Implementing Agency: Tirumala Tirupati Devasthanams
Segment: Wastewater
Work: The scope of the project includes to Study existing drains available and its capacities, and suggest delinking with underground lines, providing new / additional drains and their disposal anticipating influx of moderate to heavy rains, forecasting & recommendations on regulation of storm water drainAmbaji UGD, STP Working survey, soil investigation, design, and construction of the underground drainage project with sewage treatment plant, including providing, supplying, lowering, laying, jointings and shall access the sites, design detTirumala ailed plans & overseeing the construction of drainage system, Study and recommend the Introduction of advanced technologies, Incorporating the latest technologies for UGD recommendation for implementation of modern technologies & methods for UGD and sewage Treatment and recycling, capacity enhancement requirement.
Publishing Date: December 31, 2025
End Date: March 11, 2026
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work involves identifying industries willing to purchase and utilize treated used water for use in industrial applications, dust suppression, construction activities, gardening purpose etc, as per their use basis; solicit industry interest and insights on reuse of treated used water; obtain feedback on the TUW pricing, delivery mechanisms, and quality requirements.
Publishing Date: December 31, 2025
End Date: February 7, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, engineering design and drawings, and the supply of all materials, labour, tools and plants (T&P), construction, erection, completion, testing, and commissioning of water supply components such as the intake well-cum-pump house with approach bridge and associated works; water treatment plant of 9 mld capacity with all allied works; raw water rising main from the intake well to the water treatment plant; RCC overhead tanks; ZPSs/clear water reservoir-cum-pumping stations; rising mains; feeder mains; distribution system; drinking water house connections; SCADA room; chlorination room; meter room; panel room; staff quarters; boundary wall; site development works; and other appurtenant works, including automation. The scope of work also includes proper completion of the project in all respects. Other details and scope of work shall be as per the specifications stipulated in the tender document. The scope further includes testing, commissioning, a trial run of three months, and a defect liability period of twelve months for civil works.
Publishing Date: December 31, 2025
End Date: February 2, 2026*
Implementing Agency: Public Health Engineering Department, Bihar (PHED)
Segment: Water Supply
Work: The scope of work involves design, construction, supply, testing, commissioning of pipe water supply schemes for habitations left out under Har Ghar Nal Ka Jal Nischay Yojna in areas having ground water quality issues, with electric driven pumps and iron removal treatment plant having technology (adsorption/ion exchange/membrane/nano technology etc.) of CSIR or any other institute of national reputed with 6 months trial run period and comprehensive operation and maintenance (O&M) of 5 years.
Publishing Date: December 31, 2025
End Date: January 21, 2026
Implementing Agency: Public Health Engineering Department, Bihar (PHED)
Segment: Water Supply
Work: The scope of work involves design, construction, supply, testing, commissioning of pipe water supply schemes for habitations left out under har ghar nal ka jal nischay yojna in areas having ground water quality issues, with electric driven pumps and iron removal treatment plant having technology (adsorption/ion exchange/membrane/nano technology etc.) of csir or any other institute of national reputed with 6 months trial run period and comprehensive operation and maintenance (O&M) of 5 years.
Publishing Date: December 31, 2025
End Date: January 21, 2026
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work involves augmentation of existing Old Pump House; augmentation/ retrofitting of existing RUIDP pump house at Akelgarh,augmentation/retrofitting of existing CWPH and construction of new CWPH at Akelgarh, Raw Water Gravity Main of 1200 mm dia.; MS pipe for the length of 5.50 km from old pump house Akelgarh to BPT& RWR-PH; raw water pumping main of 700 mm dia. DI K-9 Pipe for the length of 11.28 km from RWR-PH near Kota University to Ranpur water treatment plant (WTP); construction of RWR Capacity 8.15 ml and PH near Kota University; construction of 40 mld WTP at Ranpur; Clear Water Rising (CWR) main of total length of 19.87 km of DI K-7 from Dia. 200 mm to 800 mm; construction of CWRs (2 Nos. of Total 2250 KL capacity); construction of 10 overhead service reservoirs (OHSRs) for total capacity 15900 kl; distribution system in uncovered area of Shivaji Park WTP zone in Kota South Nagar Nigam area, Talab Gaon, Haditi Colony and replacement of existing water supply pipelines in Balakund, Vigyan nagar, Subhash nagar, Mahaveer Nagar-I, III and Chawani Korti area, total length of 214.39 km of DI K-7 from dia. 100 mm to 600 mm and shifting of 8000 House Service Connections with an operation and maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 1 year.
Publishing Date: December 30, 2025
End Date: March 23, 2026*
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work involves augmentation of existing Old Pump House; augmentation/ retrofitting of existing RUIDP pump house at Akelgarh,augmentation/retrofitting of existing CWPH and construction of new CWPH at Akelgarh, Raw Water Gravity Main of 1200 mm dia.; MS pipe for the length of 5.50 km from old pump house Akelgarh to BPT& RWR-PH; raw water pumping main of 700 mm dia. DI K-9 Pipe for the length of 11.28 km from RWR-PH near Kota University to Ranpur water treatment plant (WTP); construction of RWR Capacity 8.15 ml and PH near Kota University; construction of 40 mld WTP at Ranpur; Clear Water Rising (CWR) main of total length of 19.87 km of DI K-7 from Dia. 200 mm to 800 mm; construction of CWRs (2 Nos. of Total 2250 KL capacity); construction of 10 overhead service reservoirs (OHSRs) for total capacity 15900 kl; distribution system in uncovered area of Shivaji Park WTP zone in Kota South Nagar Nigam area, Talab Gaon, Haditi Colony and replacement of existing water supply pipelines in Balakund, Vigyan nagar, Subhash nagar, Mahaveer Nagar-I, III and Chawani Korti area, total length of 214.39 km of DI K-7 from dia. 100 mm to 600 mm and shifting of 8000 House Service Connections with an operation and maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 1 year.
Publishing Date: December 30, 2025
End Date: March 23, 2026*
Implementing Agency: Public Health Engineering Department, Bihar (PHED)
Segment: Water Supply
Work: Forbesganj Multi Village Piped Water Supply Scheme (Group 1): The group contains a total 192 schemes in Forbesganj Block.
The work is likely to be completed in 9 months at an estimated cost of Rs 883.43 million.
Forbesganj Multi Village Piped Water Supply Scheme (Group 2): The group contains a total 169 schemes in Narpatganj and Bhargama Block.
The work is likely to be completed in 9 months at an estimated cost of Rs 744.3 million.
The scope of work involves design, construction, supply, testing and commissioning of piped water supply schemes for left out habitations under “Har Ghar Nal Ka Jal” Nischay in areas having ground water quality issues; with Electric Driven Pumps and IRON Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the in the District of Araria , Bihar on Turn-Key basis with 6 months trial run after commissioning and comprehensive operation and maintenance (O&M) of 60 months after successful completion of trial run period under Mukhyamantri Gramin Peyjal Nishchay Yojna (Quality Affected)
Publishing Date: December 29, 2025
End Date: January 15, 2026*
Implementing Agency: Gujarat Industrial Development Corporation (GIDC)
Segment: Desalination
Work: The scope of work involves appointment of a Project Management Consultancy (PMC) firm (from Concept to Commissioning) for the project, including carrying out detailed marine investigations and studies; detailed design and planning; preparation of the Detailed Project Report (DPR); preparation and submission of the Environmental Clearance (EC) application; and all other allied works.
Publishing Date: December 29, 2025
End Date: April 17, 2026*
Implementing Agency: Madhya Pradesh Jal Nigam (MPJN)
Segment: Water Supply
Work: Meda Multi Village Drinking WSS (Balance Works) Project
The scope of work involves completing balance work on intake well, raw water pumping main, construction of water treatment plant, clear water pumping main, clear water gravity main, overhead tanks, clear water sump cum pump house, RCC overhead master balancing reservoir and BPT, distribution network, pumping equipment including suitable motors and equipment for intake well, pumping equipment including suitable motors and equipment for pump of clear water, 33 kV/11 kV power line and substation, SCADA, house service connection, and staff quarters.
The work is likely to be completed in 18 months at an estimated cost Rs 2,031.6 million.
Wardha Multi Villages Drinking WSS (Balance Works) Project
The scope of work involves completing balance work on intake well, raw water pumping main, construction of water treatment plant, clear water pumping main, clear water gravity main, overhead tanks, clear water sump cum pump house, RCC overhead master balancing reservoir and BPT, distribution network, pumping equipment including suitable motors and equipment for intake well, pumping equipment including suitable motors and equipment for pump of clear water, 33 kV/11 kV power line and substation, SCADA, house service connection, and staff quarters.
Publishing Date: December 29, 2025
End Date: February 9, 2026*
Implementing Agency: Thiruverkadu Municipality
Segment: Wastewater
Work: The scope of work involves design, engineering, build and commissioning of 46 mld capacity STP at Koladi with sequential batch reactor (SBR) including operation and maintenance (O&M) for 10 years. The Thiruverkadu Municipality has its own land measuring approximately 7.64 acres at Koladi for implementation of the same.
Publishing Date: December 29, 2025
End Date: March 4, 2026*
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work involves providing U-PVC/RCC internal and outfall sewer network of 99.07 km length of different sizes including laying of sewer lines across NH/SH/Other main roads by HDD method as per approved design, Construction of machine holes with BBM & RCC, Receiving chambers with a size of 450mm x 450mm x 600mm depth with BBM in narrow road areas along with restoration of roads and restoration to the damaged existing utilities such as water supply and UGD pipelines & HSCs, culverts, soak pit etc damaged during execution of works (for 10nos of Zones). Desilting of existing choked sewer network, repairs to the existing machineholes, rising the existing below road level machineholes to the present road level including road restoration & replacement of damaged machinehole frame & cover with all other allied works; providing 17,000 UGD House service Connections for households with all other allied works at proposed sewer network & existing sewer network including restoration of road and repairs and replacement of existing damaged utilities; construction of one 4m diameter RCC wetwell cum Pumphouse (at Zone-4A) along with Electrification works, including construction of 1.6m x 1.5m size coarse screen chamber & construction of 4m x 4m size DG Room with 30KVA or suitable capacity DG sets along with Electrification works & other allied works, providing & laying of 300 mm diameter, K-9 class, DI Rising Main of 0.57 km length, Providing three 10 HP (2W+1S) or suitable capacity submersible non-clog sewage Pumping Machineries with all other allied works & construction of precast panel compound wall for wetwell premises; rehabilitation/replacement of existing damaged/inadequate sewer lines of length 11.25 km along with restoration of roads and restoration to the damaged existing utilities such as water supply & UGD pipelines & HSCs, culverts etc damaged during execution of works with all other allied works; rejuvenation and upgradation of existing 9 mld capacity FAL type STP to 15 mld capacity SBT type STP near Budhitittu village with components such as RCC Equivalization tank, Bio Reactor Nos 1 & 2, Collection tank Nos 1 & 2, 6 m x 8 m size Panel Board Room along with Electro Mechanical Equipments, providing Soil Bio Technology media (SBT) in the Bio Reactors Type STP Poly electrolyte dosing pump and filter press, providing 600 mm diameter bulk flow meter for existing DI rising main, providing OCEMS. Rejuvenation works such as replacement of valves, removing of accumulated silt and repair works to damaged Stone pitching rivetment of facultative aerated Lagoon beds, clearing the thick Jungle in entire STP premises, dismantling the existing RCC Polishing pond so as to facilitate for construction of 15 mld cap SBT Type STP etc complete. Repairs to the existing Electromechanical items for PTU components of Wetwell & STP, Rewamping of 320 KVA capacity DG set, repairs & servicing of 500 KVA capacity transformer, Providing 2 rows of 11 kV, 4 Core 120 sqmm or suitable size XPLE HTUG Cable for existing wetwell, repairs & servicing of existing 12 nos of 15 HP capacity aerator pumps & motors along with panel board, providing and replacing 2 nos of CI sluice gate fixed at PTU of STP, providing 3 nos of 75 HP or suitable capacity non-clog sewage pumpsets with all other allied accessories with all other allied works.
Publishing Date: December 29, 2025
End Date: January 27, 2026.
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey soil investigation, design, supply of all materials etc. required for construction of tube wells, pump house, over head tanks (2100 kl /27m Staging, 2600 kl/27 m Staging, 2500 kl/27m Staging, 2500 kl/22m Staging, 2000 kl/27m ), CWR (3 of 650 kl capacity), SCADA room, rising main of length 7.28 km, distribution network of 92.13 km total length, house connection, boundary wall, ms gate, site development work etc. as per specification in tender document including commissioning, trial & run, defect liability period (one year for civil work and two year for E&M work) and its handing over with all appurtenant works.
Publishing Date: December 29, 2025
End Date: February 4, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves upgradation of 345 MLD STP based on Upflow Anaerobic Sludge Blanket (UASB) technology with extended aeration to meet latest NGT/ CPCB norms.
