-treatment plant, SPS, boundary wall, staff quarters, gate and site development, laying and jointing of rising main and sewer network and providing sewer house connections.
Published Date: April 16, 2026
End Date: April 30, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Water Supply
Work: The scope of work involves appointment of a project management consultant (PMC) for assisting Delhi Jal Board (DJB) in programme management, review and updation of master plan and feasibility studies, network modelling, surveys, site investigations, GIS mapping, non-revenue water (NRW) reduction planning, preliminary design for Wazirabad WTP, detailed design for water transmission and distribution systems, development of a SCADA system, preparation of DPRs, institutional development within the Wazirabad WTP command area, public outreach programmes, tender preparation, prequalification and bid evaluation, review of contractor designs, supervision of construction, contract administration, monitoring of NRW reduction progress, assistance in fund disbursement and ensuring safeguard compliance. The Wazirabad Water Treatment Plant component is proposed to be executed in DBOT mode. The scope includes construction/rehabilitation of a 120 mgd WTP, installation of a SCADA system and design, operation and maintenance of the WTP and clear water pumping stations (CWPSs). The water distribution packages are proposed to be implemented in BOT mode. The scope includes upgradation, refurbishment or replacement of underground reservoirs (UGRs), booster pumping stations, primary distribution mains, secondary distribution mains, tertiary pipelines, customer connections and meters, further pipeline and meter replacement works under incentivised NRW reduction programmes, installation of SCADA systems, operation and maintenance of the distribution system, possible customer services responsibilities including new connections and complaints follow-up, and possible meter reading, billing and collection services.
Published Date: April 15, 2026
End Date: May 15, 2026
Implementing Agency: Pune Municipal Corporation (PMC)
Segment: Water Supply
Work: The scope of work involves appointment of an expert project consultant for preparation of Environment and Social Impact Assessment (ESIA) report for the project of 12 newly merged villages under Pune Municipal Corporation (PMC). The ESIA study will assess environmental and social impacts including baseline environmental conditions, community impact, biodiversity, water resource implications, land acquisition, displacement risks, labour conditions, and public health and safety concerns.
Published Date: April 13, 2026
End Date: April 28, 2026
Implementing Agency: Drinking Water and Sanitation Department, Jharkhand
Segment: Water Supply
Work: The scope of work involves detailed survey, designing and drawing, construction of 10.00 MLD water treatment plant, elevated service reservoirs staff quarters, compound wall, intake well, gangway, coffer dam, approach road, pedestal, NH/SH/railway crossing, supplying and laying of raw water and clear water rising main, distribution network and house connections, and supply and installation of vertical turbine and centrifugal pump motor on a turnkey basis including five years operation and maintenance.
Published Date: April 13, 2026
End Date: April 30, 2026
Implementing Agency: Irrigation Department, Uttarakhand
Segment: Water Supply
Work: The scope of work involves construction of a dam across Ramganga River for drinking water supply to Gairsain Town and the adjoining population in District Chamoli, Uttarakhand.
Published Date: April 11, 2026
End Date: May 1, 2026
Implementing Agency: Bharat Heavy Electricals Limited (BHEL)
Segment: Water supply
Work: The scope of work includes design, engineering, manufacturing, supply, civil, structural and architectural works, erection, testing and commissioning of raw water intake system including pump house, forebay, channel/duct and cross-country pipeline up to PT plant for the 2×660 MW Korba West Thermal Power Station at Hasdeo Thermal Power Station (HTPS), Korba, Chhattisgarh on an EPC turnkey basis.
Published Date: April 11, 2026
End Date: August 4, 2026*
Implementing Agency: Public Works Department, Delhi
Segment: Wastewater
Work: The scope of work involves the stretch from Lado Sarai T-Point to Batra Hospital. The drain type proposed is a precast RCC box drain.
Published Date: April 10, 2026
End Date: May 14, 2026*
Implementing Agency: UP Jal Nigam
Segment: Water Supply
Work: The scope of work involves construction of intake well cum pump house and approach bridge, raw water rising main from intake well to water treatment plant, 9 mldwater treatment plant, RCC overhead tanks, zone/cluster pumping stations cum clear water reservoirs, rising main, feeder main, distribution system including house connections, SCADA room, chlorination room, meter room, panel room, boundary wall and site development works on a turnkey basis.
Published Date: April 10, 2026
End Date: May 18, 2026*
Implementing Agency: Municipal Corporation, Pune
Segment: Water Supply
Work: The scope of work involves providing, lowering, laying, jointing, testing and commissioning of balance works of 1,400 mm diameter gravity main from break pressure tank at Navlakh Umbre up to Talwade Dehu.
Published Date: April 10, 2026
End Date: April 16, 2026
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Water Supply
Work: The scope of work involves construction of water works structures and boosting stations at various locations including RCC service and storage tanks, clear water tanks, pump chambers, raw water suction well, rising main lines and electrical works under 2nd and 3rd water works Package III in Dinod road and Rohtak road respectively.
Published Date: April 10, 2026
End Date: May 8, 2026
Implementing Agency: Public Health Engineering Department, Haryana (PHED)
Segment: Water Supply
Work: The scope of work involves augmentation of water supply system in 9 villages, namely, Bhainswal, Kutani, Rajakheri, Nimbri, Ugrakheri, Risalu, Nangalkheri, Kabri, Garhi Sikenderpur by installation of deep tube wells, laying of DI pipelines and allied works (Part A); and construction of sewage treatment plants of 2 mldat Bhainswal and 4 mldat Faridpur on sequential batch reactor (SBR) technology, main pumping stations, sewerage network, rising main and house sewer connections in 10 villages (Faridpur apart from 9 mentioned above) of District Panipat (Part B), including operation and maintenance cum defect liability period of 6 years after successful trial run of 3 months.
Published Date: April 9, 2026
End Date: April 30, 2026
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work includes augmentation of existing Old Pump House; augmentation/ Retrofitting of existing RUIDP Pump House at Akelgarh,augmentation/Retrofitting of existing CWPH and Construction of New CWPH at Akelgarh, Raw Water Gravity Main of 1200 mm dia.; MS Pipe for the length of 5.5 km from old pump house Akelgarh to BPT& RWR-PH; raw water pumping main of 700 mm dia. DI K-9 Pipe for the length of 11.28 km From RWR-PH near Kota University to Ranpur water treatment plant (WTP); construction of RWR Capacity 8.15 ML and PH near Kota University; Construction of 40 million litres per day (mld) WTP at Ranpur; Clear Water Rising (CWR) main of total length of 19.87 km of DI K-7 from Dia. 200 mm to 800 mm; construction of CWRs (2 Nos. of Total 2250 KL capacity); construction of overhead service reservoirs (OHSRs) (10 Nos. for total capacity 15900 kl); Distribution system in uncovered area of Shivaji Park WTP zone in Kota South Nagar Nigam area, Talab Gaon, Haditi Colony and replacement of existing water supply Pipelines in Balakund, Vigyan nagar, Subhash nagar, Mahaveer Nagar-I, III and Chawani Korti area, total length of 214.39 km of DI K-7 from Dia. 100 mm to 600 mm and Shifting of House Service Connections 8000 Nos.
Published Date: April 7, 2026
End Date: May 7, 2026
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work involves annual rate contract for replacement of old and damaged existing sewerage system along with laying of new sewerage system and all ancillary works in Nagar Nigam Jaipur area.
Published Date: April 6, 2026
End Date: June 10, 2026*
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work:The scope of work involves construction of main pumping station (MPS) of 400 mld capacity, sewage treatment plant (STP) of 100 mld capacity on 12 acres of land along with power generation and operations of maintenance (O & M) for a period of 10 years after completion of one year of defect liability period.
Published Date: April 4, 2026.
End Date: April 27, 2026
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves construction of 200 mld capacity STP, 150 mld Tertiary Treatment Plant alongwith treated water distribution network upto Narol industries and other associated works including operation and maintenance (O&M) for a period of 15 years, at the Old Pirana Site in the AMC area.
Published Date: April 4, 2026.
End Date: May 20, 2026*
Implementing Agency: Ahmedabad Urban Development Authority (AUDA)
Segment: Wastewater
Work: The scope of work involves providing and laying of sewerage network and storm water drainage network in TP-438 and TP-439 covering Nidhrad, Godhavi and Chekhla areas under AUDA jurisdiction, including excavation, laying and jointing of pipes, manholes, reinstatement of road surface and all allied works.
Published Date: April 2, 2026
End Date: April 27, 2026
Implementing Agency: Municipal Corporation of Delhi (MCD)
Segment: Water Supply
Work: The scope of work involves Design, Build, Finance, Operate and Transfer (DBFOT) of a fresh waste processing and disposal facility of minimum 800 tpd capacity at Pocket C, Integrated Freight Complex, Ghazipur site, measuring 5 acres in area, as per Solid Waste Management Rules 2026. The contractor will be responsible for segregation, processing and disposal of by-products of incoming fresh waste on a daily basis at the Ghazipur dumpsite. The bids will be invited on a tonnage basis based on weighment slips issued for incoming fresh waste. The concession period will be 5 years, extendable by up to 2 years, with 5 per cent annual escalation to the concessionaire after the first year from the date of Commercial Operation Date (COD).
Published Date: April 2, 2026
End Date: April 30, 2026
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply
Work: The scope of work includes providing and laying of 1200/1600/1800 mm dia RCC NP4 pipes using microtunneling (Trenchless Technology) method from Dayavan Lake to the connection point near Vastral Gam Talav starting chainage of 2200 mm dia pipe laid under East NDMA Project in East Zone of AMC. It involves construction of jacking and receiving shafts, installation of RCC NP-4 jacking pipes in M-50 grade concrete with MS collar, construction of RCC chambers and precast manholes in M-40 grade concrete, MS pipe pushing for National Highway crossing, reinstatement of asphalt pavement, testing of pipelines for water tightness and connection of newly laid lines to existing lines.
Published Date: April 2, 2026
End Date: May 8, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, engineering design, supply of all materials, labour, T&P, etc. required for completion of on turnkey basis: installation of tube well cum pump house and approach bridge and associated works, raw water rising main from intake well to WTP, water treatment plant of 7 mld, RCC OHTs, ZPS/CWR cum pump station, rising main, feeder main, distribution system including house connections, SCADA room, chlorination room, meter room, panel room, boundary wall and site development works, and other appurtenant works including SCADA and automation as per specifications in the tender document. and also includes a trial run of 3 months, defect liability period of 12 months.
Published Date: April 1, 2026
End Date: April 16, 2026
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work involves detailed design of dam structures including overflow and non-overflow sections, energy dissipation arrangement, outlet tunnel, intake structures and gates; structural design of tunnel components, lining and pipelines; proof checking of contractor designs; construction supervision including round the clock monitoring, quality management and safety oversight; coordination with agencies including CWPRS and MERI for model studies; time, cost and contract management; monitoring of environmental parameters; and preparation of progress reports and final completion report.
Published Date: April 1, 2026
End Date: May 19, 2026*
Implementing Agency: Gandhidham Municipal Corporation
Segment: Water Supply
Work: The scope of work involves design, engineering, supply, construction, installation, testing and commissioning of integrated water supply infrastructure including water distribution systems for Meghpar Kumbhardi and Meghpar Borichi areas, construction of 56 mld capacity water treatment plant at Rambaugh, construction of ground service reservoirs (GSRs), pumping stations and miscellaneous water supply works within Gandhidham Municipal Corporation area, providing and installation of grid-connected solar rooftop systems at various locations and providing, supplying, lowering, laying, jointing, testing and commissioning of MS bulk water pipeline from Varsamedi to Rambaugh including all civil, mechanical, electrical, instrumentation works and allied appurtenances.
Published Date: April 1, 2026
End Date: April 27, 2026*
Implementing Agency: Gandhidham Municipal Corporation
Segment: Wastewater
Work: The scope of work involves providing, lowering, laying, jointing, testing and commissioning of a drainage pipeline network in Meghpar (Borichi and Kumbhardi) areas including a rising main and construction of a pump house. It includes survey, geotechnical investigation, design, trench excavation, dewatering, laying of DI pipelines with specials, jointing with existing networks and hydro-testing.
Published Date: March 30, 2026
End Date: April 20, 2026
Implementing Agency: Greater Visakhapatnam Municipal Corporation
Segment: Wastewater
Work: The scope of work involves investigation, survey, design, construction and commissioning of sewerage collection and conveyance system in Gajuwaka Area including 2 years operation and maintenance (O&M).
Published Date: March 30, 2026
End Date: May 16, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P, etc. complete, required for proper completion of laying of sewer network and house connection works in 4 wards, namely Shivpurwa, Tulasipur, Birdopur and Kajipura.
Published Date: March 30, 2026
End Date: April 15, 2026
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves rehabilitation of the existing storm water drain line from Iscon Bridge to YMCA Club to Corporate Road via Karnavati Club in the SWZ of AMC area, including all associated civil and allied works.