Publishing Date: December 27, 2025
End Date: February 10, 2026*
Implementing Agency: Directorate of Town Panchayats, Tamil Nadu
Segment: Wastewater
Work: Package I: Andipatti Jakkampatti STP cum FSTP and Interception and Diversion (I&D) Project. It involves construction of 3.01 million litres per day (mld) capacity STP cum FSTP at Andipatti Jakkampatti Town Panchayat along with I&D for 7.7km.
Package II: Thisayanvilai, Thenthiruperai STP cum FSTP and I&D Project. It involves construction of 2.01 mld capacity STP cum FSTP at Thisayanvilai Town Panchayat and 1.01 mld capacity at Thenthiruperai Town Panchayat along with I&D for 11.58 km.
Package III: Mallankinaru, Seithur STP cum FSTP and I&D Project. It involves construction of 1.01 mld capacity STP cum FSTP at Mallankinaru Town Panchayat and 3.01 mld capacity at Seithur Town Panchayat along with I&D for 19.2 km.
Package IV: Aygudi, Rayagiri STP cum FSTP and I&D Project. It involves construction of 2.01 mld capacity STP cum FSTP at Aygudi Town Panchayat and 1.01 mld capacity at Rayagiri Town Panchayat along with I&D for 11.36 km.
Package V: Kalavai, Udhayendiram STP cum FSTP and I&D Project. It involves construction of 1.01 mld capacity STP cum FSTP at Kalavai Town Panchayat and 2.01 mld capacity at Udhayendiram Town Panchayat along with I&D for 15.7 km.
Package VI: Odugathur, Pennathur STP cum FSTP and I&D Project. It involves construction of 1.01 mld capacity STP cum FSTP at Odugathur Town Panchayat and 1.01 mld capacity at Pennathur Town Panchayat along with I&D for 16.86 km.
Package VII: Walajabad, Edakalinadu STP cum FSTP and I&D Project. It involves construction of 1.01 mld capacity STP cum FSTP at Walajabad Town Panchayat and 2.01 mld capacity at Edakalinadu Town Panchayat along with I&D for 28.265 km
The scope of work involves design, construction, supply, erection and commissioning of STP-cum-FSTP including Interception and Diversion (I&D) works, along with five years of Operation and Maintenance (O&M) on a Design-Build-Operate-Transfer (DBOT) basis.
Publishing Date: December 27, 2025
End Date: February 9, 2026*
Implementing Agency: Pune Metropolitan Region Development Authority (PMRDA)
Segment: Water Supply
Work: Pawana River Pollution Abatement Project
The scope of work involves designing and redesigning, if required, building and hydraulic testing of sewage collection and conveyance systems, including road restoration; design and construction of nalla interception and diversion works along with coffer dams and weirs; design and construction of raw sewage sumps and pumping stations, providing and installing pumping machinery, electrical and mechanical equipment, instruments, and PLC (Programmable Logic Controller) SCADA (Supervisory Control and Data Acquisition) systems; providing, laying, and hydraulic testing of RCC, DI, K-9 raw sewage rising mains and gravity mains; design and construction of sewage treatment plants of various capacities and technologies, including the construction of treated water sumps and allied and necessary works; providing and casting of RCC M-30 concrete grade piles, including load test piles for raising of structures, laying in blue and red line areas of river Pawana; testing, commissioning, trial run, and 18 months of operations and maintenance; preparation and approval and proof checking of structural designs, including hydraulic design and detailed drawings from IIT/NIT/Govt. Engineering College/Govt. Polytechnic as directed by the Engineer-in-Charge, with proof checking submitted within 60 days with approval of work order; developing solid waste management facilities for processing and scientific disposal of solid waste generated in towns and villages in the project area, along with procurement of vehicles and machineries for collection, transporting, processing, and dumping, etc.; procurement of vehicles for MSW (Municipal Solid Waste) collection and transportation; procurement and installation of machineries required for MSW management and construction of various sheds for processing solid waste, including construction of windrow composting platforms; construction of leachate collection tanks and leachate treatment plants (LTP); construction of civil infrastructure for SWM facilities, including administrative office, toilet block, internal roads and pathways, and roadside drains, and development of green belt at proposed MSW processing facilities, including 18 months of operations and maintenance for SWM; maintenance of the project during the defect liability period, which shall be 18 months, and any other works as required for the safety of the work and public as directed by the Engineer-in-Charge.
The work is likely to be completed in 12 months at an estimated cost of Rs 1,707.03 million.
The total project cost is Rs 1,970 million.
Indrayani River Pollution Abatement Project
The scope of work involves designing and redesigning, if required, building, and hydraulic testing of sewage collection and conveyance systems, including road restoration; design and construction of nalla interception and diversion works along with coffer dams and weirs; design and construction of raw sewage sumps and pumping stations, providing and installing pumping machinery, electrical and mechanical equipment, instruments, and PLC (Programmable Logic Controller) SCADA (Supervisory Control and Data Acquisition) systems; providing, laying, and hydraulic testing of R.C.C. D.I. K-9 raw sewage rising mains and gravity mains; design and construction of sewage treatment plants of various capacities and technologies – for villages with a population above 15,000, STPs are Kusgaon Budruk – 1 mld; Kamshet-Khadakale – 2 mld and Induri – 2 mld and for 15 out of 39 villages with a population below 15,000, a combined STP of 5.5 mld is proposed including construction of treated water sumps and all allied and necessary works; providing and casting of R.C.C. M-30 concrete grade piles, including load test piles for raising of structures, laying in blue and red line areas of River Indrayani; testing, commissioning, trial run, and 18 months of operations and maintenance; preparation, approval, and proof checking of structural designs, including hydraulic design and detailed drawings from IIT/NIT/Govt. Engineering College/Govt. Polytechnic as directed by the Engineer-in-Charge, with proof checking submitted within 60 days with approval of the work order; developing solid waste management facilities for processing and scientific disposal of solid waste generated in towns and villages in the project area, along with procurement of vehicles and machineries for collection, transportation, processing, and dumping; procurement of vehicles for MSW (Municipal Solid Waste) collection and transportation; procurement and installation of machineries required for MSW management and construction of various sheds for processing solid waste, including construction of windrow composting platforms; construction of leachate collection tanks and leachate treatment plants (LTP); construction of civil infrastructure for SWM facilities, including administrative office, toilet block, internal roads and pathways, roadside drains, and development of green belt at proposed MSW processing facilities, including 180 months of operations and maintenance for SWM; maintenance of the project during the defect liability period, which shall be 180 months, and any other works as required for the safety of the work and public as directed by the Engineer-in-Charge.
Publishing Date: December 25, 2025
End Date: January 15, 2026
Implementing Agency: Pune Metropolitan Region Development Authority (PMRDA)
Segment: Wastewater
Work: Mulshi Taluka Sewerage Project
The scope of work involves design, supplying, construction, erection and commissioning of STPs, sewer network and allied works for sewerage project for Urban Growth Centers, including 5 Years of operation and maintenance (O&M) with defect liability period (DLP) for 5 years, for 3 clusters comprising 6 villages in taluka Mulshi under the jurisdiction of PMRDA.
The clusters include;
Cluster 1 – Village Lawale and Pirangut
The scope includes an underground sewer collection system, intermediate and terminal pumping stations, rising mains and receiving chambers, STP of 15 mld capacity, pumping machinery including mechanical and electrical works, SCADA automation with a solar power system, and provisions for a compound wall.
Cluster 2 – Villages Maan and Bhoirwadi:
The scope includes a sewer collection system for multiple zones, major pumping stations for zone-wise conveyance, terminal pumping arrangements, STP of 33.5 mld capacity, mechanical and electrical pumping systems, SCADA with solar installation, and compound wall provisions.
Cluster 3 – Villages Marunji and Hinjewadi:
The scope includes an underground sewer network, intermediate and terminal pumping stations, rising mains to the STP of 20.5 mld capacity, sewage treatment and treated effluent disposal systems, pumping machinery and electrical systems, SCADA automation with solar power system, and compound wall provisions.
The work is likely to be completed in 12 months at an estimated cost of Rs 2,721.34 million.
Haveli Taluka Sewerage Project
The scope of work involves design, supplying, construction, erection and commissioning of STPs, sewer network and allied works for sewerage project for Urban Growth Centers, including 5 years of operation and maintenance with defect liability period for 5 years, for 5 clusters comprising 8 villages in taluka Haveli under the jurisdiction of PMRDA.
The clusters include;
Cluster 1 – Lonikand–Perne:
The scope includes an underground sewerage collection system, intermediate and terminal pumping stations, conveyance system to the STP of 25.5 mld capacity, mechanical and electrical pumping machinery, SCADA automation with solar power system, and provisions for raising structures, compound wall, and road restoration.
Cluster 2 – Kesnand Cluster:
The scope includes a sewer collection network for cluster villages, intermediate and terminal pumping stations, conveyance to the STP of 17.5 mld capacity, mechanical and electrical pumping systems, SCADA automation with solar power installations, and provisions for raising structures, compound wall, and road restoration.
Cluster 3 – Urali Kanchan:
The scope includes an underground sewer network, terminal pumping station, rising main to the STP of 13 mld capacity, pumping machinery and electrical installations, SCADA automation with solar power system, and provisions for a compound wall and road restoration.
Cluster 4 – Kadamwak Wasti:
The scope includes a sewer collection system, terminal pumping station, conveyance to the STP of 15.5 mld capacity, mechanical and electrical pumping machinery, SCADA automation with solar installation, and provisions for a compound wall and road restoration.
Cluster 5 – Lonikal Bhor:
The scope includes an underground sewer network, terminal pumping station, conveyance to the STP of 11.5 mld capacity, pumping machinery and electrical systems, SCADA automation with solar power system, and provisions for a compound wall and road restoration.
The work is likely to be completed in 12 months at an estimated cost of Rs 3,201.67 million.
Khed Taluka Sewerage Project
Cluster 1 – Bhose:
The scope includes a sewer collection network, terminal sump and pump house, rising main, SCADA with solar system, mechanical and electrical pumping machinery, and provisions for a compound wall, with an STP of 15 mld capacity using SBR technology with sewage sump.
Cluster 2 – Nanekarwadi:
The scope includes a sewer collection system, terminal and intermediate sumps, rising main, pumping machinery including mechanical and electrical works, SCADA with solar system, and provisions for a compound wall, with an STP of 8.5 mld capacity using MBBR technology with treated sewage sump.
Cluster 3 – Mahalunge:
The scope includes a sewer collection network, terminal sump and pump house, rising main, pumping machinery, SCADA with solar system, and provisions for a compound wall, with an STP of 8 mld capacity using MBBR technology with treated sewage sump.
The work is likely to be completed in 12 months at an estimated cost of Rs 1,351.01 million.
Shirur Taluka Sewerage Project
Cluster 1 – Shikrapur:
The scope includes an underground sewerage collection system, terminal and intermediate pumping stations, rising mains and receiving chambers, STP of 14.5 mld capacity with SBR technology, mechanical and electrical pumping machinery, SCADA automation with solar power system, and provisions for road reinstatement and compound wall.
Cluster 2 – Sanaswadi:
The scope includes an underground sewer network, terminal pumping station, conveyance system to the STP of 13 mld capacity with SBR technology and tertiary treatment, mechanical and electrical pumping systems, SCADA automation with solar installation, and provisions for road reinstatement and compound wall.
Cluster 3 – Dhok Sangvi:
The scope includes a sewer collection system, terminal pumping station, rising main to the STP of 15 mld capacity with SBR technology, mechanical and electrical pumping systems, SCADA automation with solar power system, and provisions for road reinstatement and compound wall.
Cluster 4 – Koregaon Bhima:
The scope includes an underground sewer network, terminal pumping station, conveyance to the STP of 15.5 mld capacity with SBR technology, pumping machinery and electrical installations, SCADA automation with solar system, and provisions for road reinstatement and compound wall.
Publishing Date: December 25, 2025
End Date: January 15, 2026
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: Package 3: The scope of work includes survey, soil investigation, design and execution of various works for procurement, laying, jointing, testing & commissioning of distribution network of 20 new overhead tanks (OHT’s) and 29 existing overhead tanks & replacement of 685.28 km long old distribution network, laying of 32 km long water feeder main with 1,21,520 house service connections an monitoring system and achieving continuous (24 x 7) pressurised water supply plus 10 years Operation and Maintenance (O&M) for Indore City at an estimated cost of Rs 3,871.8 million.
Package 4: The scope of work includes survey, soil investigation, design and execution of various works for procurement, laying, jointing, testing & commissioning of distribution network of 20 new overhead tanks (OHT’s) and 46 existing overhead tanks & replacement of 892.55 km long old distribution network, laying of 25.2 km long water feeder main with 1,26,480 house service connections and monitoring system and achieving continuous (24 x 7) pressurised water supply plus 10 years Operation and Maintenance (O&M) for Indore City at an estimated cost of Rs 4,287.6 million.