Published Date: March 30, 2026
End Date: April 15, 2026
Implementing Agency: Korba Municipal Corporation
Segment: Wastewater
Work: The scope of work involves design, construction, erection, testing and commissioning of a 20 mld UF RO based Tertiary Treatment Plant at Korba with PEB structure and all allied tanks and equipment. It includes construction and commissioning of RCC RO Permeate tank of 4,000 KL capacity, installation of pumping machinery of 1,000,000 LPH capacity with 26 m head, providing and commissioning of 1500 KVA/33/3.3 KV electric sub-station and laying of 500 mm dia. DI K-9 pumping main of 1.3 km from RO Permeate tank to NTPC premises. The project also includes Operation and Maintenance (O&M) of the entire scheme for 15 years.
Published Date: March 30, 2026
End Date: June 12, 2026*
Implementing Agency: Public Health and Engineering Department, Haryana (PHED)
Segment: Wastewater
Work: The scope of work involves construction of 60 mld STP at Devi Nagar, Ambala City on SBR technology consisting of main pumping station, inlet chamber, fine screen channel, grit chambers, SBR basins, fibre disc filters, chlorine contact tank, chlorinators, COTDM belt press system, polyelectrolyte dosing system, CCTV cameras etc. including supplying and laying of gravity main of 1000 mm DI pipe from MPS to STP, construction of RCC intermediate pumping station of 7 mld on Manakpur road with requisite pumping machinery and laying of 600 mm DI K-9 rising main from IPS on Manakpur road to main pumping station Devi Nagar including replacement of existing pumping machinery of MPS of 3 mld on Manakpur road, supplying and laying of gravity main for treated effluent of 1200 mm RCC NP-3 with HDPE liner from chlorine contact tank to drain, construction of civil structures including pathway, construction of boundary wall 2.10 m high with RCC columns, earth filling in the campus and other items.
Published Date: March 27, 2026
End Date: April 30, 2026*
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves design, supply, installation, testing and commissioning of a Sewage Pumping Station and Sewage Treatment Plant (STP) of 250 mld capacity on open technology at Vinzol in Hathijan Ward of East Zone, AMC. It includes detailed design covering hydraulic, process and equipment design, preparation of layout drawings, civil, electrical, mechanical, instrumentation and structural works, whole plant SCADA based automation system, flow meters and online monitoring equipment for process parameters, along with all associated piping, mechanical, electrical and instrumentation components. The project also includes Operation and Maintenance (O&M) for up to 10 years after successful commissioning.
Published Date: March 27, 2026
End Date: June 8, 2026*
Implementing Agency: Roads and Buildings Department, Government of Gujarat
Segment: Wastewater
Work: The scope of work involves construction of RCC storm water drains along both sides of the Ahmedabad–Bavla–Bagodara Road (NH-47) from Bhayla to Sari (Km 135/800 to Km 157/100) and culvert at Km 157/426, covering a total stretch of 40 km (20 km LHS and 20 km RHS) from Bhayla to Sari, along with construction of a culvert at Km 157/426.
Published Date: March 25, 2026
End Date: April 1, 2026.
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply
Work: The scope of work involves design, engineering, procurement and construction of raw water pumping station, 250 mld water treatment plant with zero liquid discharge (ZLD) units, and laying of 2000 mm diameter MS clear water pipeline from chlorine contact tank to existing clear water reservoir at Jaspur water works. The project also includes development of raw water infrastructure comprising raw water reservoir, pump house, raw water gravity mains and rising mains. It also includes micro-tunneling works for laying of clear water pipelines and installation of valves, flow meters and chambers.
Published Date: March 25, 2026
End Date: May 22, 2026*
Implementing Agency: Panvel Municipal Corporation invited
Segment: Water Supply
Work: The scope of work includes Conducting Working Survey, Construction of RCC Valve Tower, Gravity Main, 70 mld WTP (Water treatment Plant) at Deharang Dam, Master Balancing Reservoir, Gravity Main, Microtunelling, Road Restoration (Asphalt Road & Concrete Road), Electrical HT Supply arrangement, Renewable Energy Generation, Metering Kiosk and RMU, Repair of Existing Pump House, K.T. Weir and Collection Channel, Electromechanical work for K.T. Weir and Pump house Work etc.
Published Date: March 24, 2026
End Date: April 16, 2026
Implementing Agency: Vapi Municipal Corporation
Segment: Wastewater
Work: The scope of work involves working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing and commissioning of RCC Np3 pipes for sewer collecting system – gravity mains and DI pipes for rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, construction house connection and inspection chamber, RCC road and compound wall, electrification work and SITC of scada and instrumentation work for gravity main etc.
Published Date: March 24, 2026
End Date: April 23, 2026.
Implementing Agency: Public Health Engineering Department, Meghalaya (PHED)
Segment: Water Supply
Work: The scope of work involves survey, engineering and design of the water supply scheme. It includes laying of transmission mains, feeder mains and development of distribution system, along with construction of reservoirs and zonal tanks of various capacities and staging and providing household connections. The project also includes installation of SCADA system for monitoring and control of the water supply network.
Published Date: March 24, 2026.
End Date: April 15, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves construction of water supply infrastructure including rising main of 5.33 km using DI pipelines, development of distribution network of 436.91 km using HDPE and DI pipelines, construction of multiple overhead tanks and associated structures, construction of tube wells and pump houses, and provision of 16,105 house connections. It also includes SCADA automation, site development works, and complete system implementation including testing, commissioning and associated infrastructure works on turnkey basis.
Published Date: March 23, 2026
End Date: April 22, 2026
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Wastewater
Work: The scope of work involves design, construction, erection, testing and commissioning of a 25 mld Sewage Treatment Plant (STP) along with Intermediate Pumping Stations (IPS) and rising mains, including 3 months trial run followed by 6 years Defect Liability-cum-Operation and Maintenance (O&M) period.
Published Date: March 23, 2026
End Date: April 13, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: The scope of the project includes design, build, operate and maintain a complete and fully functioning 24×7 water supply system in the water supply area.
Published Date: March 20, 2026
End Date: June 10, 2026*
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Water Supply
Work: The scope of the project includes design, build, operate and maintain a complete and fully functioning 24×7 water supply system in the water supply area.
Published Date: March 20, 2026
End Date: June 10, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design/redesign (with IIT vetting) and execution of the project on a turnkey basis.
It includes construction of a 14.40 mld sedimentation tank, 10 mld water treatment plant (WTP) with PLC-SCADA automation, 100 ml impounding reservoir, 1250 kl CWR cum pump house and 60 kl break pressure tank. It also includes construction of 3 overhead tanks of 1500 kl (18 m staging), 1500 kl (20 m staging) and 1000 kl (24 m staging), along with clear water reservoirs, pump houses, staff quarters, boundary walls and other infrastructure.
Published Date: March 19, 2026
End Date: April 27, 2026*
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Water Supply
Work: The scope of work designing, constructing, testing, commissioning, Operation and Maintenance (O&M) for five years after 12 months defect liability period (DLP) for construction of Unit-VI at existing water works comprising 100 million litres per day (mld) automated water treatment plant (WTP), clear water reservoir for 100 mld, raw water and clear water pumping machinery, mechanical dewatering of sludge, pre and post chlorination, lowering of sub soil water table, supervisory control and data acquisition (SCADA) and all other works.
Published Date: March 18, 2026
End Date: May 4, 2026*
Implementing Agency: Kolkata Municipal Corporation (KMC)
Segment: Water Supply
Work: The scope of work includes augmentation and strengthening of Garden Reach Water Works including design, construction, commissioning and mandatory O&M of a 40 mgd water treatment plant (WTP) and allied infrastructure within the GRWW command zone in Kolkata. It also includes development of raw water arrangements of at least 28 mg, construction of a 13 mg clear water reservoir with pumping systems, upgradation of existing RWPS, CWPS and WTPs, sludge handling and disposal systems, pipeline works, shore protection along the Hooghly river, and implementation of SCADA-based automation along with associated electro-mechanical and transmission infrastructure.
Published Date: March 13, 2026
End Date: April 28, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Water Supply
Work: The scope of the work includes implementation of Bhagalpur Water Supply Scheme Project. The work is likely to be completed in 18 months at an estimated cost of Rs 620.59 million. The project is being funded under Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Published Date: March 13, 2026
End Date: June 10, 2026*
Implementing Agency: Narkhed Municipal Council
Segment: Water Supply
Work: The scope of work involves design and execution of Narkhed Water Supply Scheme including construction of an intake well (3m diameter), jack well (8m diameter), and headworks with approach bridge. It includes development of a 2.50 mld water treatment plant along with repair of existing WTP.
Published Date: March 12, 2026
End Date: March 26, 2026
Implementing Agency: State Industries Promotion Corporation of Tamil Nadu Limited (SIPCOT)
Segment: Wastewater
Work: The scope of work includes development of a 5 mld capacity Zero Liquid Discharge (ZLD) based Common Effluent Treatment Plant (CETP) on EPC basis, including design, engineering, construction, supply, installation, testing and commissioning of the complete treatment system. The project involves establishment of primary, secondary and tertiary treatment systems along with advanced membrane systems (UF & RO) and thermal systems such as Multiple Effect Evaporator (MEE) and Agitated Thin Film Dryer (ATFD) to achieve zero liquid discharge. It also includes construction of all civil structures, installation of mechanical, electrical and instrumentation systems, and integration of automation and control systems for complete plant operation.
Published Date: March 12, 2026
End Date: September 2, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P, etc. complete, required for proper completion of laying of sewer network and house connection works in 5 wards, namely Durgakund, Nariyan, Sarainandan, Jolha Northan and Bhelupur.
Published Date: March 11, 2026
End Date: March 27, 2026
Implementing Agency: Kolkata Municipal Corporation (KMC)
Segment: Wastewater
Work: The scope of work involves laying of trunk sewer network and construction of pumping station in Anandapur area. It includes laying of about 3.3 km RCC gravity sewer lines by open cut method and about 1.4 km sewer line through micro-tunnelling method, along with laying of MS rising mains of about 1.55 km, 0.83 km and 0.27 km. The work also includes construction of pumping station with inlet chamber, wet well, screen channels, substation and allied civil works, along with installation of pumps, mechanical screens, transformers, HT/LT panels and electro-mechanical equipment.
Published Date: March 10, 2026
End Date: April 30, 2026
Implementing Agency: Vapi Municipal Corporation
Segment: water supply
Work: Chhiri, Chharwada UGD (Phase-2)
The scope of work involves working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing and commissioning of rcc np3 pipes for sewer collecting system – gravity mains and di pipes for rising main pipeline, construction of sewage pumping station (sps), supplying, erecting, testing and commissioning of pumping machineries, construction house connection & inspection chamber, rcc road and compound wall, electrification work and sitc of scada and instrumentation work for gravity main etc.
Publish date: March 24, 2026
End Date: May 15, 2026*
Implementing Agency: Panipat Municipal Corporation
Segment: Wastewater
Work: The scope of work involves design, construction, erection, testing and commissioning of facilities for transfer of 60 mld treated wastewater from the 25 mld and 35 mld STPs at Siwah to existing HSVP tanks in Sector 29, Panipat. It includes construction of a treated wastewater pumping station, treated sewage storage tank with compartments, isolation valves/gates, rising main, associated electromechanical works and all allied infrastructure. The contract also includes operation and maintenance for 15 years after the defect liability period.
Published Date: March 23, 2026
End Date: April 13, 2026
Implementing Agency: Jamshedpur Notified Area Committee (JNAC)
Segment: Wastewater
Work: The scope of work involves construction of 44 mld STP on SBR Technology and allied works of Interception and Diversions at Bhojpur Ghat, Zilla School, Bagunhatu Ghat and Moharda drains under Jamshedpur Notified Area Committee. The project includes a defect liability period of 1 year and an Operation and Maintenance (O&M) period of 5 years after satisfactory completion of the project.
Published Date: March 23, 2026
End Date: May 11, 2026*
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Water Supply
Work: The scope of work involves augmentation of water supply including 2.5 mld water treatment plant (WTP), construction of independent canal-based water works No. 2, construction of structures at existing water works No. 1, construction of three boosting stations, strengthening of distribution system, and development of sewerage infrastructure including laying of sewerage network, restoration of streets, construction of 2.50 mld sewage treatment plant (STP), construction of two intermediate pumping stations, main pumping station, treated effluent rising main and other associated works.
Published Date: March 23, 2026
End Date: April 13, 2026
Implementing Agency: Jaipur Development Authority (JDA)
Segment: Wastewater
Work: The scope of work involves the construction of stormwater drains in Sanganer Aero Zone-8, Jaipur (Phase-I) along with all associated civil works required for proper disposal of stormwater in the designated area.
Published Date: March 21, 2026
End Date: May 18, 2026*
Implementing Agency: Delhi Jal Board
Segment: Wastewater
Work: The project involves Design, Construction, Operation, and Maintenance of In-Situ Wastewater Treatment for Delhi Gate Drain, directly falling into the Yamuna River.
Published Date: March 20, 2026
End Date: April 20, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P, etc. complete, required for proper completion of laying of sewer network and house connection works in 2 wards, namely Prahladgaht And Kritiwasheshwar.