Publishing Date: December 22, 2025
End Date: January 15, 2026*
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: BK 4 PH 2A (Part-1) RWSS Project
The scope of work involves working survey, soil investigation, design, build and operate (with trial run of three months) contract for construction of water treatment plant, providing, supplying, lowering, laying and jointing of rising main, gravity main and distribution pipeline, supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories, clear water sump, elevated service reservoir, pump house, compound wall, approach road (R.C.C.) at various HW/SHW/villages, with operation and maintenance of all types of civil structures, mechanical equipment and pipeline network for 10 years, for 65 villages under BK-4 PH-2A (Part-1) Regional Water Supply Scheme (old and new components), based on Devpura and Chudmer NMC offtake, District Vav, Tharad.
The capacity of WTP is 15 mld
BK-4 Ph 2A (Part-2) RWSS Project
The scope of work involves working survey, soil investigation, design, build and operate (with trial run of three months) contract for providing, supplying, lowering, laying and jointing of rising main and gravity main of length 302.05 km and distribution pipeline; supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories; clear water sump, elevated service reservoir, pump house, compound wall, approach road (R.C.C.), protection wall, street lighting, and HW development at various HW/SHW/villages, with operation and maintenance of all types of civil structures, mechanical equipment and pipeline network for 10 years, for 67 villages under BK-4 PH-2A RWSS (old and new components), based on NMC (Devpura-II), District Vav, Tharad.
BK 4 Ph 2B&3A (West Zone) RWSS Project
The scope of work involves working survey, soil investigation, design, build and operate (with trial run of three months) contract for providing, supplying, lowering, laying and jointing of rising main and gravity main of length 205.6 km and distribution pipeline; supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories; water treatment plant, clear water sump, elevated service reservoir, pump house, compound wall and approach road (R.C.C.) at various HW/SHW/villages, with operation and maintenance of all types of civil structures, mechanical equipment and pipeline network for 10 years, for 52 villages under Tharad (Bhapi HW) Regional Water Supply Scheme (old and new components), based on NMC (NMC West Zone), District Vav, Tharad.
Augmentation of NMC Kureja Based P-1 RWSS Project
The scope of work involves working survey, soil investigation, design, build and operate (with trial run of three months) contract for providing, supplying, lowering, laying and jointing of rising main, gravity main and distribution pipeline; supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipment, instruments and accessories; clear water sump, elevated service reservoir, pump house, staff quarters, compound wall and approach road (R.C.C.) at various HW/SHW/villages/hamlets/city, with operation and maintenance of new and existing all types of civil structures, mechanical and electro-mechanical equipment, WTPs and pipeline network for 10 years, for 137 villages, 16 hamlets and 1 city under the NMC Kureja Based Augmentation P-1 Regional Water Supply Scheme, Taluka Harij, Sami and Shankheshwar, District Patan.
Publishing Date: December 24, 2025
End Date: January 22, 2026 ; January 23, 2026
Implementing Agency: Odisha Water Supply and Sewerage Board (OWSSB)
Segment: Wastewater
Work: The scope of work involves drain study, interception point selection, diversion of flow, land identification, technology evaluation, strategic planning, collection of secondary data from ULBs, departments, and existing studies, total station (TS)/DGPS survey for sewer mains/pumping and mains/ I&D Structures, Contour survey for STP/Pump Station/ I&D structures sites etc., flow measurements and estimation of dry and wet weather flow at various critical locations/outfall locations including proposed I&D locations referring NMCG/relevant guidelines., soil investigations of all critical structures PS, STP, SPS, MHPS, IPS, I&D structure etc. including water retaining structure if any and identifying all drain outfalls into the Sapua and Bahana nala and demarcate catchment of area of each drain discharging into Sapua and Bahana Nala.
Publishing Date: December 24, 2025
End Date: January 20, 2026
Implementing Agency: Public Health and Engineering Department, Haryana (PHED)
Segment: Wastewater
Work: The scope of work involves construction of 60 mld STP at Devi Nagar, Ambala City on SBR technology consisting of main pumping station, inlet chamber, fine screen channel, grit chambers, sbr basins, fibre disc filters, chlorine contact tank, chlorinators, COTDM belt press system , polyelectrolyte dosing system, CCTV cameras etc. including supplying and laying of gravity main of 1000 mm DI K-9 pipe from MPS to STP, construction of RCC intermediate pumping station of 7 mld on Manakpur road with requisite pumping machinery and laying of 600 mm DI K-9 rising main from IPS on Manakpur road to main pumping station Devi Nagar including replacement of existing pumping machinery of MPS of 3 mld on Manakpur road, supplying and laying of gravity main for treated effluent of 1200 mm RCC NP-3 with HDPE liner from Chlorine Contact Tank to Ambala drain, construction of civil structures i.e roads and pathway, construction of brick masonry boundary wall 2.10 m high with RCC columns with concertina wire fencing coil 450 mm dia complete, earth filling in the campus of 60 mld and other items including operation and maintenance (O&M) for 5 years after 3 months of successful trail run followed by 12 months of defect liability period (DLP).
Publishing Date: December 22, 2025
End Date: February 24, 2026*
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: Package 1: The scope of work involves rehabilitation of sewer line from Naroda Galaxy to Naroda Patiya to Shyamshilkhar Char Rasta; rehabilitation of sewer line from Memco Char Rasta to Shyamshikhar Char Rasta; rehabilitation of trunk main from Naroda Shamshan to Naroda Gam to Naroda Bethak.
The work is likely to be completed in 24 months at an estimated cost of Rs 1,560 million.
Package 2: The scope of work involves rehabilitation of sewer line from New Gomtipur to New Cloth Market; rehabilitation of sewer line from Metro Pillar 99 to United School; rehabilitation of sewer line from New Cotton market to Swastik Char Rasta; rehabilitation of sewer line from Satnam associates to Vinzol 102 mld STP.
The work is likely to be completed in 24 months at an estimated cost of Rs 740 million.
Package 3: The scope of work involves rehabilitation of main trunk line from Odhav 310 to Panjrapole Char Rasta to Nirant Cross Road to Mahadev imperial; rehabilitation of main trunk line from Metro Pillar No 99 to Nirant Char Rasta.
The work is likely to be completed in 24 months at an estimated cost of Rs 1,200 million.
Package 4: The scope of work involves rehabilitation of main trunk line from Sutarna Karkhana to Naroda Galaxy to Naroda Bethak Naroda Patiya to Krishana Nagar to Viratnagar to Soni Ni Chali to Jashoda Nagar.
Publishing Date: December 20, 2025
End Date: January 21, 2026
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Water Supply
Work: The scope of work involves supply, laying, testing and commissioning of a ring main for a total length of 91 km with MS pipes of sizes varying from 1200mm to 1800 mm, three new HSC Centrifugal Pumps and four new VT pumps by replacing the existing similar type of pumps in the existing pump stations including associated electrical equipments at WTPs/Booster stations. Providing Feeder mains from pump stations to the Ring Main for a total length of 2.7 km and providing Transmission Mains for a total length of 64 km from the Ring Main to various Water Distribution Stations, with MS pipe/ DI pipe of size varying from 200mm to 1800 mm and allied works including surge protection works, SCADA system, providing 24 Pipe carrying bridges for crossing water bodies and providing Trenchless technology for railway crossing, NH/SH and Metro Railways within the Greater Chennai Corporation (GCC) Area and operation and maintenance (O&M) services for 10 years for entire system from Feeder pumping stations to Water Distribution stations.
Publishing Date: December 20, 2026
End Date: February 3, 2026
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Wastewater
Work: The scope of work involves working survey, soil investigation, design and construction, testing and commissioning of providing, supplying, lowering, laying and jointing rising and gravity main pipeline network and box drainage network, pumping station, compound wall, electro-mechanical work with post completion including operation and maintenance (O&M) for 2 years and defect liability period (DLP) of 3 years.
Publishing Date: December 19, 2025
End Date: January 31, 2026*
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of the project includes construction of clear water transmission main of length 65.204 km, rising main of length 190.42 km, 6 clear water reservoirs and 7 new pumping stations for the work of providing water supply From Bisalpur- Jaipur System for RWSS of 130 Villages of Sanganer Block District Jaipur.
Publishing Date: December 24, 2025
End Date: January 29, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves survey, soil investigation, design, supply of all materials, labour, T&P, etc. required for construction, erection, completion, testing and commissioning of water supply works such as RCC overhead tank, RCC CWR, pump house cum chlorinating room, pump house, distribution system, dismantling and reinstatement of all types of roads, raising main, boundary wall, M.S. gate, site development and construction of tube wells including PLC SCADA automation, E&M works and other appurtenant works of water supply and also includes trial run of 3 months, defect liability period of 12 months.
Publishing Date: December 18, 2025
End Date: January 15, 2026
Implementing Agency: Swaccha Andhra Corporation, Andhra Pradesh
Segment: Wastewater
Work: The scope of work involves investigation, survey, design and construction of 22 STPs under Package-2 with cumulative capacity of 157.1 mld in 17 ULBs based on modern technology with three months trial run post completion, operation and maintenance (O&M) for 5 years including 2 defect liability period (DLP).
Publishing Date: December 18, 2025
End Date: January 2, 2026
Implementing Agency: Swaccha Andhra Corporation, Andhra Pradesh
Segment: Wastewater
Work: The scope of work involves investigation, survey, design and construction of 60 STPs under Package-1 with cumulative capacity of 281.35 mld in 38 ULBs based on modern technology with three months trial run post completion, operation and maintenance (O&M) for 5 years including 2 defect liability period (DLP).
Publishing Date: December 18, 2025.
End Date: January 2, 2026
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of various works for augmentation of water supply system including providing, laying, jointing, testing and commissioning of clear water gravity pipeline of diameter having length of 38.850 km and boring machine tunnel construction of total 2.870 km with operation and maintenance (O&M) 10 years operation and maintenance.
Publishing Date: December 18, 2025
End Date: January 15, 2026*
Implementing Agency: Gujarat Urban Development Company Limited (GUDCL)
Segment: Wastewater
Work: The scope of work involves working survey, soil investigation, design & construction, testing & commissioning, providing, supplying, lowering, laying and jointing DI / RCC pipeline network, providing house connection, augmentation of pumping machinery of sub pumping station with operation and maintenance (O&M) for 2 years including 3 years defect liability period (DLP)
Publishing Date: December 18, 2025
End Date: January 17, 2026
Implementing Agency: Himachal Pradesh Irrigation and Public Health Department
Segment: Wastewater
Work: The scope of work involves preparation of DPR for sewerage interception and diversion works under Swatch Bharat Mission for NP Jawali, district Kangra.
Publising Date: December 17, 2025
End Date: December 30, 2025
Implementing Agency: Public Health and Engineering Department, Andhra Pradesh (PHED)
Segment: Water Supply
Work: The scope of work involves implementation of water supply project with 5 years operation and maintenance (O&M) including defect liability period in Mangalagiri Tadepalli Municipal Corporation under Urban Infrastructure Development Fund (UIDF) – Tranche-I for FY : 2023-24.
Publishing Date: December 17, 2025
End Date: December 31, 2025
Implementing Agency: Greater Bengaluru Authority (GBA)
Segment: Wastewater
Work: The scope of work involves providing PMC Services including supervision, quality control for construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solution structures/bridges and culverts under Karnataka Water Security and Resilience Programme (KWSRP) with externally funded projects (World Bank) in Rajarajeshwari Nagar Zone.
Publising Date: December 16, 2025
End Date: December 30, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves construction of RCC OHT, PH, rising main, D/S, staff quarter, pump house for TW, boundary wall and gate. site development, supply, laying & jointing of rising main, distribution system, house connections, along with renovation, repair and painting etc. of existing facilities/existing structures such as BW, PH, OHTs etc. including all labour and T & P etc. also supply of all material labour, T&P etc. for construction and rebore of tubewells, SITC of pumping plants including SITC of SCADA automation of all OHT& MCS as per provisions and specifications in tender document complete in all respect including commissioning, testing, 3 month trial and run, completing defect liabilities on turn-key basis.