Published Date: March 18, 2026
End Date: April 7, 2026*
Implementing Agency: Public Health Engineering Department, Haryana (PHED)
Segment: Water Supply
Work: The scope of work involves construction of a 12.50 mld water treatment plant (WTP) at Saidpur to augment total capacity from 32 mld to 44.50 mld of Badli WTP. It includes development of an 8 km long rising main from Iqbalpur to Saidpur and 1.5 km long 500 mm PCCP clear water rising main.
Published Date: March 18, 2026
End Date: May 1, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design and execution of the project. It includes construction of 6 overhead tanks along with CWRs, 21 pump houses, LCS room, master control station, boundary wall, site development and approach roads.
Published Date: March 17, 2026
End Date: April 20, 2026
Implementing Agency: Rajkot Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing, supplying, lowering, laying, joining, testing & commissioning Of DI Pipe Line (K-7 Class) distribution with house connection and road restoration at remaining area between Nanamava Road & Kalavad Road in ward number 8.
Published Date: March 17, 2026
End Date: April 13, 2026*
Implementing Agency: Bangalore Water Supply and Sewerage Board (BWSSB)
Segment: Wastewater
Work: It includes design, construction, and commissioning of 75 mld stp based on SBR with BNR, tertiary sewage pumping station of capacity 75 mld, power generation of 4 mw & odour control units at Madiwala.
Published Date: March 16, 2026
End Date: April 2, 2026
Implementing Agency: Gujarat Urban Development Company Limited (GUDC)
Segment: Water Supply
Work: The scope of work involves desilting, redevelopment and construction of selected water bodies and interlinking of various water bodies in Vadnagar. It includes site surveys, investigations, design (hydraulic, structural, mechanical and electrical), and preparation of drawings, along with execution of interlinking works, desilting operations, and development of associated infrastructure such as channels and pipelines.
Published Date: March 13, 2026
End Date: March 27, 2026
Implementing Agency: Public Works Department, Puducherry
Segment: Water Supply
Work: Package I: Rising Main from Lakes & Rivers to WTP In Puducherry.
The entire project includes constructing intake wells with specific capacities Bahour Lake (13 mld), Abhishegapakkam Lake (4 mld), Kirumampakkam Lake (3 mld), Korkadu Lake (4 mld), and Sankarabarani River (2 locations of 3 mld each) to draw a total of 30 mld of water. It also includes supply, laying and jointing of 34.87 km long raw water transmission mains of 250 mm to 800 mm diameter (DI and HDPE pipes) connecting intake points to a 30 mld Water Treatment Plant at Thirukanji.
Package II: Rising Main emanating from Thirkanji to 46 nos OHT in Puducherry
The entire project includes constructing intake wells with specific capacities Bahour Lake (13 mld), Abhishegapakkam Lake (4 mld), Kirumampakkam Lake (3 mld), Korkadu Lake (4 mld), and Sankarabarani River (2 locations of 3 mld each) to draw a total of 30 mld of water. It also includes supply, laying and jointing of 34.87 km long raw water transmission mains of 250 mm to 800 mm diameter (DI and HDPE pipes) connecting intake points to a 30 mld Water Treatment Plant at Thirukanji.
Published Date: March 13, 2026; March 14, 2026
End Date: June 30, 2026*
Implementing Agency: Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB)
Segment: Wastewater
Work: The scope of work involves rehabilitation of 1600 mm and 1800 mm diameter trunk sewer main (Duplicate A main) from Divyashakti Apartment to 20 MLD STP at Hussain Sagar Lake in Hyderabad, Telangana using trenchless structural lining system and trenchless technology (MWSL structural lining system).
Published Date: March 13, 2026
End Date: April 8, 2026
Implementing Agency: Irrigation and Flood Control Department, Government of Delhi
Segment: Water Supply
Work: The scope of work involves engineering, procurement, and construction (EPC Mode-II) of a proposed 4.5 km long major drain along the railway alignment from Mundka Halt Station (Km 19/26–28) to Najafgarh Supplementary Drain (Km 15/10–12) of Delhi-Bhatinda railway line.
Published Date: March 13, 2026
End Date: April 10, 2026
Implementing Agency: Municipal Council Ghuggus
Segment: Water Supply
Work: The scope of work includes detailed survey, soil investigation and design, along with construction of an RCC bandhara across the Wardha river, jack well, pump house, and approach bridge with road.
Published Date: March 13, 2026
End Date: April 2, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCO)
Segment: Water Supply
Work: The scope of work involves surveying, data collection, soil investigation, analysis and preparation of Detailed Project Reports (DPRs) for the project to ensure 24×7 water supply. It includes assessment of existing systems, demand estimation, identification of suitable water sources, and planning of required infrastructure such as overhead tanks, pipelines and other system components.
Published Date: March 13, 2026
End Date: March 17, 2026
Implementing Agency: Public Works Department, Puducherry
Segment: Wastewater
Work: The scope of work involves collection and review of secondary data, master plans and utility records; assessment of technical feasibility of implementing UGSS for the entire project area; population projections and wastewater generation estimates; topographical surveys using Total Station and DGPS-RTK; GIS-based base map preparation and utility mapping; soil investigations and groundwater table studies; functional planning and engineering design of sewerage system including collection systems, gravity mains, rising mains and pumping stations; hydraulic modelling of sewer network using SEWERGEMS or equivalent software; preparation of detailed drawings, quantity estimates and bill of quantities (BOQ); preparation of project cost estimates including capital and O&M costs; economic and financial analysis; and preparation of complete tender documents in accordance with ADB Standard Bidding Documents.
Published Date: March 12, 2026
End Date: June 10, 2026*
Implementing Agency: Gandhidham Municipal Corporation
Segment: Wastewater
Work: The scope of work involves providing, lowering, laying, jointing, testing and commissioning of drainage pipeline network in Meghpar (Borichi and Kumbhardi) areas including rising main and construction of a pump house. It includes survey, geotechnical investigation, design, trench excavation, dewatering, laying of DI pipelines with specials, jointing with existing network and hydro-testing.
Published Date: March 11, 2026
End Date: March 23, 2026.
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P, etc. complete, required for proper completion of laying of sewer network and rising main, house connection works and 23 mld SPS in 2 wards, namely Hukulganj and Naibasti.
Published Date: March 11, 2026
End Date: March 27, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, design, involves construction of multiple overhead tanks of capacities 2400 kl, 1600 kl and 3100 kl with staging heights of 27 m to 29 m, and clear water reservoir (CWR) cum pump houses of 400 kl to 800 kl capacities. It includes supply, laying and jointing of rising mains (300 mm to 400 mm dia, approx. 350 m length) and development of a 94.774 km distribution network (110 mm to 700 mm dia using HDPE and DI pipes) along with house connections in Nagwa, Shivala, Baghada, Bengali Tola and Jangambadi wards (Cluster-5 of 18 wards).
Published Date: March 7, 2026
End Date: April 15, 2026*
Implementing Agency: Special Economic Zone Authority (MSEZA)
Segment: Wastewater
Work: The scope of work involves design, engineering, fabrication, supply, construction, erection, testing and commissioning of a 2.0 mld Zero Liquid Discharge (ZLD) based Common Effluent Treatment Plant (CETP) and a 3.5 mld Common Sewage Treatment Plant (CSTP) at Madras Export Processing Zone (MEPZ), Tambaram. It includes pretreatment, biological and tertiary treatment systems, membrane separation, thermal evaporation system, sludge management system, disinfection units, common civil and electrical works such as transformers and DG sets, and installation of PLC/SCADA and OCEMS systems along with laboratory instruments and associated infrastructure works.
Published Date: March 7, 2026
End date: April 24, 2026*
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves providing and laying 1600 mm diameter gravity trunk sewer line through micro tunneling from existing chamber to proposed sewage pumping station (SPS), construction of SPS with electro-mechanical works, and providing and laying 1400 mm diameter MS rising main of about 5.1 km length. It also includes construction of associated infrastructure such as transformer yard, HT/LT rooms, internal roads, compound wall and pipeline crossing works.
Published Date: March 6, 2026
End Date: March 24, 2026
Implementing Agency: Local Self Government Department (DLB), Rajasthan
Segment: Wastewater
Work: The scope of work involves design, supply, construction, testing, trial run and commissioning of 10 kld faecal sludge treatment plants (FSTPs) each at 100 nodal villages (Total capacity 1 mld) in Rajasthan under the Faecal Sludge and Septage Management (FSSM) programme, including supply, testing and commissioning of vehicle-mounted suction machines for desludging operations.
Published Date: March 6, 2026
End Date: April 6, 2026
Implementing Agency: Sardar Sarovar Narmada Nigam Limited
Segment: Water Supply
Work: The scope of work involves engineering, procurement and construction (EPC) of raw water transmission system, including design, survey and construction of head works, intake structures, pumping station and a around 95 km long mild steel pipeline from Bhaskarpura Tank to Dholera SIR, along with all civil, mechanical, electrical and instrumentation systems. The aim is to provide 100 mld water to Dholera SIR.
Published Date: March 7, 2026
End Date: April 6, 2026*
Implementing Agency: Madhya Pradesh Jal Nigam (MPJNM)
Segment: water supply
Work: The scope of work involves survey, design verification/confirmation, validation, engineering, procurement, construction, testing, commissioning, trial run and operation & maintenance for 10 years of the Ghategaon Bhitarwar multi-village drinking water supply scheme on a turn-key basis. It includes construction of an intake well cum pump house (approx. 41.75 mld capacity), raw water pumping main, 34 mld water treatment plant at Bamor village, clear water sump, pump house, pipeline works, automation systems, and associated civil, electrical and infrastructure works. The project will be implemented on a turn-key basis.
Published Date: March 7, 2026
End Date: April 15, 2026
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: Niwai: The scope of work involves construction of rising main of length 20.56 km and distribution pipeline of length 125.1 km.
Diggi: The scope of work involves construction of rising main of length 22.98 km and distribution pipeline of length 38.77 km.
Lambaharisingh: The scope of work involves construction of rising main of length 30.22 km and distribution pipeline of length 22.47 km.
Jadmo ki Dhan : The scope of work involves construction of rising main of length 5.15 km and distribution pipeline of length 20.01 km.
Published Date: March 6, 2026
End Date: April 6, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: Durgakund, Bhelupur, Jolha Northan, Sarainandan and Nariya (5 of 18 Problematic Wards) Water Supply Augmentation Project Cluster-4:
The scope of work involves surveying, soil investigation, detailed design and supply of materials, labour and T&P for augmentation and extension of the water supply system.It involves construction of multiple overhead tanks of capacities 2600 KL and 3100 KL with staging heights of 27 m and 29 m, along with clear water reservoir (CWR) cum pump houses, including all associated civil and electromechanical components.. The work involves laying and jointing of rising mains and development of the distribution network system along with house service connections. The rising main length of the project is 0.63 km.
Published Date: March 5, 2026
End Date: April 6, 2026
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves augmentation and upgradation of the existing 35 mld sewage treatment plant to 50 mld capacity at Vasna in Ahmedabad under the Augment, Build, Operate and Transfer (ABOT) model, including design, construction, erection, testing and commissioning along with associated infrastructure works.
Published Date: March 3, 2026
End Date: April 7, 2026*
Implementing Agency: Public Health Engineering Department (PHED), Haryana
Segment: Water Supply
Work: The scope of work involves augmentation of water supply and development of sewerage infrastructure including construction of independent canal-based water works No. 2, construction of structures at existing water works No. 1, construction of three boosting stations, strengthening of distribution system, laying of sewerage network, restoration of streets, construction of 2.50 mld sewage treatment plant (STP), construction of two intermediate pumping stations, main pumping station, treated effluent rising main and other associated works.
Published Date: March 3, 2026
End Date: March 25, 2026
Implementing Agency: Kolkata Municipal Corporation (KMC)
Segment: Wastewater
Work: The scope of work involves design, construction and commissioning of a 41 mld sewage treatment plant based on Sequential Batch Reactor (SBR) technology including substation facilities. It also includes supply and laying of 700 mm diameter ductile iron pipe (K9 grade) for inlet to the STP and supply and laying of MS spiral welded pipes for discharge of treated effluent along with associated infrastructure works.
Published Date: March 3, 2026
End Date: April 23, 2026
Implementing Agency: Navi Mumbai Municipal Corporation (NMMC)
Segment: Wastewater
Work: The scope of work involves construction of elevated service reservoir (ESR), ground service reservoir (GSR) and allied works at Sector-18 Teen Taki area in Koperkhairane ward including associated civil works, site development and other appurtenant infrastructure required for strengthening the water supply system.
Published Date: March 2, 2026
End Date: April 10, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: Hukulganj and Nai Basti (2 of 18 Problematic Wards) Water Supply Augmentation Project Cluster-1:
The scope of work involves survey, soil investigation, design and construction of water supply infrastructure under augmentation and extension scheme. It includes construction of overhead tanks, clear water reservoirs (CWRs), pump houses, SCADA room, boundary wall, site development and allied infrastructure, along with laying and jointing of rising mains and distribution network, installation of pumping systems, house connections and automation through PLC-SCADA systems. The rising main length of the project is 1.82 km.