Publishing Date: December 15, 2025
End Date: January 19, 2026*
Implementing Agency: Parbhani City Municipal Corporation
Segment: Water Supply
Work: The scope of work involves working survey, raw water rising main from Yeldari HW to BPT near Jintur (600 mm dia di k – 9 pipe, l = 7.92 km), raw water gravity main from ex bpt at Jintur to old WTP of Parbhani WSS (700 mm dia di k9 and k7, total L = 61.5 km), conventional WTP of capacity 6 mld, pure water rising main from WTP 6 mld sump to mkv & MIDC ex esr, rcc esr at Kranti Nagar (capacity 14.2 ll and st. ht. 15m), canal crossing of raw water gravity main, m s pipes required for canal crossing, trial run for 3 months, pure water pumping machinery at 6 mld WTP, repairs to existing WTP 21.6 mld (mechanical & electrical works), providing, erecting, commissioning and testing of flowmeters
Publishing Date: December 15, 2025
End Date: January 5, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves construction of RCC Over Head Tank (1200 kl – 2 no., 1500 kl and 1700 kl), pump house, MCS Room, booster pump room, boundary wall, staff quarter, gate, site development and repairing of existing Over Head Tank (600 kl and 1250 kl), laying and jointing of rising main, distribution system (90mm to 160mm HPDE pipe & 200mm to 400 mm dia DI pipe Class K-7) in length of about 284.968 km.
Publishing Date: December 15, 2025
End Date: December 30, 2025
Implementing Agency: Jaipur Nagar Nigam
Segment: Wastewater
Work: The scope of work involves survey work including length, diameter, invert level, ground level depth of both u/s and d/s connectivity (if any) till the trunk main, Contour Plan, L Section, X Section, and other required detail / drawing and planning and designing of sewerage network as per RUIDP/ RUDSICO/AMRUT guidelines, assessment of the existing maps with size, invert and alignment details of existing sewers and left out un-sewered area and rehabilitation of existing sewer network if required, designing and estimation of sewer network including survey work, levels at site, designing of sewer mains and laterals, manholes, STP on SBR technology/MPS (if required), house connections etc
Publishing Date: December 15, 2025
End Date: December 29, 2025
Implementing Agency: Parbhani City Municipal Corporation
Segment: Water Supply
Work: The scope of work involves working survey, sewer networks for Zone I HDPE pipe dia 200 mm to 300 mm L = 239.82 km & RCC pipe dia 350 mm to 1200 mm L = 26.90 km (total 266.71 km), utility shifting for Zone I, property connection for Zone I, sewer networks for Zone II HDPE pipe dia 200 mm to 300 mm L = 175.68 km & RCC pipe dia 350 mm to 900 mm L = 12 km (total 187.69 km), utility shifting for Zone II, property connection for Zone II, wet well Zone-I (10.00 m dia & 13.47 m depth) with mechanical screens, wet well Zone-II (7.50 m dia & 11.40 M depth ) with mechanical screens, rising main of total length 0.2 km, three STPs of 32.5, 2.5 (based on wetland integrated technology) and 18 mld capacity, road reinstating for Zone I, miscellaneous charges, nala interception at three locations for Zone 2, Grit / silt & screen chamber for nala interception in Zone 2, trunk main for nala interception, pumping machinery for SPS I & II, trial run for Zone I, road reinstating for Zone II, trial run for Zone I
Publishing Date: December 15, 2025
End Date: January 5, 2026
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, engineering design, supply of all materials, labour, T&P, etc. required for completion of on turnkey basis: installation of tube well cum pump house and approach bridge and associated works, raw water rising main from intake well to WTP, water treatment plant of 7 mld, RCC OHTs, ZPS/CWR cum pump station, rising main, feeder main, distribution system including house connections, SCADA room, chlorination room, meter room, panel room, boundary wall and site development works, and other appurtenant works including SCADA and automation as per specifications in the tender document. and also includes a trial run of 3 months, defect liability period of 12 months.
Publishing Date: December 15, 2025
End Date: February 17, 2026*
Implementing Agency: Solapur Municipal Corporation
Segment: Water Supply
Work: The scope of work involves preparation of a GIS-based base map, development of a city-wide hydraulic model, conduct of a comprehensive water audit to establish baseline system performance, phased master plan for achieving continuous (24×7) water supply, including source optimization, upgradation of WTPs, transmission and feeder mains, rationalization of storage infrastructure, and restructuring of the distribution network into operational zones and DMAs with adequate pressure management. The scope also includes NRW reduction measures, provision of bulk and consumer metering, integration of SCADA and monitoring systems, and preparation of a detailed project report (DPR) with technical designs, cost estimates, implementation phasing, and sustainability measures in line with World Bank, MoHUA / AMRUT, CPHEEO guidelines, latest standards and best practices to prepare an optimized proposal to convert the existing intermittent supply system (once in 4 days) to continuous 24×7 water supply, including source augmentation (110+ mld additional requirement), new 120 mld WTP at Soregaon, feeder mains (Phase I: 68.64 km), ESR and MBR rehabilitation/replacement plans approximately 30 reservoirs, new distribution network (Phase-wise approximately 720 km), consumer metering strategy and SCADA & automation for system transparency
Publishing Date: December 13, 2025
End Date: December 22, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes construction of overhead tanks, pump houses, staff quarters, boundary wall, gate, site development, supply, laying & jointing of rising main, distribution system and construction of tube well including programmable logic controller (PLC) supervisory control and data acquisition (SCADA) automation including commissioning, testing, three months trial and run, defect liability period of one year for civil works and two years for electrical and mechanical work and handing over complete works of Bareilly Reorganization Water Supply Scheme (Phase-1) with 100 per cent saturation of household connections & its appurtenant works on turnkey basis. The length of rising main is 19.47 km.
Publishing Date: December 18, 2025
End Date: January 20, 2026
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of clear water gravity main having diameter 2235 mm from prop break pressure tank (BPT) to Rau interconnection point of length 39.18 km including excavation, refilling, road cutting/dismantling, restoration, providing valves, surge protection system and specials and fittings, tunnel construction of total 2.87 km at different 3 different locations, the works include entry exit pit and pushing M.S pipe of diameter 2235 mm diameter pipe from its include, soil testing, geological study and testing, design and required all material & labour to complete the work in all respect, interconnection proposed gravity pipeline with existing 1900 mm dia, 1700 mm dia & 1200 mm diameter pipeline at rau circle, design and construction of pipeline reinforced cement concrete (RCC) bridge for river crossing , nallah crossing , canal crossing, box culvert for railway line crossing at mhow as per the norms of railway department , the works include all supply and pipe laying from box culvert, Development of security check post for pipeline at 4 location i.e on every 10 km. checking daily pipeline condition and safety, installation of flow meter on gravity main, installation of instrument and operation by Programmable Logic Controller (PLC)- supervisory control and data acquisition (SCADA) for monitoring and controlling of gravity man, Laying of pipe line of 1800 mm dia . M.S. pipe in tunnels of phase-3 to stop leakages of RCC tunnel construction of chlorine system and chlorine building at Rau with operation and maintenance (O&M) 10 years operation and maintenance
Publishing Date: December 18, 2025
End Date: January 6, 2026
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Water Supply
Work: The scope of the work includes designing, constructing, testing, commissioning, Operation and Maintenance for 5 years after 12 months defect liability period for providing, testing and commissioning of raw water pipeline of 1800 mm i/d MS pipe, silt removal clarifiers 2 nos., raw water channel from silt removal chambers to 2 No. sedimentation cum storage tanks each of 308887.5 kl storage capacity, raw water RCC- M30 DUCT from Storage tanks outlet to Common Raw Water Sump, lowering of sub-soil water table and construction of one unit of 100 mld automated Water Treatment Plant (WTP) , Clear Water Reservoir (CWR) for 100 mld capacity common clear water sump suitable for 2 Units of 100 mld each, common clear water & raw water pump house suitable for 2 Units Of 100 mld, Common Clear Water & Raw Water Pump House suitable for 2 Units Of 100 mld, clear water and raw water pumping machinery, mechanical dewatering of sludge, permanent dewatering system, HT & LT electrical works, SCADA and all other works.. The project will be implemented on a turn-key basis.
Published Date: December 17, 2025
End Date: March 24, 2026
Implementing Agency: Yamuna Expressway Industrial Development Authority (YEIDA)
Segment: Water supply
Work: The scope of work involves conducting necessary surveys, data collection and base mapping to establish an accurate and comprehensive understanding of the existing situation. It includes preparing a comprehensive, integrated and future-ready Service Master Plan for YEIDA, ensuring full alignment with the development proposals of Master Plan 2041 and seamless integration of the previously prepared service plan with the updated requirements. The project aims to establish a technically robust framework for revising, augmenting and consolidating the earlier infrastructure proposals with the new assessments, enabling the phased implementation of sewerage, water supply and storm water drainage systems that are sustainable, efficient and resilient for the designated area.
Publishing Date: December 12, 2025
End Date: January 13, 2026*
Implementing Agency: Akole Nagar Panchayat
Segment: Wastewater
Work: The scope of work involves providing services for preparation of tender documents and bid process management including preparing proposals for getting requisite permissions from various concerned competent authorities and functioning as PMC and Technical Auditor.
Publising Date: December 12, 2025
End Date: December 19, 2025
Implementing Agency: Uttarakhand Tourism Development Board (UTDB)
Segment: Wastewater
Work: The scope of work involves development of sewerage system in five areas/blocks of New Tehri; Dungidhar Area, 7A/7B/7C Muslim Mohalla/Colony, Kemsari Tin Shed Area, K-Block Area and M-Block Area, 5 mld STP, with 20 kld SeTP, sewer network, 4 SPS and allied works including 5 years of operation and maintenance (O&M) at New Tehri town in Uttarakhand.
Publishing Date: December 12, 2025
End Date: January 23, 2026*
Implementing Agency: Notified Area Council (NAC), Ganjam
Segment: Wastewater
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publising Date: December 12, 2025
End Date: December 26, 2025
Implementing Agency: Notified Area Council, Tusura
Segment: Water Supply
Work: The scope of work is to to study the Topography, Hydrology of the site and surrounding areas, Design and prepare the Surface runoff Water Drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019/ Central Ground Water Board (CGWB) guidelines/ River centric urban development planning guideline of MoHUA
Publising Date: December 11, 2025
End Date: December 21, 2025
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work includes:
Ranavav WSS under the Atal Mission for Rejuvenation and Urban Transformation 2.0 (AMRUT 2.0): The scope of work includes working survey, soil investigation, design, construction, testing, commissioning of reinforced cement concrete (RCC), elevated service reservoir (ESR), providing, supplying, lowering, laying and jointing di/pvc pipeline network, gravity distribution network of 31.62 km length, repairing of existing pipeline, providing 5,895 house connection work etc. with Operation and Maintenance (O&M) of five years and three years defect liability period(DLP).
Ranavav UGD-II under Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY). : The scope of work includes working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing & commissioning of RCC NP3 pipes for sewer collecting system of length 24.42 km – gravity mains and di pipes for rising main pipeline of length 2.53 km, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, construction of house connections, road restoration, electrical work etc. with two years O&M and three years DLP.
Ranavav Sewage Treatment Plant (STP)-I and II under SJMMSVY: The scope of work includes designing and construction of sewage treatment plant of 6 mld at Ranavav and 4 mld at Adityana along with all allied works, designing, providing, supplying, lowering, laying & jointing rising main network, including seven years O&M and three years DLP.