Published Date: February 28, 2026
End Date: April 6, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (Urban)
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P etc. complete required for construction, erection, completion, testing & commissioning of water supply works such RCC over head tank, CWR, laying of 9.84 km rising main, distribution system, pump house, boundary wall, gate, site development, renovation of existing facilities and construction of tube wells including PLC SCADA automation and other appurtenant works of water supply scheme on turnkey basis under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0 programme
Publishing Date: February 28, 2026
End Date: March 31, 2026*
Implementing Agency: Ahmedabad Urban Development Authority (AUDA)
Segment: Wastewater
Work: The scope of work involves construction and commissioning of a sewage treatment plant (STP) along with development of an underground drainage network in various Town Planning (TP) schemes of Section-2 within the AUDA area. The project includes development of 30 mld STP at Badodara – Devdi – Vanch – TP-424 and 10 mld STP at Jetalpur – TP-130 and laying of approximately 27.29 km of rising/pumping main across multiple TP schemes along with associated sewerage infrastructure and pumping facilities.
Publishing Date: February 27, 2026
End Date: April 4, 2026*
Implementing Agency: Public Works Department, Puducherry (PWD)
Segment: Wastewater
Work: The scope of work involves condition assessment and remodeling of approximately 42 km of the underground sewerage system at Orleanpet & Rainbow Nagar. Entire work is proposed to be implemented in two phases. Phase 1: Condition assessment which include capacity assessment and recovery planning assessment of existing sewerage system. Phase 2: Rectification/Rehabilitation which includes capacity augmentation and hydraulic modeling work; On-spot-repair work for speedy recovery of localized faults and rectification, recovery and augmentation of existing network.
Published Date: February 27, 2026
End Date: April 29, 2026*
Implementing Agency: Public Works Department, Puducherry (PWD)
Segment: Wastewater
Work: The scope of work involves providing and laying underground sewerage networks in Zones 13-5 and 14-3 along with the construction of in-line pumping stations such as SPS-13-5-1, SPS-14-3-1, SPS-14-3-2 and SPS-14-3-3 at Thengaithittu and Ariyankuppam in Puducherry. It includes laying of 33 km DWC Sewer Pipes and 7 km HDPE Sewer Pipes using Trenchless methods.
Published Date: February 27, 2026
End Date: April 22, 2026*
Implementing Agency: Ahmedabad Urban Development Authority (AUDA)
Segment: Wastewater
Work: The scope of work involves construction of a sewer network under TP Schemes Nos. 412A, 412B, 243, 109, 413 and 411 along with development of a 30 mld sewage treatment plant (STP) within AUDA TP Scheme areas. The project also includes design, supply, installation, testing and commissioning of sewerage infrastructure and construction of gravity sewer networks, house and property connections, rising mains, and three pumping stations, namely MPS-01 (11.98 mld), MPS-02 (12.24 mld), and MPS-03 (20.55 mld) on a turnkey basis.
Publishing Date: February 26, 2026
End Date: April 4, 2026*
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: The scope of work involves rehabilitation of the existing drainage line from Nagarvel Hanuman Temple to Guruji Bridge, Khokhara and other areas in South Zone of AMC Area.
Published Date: February 26, 2026
End Date: March 24, 2026
Implementing Agency: Andhra Pradesh Township and Infrastructure Development Corporation (APTIDCO)
Segment: Wastewater
Work: The scope of work includes construction of balance infrastructure such as internal roads, storm water drains, water supply systems, sewerage networks, courtyard filling and trunk mains in approved layouts located in Nuziveedu and Vuyyuru ULBs in Krishna district; Jaggayapeta, Tiruvuru and Nandigama ULBs in NTR district; Addanki in Bapatla district; and Kanigiri and Giddalur ULBs in Prakasam district in Andhra Pradesh.
Published Date: February 25, 2026
End Date: March 13, 2026
Implementing Agency: Pune Metropolitan Region Development Authority (PMRDA)
Segment: Wastewater
Work: The scope of work includes design and construction of sewage treatment plants (STPs) of total 59 mld capacity, including 19 mld under Phase I and 40 mld under Phase II, along with all appurtenant structures and allied works. It also includes survey and construction of about 60 km underground sewerage network, interception and diversion works including about 15 km interception sewer, and 44 drain tapping/diversion works.
Published Date: February 25, 2026
End Date: April 13, 2026
Implementing Agency: Pune Metropolitan Region Development Authority (PMRDA)
Segment: Wastewater
Work: The scope of work involves design, construction, testing and commissioning of sewage treatment plants with a total installed capacity of about 4.5 mld along with associated interception, diversion and sewerage infrastructure for pollution abatement of the Pawana River. The project includes construction of 14 decentralized sewage treatment plants across villages such as Somatane, Urse, Parandwadi, Shirgaon, Gahunje, Shivane, Bebad Ohol, Dhamane, Godumbare, Salumbare and Sangvade in the PMRDA region of Pune. The works also include construction of 13 nalla interception and diversion structures, development of about 3.93 km interceptor sewer network, installation of 16 intermediate and main sewage pumping stations, and construction of rising mains and treated water disposal pipelines connected to the sewage treatment plants.
Published Date: February 25, 2026
End Date: April 13, 2026*
Implementing Agency: Kolkata Municipal Corporation (KMC)
Segment: Wastewater
Work: The scope of work includes excavation and development of the natural drainage channel from Parama Island towards the Vidyadhari River in Ward-58 under Borough VII.
Published Date: February 24, 2026
End Date: March 23, 2026.
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes working survey, soil investigation, design, construction and operation contract for providing, supplying, lowering, laying and jointing various d.i./p.v.c. rising main and gravity main pipelines, intake well, WTP, RCC ESR, RCC sump, pump house, staff quarters, RCC road, compound wall, and supplying and erecting pumping machinery and instrumentation works at various HW/SHW, together with all associated structures, including Operation and Maintenance of new and existing civil structures and pipeline network, mechanical and electrical equipment for 10 years under the Augmentation of Kodinar Regional Water Supply Scheme for supplying water to all beneficiary villages of Taluka: Sutrapada, Kodinar & Gir gadhda, Dist.: Gir Somnath. It involves construction of 15 mld Ghantwad Right Bank Prop WTP and 12 mld Malgam Prop WTP.
Published Date: February 24, 2026
End Date: April 8, 2026*
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes sewerage and septage management systems with construction of sewage treatment plants (STPs), laying, jointing, testing and commissioning of sewer networks, house sewer connections, faecal sludge and septage management (FSSM), SCADA systems, pumping infrastructure, road restoration works and other allied infrastructure. The projects also include one year defect liability period (DLP) and 10 years operation and maintenance (O&M) of the sewerage infrastructure.
The key components in seven ULBs include:
-Basni Sewerage Network System: Construction of about 26.06 km sewer network with minimum 200 mm diameter pipelines, 2.0 mld sewage treatment plant based on MBBR technology, and about 2,898 house sewer connections along with allied infrastructure.
-Shri Karanpur Sewerage Network System: Construction of about 14.93 km sewer network with minimum 200 mm diameter pipelines and a 1.5 mld sewage treatment plant based on MBBR technology along with house sewer connections and associated infrastructure.
-Merta City Sewerage Network System: Construction of about 44.71 km sewer network and a 2.5 mld sewage treatment plant (1.0 mld and 1.5 mld) based on MBBR technology with associated sewerage infrastructure.
-Nawa Sewerage Network System: Construction of about 19.79 km sewer network and a 1.0 mld sewage treatment plant based on MBBR technology along with associated sewerage facilities.
-Sadulshahar Sewerage Network System: Construction of about 19.54 km sewer network and a 1.5 mld sewage treatment plant based on MBBR technology with allied works.
-Behror Sewerage Network System: Construction of about 30.55 km sewer network in Phase I with a 2.5 mld sewage treatment plant and additional STPs of 2.0 mld and 1.0 mld capacity proposed in Phase II along with associated infrastructure.
-Surajgarh Sewerage Network System: Construction of about 25.29 km sewer network in Phase I with a 1.5 mld sewage treatment plant and provision for 1.6 mld STP expansion and 37.19 km sewer line in Phase II along with pumping stations and associated infrastructure.
Publishing Date: February 24, 2026
End Date: April 9, 2026*
Implementing Agency: Ujjain Municipal Corporation
Segment: Wastewater
Work: The scope of work includes survey, design, construction of sewage treatment plants (STPs) having capacities of 2.38 mld for Bhairavgarh drain and 22 mld for Piliyakhal drain, I&D work with construction of two drain tapping for Piliykhal drain and Bhairavgarh drain, approach sewer (1.42 km), construction of two sewage pumping station (SPS) (10 m dia 6 m depth for Piliyakhal drain and 3 m dia- 6 m depth for Bhairavgarh drain) with allied works including sewer rising mains (1420 m) and 2 nos. effluent pumping station at both proposed STPs campus with all allied works including effluent rising main (3500 m) and all appurtenant structures and allied works including 15 years Operation and Maintenance (O&M).
Publishing Date: February 23, 2026
End Date: April 10, 2026*
Implementing Agency: Public Works Department, Puducherry (PWD)
Segment: Wastewater
Work: The scope of work involves installation of 26 km gravity sewer mains in Zone-13 sub-areas and 22 km in Zone-14 sub-areas serving Sewage Pumping Stations (SPS) SPS-13-Park in Sewerage Zone-13 and SPS-14-2 in Sewerage Zone-14, within the uncovered areas of the Puducherry Urban Agglomeration Area (PUAA).
Publishing Date: February 27, 2026
End Date: April 22, 2026
Implementing Agency: Swaccha Andhra Corporation, Andhra Pradesh
Segment: Wastewater
Work: The scope of work involves investigation, survey, design and construction of 60 STPs under Package-1 with cumulative capacity of 281.35 mld in 38 ULBs based on modern technology with three months trial run post completion, operation and maintenance (O&M) for 5 years including 2 defect liability period (DLP).
Publishing date: February 21, 2026
End Date: March 9, 2026
Implementing Agency: Public Health and Engineering Department, Andhra Pradesh (PHED)
Segment: Wastewater
Work: The scope of work involves execution of underground drainage / storm water drains in Nellore municipal corporation municipality in 6 packages including operation and maintenance under UIDF Tranche II (FY 2024-25). It includes laying of Gravity Underground Sewer Network of length 6.34 km, construction of balance decentralized 20 mld STP at HWW zone and decentralised 14 mld STP at Kondayapalem Zone
Publishing date: February 21, 2026
End Date: March 23, 2026*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BIDCO)
Segment: Wastewater
Work: The scope of work includes providing house sewer connections under the Digha–Kankarbagh sewerage network in Patna, along with associated sewer infrastructure works required for connecting households to the existing sewerage system under the Namami Gange programme.
Published Date: February 20, 2026
End Date: April 6, 2026
Implementing Agency: Maharashtra Jeevan Pradhikaran (MJP)
Segment: Water Supply
Work: The scope of work involves construction of rising main of length 9.8 km, gravity main of length 15.25 km, 60 mld WTP, repairing of 18 mld WTP and old ESR.
Publishing date: February 20, 2026
End Date: April 6, 2026
Implementing Agency: Sambalpur Municipal Corporation has
Segment: Wastewater
Work: The scope of work involves assistance in bidding process including preparation of bid documents and bid evaluation; construction supervision including review and approval of designs, drawings and construction methods; quality assurance and quality control of works; health, safety and environment compliance monitoring; processing and certification of running account bills; contract management including progress monitoring and change order administration; and project completion testing, commissioning and closure. The total duration of services is 36 months comprising a preparatory and bidding stage of 3 months, construction phase of 32 months and contract closing and O&M activities of 1 month.
Published Date: February 19, 2026
End Date: May 19, 2026
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Kishangarh: It includes providing, laying, joining, testing and commissioning of rising main pipe line of length 13.25 km, 5128 FHTCs.
Pushkar: It includes providing, laying, joining, testing and commissioning of rising main pipe line of length 5.22 km, 776 FHTCs.
Nasirabad Cantt: It includes providing, laying, joining, testing and commissioning of rising main pipe line of length 1.55 km, 2037 FHTCs.
Nasirabad Town: It includes providing, laying, joining, testing and commissioning of rising main pipe line of length 0.25 km.
Publishing Date: February 19, 2026
End Date: March 5, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design and construction of water supply infrastructure on a turnkey basis. Key components include construction of overhead tanks (OHTs), clear water reservoirs (CWRs), pump houses, tube wells and allied civil structures, along with laying of rising mains and distribution pipelines and integration with the existing water supply network.
Publishing Date: February 19, 2026
End Date: March 23, 2026
Implementing Agency: Ujjain Municipal Corporation
Segment: Water Supply
Work: The scope of work involves providing independent technical oversight; review of contractor’s designs and ensuring compliance with standards; supervision of construction and monitoring of quality; certification of measurements and payments; monitoring of timelines and milestones; assisting Ujjain Municipal Corporation (UMC) in contract management; and overseeing testing, commissioning and project completion.
Published Date: February 25, 2026
End Date: May 21, 2026
Implementing Agency: State Industries Promotion Corporation of Tamil Nadu Limited (SIPCOT)
Segment: Desalination
Work: The scope of work involves review of designs, drawings, structural calculations and environment, health and safety plans submitted by the concessionaire; monthly inspection of facilities during construction period and preparation of inspection reports; monitoring of environment, health and safety plan compliance; review of construction progress as per payment milestones; issuance of construction completion certificate; monitoring of trial operations and issuance of scheduled commercial operations date (COD) certificate; monthly inspection and KPI adherence reporting during O&M period; review of online monitoring system reports; inspection of testing laboratories; and assessment of implications of events related to emergency, change in law and force majeure.
Published Date: February 17, 2026
End Date: May 21, 2026
Implementing Agency: Uttarakhand Pey Jal Nigam
Segment: Wastewater
Work: The scope of DPR preparation work includes hydraulic design of the sewer network; hydraulic design of the sewerage network and required STPs; disposal works for reuse of treated effluent; detailed DGPS/total station survey for the sewer network and household survey for house connections; preparation of BOQ and cost estimation as per the latest CPWD DSR, UKPJN SOR and UKPWD SOR for all civil and E&M works required, from house connection to treatment, disposal and reuse of treated effluent; design and drawings preparation including L-section and index plan on AutoCAD software; submission of seven hard copies of the DPR and drawings along with soft copies of all documents; and design to be carried out as per the latest NMCG/CPHEEO guidelines and relevant IS codes.
Publishing Date: February 13, 2026
End Date: February 24, 2026
Implementing Agency: Greater Visakhapatnam Municipal Corporation (GVMC)
Segment: Wastewater
Work: The scope of work involves construction, supplying, erection, testing and commissioning of required civil, mechanical, electrical and instrumentation works required for sewerage collection, conveyance and treatment system for Madhurawada area including house service connections (one HSC connection includes connecting all wastewater (sewage and sullage) outlet from one plot), road restoration, providing required numbers of sewage pumping stations, lift stations, raw sewage conveyance mains and STP at Kapuluppada; construction and commissioning of Sewage Treatment Plant with SBR Technology for 20 mld which can meet the desired water quality parameters as per CPHEEO and NGT Guidelines including 2 years Defect liability period (DLP), and Operation and Maintenance (O&M) period for 2 years of pumping stations, transmission mains and treatment plants commissioned.
Publishing Date: February 13, 2026.
End Date: March 5, 2026.
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: The scope of work involves upgradation and augmentation of existing 60 mld STP to 75 mld capacity STP at Pirana including design, construction, erection, testing and commissioning and successive operation and maintenance for the period of 10 years.
Publishing Date: February 13, 2026
End Date: March 27, 2026*
Implementing Agency: Pune Metropolitan Region Development Authority (PMRDA)
Segment: Wastewater
Work: Mulshi Taluka Sewerage Project: The scope of work involves design, supplying, construction, erection and commissioning of STPs, sewer network and allied works for sewerage project for Urban Growth Centers, including 5 Years of operation and maintenance (O&M) with defect liability period (DLP) for 5 years, for 3 clusters comprising 6 villages in taluka Mulshi under the jurisdiction of PMRDA.
The clusters include;
Cluster 1 – Village Lawale and Pirangut: The scope includes an underground sewer collection system, intermediate and terminal pumping stations, rising mains and receiving chambers, STP of 15 mld capacity, pumping machinery including mechanical and electrical works, SCADA automation with a solar power system, and provisions for a compound wall.
Cluster 2 – Villages Maan and Bhoirwadi: The scope includes a sewer collection system for multiple zones, major pumping stations for zone-wise conveyance, terminal pumping arrangements, STP of 33.5 mld capacity, mechanical and electrical pumping systems, SCADA with solar installation, and compound wall provisions.
Cluster 3 – Villages Marunji and Hinjewadi: The scope includes an underground sewer network, intermediate and terminal pumping stations, rising mains to the STP of 20.5 mld capacity, sewage treatment and treated effluent disposal systems, pumping machinery and electrical systems, SCADA automation with solar power system, and compound wall provisions.
Haveli Taluka Sewerage Project : The scope of work involves design, supplying, construction, erection and commissioning of STPs, sewer network and allied works for sewerage project for Urban Growth Centers, including 5 years of operation and maintenance with defect liability period for 5 years, for 5 clusters comprising 8 villages in taluka Haveli under the jurisdiction of PMRDA.
The clusters include;
Cluster 1 – Lonikand–Perne: The scope includes an underground sewerage collection system, intermediate and terminal pumping stations, conveyance system to the STP of 25.5 mld capacity, mechanical and electrical pumping machinery, SCADA automation with solar power system, and provisions for raising structures, compound wall, and road restoration.
Cluster 2 – Kesnand Cluster: The scope includes a sewer collection network for cluster villages, intermediate and terminal pumping stations, conveyance to the STP of 17.5 mld capacity, mechanical and electrical pumping systems, SCADA automation with solar power installations, and provisions for raising structures, compound wall, and road restoration.
Cluster 3 – Urali Kanchan: The scope includes an underground sewer network, terminal pumping station, rising main to the STP of 13 mld capacity, pumping machinery and electrical installations, SCADA automation with solar power system, and provisions for a compound wall and road restoration.
Cluster 4 – Kadamwak Wasti: The scope includes a sewer collection system, terminal pumping station, conveyance to the STP of 15.5 mld capacity, mechanical and electrical pumping machinery, SCADA automation with solar installation, and provisions for a compound wall and road restoration.
Cluster 5 – Lonikal Bhor: The scope includes an underground sewer network, terminal pumping station, conveyance to the STP of 11.5 mld capacity, pumping machinery and electrical systems, SCADA automation with solar power system, and provisions for a compound wall and road restoration.
Khed Taluka Sewerage Project
Cluster 1 – Bhose: The scope includes a sewer collection network, terminal sump and pump house, rising main, SCADA with solar system, mechanical and electrical pumping machinery, and provisions for a compound wall, with an STP of 15 mld capacity using SBR technology with sewage sump.
Cluster 2 – Nanekarwadi: The scope includes a sewer collection system, terminal and intermediate sumps, rising main, pumping machinery including mechanical and electrical works, SCADA with solar system, and provisions for a compound wall, with an STP of 8.5 mld capacity using MBBR technology with treated sewage sump.
Cluster 3 – Mahalunge: The scope includes a sewer collection network, terminal sump and pump house, rising main, pumping machinery, SCADA with solar system, and provisions for a compound wall, with an STP of 8 mld capacity using MBBR technology with treated sewage sump.
Shirur Taluka Sewerage Project
Cluster 1 – Shikrapur: The scope includes an underground sewerage collection system, terminal and intermediate pumping stations, rising mains and receiving chambers, STP of 14.5 mld capacity with SBR technology, mechanical and electrical pumping machinery, SCADA automation with solar power system, and provisions for road reinstatement and compound wall.
Cluster 2 – Sanaswadi: The scope includes an underground sewer network, terminal pumping station, conveyance system to the STP of 13 mld capacity with SBR technology and tertiary treatment, mechanical and electrical pumping systems, SCADA automation with solar installation, and provisions for road reinstatement and compound wall.
Cluster 3 – Dhok Sangvi: The scope includes a sewer collection system, terminal pumping station, rising main to the STP of 15 mld capacity with SBR technology, mechanical and electrical pumping systems, SCADA automation with solar power system, and provisions for road reinstatement and compound wall.
Cluster 4 – Koregaon Bhima: The scope includes an underground sewer network, terminal pumping station, conveyance to the STP of 15.5 mld capacity with SBR technology, pumping machinery and electrical installations, SCADA automation with solar system, and provisions for road reinstatement and compound wall.
Publishing Date: February 12, 2026
End Date: April 8, 2026*
Implementing Agency: Public Health Engineering Department, Bihar (PHED)
Segment: Water Supply
Work: The scope of work involves Design, Construction, Supply, Testing and Commissioning of Water Supply Schemes (Balance Work Left by previous Contractor) with Electric Driven Pumps and Iron Removal Treatment Plant having Technology (Adsorption/Nano Technology) of CSIR or any other Technology endorsed/approved by Gol in the Iron affected Habitations/Wards of Different Panchayats of Block – Sonbarsa & Salkuha (Total – 212 numbers of schemes, as mentioned in NIT) of District – Saharsa of Bihar.
Published Date: February 12, 2026
End Date: May 4, 2026*
Implementing Agency: Engineers India Limited (EIL)
Segment: Wastewater
Work: The scope of work includes development of oil water separator (OWS) treatment system with 260 m3/h capacity at Bina Petchem and Refinery Expansion Project (BPREP) of Bharat Petroleum Corporation Limited (BPCL), contaminated rain water (CRW) treatment with 150 m3/h capacity, spent caustic treatment with 5 m3/h capacity, spent caustic treatment for wet air oxidation (WAO) treated spent caustic with 20 m3/hr capacity and 6.25 m3/h capacity sewage treatment, sludge handling & dewatering facilities, chemicals handling and dosing facilities, voc collection and treatment section, intermediate storage and pumping facilities, chemical house, substation, control room & other buildings/structures/works, all geo-tech, civil and structural, architectural, electrical, instrumentation, mechanical, process, hazard and operability (HAZOP) studies, 3D modeling, development of all p&ids in smart plant system and other works required for ETP.
Publishing date: February 20, 2026
End Date: April 6, 2026*
Implementing Agency: Karnataka Industrial Areas Development Board (KIADB)
Segment: water supply
Work: The scope of work involves providing consultancy services for preparation of a Detailed Project Report (DPR) for economic analysis, surveying, layout plan design, and feasibility report for the external water supply scheme to Kuduthini, Mundaragi, Sanjeevarayanakote, Ananthapura, and the future industrial area in Ballari district.
Publishing Date: February 12, 2026
End Date: March 4, 2026
Implementing Agency: Ahmedabad Urban Development Authority (AUDA)
Segment: Wastewater
Work: The scope of work involves providing & laying storm water disposal line in TP-5 & TP-6 in Kalol Of AUDA area.
Publishing Date: February 12, 2026
End Date: March 12, 2026
Implementing Agency: Punjab Water Supply and Sewerage Board (PWSSB)
Segment: Wastewater
Work: Part A: Involves providing and laying intercepting and diversion sewer, construction of manhole chamber, construction of IPS, construction of MPS, laying of rising main, and all other works contingent thereto in Derabassi Town, district S.A.S. Nagar.
Part B
Construction of sewage treatment plants of 3 mld, 3.5 mld and 7.5 mld, including FSTP of 9 kld, 10.5 kld and 22.5 kld respectively, based on any suitable sustainable and proven biological technology, and all other works contingent thereto in Derabassi Town, district S.A.S. Nagar.
Publishing Date: February 12, 2026
End Date: March 26, 2026*
Implementing Agency: Ahmedabad Urban Development Authority (AUDA)
Segment: Wastewater
Work: The scope of work involves providing, supplying, lowering, laying and jointing pipeline network; sewage infrastructure development work for IG Zones; providing house connections; construction of sub pumping stations; 16 mld STP with all allied works, along with operation & maintenance for 05 (five) years, for work in DTPS 134, 138/A, and 138/B Area at Sanand, DTPS 139/A, DTPS 139/B, DTPS 140/A, DTPS 140/B, DTPS 139/C, DTPS 141, DTPS 144, DTPS 383, DTPS 145, and DTPS 142 at AUDA area.
Publishing Date: February 12, 2026
End Date: March 30, 2026*
Implementing Agency: Kolkata Metropolitan Development Authority (KMDA)
Segment: Wastewater
Work: The scope of work involves preparation for Geographic Information System (GIS) based Detailed Project Report (DPR) for pollution abatement by sewerage project (interception and diversion with STP) of River Saraswati, the tributary-cum-distributary of River Ganga.
Publishing Date: February 11, 2026
End Date: March 10, 2026
Implementing Agency: Uttarakhand Urban Sector Development Agency (UUSDA)
Segment: Water Supply
Work: The scope of work includes construction of:- A Sewage Treatment Plant of 2.95 mld, 3 Sewerage Zones in Phase I (from Zone A to Zone C), 3858 household service connections in Phase I with a total length of network of 86.34 km. The number of wards that will be covered in Phase I are 8 (Ward 1 to 7 & 9)
Publishing Date: February 11, 2026
End Date: March 11, 2026
Implementing Agency: Tirunelveli City Municipal Corporation
Segment: Wastewater
Work: The scope of work involves riverfront development and pollution abatement through nature-based solutions along the Thamirabarani River in Tirunelveli City Municipal Corporation.