Publishing Date: December 10, 2025
End Date: December 24, 2025
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work involves upgradation and expansion of existing water supply scheme by designing and construction of new 72 mld WTP and allied works. It also includes geotechnical investigation, preparation of hydraulic and RCC designs and drawings, construction of aeration fountain, inlet chamber, flash mixer, raw water channels, construction of two numbers of Clari flocculators (36 mld capacity each), byepass arrangements, filter house, chemical house including testing laboratory and toilets, filter backwash arrangements with elevated water tank, air blowers and pumps, store room, filter beds, under-drain system with v-wire arrangement & required sluice gates/valves, construction of chlorine contact tank and chlorine room, chemical dosing pumps and pipeline, construction of RCC pure water sumps (2 numbers having 9000 cum capacity each), pump house over pure water sumps, interconnections and bye-pass arrangements, waste water recirculation sump and pump house, valves, including all necessary piping arrangement for recirculation and arrangement for sludge removal as per site requirement, arrangement for integration of new WTP with existing WTP, construction of internal CC roads with RCC built up gutters, kerbing, service pipes, road markings etc., LED street lights, roof top grid connected solar PV system over pure water sumps as per specification, landscaping, tree plantation, construction of minimum 100 sqm built up area conference cum display RCC building with all furnishings and furniture, providing all external/internal painting to the structure with waterproof apex paint and all waterproof apex paint and all water contacting surfaces painting, food grade or special epoxy paint, waterproofing work of all structures, providing lightening arresters at WTP site, providing, designing, erecting and commissioning of CCTV camera and intercom system at new WTP site
Publishing Date: December 10, 2025
End Date: January 21, 2026
Implementing Agency: Himachal Pradesh State Industrial Development Corporation Limited (HPSIDC)
Segment: Wastewater
Work: The scope of the project includes construction of common effluent treatment plant (CETP) with a combined capacity of 5mld; Phase I – 2 mld (High Total Dissolved Solids (HTDS) : 0.5 mld, Low Total Dissolved Solids (LTDS) :1.5 mld) and Phase II – 3 mld (HTDS : 1 mld, LTDS :2 mld) and effluent conveyance network at the Bulk Drug Park including a 3 year defect liability period (DLP) followed by a 22 year operation and maintenance (O&M) period
Publishing Date: December 10, 2025
End Date: January 12, 2026
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work involves construction of approx. 69 m high and 979.5 m long Roller Compacted Concrete dam (RCC dam) along with a Water conveyance tunnel of 2.2 m dia. and 1.6 km length including provision of radial gates with stoplog over spillway, Turbine and allied work for power generation of minimum 1.2 MW. It also includes conducting geotechnical investigation along with all necessary tests by taking boreholes at the locations approved by the Engineer along the alignment of the proposed dam and tunnel including minimum 20 boreholes for dam, tunnel and appurtenant structures (Spillway, EDA, bridges, etc), installation of piezometric tubes at suitable locations suggested by the Engineer along alignment of tunnel to monitor ground water table and including interpretation and submission of geotechnical investigation report
Published Date: December 9, 2025
End Date: January 20, 2026*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves demolition of the old existing 10 mgd STP, construction of 20 mgd STP including incoming receiving chamber, screening system, grit removal system, all the open units should be covered and gases should pass through an odour control system, biological treatment units capable of achieving the treated effluent standards as mentioned in the NIT, ultraviolet disinfection system for faecal coliform treatment, sludge holding units for sludge digestion and dewatering, with the dewatered sludge having a consistency of 20-25 per cent, biogas generation, plant drains, sumps and pumps, H.T., L.T. and MCC rooms, transformer yard, internal roads and storm water drains with railings, compound wall, entry gate and security room, interconnecting piping, mechanical works, electrical works including plant internal and external lighting, instrumentation and automation work, miscellaneous work, disposal line up to the discharge point, construction of admin building, approach/access road from the main road to the premises, parking, treated effluent filling point for tankers, and a rainwater harvesting system of suitable capacity along with 15 years operation and maintenance (O&M) and two year defect liability period (DLP).
Publishing Date: December 8, 2025
End Date: May 28, 2026*
Implementing Agency: City and Industrial Development Corporation (CIDCO)
Segment: Water Supply
Work: The scope of work involves;
Part A : Design and construction of 22.21 km long raw water tunnel and allied works from Kondhane Dam at village Chochi, Taluk Karjat to the 250 mld Mohope WTP in Panvel Taluka, Raigad
Part B : Design, build, supply, erect, testing and commissioning of 250 mld water treatment plant and 15 years operation and maintenance (O&M) at village Mohope, Taluka Panvel, Raigad.
Publishing Date: December 8, 2025
End Date: January 21, 2026
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: Package 4: The scope of work involves rehabilitation of sewer line from Baliya Dev Temple to Sonal Cinema to Vasna APMC and sewer line from Gulshane Maher school to Modern furniture to 285 MLD TSPS.
Publishing Date: December 8, 2025
End Date: February 5, 2026*
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: Package 1 Lot 1: The scope of work involves rehabilitation of sewer line from Chimanbhai bridge to Prabodh Raval bridge to Akhabarnagar and sewer line from Mithakhali Char Rasta to Paldi Char Rasta.
The work is likely to be completed in 24 months at an estimated cost of Rs 840 million.
Package 1 Lot 2: The scope of work involves rehabilitation of main trunk line from Gota Lake to 285 TSPS (Marengo CIMS Hospital Char Rasta to Iskcon Char Rasta).
The work is likely to be completed in 24 months at an estimated cost of Rs 1,390 million.
Package 2: The scope of work involves rehabilitation of sewer line from Vivekanand Circle to Helmet Char Rasta and sewer line from Gota Lake to 285 TSPS (Marengo CIMS Hospital Char Rasta to Iskcon Char Rasta).
The work is likely to be completed in 24 months at an estimated cost of Rs 2,070 million.
Package 3: The scope of work involves rehabilitation of main trunk line from Gota Lake to 285 TSPS (Iskcon Char Rasta to 285 MLD TSPS).
Published Date: December 8, 2025
End Date: February 5, 2026*
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work involves providing, laying, jointing of 1000 mm dia. main MS pipeline for water supply from WTP Poynad to Shahapur Dherand Industrial Area
Published Date: December 6, 2025.
End Date: December 22, 2025
Implementing Agency: Public Health and Engineering Department, Andhra Pradesh (PHED)
Segment: Water Supply
Work: The scope of work involves providing of water supply, house service connections, distribution pipe lines, sewage and septage management and water body rejuvenation in ULBs of Kondapalli, YSR Tadigadapa Municipality, Dachepalli, Vijayawada Municipal Corporation, Jaggaiahpeta, Machilipatnam, Gudivada, Pedana, Narasaraopet, Chilakaluripet, Vinukonda, Piduguralla, Gurazala, Macherla, Guntur Municipal Corporation, MangalagiriTadepalli Municipal Corporation, Tenali, Ponnur, Chirala, Bapatla, Repalle, Vuyyuru, Tiruvuru, Sattenapalli and Addanki ULBs.
Published Date: December 4, 2025
End Date: December 23, 2025
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work involves construction of 3200 mm bored diameter 7.05 km (± 5 meters) long reinforced concrete-lined tunnel of 2.5 meters finished diameter by simultaneous deployment of two TBM (Tunnel Boring Machine), one from Manori and another from Mahavir Nagar, connecting the proposed pumping station near Manori desalination plant to the proposed shaft at Charkop near Saint Mary School and further upto proposed Mahavir Nagar shaft at BMC garden, Kandivali and then connecting the same with existing Mahavir Nagar shaft outlet /control room and allied works including operation and maintenance (O&M) for a period of 7 years. It also includes conducting Geotechnical Investigation along with all necessary tests by taking boreholes at the locations, conducting survey including tunnel alignment, proposed shafts and location of pumphouse at Manori and wherever required, conducting Bathymetric survey in Gorai creek along the tunnel alignment, Seeking and obtaining permissions such as Coastal Regulation Zone (CRZ), Maharashtra Coastal Zone Management Authority (MCZMA), Mumbai Metropolitan Region Development Authority (MMRDA), Forest, Environmental, Police, Traffic, MPCB, BMC wards & other departments and any other necessary clearances, permissions, licenses, permits, NOCs etc
Publishing Date: December 4, 2025
End Date: April 22, 2026*
Implementing Agency: Vasai Virar Municipal Corporation
Segment: Wastewater
Work: The scope of work involves survey, collection system (total length – 64.93 km, HDPE DWC – 52.04 km dia 200 to 300 mm, rcc np-3 & np-4 – 12.89 km, dia 350 to 1000 mm), 7,128 property connection, road restoration (length – 64.93 km bituminous road), sewage pumping main for STP-6a (length – 50 m, diameter – 750 mm, di k-9) and for STP-6B (length – 50 m, diameter – 600 mm, di k-9), sewage pumping station (2 for 30 mld and 17 mld STP), STP (STP-6A – 30 mld and STP-6B – 17 mld), Treated Outfall at STP – STP-6A (Length – 480 m, Diameter – 700 mm, RCC NP-III) and STP-6B (Length – 550 m, Diameter – 600 mm, RCC NP-III), Recycle Water – Tertiary Treatment Plant (Capacity – 10 mld) including pumping main, sump, distribution system and ESR, Shifting of utilities (water supply pipe, gas pipeline, electric line, optic fiber, cable etc.), trial run for 3 month, Electro-mechanical works
Published Date: December 5, 2025
End Date: December 26, 2025
Implementing Agency: Vasai Virar Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of collection system (Length – 45.05 km, HDPE DWC – 36.61 km dia-200 to 300 mm, RCC NP-3 – 0.12 km & NP-4 – 8.31 km, from 350 to 1200 mm), 2,494 property connection, sewage pumping main (L-50 m, Dia-800 m, DI K-9), Sewage Pumping Station (SPS), 34.5 mld STP, treated outfall at STP (L-500 m, Dia- 900 mm, DI K-9) and trial run for 3 months.
Published Date: December 5, 2025
End Date: December 26, 2025
Implementing Agency: Kanpur Development Authority
Segment: Wastewater
Work: The scope of work involves laying Trunk Sewer Line, Trunk Drain Line, Trunk Water Line and Cable Trench.
Published Date: December 5, 2025
End Date: December 18, 2025
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Water Supply
Work: The scope of work for the independent engineer is to review the detailed drawings, detailed project report and other documents during the study period, review, inspection and monitoring of construction works; conducting tests on completion of construction and issuing completion/ provisional certificate during the construction period, review, inspection and monitoring of O&M during the Operations Period of 20 years
Published Date: December 4, 2025
End Date: December 17, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh (PHMED)
Segment: Water Supply
Work: The scope of work involves execution of water supply, sewerage & septage management and water body rejuvenation scheme works in 24 urban local bodies of SPSR Nellore, Prakasam, Tirupati & Chittoor districts, construction of 2.00 mld rapid gravity water treatment plant in atmakur, proposed 10 mld WTP at existing WTP location near ss tank, 10 mld WTP at Travagunta, 15 mld WTP at Travagunta Tidco housing colony, construction of 10 mld WTP including ELSR & distribution network for uncovered area in Ongole municipal corporation, construction of 15 mld STP in Ongole municipal corporation with an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 2 years
Published Date: December 3, 2025
End date: December 23, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: Package 1: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation and maintenance in 11 Urban Local Bodies Of Ananthapuramu, Sri Satya Sai And Annamayya districts at an estimated cost of Rs 4,265.64 million. It also includes construction of 8 mld water treatment plant (WTP) in Rayadurg Municipality, 10 mld WTP in Dharmavaram Municipality, 25 mld STP based on Sequential Batch Reactor (SBR) technology in Ananthapuramu Municipal Corporation Municipality and 28 mld STP in Hindupur Municipality with an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 2 years.
Package 2: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation and maintenance in 5 Urban Local Bodies Of Kurnool And Nandyal districts at an estimated cost of Rs 3,981.47 million. It also includes construction of 30 mld WTP at Jagannathagattu, 35 mld STP in Kurnool, 0.2 mld STP at Mamidapadu village, 0.4 mld STP at Munagalapadu village, 11 mld STP at Kallubavi in Adoni town, 14.5 mld STP at Aptidco housing in Adoni town and 32 mld STP at Kundu river near Chamakaluva with an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 2 years.
Package 3: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation works including operation and maintenance in 5 Urban Local Bodies Of YSR Kadapa district at an estimated cost of Rs 6,489.06 million. It also includes construction of 95 mld WTP near Bandikanuma Hilllock, 15 mld STP at Palempalli in Kadapa Town, 3 mld STP in Devuni Kadapa Cheruvu, 2 mld STP in Budayapalle Cheruvu and 2 mld STP in Putlampalli Cheruvu with an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 2 years
Published Date: December 3, 2025
End date: December 23, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of work involves:
Package 1: The scope of work includes execution of 18 water supply, sewage & septage management and water body rejuvenation works including operations and maintenance in 7 Urban Local Bodies of East Godavari, West Godavari Districts at an estimated cost of Rs 5,630.88 million with an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 2 years.
It also involves providing of 450 mm dia DI K7 Raw water gravity main from proposed off take chamber to raw water sump cum pump house at Godavari Western Delta canal, construction of 10.00 m dia.(314.4 kl) Raw Water sump cum pump house at proposed Off take Chamber at Godavari Western Delta canal bund, construction of 10.00 mld Rapid Gravity Filtration plant, construction 11.00 m dia (228.25 kl) clear water sump at WTP.
Package 2: The scope of work includes execution of 18 water supply, sewerage & water body rejuvenation scheme works including operation and maintenance in 11 Urban Local Bodies of Dr. B.R. Ambedkar Konseema & Kakinada Districts at an estimated cost of Rs 4,050.90 million with an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 2 years.
It also involves Providing 600 mm dia DI K7 Clear Water Gravity Main from Kirlampudi Junction to Tatiparthi, construction of 22.0 mld STP with SBR Technology in Dummulapeta, Providing House service connections to 19,535 households.