Publishing Date: February 10, 2026
End Date: March 2, 2026
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work involves providing underground drainage scheme to Challakere city; Providing UPVC/SWG/RCC/DI sewer network in the city as per CPHEEO guidelines, and house service connections including road restoration; construction of 4 No. RCC wetwell cum pump house including PTU for wetwell; construction of 4 No. D.G. rooms and chainlink fencing for wetwells; providing and laying DI K7 rising main from Wetwell 1 to STP, Wetwell 3 to Wetwell 1, Wetwell 2 to Ridge MH 8, and Wetwell 4 to STP; supply, erection, testing and commissioning of non-clog sewage pumps with allied accessories including transformer and DG set at the wetwells; dedicated express feeder main for the project at wetwells and STP from MSEB; construction of 250 KLD SBR type STP with allied accessories; construction of 2 No. twin quarters for maintenance staff; providing approach roads to wetwells and protection works to wetwells; supply of 2 Nos. truck-mounted sewage sucking and jetting machines, 1 No. desilting machine, and 1 No. sewer rodding machine including operation and maintenance (O&M) for a period of 5 years (including 1 year DLP) through design, build, operation and transfer (DBOT) mode.
Publishing Date: February 9, 2026
End Date: March 11, 2026
Implementing Agency: Dholera Industrial City Development Limited (DICDL)
Segment: Wastewater
Work: The scope of work involves modification of existing 20 mld Industrial Effluent Pumping Stations, Common Effluent Treatment Plant (CETP) & pumping station including design engineering, construction, procurement, erection (installation), testing & commissioning (EPC basis) with RO reject disposal in Dholera including an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 5 years.
Publishing Date: February 9, 2026
End Date: March 30, 2026*
Implementing Agency: Thiruverkadu Municipality
Segment: water supply
Work: The project includes the construction of one sump at Koladi with a capacity of 20 LL and an 18 km feeder main. It also involves pipe-carrying bridges for crossing the Cooum River at two locations. A total of twelve overhead tanks (OHTs) are proposed at different locations, namely Gayathri Nagar (1.50 LL), Elumalai Nagar (10 LL), Koladi Road (2.50 LL), Saraswathi Nagar (5 LL), Jeswanth Nagar Park (10 LL), MGR Nagar (10 LL), Kamadenu Nagar (10 LL), Green Park (10 LL), Co-operative Nagar (5 LL), Co-operative Nagar (10 LL), Mahalaxmi Nagar (7.50 LL), and Moogampikai Nagar (10 LL). The distribution system will cover a length of 208.15 km, and the project includes provision of 23,368 house service connections.
Publishing Date: February 9, 2026
End Date: March 5, 2026*
Implementing Agency: Karur Corporation
Segment: Water Supply
Work: Providing Comprehensive Water Supply System to Karur City Municipal Corporation-Package I: The scope of the project involves laying of 11.4 km distribution system, 936 HSCs, 6 OHTs sourcing water from Cauvery River. Providing Comprehensive Water Supply System to Karur City Municipal Corporation-Package II: The scope of the project involves laying of 115 km distribution system, 9652 HSCs, 7 OHTs sourcing water from Cauvery River.
Publishing Date: February 7, 2026; February 9, 2026
End Date: March 5, 2026
Implementing Agency: Gujarat Urban Development Company Limited (GUDCL)
Segment: Wastewater
Work: Ambaji UGD, STP: Working survey, soil investigation, design, and construction of the underground drainage project with sewage treatment plant, including providing, supplying, lowering, laying, jointing, testing, and commissioning of rising main and gravity main pipes for the sewer collection system; construction of sewage pumping stations (SPS); supplying, erecting, testing, and commissioning of pumping machinery; construction of house connections; road restoration; electrical works; and all allied works, with operation and maintenance for two years for UGD works and seven years for STP, including a three year defect liability period.
Ambaji WSS: Working survey, soil investigation, design, construction, testing, and commissioning of RCC ESR and GSR; providing, supplying, lowering, laying, and jointing of rising main of length 5.94 km and gravity main pipeline networks; house connections; road restoration; electrical works; and all allied works, with operation and maintenance for two years, including a three year defect liability period.
Publishing Date: February 7, 2026
End Date: March 9, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves upgradation of the Keshopur STP Phase-I, from 12 mgd to 18 mgd on design, build and operate (DBO) basis along with 11 years comprehensive operation and maintenance (O&M) including 2 year defect liability period (DLP).
Publishing Date: February 7, 2026
End Date: April 15, 2026*
Implementing Agency: Bengaluru Water Supply and Sewerage Board (BWSSB)
Segment: Wastewater
Work: 60 mld Bellandur STP Project: It includes design, construction, and commissioning of 60 mld STP based on A20 with BNR, tertiary sewage pumping station of capacity 60 mld, power generation of 4 mw & odour control units at Bellandur.
50 mld Kadabeesanahalli STP Project: It includes design construction, commissioning of 50 mld STP with additional secondary sludge from existing 50 mld STP based on SBR with BNR, tertiary treatment and power generation of 4 mw & odour control units at Kadabeesanahalli.
Publishing Date: February 2, 2026; February 9, 2026
End Date: February 20, 2026; February 23, 2026
Implementing Agency: Khamgaon Municipal Council
Segment: Wastewater
Work: The scope of work includes providing lowering,laying and jointing DI/K9 pipe pumping main, construction of 15.50 mld raw sewage pumping station and Sewage Treatment Plant (STP) based on SBR technology.
Publishing Date: February 6, 2026
End Date: March 2, 2026*
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, transmission/rising main of length 13.32 km, distribution network of length 340.54 km, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publishing Date: February 3, 2026
End Date: February 17, 2026
Implementing Agency: Punjab Water Supply and Sewerage Board (PWSSB)
Segment: Wastewater
Work: The scope of work involves construction of STP and Extension and augmentation of existing 10 mld STP to 16 mld STP capacity in Village Bari Haveli at Ropar based on any suitable, sustainable and proven biological technology along with campus development.
Publishing Date: February 2, 2026
End Date: February 17, 2026*
Implementing Agency: Nagarpanchayat Bhamragad
Segment: Water Supply
Work: The scope of work involves working survey; construction of an 8.0 m diameter jack well; construction of pump house over the jack well; construction of approach bridge (100 m length and 3.5 m width) and approach road (50 m length and 3.5 m width); providing, supplying, installing, testing and commissioning of raw water pumping machinery on jack well (2 Nos. 65 HP VT pumps, discharge 324,177 LPH, head 34 m); construction of raw water rising main from head works to water treatment plant using DI K-9 pipes of 400 mm diameter for a length of 2.95 km, including push-through road crossing for National Highway; construction of conventional water treatment plant of 7 mld capacity; providing pure water pumping machinery at water treatment plant (2 Nos. 75 HP VT pumps, discharge 311,500 LPH, head 40 m); construction of pure water rising main from water treatment plant to MBR using DI K-9 pipes of 400 mm diameter for a length of 0.1 km; construction of pure water gravity main using DI K-7 pipes of 100 mm to 350 mm diameter for a total length of 25.45 km; construction of RCC sump of 13,000 litre capacity at Bejur with pump house over pure water sump and pure water rising main from sump to ESR using DI K-9 pipes of 100 mm diameter for a length of 0.05 km; construction of RCC sump of 1,14,000 litre capacity at Tadgaon with pump house over pure water sump and pure water rising main from sump to ESR using DI K-9 pipes of 100 mm diameter for a length of 50 m; providing pure water pumping machinery for Bejur and Tadgaon; construction of MBR and ESRs with Pota cabin; construction of distribution network using HDPE PE 6 kg/cm² pipes of 110 mm to 400 mm diameter with a net length of 49,658 m; road restoration works for RWPM, PWRM, PWGM and distribution network; provision of express feeder; installation of 161 kWp solar power plant for head works and water treatment plant; and miscellaneous works including trial run, permission charges for road crossing, utility shifting, high mast, staff quarters, and operation & maintenance.
Publishing Date: February 2, 2026
End Date: February 16, 2026
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: Niwai: The scope of work involves construction of rising main of length 20.56 km and distribution pipeline of length 125.1 km.
Diggi: The scope of work involves construction of rising main of length 22.98 km and distribution pipeline of length 38.77 km.
Lambaharisingh: The scope of work involves construction of rising main of length 30.22 km and distribution pipeline of length 22.47 km.
Jadmo ki Dhan : The scope of work involves construction of rising main of length 5.15 km and distribution pipeline of length 20.01 km.
Publishing Date: February 2, 2026
End Date: April 6, 2026*
Implementing Agency: Jal Jeevan Mission, Chhattisgarh
Segment: Water Supply
Work: The scope of work involves design, drawing, construction, interconnection, testing, and commissioning of a 6 m diameter intake well of 26 m height along with raw water vertical turbine pumps and motors of 2874 LPM capacity and 20 m head (3 Nos.); construction and commissioning of raw and clear water electrical substation of 400 KVA, 33/0.415 kV with all associated works; construction of a 7 mld conventional type WTP; supply, installation, testing, and commissioning of centrifugal pumps including 3 Nos. of 1326 LPM capacity with 165 m head and 3 Nos. of 1437 LPM capacity with 150 m head for clear water pumping; construction of RCC overhead service reservoirs (MBR) comprising 4 Nos. of 150 KL capacity with 30 m staging, 1 No. of 220 KL capacity with 30 m staging, 1 No. of 90 KL capacity with 30 m staging, and construction of a 310 KL Ground Service Reservoir (GSR); providing, laying, jointing, testing, and commissioning of raw water pumping main using 400 mm dia DI K-9 pipes of 0.12 km length and clear water pumping mains using DI K-9 pipes of 300 mm dia (19.28 km), 250 mm dia (12.12 km), 200 mm dia (6.76 km), and 150 mm dia (0.11 km), with a total DI pumping main length of 38.28 km; providing and laying clear water gravity mains using OPVC pipes of 110 mm dia (52.68 km), 160 mm dia (40.19 km), and 250 mm dia (35.35 km) totaling 128.22 km, along with 300 mm dia DI K-7 pipes of 8.6 km, making the total gravity main length 136.82 km, inclusive of all required valves and specials; providing and fixing bulk flow meters; execution of the entire water supply scheme up to village OHTs including all allied civil works such as boundary wall around the WTP campus; followed by 3 months of testing and 9 months of trial run of the complete scheme after completion of all components.
Publishing Date: January 31, 2026
End Date: February 23, 2026
Implementing Agency: Central Public Works Department, Gaya (CPWD)
Segment: Wastewater
Work: The scope of work involves providing comprehensive integrated consultancy services for: preparation of DPR i/c Sewerage System, Collection sumps including electrical and mechanical components, drainage system network, STP, water supply system, rain water harvesting system, road & footpath, electrical sub-station and street lighting for development and bulk services of BSF site at KLP Gaya.
Publishing Date: January 31, 2026
End Date: February 21, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves construction of 15 mgd (52.2 mld) WWPS and its allied works for intercepting wastewater flowing in Chirag Delhi Drain into Andrews Ganj SPS, including flow measurement of the Defence Colony drain/Chirag Delhi drain adjacent to the Andrews Ganj pumping station; diversion of the Defence Colony drain flow by making suitable arrangements that shall not obstruct flow during the monsoon period, with laying of two 1200 mm dia NP4 RCC pipe with a silt removal chamber before the WWPS; construction of two coarse screen chambers at the drain intake and an additional two multi-rake screens as per design, before the main sump, each having a capacity of 15 mgd; interconnection provision through two of 800 mm dia rising mains to the existing 1000 mm dia SPS rising main; and survey, investigation, and planning, including detailed topographical and utility surveys of the drain, proposed SPS site, pipeline alignment, and connection point with the existing rising main.
Publishing Date: January 30, 2026
End Date: March 9, 2026*
Implementing Agency: Karnataka Industrial Areas Development Board (KIADB)
Segment: Water Supply
Work: The scope of work involves survey, investigation, design, supply, installation, erection, laying, construction and commissioning of MS Pipe Rising Main from IPS-03 to Malur and Other Industrial Areas, Land Acquisition, 5 years of operation and maintenance (O&M) for providing and supplying fresh water to the industrial areas in districts around Bengaluru.
Publishing Date: January 27, 2026
End Date: February 13, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves construction of Intake Well-cum-Pump House with Approach Bridge and associated works; WTP of 20 mld capacity and associated works; Tube Well; Pump House and associated works; Raw Water Rising Main from Intake Well to Water Treatment Plant; RCC Overhead Tanks; ZPS/Clear Water Reservoir-cum-Pump Station; Clear Water Rising Main; Feeder Mains; Distribution System; Drinking Water House Service Connections; SCADA Room; Chlorination Room; Meter Room; Panel Room; Staff Quarters; Boundary Wall; and Site Development Works, along with all other appurtenant works including automation.
Publishing Date: January 27, 2026
End Date: March 6, 2026*
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work involves work of augmentation of various RWSS of Block Govindgarh to provide FHTC, including one-year defect liability period of SVs and MVs, under JJM in the jurisdiction of PHED, Sub-Division Amarsar and Division Shahpura, Jaipur, at risk and cost.
Publishing Date: January 24, 2026
End Date: February 26, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Water Supply
Work: The scope of work involves assisting DJB in implementing the project of the proposed investment program through the period of the loan.
The scope of PMC includes; works and operation contracts for water network improvement; a suitable work and operation contract for the 140 mgd capacity WTP at Wazirabad, including improvements to water quality testing and monitoring; Distribution network improvement in UGR command area in four Packages; upgradation of water treatment processes using ceramic membrane filtration, biological ammonia removal and modern monitoring systems to improve water service deliveries for residents of Burari, Sanjay Gandhi Transport Nagar, Model Town, Punjabi Bagh, Shakur Basti, Jahangirpuri, Peeragarhi, Avantika, Pitampura and surrounding localities.
Publishing Date: January 23, 2026
End Date: February 23, 2026
Implementing Agency: Public Health and Engineering Department, Telangana (PHED)
Segment: Water Supply
Work: The project involves for implementation of Greater Warangal Water Supply Improvement Scheme (Package II) under Urban Infrastructure Development Fund (UIDF) funding
Publishing Date: January 23, 2026
End Date: February 10, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design, supply of all materials, labour, tools & plants (T&P) and all other inputs required for construction, completion, testing and commissioning of water supply works, including but not limited to RCC Overhead Tanks (OHT), Clear Water Reservoirs (CWR), rising mains of 11.04 km length, distribution system of 270.34 km total length, tube wells, pump house, boundary wall and site development works, along with all other appurtenant works, including SCADA and automation, on a turnkey basis.
Publishing Date: January 23, 2026
End Date: March 5, 2026*
Implementing Agency: Public Health and Engineering Department, Telangana (PHED)
Segment: Wastewater
Work: The project involves for implementation of Siddipet UGD Project (newly developed colonies and villages).
Publishing Date: January 22, 2026
End Date: February 16, 2026*
Implementing Agency: Gujarat Urban Development Company Limited (GUDCL)
Segment: Water Supply
Work: The project involves implementation of Ambaji WSS and UGDS Project under Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY).
Publishing Date: January 22, 2026
End Date: February 5, 2026
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, rising main of length 18.04 km, transfer main of length 1.23 km, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publishing Date: January 21, 2026
End Date: February 24, 2026
Implementing Agency: Ahmadabad Urban Development Authority (AUDA)
Segment: Water Supply
Work: The scope of work involves construction of water supply scheme including WDS & ESR with 2 year operation and maintenance (O&M), storm water disposal scheme, sewerage scheme in TP-457 (Godhavi).
Publishing Date: January 21, 2026
End Date: February 10, 2026
Implementing Agency: Notified Area Council (NAC), Ganjam
Segment: Water Supply
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Mannt 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publishing Date: January 20, 2026
End Date: February 3, 2026
Implementing Agency: Public Health and Engineering Department, Telangana (PHED)
Segment: Water Supply
Work: The project involves implementation of Khammam Water Supply Improvement Scheme (Package III) under Urban Infrastructure Development Fund (UIDF) funding.
Publishing Date: January 20, 2026
End Date: February 5, 2026.
Implementing Agency: Public Health and Engineering Department, Telangana (PHED)
Segment: Wastewater
Work: The project involves implementation of Karimnagar UGDS Project (Package VI) under Urban Infrastructure Development Fund (UIDF) funding.
Publishing Date: January 20, 2026
End Date: February 12, 2026*
Implmenting Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design, build and operate (with a trial run of 3 months) contract for providing, supplying, lowering, laying and jointing rising main, gravity main and distribution pipelines; supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories; clear water sump, elevated service reservoir, staff quarters, pump house, compound wall and RCC approach road at various HW/SHW/villages, along with operation and maintenance of all types of civil structures, mechanical equipment and pipeline network for a period of 10 years, for 71 villages under the BK4 Phase 2B & 3A Regional Water Supply Scheme (old and new components), based on NMC (East Zone), District: Vav, Tharad.
Publishing Date: January 17, 2026
End Date: February 16, 2026
Implementing Agency: Nagar Palika Parishad, Lormi
Segment: Water supply
Work: The scope of work involves providing combined raw Water supply scheme (RWSS) based on Khudiya Dam (Package I) and Lormi 24×7 (DfT) water supply scheme (Package II), providing and installing floating pontoon in Khudiya dam and floating approach bridge 60 m length, providing and installing three raw water pumping machinery of quantity 547,273 lph, providing and laying DI K-9 Raw water pumping main of total length 3.73 km up to BPT at Karidongri, construction of 300 kl break pressure tank (Sump) at Karidongri, providing and laying DI K-7 Dia 600 mm, 500 mm & 400 mm & length 54.19 km & DI K-9 Dia 500 mm & 400 mm & Length 14.23 km & MS 600 mm dia length 0.51 km raw water gravity main (Dia 400 to 600 mm Total length – 68.94 km), conventional water treatment plant (WTP) of capacity 8.5 mld, providing and laying DI K-9 Clear Water Pumping Main (Dia 100 mm to 350 mm total length – 7.03 km) & MS 250 mm & 300 mm dia. Length 137 m from WTP Sump to Existing and Proposed OHTs, construction OHT at Old Garden (1000 KL & St. Ht. 22 m S.H.), at Mela Ground (1100 KL & 22 m St. Ht.) and at Hero Show Room (900 KL & St.Ht. 24 m) including booster pumps (2 Nos3 HP & 7.5 HP) at existing OHTs, 15 Sqm SCADA Rooms and Solar PV Modules of adequate capacity (for power supply to sensors in RTU panel & for lighting at each OHT site) at each of the 5 OHTs, distribution system with 24×7 (DfT) Water supply as per hydraulic modelling DI K-7 L= 68.07 km (Dia 100 mm to 300 mm.) including 3 months trial run, 12 months defects liability period and 5 years operation and maintenance (O&M).
Publishing Date: January 16, 2026
End Date: February 23, 2026*
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of the project includes construction of clear water transmission main of length 65.204 km, rising main of length 190.42 km, 6 clear water reservoirs and 7 new pumping stations for the work of providing water supply From Bisalpur- Jaipur System for RWSS of 130 Villages of Sanganer Block District Jaipur.
Publishing Date: January 16, 2026
End Date: February 23, 2026
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: BK 4 PH 2A (Part-1) RWSS Project: The scope of work involves working survey, soil investigation, design, build and operate (with trial run of three months) contract for construction of water treatment plant, providing, supplying, lowering, laying and jointing of rising main, gravity main and distribution pipeline, supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories, clear water sump, elevated service reservoir, pump house, compound wall, approach road (R.C.C.) at various HW/SHW/villages, with operation and maintenance of all types of civil structures, mechanical equipment and pipeline network for 10 years, for 65 villages under BK-4 PH-2A (Part-1) Regional Water Supply Scheme (old and new components), based on Devpura and Chudmer NMC offtake, District Vav, Tharad.
BK-4 Ph 2A (Part-2) RWSS Project: The scope of work involves working survey, soil investigation, design, build and operate (with trial run of three months) contract for providing, supplying, lowering, laying and jointing of rising main and gravity main of length 302.05 km and distribution pipeline; supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories; clear water sump, elevated service reservoir, pump house, compound wall, approach road (R.C.C.), protection wall, street lighting, and HW development at various HW/SHW/villages, with operation and maintenance of all types of civil structures, mechanical equipment and pipeline network for 10 years, for 67 villages under BK-4 PH-2A RWSS (old and new components), based on NMC (Devpura-II), District Vav, Tharad.
Publishing Date: January 16, 2026
End Date: February 16, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves:
Galibpur, Sarangpur and Shikarpur DSTP Project (Package 1)
The scope of work involves sewage treatment plants (STPs) and sewage pumping stations (SPSs) of 2.5 mgd at Galibpur, 5 mgd at Sarangpur and 1 mgd at Shikarpur and disposal pipeline of length 0.35 km, 0.2 km and 2.55 km at Galibpur, Sarangpur and Shikarpur respectively.
Hasanpur, Jaffarpur, Kazipur and Kheradabar DSTP Project (Package 2)
The scope of work involves sewage treatment plants (STPs) and sewage pumping stations (SPSs) of 2.5 mgd at Jaffarpur, 1 mgd at Kheradabar, 2.5 mgd at Hasanpur and 1 mgd at Kazipur and disposal pipeline of length 0.49 km, 2.20 km, 3.10 km and 5.70 km at Jaffarpur, Kheradabar, Hasanpur and Kazipur respectively.
Publishing Date: January 15, 2026
End Date: April 16, 2026*
Implementing Agency: Delhi Jal Board
Segment: Wastewater
Work: The scope of work includes construction of 4 DSTPs (Decentralised Sewage Treatment Plants) and SPSs (Sewage Pumping Stations) in Kair with a capacity of 5 MLD for DSTP and 11.25 for SPS, Kakrola with a capacity of 12 MLD for DSTP and 27 for SPS, Kanganheri with a capacity of 2.5 MLD for DSTP and 5.63 for SPS and Dichaon Kalan with a capacity of 9 MLD for DSTP and 20.25 for SPS.
Publish Date: January 15, 2025
End Date: April 16, 2026*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work comprises the construction of four DSTPs along with corresponding SPSs. The project includes a DSTP of 1 mgd capacity at Kair with a disposal pipeline of 4 km, 5.5 mgd capacity at Kakrola with a disposal pipeline of 0.3 km, 2 mgd capacity at Kanganheri with a disposal pipeline of 1 km, and 5.5 mgd capacity at Dichaon Kalan with a disposal pipeline of 0.5 km.
Publishing Date: January 15, 2026
End Date: February 16, 2026*
Implementing Agency: Jashpur Nagar Urban Local Body
Segment: Water supply
Work: The scope of work involves survey, engineering, procurement, construction, testing, commissioning of raw water pumping main of 7.24 km length, raw water pumping machinery, 5.5 mld WTP, clear water pumping machinery, clear water pumping main of 10.33 km length, 5 RCC OHSR, distribution network of 84.39 km total length, functional house service connections with AMR meters and billing softwares with all allied works, accessories and equipment 5208 job additionally 2457 AMR meters and 26 Electro magnetic Bulk Flow Meters including operation and maintenance (O&M) for a period of five years.
Publishing Date: January 15, 2026
End Date: February 9, 2026*
Implementing Agency: Virudhunagar Municipality
Segment: Wastewater
Work: The scope of work involves laying and commissioning of collection system of pipes (DWC SN8 class and CI LA class) of total length 42.455 km including construction of 1,149 machineholes and 1,306 chambers in narrow streets; providing house service connections by laying and commissioning of pipelines from machineholes to property boundaries (3,442 Nos.) and from chambers in narrow streets to property boundaries (10,061 Nos.); providing house service connections with internal plumbing by construction of two inspection chambers within the property boundary and laying and commissioning of pipelines for machineholes (3,442 Nos.) and internal plumbing with construction of one inspection chamber for chambers in narrow streets (10,061 Nos.); construction of grit wells for existing pumping stations PS-01 (4.0 m dia) and PS-02 (3.0 m dia) along with erection and commissioning of electromechanical arrangements at pumping stations; construction of six lifting wells at Athumedu, Anna Nagar, West Pandian Nagar, Ayyamal Nagar, Professor Colony and Ganesh Nagar along with erection and commissioning of electromechanical arrangements at existing and proposed lifting wells; laying and commissioning of pumping main using CI LA class pipes of length 2.46 km including valves and specials; erection and commissioning of electromechanical items in the existing sewage treatment plant to enhance full capacity; conducting soil tests for proposed lifting well locations and other infrastructure, with execution of reinforcement structures such as machineholes and lifting wells based on hydraulic and structural designs vetted by government institutions; construction of air vent shafts at manholes for the collection system as per approved estimates and directions of the departmental engineer-in-charge; raising of machineholes wherever new roads are laid over existing machineholes as per approved estimates; desilting of existing machineholes wherever flow obstruction occurs during execution as per estimates; laying of stoneware pipes wherever pipes are damaged during execution at integration points of existing machineholes or pipelines; and carrying out topographical survey of the project area with checking and redesigning of designs, if required, as per site conditions, after discussion and prior approval of the Regional Engineer before commencement of execution for any changes in approved designs or drawings.
Publishing Date: January 14, 2026
End Date: February 11, 2026
Implementing Agency: Karnataka Urban Infrastructure Development And Finance Corporation (KUIDFC)
Segment: Wastewater
Work: The scope of projects involves construction of; Nagaur 2.59 mld STP; Kankanawadi 2.61 mld STP; Kabbura 3.02 mld STP; Arabavi 2.9 mld STP; Boregaon 2.56 mld STP; Channamma Kittur 2.81 mld STP; Kagawada 2.23 mld STP; Konnur 2.96 mld STP; Kallolli 2.55 mld STP; Mudhol 4.88 mld STP; Raibagh 2.86 mld STP; Shedbal 2.81 mld STP; Ghataprabha 4.2 mld STP
Publishing Date: January 14, 2026
End Date: February 3, 2026
Implementing Agency: Bengaluru Water Supply and Sewerage Board (BWSSB)
Segment: Wastewater
Work: The scope of work includes design, construction, and commissioning of 20 mld STP based on integrated fixed film activated sludge (ifas-process) with bnr, tertiary sewage pumping station of capacity 50 mld and odour control units at Kadugodi including 7 years of Operation & Maintenance (O&M) (turnkey contract).