Published Date: December 3, 2025
End date: December 23, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation & maintenance in 10 Urban Local Bodies of Visakhapatnam, Vizianagaram Srikakulam, Parvathipuram Manyam and Anakapalli districts at an estimated cost of Rs 3,814.16 million
Published Date: December 3, 2025
End date: December 23, 2025
Implementing Agency: Greater Bengaluru Authority (GBA)
Segment: Water Supply
Work: The scope of work involves construction supervision of works, quality control and project management. It also includes provision of field supervision and sufficient technical assistance (Staff) to keep check on Quality Control of the Work at Site on daily basis. For this purpose, the Project Management Consultant shall have to post their Engineer-in-Charge at the Site of Work and provide the agreed necessary and adequate Technical Staff for Supervision and exercising Adequate and constant day to day technical supervision over the construction including giving layout and alignment, its checking, checking requirements of materials and equipment and their procurement in time, conforming to approved specifications and accepted standards
Published Date: December 3, 2025
End Date: December 12, 2025
Implementing Agency: Guwahati Jal Board
Segment: Water Supply
Work: The scope of the project includes design, construction, supply, installation, testing, commissioning of a water treatment plant (WTP) of 98 mld capacity (having design provision for extension up to 147 mld), floating barge mounted intake works, raw water rising mains of length 2.4 km and transmission main of length 27.94 km, three reservoirs viz. Hengrabari (13 mld), Naba Jyoti Nagar (3.2 mld) and Basistha (5 mld) and distribution system of length 553 km
Published Date: December 3, 2025
End date: December 12, 2025
Implementing Agency: Tirumala Tirupati Devasthanams
Segment: Wastewater
Work: The scope of the project includes to Study existing drains available and its capacities, and suggest delinking with underground lines, providing new / additional drains and their disposal anticipating influx of moderate to heavy rains, forecasting & recommendations on regulation of storm water drains and shall access the sites, design detailed plans & overseeing the construction of drainage system, Study and recommend the Introduction of advanced technologies, Incorporating the latest technologies for UGD recommendation for implementation of modern technologies & methods for UGD and sewage Treatment and recycling, capacity enhancement requirement.
Published Date: December 3, 2025
End date: December 12, 2025
Implementing Agency: Municipal Board Niwai
Segment: Wastewater
Work: The scope of work involves preparation of Detailed Project Report (DPR) for sewerage works in Nagar palika Niwai.
Published Date: December 2, 2025.
End Date: December 15, 2025
Implementing Agency: Dholera Industrial City Development Limited (DICDL)
Segment: Wastewater
Work: The scope of work involves modification of existing 20 mld Industrial Effluent Pumping Stations, Common Effluent Treatment Plant (CETP) & pumping station including design engineering, construction, procurement, erection (installation), testing & commissioning (EPC basis) with RO reject disposal in Dholera including an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 5 year
Published Date: December 2, 2025
End Date: January 15, 2026*
Implmenting Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves construction of Tertiary Treatment Plant (TTP) of 16 mld capacity at PM Mitra Park campus along with all necessary process units including UF and RO with associated infrastructure and allied works, construction of pumping station of 22.5 mld capacity at the existing 39 mld STP Daulatganj campus including, laying of approximately 49.7 km rising main, construction of intake well of 8.25 mld capacity at Gomti River near Sambodhi Bridge (Itaunja–Mall Road) along with all associated infrastructure and allied works including 15 years operation and maintenance (O&M) for supply of Industrial and Domestic Water for use of PM Mitra Textile Park.
Publishing Date: December 2, 2025
End Date: January 24, 2026
Implementing Agency: Surat Municipal Corporation
Segment: Wastewater
Work: The scope of work involves 100 mld STP and treated water pumping station with electrical-mechanical at Valak including providing and laying of treated water transmission line from Valak STP to Varachha STP with operation and maintenance (O&M) for 10 years in new East Zone-B (Sarthana). The approximate length of Treated Water Transmission Line to be laid is 5000 rmt.
Publishing Date: December 4, 2025
End Date: January 19, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and supply of all materials, labour, T&P etc required for completion of work at Mainpuri Water Supply Re-Organisation Scheme. It also includes commissioning, testing, trial run, defect liabilities and handling over the work to Mainpuri Nagar Palika with a defect liability period of 12 months for civil works and 24 months for E/M works.
Publishing Date: December 2, 2025
End Date: January 12, 2026*
Implementing Agency: Dholera Industrial City Development Limited (DICDL)
Segment: Wastewater
Work: The scope of work involves appointing a project management consultant (PMC) to provide comprehensive technical and supervisory support for implementation of the project.
Publishing Date: December 2, 2025
End Date: January 12, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves prevention of pollution of river Ramganga by Interception & Diversion of drains and construction of two interception and diversion (I&D) points at Zone-3 and 3 at Zone -4, 4.5 km long I&D sewer network, two MPS, 80 m rising main, 15 mld STP in Zone-3 at Budh Vihar, Phase-2, Sector-9 and 65 mld STP at Zone 4 at Sihora Govind Near Delhi Global Public School, 900 m Long effluent line, 50 kld septage co-treatment facility, effluent line of 1 km including 15 years Opeartion & Maintenance (O&M) period on HAM basis in Uttar Pradesh.
Publishing Date: December 1, 2025
End Date: January 20, 2026
Implementing Agency: Greater Visakhapatnam Municipal Corporation (GVMC)
Segment: Wastewater
Work: The scope of work involves construction, supplying, erection, testing and commissioning of required civil, mechanical, electrical and instrumentation works required for sewerage collection, conveyance and treatment system for Madhurawada area including house service connections (one HSC connection includes connecting all wastewater (sewage and sullage) outlet from one plot), road restoration, providing required numbers of sewage pumping stations, lift stations, raw sewage conveyance mains and STP at Kapuluppada; construction and commissioning of Sewage Treatment Plant with SBR Technology for 20 mld which can meet the desired water quality parameters as per CPHEEO and NGT Guidelines including 2 years Defect liability period (DLP), and Operation and Maintenance (O&M) period for 2 years of pumping stations, transmission mains and treatment plants commissioned
Published Date: December 1, 2025
End Date: December 26, 2025
Implementaion Agency: Kolkata Municipal Corporation (KMC)
Segment: Wastewater
Work: The scope of work includes designing, drawing and construction of 2 (two) nos. separate 14 m dia (id) rcc well each having a capacity of 1125 cum each (minimum) including superstructure (9.50 m minimum height), 2 nos. inlet channel (5.0 m x5.0 m), 2 nos. Reinforced cement concrete (RCC) screen chamber [minimum 7.0 m x 5.0 m x 5.0 m(inside)] each including gates (minimum 8 nos. ci sluice gates), screens (two nos. screen for each channel totaling to 8 nos.), lifting arrangement for the screen with rope drum arrangement electrically operated with adequate rated gear box and motor complete and supporting ms structure, supplying and laying 12mm thick 240.0 m- 1200 mm dia. ms delivery main as per specification , electro-mechanical work such as design, drawing, supply, delivery, installation, commissioning with inspection & trial run of 8 nos non-clog tubular casing mixed flow type wet pit vertical pump-motor set with extended power cable with smart controller for swf application (4 nos. pumps for each sump) as per specification having discharge-15000 m3/hr, head-13m, capable of running satisfactorily up to 3 meter sewage water level of the sump along with reflux valve, dismantling joint, carbon steel pipe of 12 mm thick (minimum), diameter conforming to the pump delivery and length as per design for individual delivery line complete with flanged ends/ specials and ss fasteners including electromagnetic type flow meter (insertion type flow meter) suitable for a mild steel pipeline of required diameter, there will be an individual discharge line for each pump and the individual delivery main will be from pump end up to the canal for swf application as per specification. moreover, sluice gate, s.s. manual screen with rope drum type motorized lifting arrangement along with required structure and other related works
Published date: November 29, 2025
End Date: December 27, 2025
Implementing Agency: Berhampur Municipal Corporation (BeMC)
Segment: Wastewater
Work: The scope of work is to assess the existing sewerage plans, systems being taken up in the area and determine their interface and interaction with the proposed sewerage system, carry out necessary survey including Total Station (TS) / DGPS survey for Sewer Mains / Pumping Mains, along with Collection networks, contour survey for STP Pump Station sites wherever required, to fix-up benchmark stations at all proposed sites such as STP, Sewage Pumping Station, MHPS etc, to identify suitable land for Pumping Stations & STP, to carry out soil investigations such as collection of samples and testing as per relevant BIS for water retaining structures PS, STP, SPS, MHPS, IPS etc
Published Date: November 29, 2025
End Date: December 12, 2025
Implementing Agency: Nagar Panchayat Hussainabad
Segment: Water Supply
Work: The scope of project involves inception and preliminary data collection, technical feasibility and planning, engineering design and drawings, cost estimation and financial analysis, environmental and social assessments, final DPR documentation, pre-construction assistance, construction supervision, quality assurance and monitoring, commissioning and handover and project documentation and reporting. The reports will be prepared for urban sanitation, waste management, used/wastewater management, drainage planning & urban infrastructure projects.
Published Date: November 28, 2025
End Date: December 6, 2025
Implementating Agency: Pimpri Chinchwad Municipal Corporation (PCMC)
Segment: Water Supply
Work: The scope of work is construction of Proposed STP (20 mld at Dudulgaon & 40 mld at Chikhli, Near River Residency), Sump & Pump House, Pumping Main from PS Sump to Receiving Chamber, Raising of Structure, Tertiary Treatment, Compound Wall etc. With rejuvenation of water bodies by desilting strengthening the embankment and stone packing, earthwork clearing and grubbing, desilting, dredging from river, disposal of all type of rubbish, embankment and embankment strengthening, general development stone pitching, rubble stone soling, non woven geotextile filter, retaining wall etc., horticulture & landscaping, dismantling and demolishing, street furniture, electrical & lighting works, harvesting the rainwater through storm water drains into water body, diverting the polluting drains to treatment plant etc, with an embankment to be developed of length 18.5 km. It includes an Operation & Maintenance (O&M) period of 12 months
Published Date: November 28, 2025
End Date: January 19, 2026*
Implementation Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design & construction of rcc clear water sump , elevated service reservoir, gravity main distribution network, providing, supplying, erecting and testing of pumping machineries, pump house cum panel room, road restoration, house connection, electrification work, electromagnetic flowmeter etc. and providing, supplying, lowering, laying and jointing DI pipeline for raw & clear water rising main at Porbandar – Chhaya Nagarpalika, in Porbandar, Gujarat including Operation & Maintenance (O&M) period for 5 years.
Published date: November 28, 2025
End Date: December 17, 2025*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves providing, laying, jointing of Internal/Peripheral sewer lines and House sewer connection along with construction of 15 mgd Decentralized Sewage Treatment Plant and Sewage Pumping Station along with other associated / allied appurtenant work on under Najafgarh drainage Zone on Design, Build and Operate (DBO) basis including 13 years Operation & Maintenance (O&M) period at Rangpuri including Defect Liability Period (DLP) for 5 years for sewer line work and 2 years for STP EPH & SPSs (Civil & E&M) works
Published Date: November 28, 2025
End Date: February 16, 2026*
Implementing Agency: New Delhi Municipal Council (NDMC)
Segment: Water Supply
Work: The scope of work involves holistic study of the water supply network of entire NDMC area for furnishing Master Plan for another 25 years and consultancy services for study & preparation of Detailed Project Report (DPR) for Improvement and Revamping the existing water supply system including hydraulic modelling, water audit & balancing, consumers survey, GIS mapping, measures to reduce NRW / UFW, achievement of service level Benchmark And Upgrading the System for Continuous (24×7) Water Supply with predefined Key Performance Indicators to the command area of NDMC with design period for consideration of time frame of 25 years and enhancement of storage capacity of water and upgradation of GIS for integration of water supply arrangements and other services
Published Date: November 28, 2025
End Date: January 21, 2026*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves construction of 1.5 mgd Sewerage Treatment Plant (STP) along with associated /allied appurtenant work on Design, Built and Operate (DBO) basis including 13 years Operation & Maintenance (O&M) period at Bijwasan including a Defect Liability Period (DLP) of 2 years.
Publishing Date: November 27, 2025; November 28, 2025
End Date: April 7, 2026*
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work involves augmentation of existing Old Pump House; augmentation/ retrofitting of existing RUIDP pump house at Akelgarh,augmentation/retrofitting of existing CWPH and construction of new CWPH at Akelgarh, Raw Water Gravity Main of 1200 mm dia.; MS pipe for the length of 5.50 km from old pump house Akelgarh to BPT& RWR-PH; raw water pumping main of 700 mm dia. DI K-9 Pipe for the length of 11.28 km from RWR-PH near Kota University to Ranpur water treatment plant (WTP); construction of RWR Capacity 8.15 ml and PH near Kota University; construction of 40 million litres per day (mld) WTP at Ranpur; Clear Water Rising (CWR) main of total length of 19.87 km of DI K-7 from Dia. 200 mm to 800 mm; construction of CWRs (2 Nos. of Total 2250 KL capacity); construction of 10 overhead service reservoirs (OHSRs) for total capacity 15900 kl; distribution system in uncovered area of Shivaji Park WTP zone in Kota South Nagar Nigam area, Talab Gaon, Haditi Colony and replacement of existing water supply pipelines in Balakund, Vigyan nagar, Subhash nagar, Mahaveer Nagar-I, III and Chawani Korti area, total length of 214.39 km of DI K-7 from dia. 100 mm to 600 mm and shifting of 8000 House Service Connections with an Operation & Maintenance (O&M) period of 5 years and a Defect Liability Period (DLP) of 1 year.