Publishing Date: January 14, 2026
End Date: January 28, 2026
Implementing Agency: Madhya Pradesh Urban Development Company Limited
Segment: Wastewater
Work: The scope of work includes detailed engineering design, supply, construction, testing, commissioning and operation and maintenance of sewerage system including provide house sewer connections for the households to collect and convey the sewage and providing sewage treatment facility prior to discharge into nearby water body.
Publishing Date: January 14, 2026
End Date: May 7, 2026*
Implementing Agency: Saraipali Urban Local Body
Segment: Water supply
Work: The scope of work involves survey, engineering, procurement, construction, testing, commissioning of intake well cum pump house, raw water pumping main of 48.63 km length, raw water pumping machinery, 7 mld WTP, clear water pumping machinery, clear water pumping main of 9.56 km length, 5 RCC OHSR, distribution network of 114.67 km total length, 4058 functional house service connections with AMR meters and billing softwares with all allied works, accessories and equipment, 20 electro magnetic bulk flow meters including operation and maintenance (O&M) for a period of five years.
Publishing Date: January 13, 2026
End Date: January 30, 2026
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves construction of 4.5 mld STP along with other allied works at Sector-A, Vasant Kunj to feed treated water to Shamshi Talab at Mehrauli Talab.
Publishing Date: January 13, 2026
End Date: May 8, 2026*
Implementing Agency: Public Health and Engineering Department, Telangana (PHED)
Segment: Wastewater
Work: The project involves implementation of the Mahabubnagar Underground Drainage Project in Telangana
Publishing Date: January 13, 2026
End Date: February 2, 2026
Implementing Agency: Sagar Cantonment Board
Segment: Wastewater
Work: The scope of the project includes providing, laying and jointing of sewer lines of 45.8 km length, construction of 1976 manholes, 5600 house sewerage connections and STP of 5 mld capacity on 0.3 ha land, providing house sewer chambers and laterals for connecting sewer of consumers to sewer line, providing pumping main and construction of sewerage pumping station, providing and laying of HT feeder connection, etc including 10 years of operation and maintenance (O&M).
Publishing Date: January 13, 2026
End Date: February 12, 2026*
Implementing Agency: Madhya Pradesh Urban Development Company Limited
Segment: Wastewater
Work: The scope of work includes detailed engineering design, supply, construction, testing, commissioning and operation and maintenance of sewerage system including provide house sewer connections for the households to collect and convey the sewage and providing sewage treatment facility prior to discharge into nearby water body.
Publishing Date: January 12, 2026
End Date: February 11, 2026
Implementing Agency: Uttarakhand Project Development and Construction Corporation Limited (UPDCC)
Segment: Wastewater
Work: The scope of work involves implementation of city drainage plan Phase -1 including STP.
Publishing Date: January 12, 2026
End Date: January 30, 2026
Implementing Agency: Madhya Pradesh Urban Development Company Limited
Segment: Wastewater
Work: The scope of work includes detailed engineering design, supply, construction, testing, commissioning and operation and maintenance of sewerage system including provide house sewer connections for the households to collect and convey the sewage and providing sewage treatment facility prior to discharge into nearby water body.
Publishing Date: January 12, 2026
End Date: February 17, 2026
Implementing Agency: Bengaluru Water Supply and Sewerage Board (BWSSB)
Segment: Wastewater
Work: The scope of work includes:
20 mld Kadugodi STP Project:
It includes design, construction, and commissioning of 20 mld STP based on integrated fixed film activated sludge (ifas-process) with bnr, tertiary sewage pumping station of capacity 50 mld and odour control units at Kadugodi including 7 years of Operation & Maintenance (O&M) (turnkey contract).
The estimated cost of the project is Rs 806.6 million.
10 mld Basavanapura STP Project:
It includes design construction, commissioning of 10 mld STP based on SBR with BNR, tertiary treatment and odour control units at Basavanapura.
The estimated cost of the project is Rs 459.2 million.
20 mld Koramangala STP Project:
It includes design, construction, and commissioning of 20 mld stp based on integrated fixed film activated sludge (ifas-process) with BNR, tertiary treatment and odour control units at Koramangala.
The estimated cost of the project is Rs 736 million.
The work is to be completed in 30 months.
Besides, on the same day, BWSSB invited bids for project management consultancy (PMC) services for Shiva Balancing Reservoir-V Stage Pipeline Raw Water Pipeline Project. The last date for bid submission is January 28, 2026.
The scope of work includes construction supervision for work of extending an additional raw water pipeline of 3200mm dia from Shiva Balancing Reservoir (SBR) to V Stage Pipeline at SBR pipe intake.
Publishing Date: January 12, 2026
End Date: February 4, 2026*
Implementing Agency: Madhya Pradesh Urban Development Company Limited
Segment: Wastewater
Work: The scope of work includes detailed engineering design, supply, construction, testing, commissioning and operation and maintenance of sewerage system including provide house sewer connections for the households to collect and convey the sewage and providing sewage treatment facility prior to discharge into nearby water body.
Publishing Date: January 9, 2026
End Date: February 26, 2026*
Implementing Agency: Vapi Municipal Corporation
Segment: Wastewater
Work: The scope of work involves working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing and commissioning of RCC Np3 pipes for sewer collecting system – gravity mains and DI pipes for rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, construction house connection and inspection chamber, RCC road and compound wall, electrification work and SITC of scada and instrumentation work for gravity main etc.
Publishing Date: January 8, 2026
End Date: February 20, 2026*
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Water Supply
Work: Moti Talab Lake Improvement for Drinking Water Supply Project:
The scope of work involves improvement of Moti Talab Lake in Savanur to store water from the Varada River to provide drinking water supply to Savanur town; Construction of Impounding Reservoir of minimum capacity 3599 ML with earthen embankment which includes providing Impervious blanket for entire tank bed, diversion drain, toe drain, toe wall, rock toe, filter drains, template & toe wall, upstream side lining for the bund, Hariyala for the bund slopes, fencing with GI Barbed wire with RCC pre cast poles and MS gates etc complete with all necessary arrangements complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Providing and laying HDPE virgin type geo membrane sheet for tank bed and slope etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Formation of minimum 3 Mtr width Bituminous road on top of earthen bund etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Supply, Erection, Electrification, Testing and Commissioning of 650 HP/suitable HP DWT pumpset with allied accessories and other works at existing head works at Mellagatti Village for Savanur town etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Providing and laying of 457 mm dia of 5.6 mm thick M.S. pipes of required length raw water rising main from existing line to proposed IR inside at Motitalab Tank in Savanur Town
Naganur Lake Improvement for Drinking Water Supply Project:
The scope of work involves development of Naganur lake in Shiggaon to transform the town’s water supply infrastructure; Construction of Impounding Reservoir of minimum capacity 2603 ML with earthen embankment which includes providing Impervious blanket for entire tank bed, diversion drain, toe drain, toe wall, rock toe, filter drains, template & toe wall, upstream side lining for the bund, Hariyala for the bund slopes, fencing with GI Barbed wire with RCC pre cast poles and MS gates etc complete with all necessary arrangements complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Providing and laying HDPE virgin type geomembrane sheet for tank bed and slope etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Formation of minimum 3 Mtr width Bituminous road on top of earthen bund etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Supply, Erection, Electrification, Testing and Commissioning of 900 HP/ suitable HP DWT pumpset with allied accessories and other works at existing Jackwell at Halehalsaur village including providing surge protection valves, replacement of existing valves on existing RWRM etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Renovation of existing housing chamber cum pump house, footbridge at Naganur tank and providing and laying of 457mm dia of 5.6mm thick M.S. pipes of required length from existing line to proposed IR at Naganur Tank
Tevarmallihalli Lake Improvement for Drinking Water Supply Project:
The scope of work involves improvement of Tevarmallihalli lake in Bankapur to create a sustainable water supply system; Construction of Impounding Reservoir of minimum capacity 2062 ML with earthen embankment which includes providing Impervious blanket for entire tank bed, diversion drain, toe drain, toe wall, rock toe, filter drains, template & toe wall, upstream side lining for the bund, Hariyala for the bund slopes, fencing with GI Barbed wire with RCC pre cast poles and MS gates etc complete with all necessary arrangements complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Providing and laying HDPE virgin type geo membrane sheet for tank bed and slope etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Formation of minimum 3 Mtr width Bituminous road on top of earthen bund etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Supply, Erection, Electrification, Testing and Commissioning of 250 HP/ suitable HP DWT pumpset with allied accessories at existing jackwell near Halasur village etc complete with all lead and lift as directed by Engineer-In-Charge (Shall be read in conjunction with Section 7 Technical Specifications for all the items); Providing and laying of 457 mm dia of 5.6 mm thick M.S.pipe of required length raw water rising main from existing line to feed proposed IR at Tevermelihalli tank etc.
Publishing Date: January 8, 2026
End Date: February 10, 2026
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves construction of 200 mld capacity STP, incoming MS/DI rising mains, disposal pipeline, 66 kV switchyard, and associated miscellaneous works, including operation and maintenance (O&M) for a period of 10 years, at the Old Pirana Site in the AMC area.
Publishing Date: January 8, 2026
End Date: January 24, 2026
Implementing Agency: Udaipur Development Authority
Segment: Wastewater
Work: The scope of work involves providing, laying, jointing, testing and commissioning of sewerage system and all ancillary works including 10 year operation and maintenance (O&M) for Navratan Complex Area, Bhuwana.
Publishing Date: January 7, 2026
End Date: February 23, 2026*
Implementing Agency: Porbandar Municipal Corporation
Segment: Wastewater
Work: The scope of work involves designing and construction of STPs of 11 mld and 3 mld; designing and construction of various pumping stations along with all allied works; design, providing, supplying, lowering, laying, and jointing of the rising main network and sewer network; supply, installation, testing, and commissioning of solar panels; including operation and maintenance (O&M) for a period of two years for the rising main network, sewer network, solar panels, and allied works, and O&M for a period of seven years for the STPs.
Publishing Date: January 6, 2026
End Date: February 4, 2026
Implementing Agency: Karur Corporation
Segment: Wastewater
Work: Karur UGSS Project (for leftout and added areas) (KfW) – Package 1: The scope of work involves laying of 105.53 km sewer network, 6038 HSCs and 10.8 km pumping mains.
Karur UGSS Project (for leftout and added areas) (KfW) – Package 2: The scope of work involves laying of 263 km sewer network, 23,589 HSCs and 15.47 km pumping mains.
Karur UGSS Project (35.25 mld Arasu Colony STP)(KfW) – Package 3 : The scope of work involves design, engineering, supply, construction, erection, installation, Testing, commissioning etc complete for the 35.25 mld STP at Arasu colony, and Solar Sludge drying beds (SSD) within STP premises.
Publishing Date: January 5, 2026; January 6, 2026
End Date: February 24, 2026*
Implementing Agency: Uttarakhand Pey Jal Nigam
Segment: Water Supply
Work: The scope of work involves survey, design and construction of works consisting of infiltration well-cum-pump house; supply, carting, laying and jointing of rising mains of 16.16 km, supply mains of 5.43 km length and distribution system; construction of sump well, clear water reservoirs, pump houses, HT panel room and Type-1 staff quarters; SITC of pumping plants, automation works and all other appurtenant works, including civil and electro-mechanical works, as specified in the BOQ of the tender document, including supply of all materials, labour, T&P, etc., required for proper completion of the work including operation and maintenance (O&M) for 5 years.
Publishing Date: January 5, 2026
End Date: February 3, 2026*
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design, build and operate (with a trial run of 3 months) contract for providing, supplying, lowering, laying and jointing rising main, gravity main and distribution pipelines; supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories; clear water sump, elevated service reservoir, staff quarters, pump house, compound wall and RCC approach road at various HW/SHW/villages, along with operation and maintenance of all types of civil structures, mechanical equipment and pipeline network for a period of 10 years, for 71 villages under the BK4 Phase 2B & 3A Regional Water Supply Scheme (old and new components), based on NMC (East Zone), District: Vav, Tharad.
Publishing Date: January 2, 2026
End Date: February 2, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design and supply of all materials, labour, T&P etc. required for construction of overhead tank, CWR, pump house, rising main, distribution system, construction of tube wells with automation, LCS & MCS, boundary wall, approach road, site development etc.
Publishing Date: January 2, 2026
End Date: January 20, 2026
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Wastewater
Work: The project involves implementation of the Bodhgaya Sewerage Network Project under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Publishing Date: January 12, 2026
End Date: September 1, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves construction of 10 mld STP with co-treatment plant, SPS, boundary wall, staff quarters, gate, and site development laying and jointing of rising main and sewer network and providing sewer house connections.
Publishing Date: January 1, 2026
End Date: February 5, 2026*