Publish Date: November 27, 2025
End Date: December 15, 2025
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves providing & laying 300 mm to 1200 mm nominal dia internal and peripheral sewer line for the work of Mahipalpur GOC under Bijwasan Constituency and Construction of 6 mgd Sewerage Treatment Plant (STP) along with associated /allied appurtenant work on Design, Build and Operate (DBO) basis including 13 years Operation & Maintenance (O&M) period at Rangpuri including Defect Liability Period (DLP) for 5 years for sewer line work and 2 years for STP EPH & SPSs (Civil & E&M) works.
The scope of work involves providing, laying, jointing of Internal/Peripheral sewer lines and House sewer connection along with construction of 15 mgd Decentralized Sewage Treatment Plant and Sewage Pumping Station along with other associated / allied appurtenant work on under Najafgarh drainage Zone on Design, Build and Operate (DBO) basis including 13 years Operation & Maintenance (O&M) period at Rangpuri including Defect Liability Period (DLP) for 5 years for sewer line work and 2 years for STP EPH & SPSs (Civil & E&M) works.
The scope of work involves providing, laying 300 mm to 1000 mm nominal dia Internal and Peripheral sewer line for Jaunapur GOC in Chattarpur constituency and construction of 8.5 mgd Sewage Treatment Plant (STP) at Fatehpur Beri along with associated / allied appurtenant work on Design, Build and Operate (DBO) basis including 13 years of Operation & Maintenance (O&M) period including Defect Liability Period (DLP) for 5 years for sewer line work and 2 years for STP EPH & SPSs (Civil & E&M) works.
The scope of work involves providing, laying 300 mm to 1000 mm nominal dia Internal and Peripheral sewer line for Chattarpur Extension in Chattarpur constituency and construction of 15 mgd Sewage Treatment Plant (STP) at Ghitorni along with associated / allied appurtenant work on Design, Build and Operate (DBO) basis including 13 years of Operation & Maintenance (O&M) period including Defect Liability Period (DLP) for 5 years for sewer line work and 2 years for STP EPH & SPSs (Civil & E&M) works.
The scope of work involves providing, laying 300 mm to 900 mm nominal dia Internal and Peripheral sewer line for Tajpur Pahadi (Excluding O-Zone) in Badarpur constituency and construction of 18.5 mgd Sewage Treatment Plant (STP) at Tajpur Pahadi along with associated / allied appurtenant work on Design, Build and Operate (DBO) basis including 13 years of Operation & Maintenance (O&M) period including Defect Liability Period (DLP) for 5 years for sewer line work and 2 years for STP EPH & SPSs (Civil & E&M) works.
The scope of work involves construction of 1.5 mgd Sewerage Treatment Plant (STP) along with associated /allied appurtenant work on Design, Built and Operate (DBO) basis including 13 years Operation & Maintenance (O&M) period at Bijwasan including a Defect Liability Period (DLP) of 2 years.
Publishing Date: November 27, 2025; November 28, 2025
End Date: March 25, 2026*
Implementating Agency: Himachal Pradesh Irrigation and Public Health Department
Segment: Wastewater
Work: The scope of work involves; construction of nine water treatment plants (WTPs) in Manali adjoining areas:- Balsari, Siyal, Nasogi – 1.9 mld, Bhang in gram panchayat (G.P.) Shanag – 1.4 mld, Vashisht in G.P. Vashisht – 0.9 mld, Jagat Sukh in G.P. Jagat Sukh – 0.5 mld, Prini, Boon Pujan Galsai Tilgan and Shami Nallah – 2.0 mld, Barod Parsha in G.P. Shaleen – 0.8 mld, Dungri Kalingcha & Old Manali – 2.5 mld, Simsa Rangri & Gadherni – 1.5 mld and Kanyal & Chhiyal – 0.6 mld; two sewerage treatment plants (STPs) in Palampur:- Palampur Zone 1 – 0.5 mld and Palampur Zone 3 – 1.35 mld; one STP in Karsog of 1.93 mld and three STPs in Nahan of 2.87 mld, 3.5 mld & 2.42 mld.
Published Date: November 27, 2025
End Date: December 25, 2025
Implementating Agency: Himachal Pradesh Irrigation and Public Health Department
Segment: Water Supply
Work: The scope of work involves construction of 195 km water supply pipeline in Manali adjoining areas, 61 km sewerage pipeline in Palampur, 35 km sewerage pipeline in Karsog and 61 km sewerage pipeline in Nahan, construction of 23 Water Service Reservoirs capacity 10 kl to 850 kl.
Published Date: November 27, 2025
End Date: December 25, 2025
Implementing Agency: Gandhinagar Municipal Corporation (GMC)
Segment: Wastewater
Work: The scope of work involves providing & laying incoming raw sewage gravity main pipe line from nearby machine hole (or connection with existing 1200mm dia RCC pipe) to Inlet Chamber of proposed SPS of 1200mm dia RCC NP4 pipe line, sewage pumping station (SPS) with all civil and electro-mechanical works (except pumping machinery) for ultimate average flow of 21.14 mld (47.57 mld peak flow i.e. peak factor 2.25) capacity and pumping machinery for intermediate average flow of 10.72 mld (24.12 mld peak flow i.e. peak factor 2.25) capacity, rising mains from SPS to STP inlet of min. 600 mm dia. DI K-9 along with electro-magnetic flow meter with metallic expansion below, rising mains to STP inlet of 800 mm dia. DI K-9 of approx. 25 RM length or higher as required along with electro-magnetic flow meter, rising mains to STP inlet of 600 mm dia. DI K-9 of approx. 25 RM length or higher as required along with electro-magnetic flow meter. It also involves construction of a 100 mld STP and 5 mld TTP at Palaj area on EPC basis with an Operation & Maintenance (O&M) period of 5 years.
Publish Date: November 26, 2025
End Date: February 20, 2026*
Implementing Agency: Mehgaon Municipal Council
Segment: Wastewater
Work: The scope of work involves preparation of DPR, preparation of tender document, topographical survey of drains, natural water paths & catchment, hydrological study, rainfall pattern analysis, assessment of existing drains, bottlenecks, encroachments, design of new drainage network including cross sections, hydraulic design, flow capacity, cost estimates as per latest UADD ISSOR.
Publish Date: November 25, 2025
End Date: December 10, 2025
Implementing Agency: Bangalore Water Supply & Sewerage Board (BWSSB)
Segment: Water Supply
Work: The scope of work involves data collection, screening, and prioritization of water bodies (Greater Bangalore Region), detailed assessment of water systems in Koramangala Valley, preparation of GIS-based conceptual Master Plan and strategic framework, prepare an implementation roadmap, highlighting strategies for interagency coordination and future scale-up to other valleys, conduct stakeholder validation workshops and finalize the strategic framework report
Publish Date: November 25, 2025
End Date: December 8, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: Phase 1: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P etc on turn key basis and commissioning, testing, trial & run, defect liabilities and handing over the complete works to Nagar Nigam Ayodhya. It also involves setting up baseline levels for 24 x 7 water supplies, laying / replacement of 284.60 km of new distribution DI and HDPE pipe line to attain minimum terminal pressure of 17-21 m along with new/shifting house service connections.
Phase 2: The scope of work involves surveying, soil investigation, design and supply of all materials, labour, T&P etc. complete required for construction, erection, completion, testing & commissioning of water supply works such RCC Over Head Tank, CWR, Rising Main, Distribution System, Pump House, Boundary Wall, Gate, Site development, renovation of existing facilities and construction of Tube wells including PLC SCADA automation and other appurtenant works of Water Supply Scheme on Turnkey Basis. The rising main capacity is 11.81 km and the distribution network is 339.84 km
Publish Date: November 21, 2025 ; November 20, 2025
End date: December 16, 2025; December 20, 2025
Implementing Agency: Uttarakhand Urban Sector Development Agency (UUSDA)
Segment: Wastewater
Work: The scope of work includes site clearance, excavation, construction and commissioning of R.C.C. type storm water drainage network of total length 81.55 km including construction of catch basins, survey, site investigations, planning and designing of Storm Water Drainage Network System for Jyotirmath Town, construction of 14 culverts, integration of existing and Proposed Drainage Network for avoiding accumulation or flooding of susceptible locations within project boundary
Publish Date: November 21, 2025
End date: December 26, 2025
Implementing Agency: Uttarakhand Urban Sector Development Agency (UUSDA)
Segment: Water Supply
Work: The scope of work includes construction of a Sewage Treatment Plant of 2.95 mld, 3 Sewerage Zones in Phase I (from Zone A to Zone C), 3858 household service connections in Phase I with a total length of network of 86.34 km. The number of wards that will be covered in Phase I are 8 (Ward 1 to 7 & 9) with 5 years of Operation and Maintenance (O&M) Period on a Design, Build (DB) basis
Publish Date: November 21, 2025
End date: December 26, 2025
Implementing Agency: Steel Authority of India (SAIL)
Segment: Water Supply
Work: The scope of work involves construction of WTP of 144 mld on build, own and operate (BOO) basis at Bhilai Steel Plant
Publish Date: November 20, 2025
End Date: December 4, 2025
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work includes providing an underground drainage system to the south part of Hiriyur city (Phase- 1), providing UPVC/SWG/RCC sewer net work in the south part of the city as per CPHEEO Guidelines and House service connections including road restoration, construction of 2 RCC Wetwell cum pump house, construction of 2 DG rooms, providing and laying DI K9 rising main from wetwell to peak MH & wetwell to STP, supply, erection, testing & commissioning of non-clog sewage pumpsets with allied accessories including transformer & DG set, at both the wet wells, dedicated express feeder main for the project, at wetwells. The sewer network capacity is 109 km, while rising main length from wet well to STP is 1.5 km and from Wet Well-1 to Peak MH at Govt Hospital in Bengaluru Road is 0.9 km
Publish date: November 20, 2025
End Date: December 29, 2025*
Implementing Agency: Gandhinagar Municipal Corporation (GMC)
Segment: Wastewater
Work: The scope of work includes provision of Storm Water Disposal Network in TP-25 &TP-32 in GMC area, providing, supplying and joining RCC pipe with Ordinary Portland Cement.
Publish Date: November 19, 2025
End Date: December 22, 2025*
Implementing Agency: Navi Mumbai Municipal Corporation (NMMC)
Segment: Wastewater
Work: The scope of work includes laying and installing M.S. Pipe 1500 mm finished diameter underground pipeline, 12 mm thick and about 14 km in length using Trenchless Technology (Microtunneling) at following places: Crossing of Road Junction near Apollo Hospital, LP Junction Road crossing, below Turbhe flyover, Turbhe railway station area, crossing of Thane Belapur road at Khairane Chowk and Mahape Junction.
Publish Date: November 18, 2025
End Date: December 8, 2025
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply
Work: The scope of work includes providing and laying 1200 mm dia. MS pipe from existing Raska inlet to proposed Raw Water Pumping Station, Raw Water Reservoir & Pump House including raw water rising mains in MS of min 1000 mm dia. (1016 mm OD x 10 mm thk) upto WTP inlet chamber, 100 mld Water Treatment Plant at Raska water works on EPC basis with Operation & Maintenance (O&M) Period of 5 years
Publish Date: November 18, 2025
End Date: December 16, 2025*
Implementing Agency: Amaravati Development Corporation Limited (ADCL)
Segment: Wastewater
Work: The scope of work involves survey, design, investigation, testing, commissioning and construction of a flood pumping station-2 with a total discharge capacity of 240 cumecs (8,400 cusecs) at Undavalli, strategically located to efficiently discharge floodwaters from Kondaveeti Vagu into the Krishna River and 15 years Operation & Maintenance (O&M) on lumpsum contract (% tender) basis in Amaravati capital city of Andhra Pradesh.
Publish Date: November 18, 2025
End date: December 9, 2025
Implementing Agency: Morbi Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing and laying stormwater pipeline & constructing of rcc box drain for the storm water drainage system. It involves providing, supplying & laying of RCC NP -3 & NP-4 (OPC) as per Bill of Quantities and Specification, construction of brick masonry Junction manhole & scraper manhole with Ordinary Portland Cement as per Bill of Quantities and Specification, providing and cast in situ C.C. in grade M-30 proportions slab drain with Ordinary Portland Cement as per Bill of Quantities and Specification Construction of brick masonry catch pit with providing and supplying inter connecting RCC pipeline from catch pit to manhole etc. complete, construction of RCC shaft 60 m c/ as per Bill of Quantities and Specification.
Publish Date: November 17, 2025
End Date: December 1, 2025
Implementing Agency: Jaipur Development Authority
Segment: Wastewater
Work: The scope of the project includes design, construction, supplying, erection, testing and commissioning of STP of 40 mld capacity based on sequential batch reactor (SBR) technology and 1.5 km long outfall treated water line for Bambala area in Sanganer. It also includes raw sewage pumping station comprising connection of incoming sewer to receiving chamber, well along with pumping main at STP area, inlet chamber, storm water drains, RCC overhead tank of 0.5 million litres capacity with 22 m staging height, etc including three months trial run and one year operation and maintenance (O&M)
Publish Date: November 17, 2025
End Date: December 22, 2025*
Implementing Agency: Notified Area Council, Kodala
Segment: Wastewater
Work: The scope of work includes study the Topography, Hydrology of the site and surrounding areas, design and prepare the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA, objectives of planning and investigation, Data Collection and Map Development, Other Components to study – Diversion of Septic Flow and Treatment.
Publish date: November 15, 2025
End Date: November 28, 2025*
Implementing Agency: Hyderabad Metropolitan Water Supply And Sewerage Board (HMWSSB)
Segment: Wastewater
Work: The scope of work involves preparation of a Sewerage Master Plan and a detailed project report (DPR) for HMWSSB water supply service area up to Telangana Core Urban Region (TCUR)
Publish Date: November 15, 2025
End Date: November 27, 2025
Implementing Agency: Water Resources Department, Chennai
Segment: Wastewater
Work: The scope of work involves formation of New Reservoir in Kovalam Sub Basin in between ECR and OMR Road in Thiruporur Taluk of Chengalpattu district
Publish Date: November 14, 2025
End Date: November 25, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan (PHED)
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, transmission/rising main of length 13.32 km, distribution network of length 340.54 km, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M)
Publish date: November 14, 2025
End Date: December 18, 2025
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves up-gradation of existing 0.66 mgd STP to 1.00 mgd at Molar band to achieve the parameters of treated effluent recently prescribed by DPCC/CPCB with 2 years of Defect Liability Period (DLP) and 10 years Operation & Maintenance (O&M) on a Design, Build and Operate (DBO) basis
Publish Date: November 13, 2025
End Date: November 21, 2025
Implementation Agency: Bruhat Bengaluru Mahangara Palike (BBMP)
Segment: Wastewater
Work: The scope of work for both packages include construction of flood protection structures to SWD including reinforced cement concrete (RCC) retaining walls, Water retention structures, nature based solution structures / bridges and culverts.
Publish Date: November 13, 2025
End Date: November 27, 2025
Implementing Agency: Public Health and Engineering Department (PHED), Haryana
Segment: Wastewater
Work: The scope of work includes construction of main pumping station and Sewage Treatment Plant of 25.00 mld in the vicinity of existing 40.00 mld STP, Rishi Nagar, intermediate pumping station in Roop Nagar, 12 Qtr. Road near Cremation Land and Jindal Park, Mill Gate Chowk (both Serving 25.00 mld STP), HDPE Rising Mains of IPS Roop Nagar, Jindal Park up to Senior Citizen club sec. 14 (Serving 25.00 MLD STP), main pumping station and Sewage Treatment Plant of 10.00 mld in the vicinity of existing 4.00 mld STP, on Kaimiri Road, Intermediate Pumping Station in Industrial Area (Serving 10.00 mld STP), HDPE Rising Mains (Serving 10.00 mld STP and Mini Sect. Disposal) and Intermediate Pumping Station in Canal Colony, IG Chowk
Publish Date: November 13, 2025
End Date: January 8, 2026*
Implementation Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves rehabilitation of existing drainage line from Tapasavi Icon to Hathijan Circle (1800 mm dia) and Nikol Char Rasta to Barcelona Complex (1200 mm to 1400 mm dia.) and other areas in the East Zone of AMC area
Publish Date: November 13, 2025
End Date: November 24, 2025
Implementing Agency: Chhattisgarh State Industrial Development Corporation Limited (CSIDCL)
Segment: Water Supply
Work: The scope of work includes consultancy services for preparation of Detailed Project Report for Water Supply Project for proposed Smart Industrial area at Bijetala & Patewa villages in Rajnandgaon which include topographical survey total station survey/DGPS/GPS/UAV or any other faster means of such as GIS mapping & investigation, design, drawing, cost estimates, technical specifications and bill of quantities
Publish Date: November 13, 2025
End Date: November 28, 2025
Implementing Agency: Gandhinagar Municipal Corporation (GMC)
Segment: Wastewater
Work: The scope of work includes construction of a 100 mld STP and 5 mld TTP (Tertiary Treatment Plant) in Town Planning Scheme 25, 32 and Shahpur area
Publish Date: November 13, 2025
End Date: December 12, 2025
Implementing Agency: Rajasthan Water Grid Corporation Limited (RWGCL)
Segment: Wastewater
Work: The scope of work includes preparation of Forest Diversion proposal as per MoEF&CC updated guidelines and Forest Conservation Act 1980 based on pre-application activity by consultant and provision of requisite documents by the client, filling of application form and uploading of requisite documents for seeking prior approval of Central Government under section 2 of the Forest (Conservation) Act, 1980 for diversion of fresh forest area, Geo-Referencing and superimposition of required forest land on Survey of India Topo sheets, preparing GIS & remote sensing based Digital Map and Geo-Referenced Cadastral Map, preparing GIS Shape File (SHP) and KML file of required forest land, submission of proposal to District Forest Officer and District Collector, follow ups and getting clearance & approvals from Forest Department/ authorities and MoEF&CC.
Publish Date: November 12, 2025
End Date: November 24, 2025
Implementing Agency: Urban Administration & Development, Chhattisgarh
Segment: Water Supply
Work: The scope of work includes identification of sustainable water sources, preparation of As-IS Assessment Report, survey, studies and investigations, Feasibility Study Report, preparation of a detailed project report (DPR) and providing Project Management Consultancy Service
Publish Date: November 12, 2025
End Date: December 9, 2025*
Implementing Agency: Maharashtra Industrial Development Corporation (MIDC)
Segment: Water Supply
Work: The scope of work involves demolition of old pumping station and construction of new raw water pumping station, demolition and safe dismantling of the existing raw-water pumping station, including civil structures, pumps, motors, valves, cables, and other appurtenances, with due environmental and safety measures, design and construction of a new raw-water pumping station of 48 mld capacity, comprising RCC pump-house structure with suction and delivery manifolds, foundations, and access arrangements, providing and laying of new raw – water rising main, design, supply, laying, jointing, and testing of a new raw-water rising main from the intake/pumping station to the WTP, designed for 48 mld capacity
Publish date: November 12, 2025
End Date: December 8, 2025
Implementing Agency: Karnataka Urban Infrastructure Development And Finance Corporation (KUIDFC)
Segment: wastewater
Work: The scope of work includes:
Hubballi: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer Pipeline for construction of main trunk line, reinforced cement concrete (RCC) for minimum length of 5.1 km, hydraulic tests, including restoration works in flexible and rigid pavements, providing, laying, jointing sewer line with dia varying from 250 mm to 1000 for sub trunk main works with RCC NP3, for a minimum length 2.50 km confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test, including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.5m, 1.8m and 2.4m dia cast-in situ/pre-cast with heavy-duty steel fiber reinforced concrete (SFRC) cover and frame, for varying depths (the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and stair case arrangement for the maintenance in screen chamber for the wet well of capacity 80 million litres per day (mld) at Gabbur Village, providing, laying, jointing, testing and commissioning of required diameter of DI K-9 class rising main from wet well to sewage pumping station (STP) minimum of Length: 1.1 km including necessary pipe ancillary works, including restoration works in flexible and rigid pavements, supply, erection, electrification, testing and commissioning of non-clog sewage pump sets of required capacity including panel bords etc along with all accessories at wet well including allied works such as DG room, Chain link fencing etc, providing 11 KV – 3 Phase power supply line from Sub-station to wet well from sub-station at Hubballi road with necessary transformers including approval, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, Construction of internal developments such as roads, street light etc.,
Dharwad: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer pipeline by using 250 mm to 500 mm dia RCC, NP3 class confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 6.35 km including restoration works in flexible and rigid pavements, providing, laying and jointing HDPE sewer pipeline by using 150 mm to 200 mm dia HDPE SN8 pipes IS:16098 and jointing of pipes, cutting of pipes etc along with hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 10 km including restoration works in flexible and rigid pavements, providing, laying and jointing PVC Sewer Pipeline by using 200 mm dia as per IS:16098 and jointing of pipes, cutting of pipes etc along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 3.7 km including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.2 and 1.5 dia cast-insitu/pre-cast with heavy-duty SFRC cover and frame, for varying depths ( the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, providing house service connections (HSC) :3641 Nos. (which shall be laid from inside the customer property to the machine hole as per site condition) , construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and staircase arrangement for the maintenance in screen chamber for the wet well of capacity 12 mld and 12 mld viz Wet well -1 near Madihal STP, Wet well 2 near Agriculture Research Center), Construction of rising Main for wet well 1 from wet well -1 to STP and wet well 2 from Agriculture Research centre to proposed wet well -1 at Madihal, with DI K-9 pipe having diameters varies from 300 mm to 350 mm, minimum length of 2.85 km, supply, erection, electrification, testing and commissioning of required capacity of non-clog sewage pump sets along with all accessories at Wet well – 1 and Wet well -2 including allied works such as DG room, chain link fencing etc, providing 11 KV – 3 phase power supply Line from sub-station to wet well from nearest substation with necessary transformers for Wet well -1 and Wet well -2, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, construction of internal developments such as roads, street light etc
Publish Date: November 12, 2025
End Date: December2, 2025*
Implementing Agency: Pune Municipal Corporation (PMC)
Sgement: Wastewater
Work: The scope of work includes construction of promenade, stone masonry works, gabion works, r.c.c. retaining wall, earth filling, flooring works with infrastructure services like electrical, storm water, drainage, irrigation, horticulture works including 5 years Operation & Maintenance (O&M) after commissioning from Wadgaon bypass to Rajaram Bridge (stretch-6) on the bank of Mutha River. The total length of the embankment to be developed is approximately 4 km i.e. 2 km on the right bank and 2 km on left bank.
Publish Date: November 11, 2025
End date: December 8, 2025*
Implementing Agency: Assam Urban Infrastructure Development & Finance Corporation Limited (AUIDFCL)
Segment: Water Supply
Work: The scope of the project includes construction of a water treatment plant (WTP) of 10.4 mld capacity, raw water pumping main of length 4.15 km, clear water pumping main of length 4.23 km, distribution network of length 90.57 km and 13,320 metered house connections
Publish Date: November 10, 2025
End Date: December 15, 2025.
Implementing Agency: Panvel Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of pumping station including a gate and gate pump, control panel, screens, stoplogs and other works in sector -7 at Kalamboli Holding Pond.
Publish Date: November 10, 2025
End Date: January 28, 2025*
Implementing Agency: Bareilly Cantonment Board invited Expression of Interest (EoI)
Segment: wastewater
Work: The scope of work involves design, engineering, and construction of STP with suitable capacity as per the population and sewage generation load of the Cantonment area, construction of sewerage network, including collection mains, manholes, pumping stations, and disposal arrangements, installation of decentralized wastewater treatment systems (DEWATS) where central connectivity is not feasible including operation and maintenance (O&M) of the STP and sewerage system for a minimum of five years post-commissioning
Publish Date: November 8, 2025
End Date: November 15, 2025
Implementing Agency: Greater Mohali Area Development Authority
Segment: wastewater
Work: The scope of work involves design, drawings and consultancy services for construction of required capacity of STP with tertiary treatment by UF and CETP with ZLD Plant by some modern technology to achieve the latest parameters fixed by CPCB/ PPCB for Sector 101, IT City (Sector 66-B, 82-A, 83-A, 101-A) and Aerotropolis (Pocket B, C and D) at Sector 101 Alpha, IT City Mohali consisting of Detailed Project Report, Tender Documents, Evaluation of bids, proof checking of documents of construction agency and fortnightly supervision up to completion of construction and stabilization of STP with tertiary treatment by UF and CETP with ZLD Plant in First Phase. The tentative capacity of sewage treatment plant is 45 mld and ETP is 8 mld
Publish Date: November 8, 2025
End Date: November 24, 2025
Implementing Agency: Kanpur Development Authority
Segment: Water Supply
Work: The scope of work involves laying Trunk Sewer Line, Trunk Drain Line, Trunk Water Line and Cable Trench.
Publish Date: November 8, 2025
End Date: November 24, 2025
Implementing Agency: Berhampur Municipal Corporation (BeMC)
Segment: Wastewater
Work: The scope of work is to assess the existing sewerage plans, systems being taken up in the area and determine their interface and interaction with the proposed sewerage system, carry out necessary survey including Total Station (TS) / DGPS survey for Sewer Mains / Pumping Mains, along with Collection networks, contour survey for STP Pump Station sites wherever required, to fix-up benchmark stations at all proposed sites such as STP, Sewage Pumping Station, MHPS etc, to identify suitable land for Pumping Stations & STP, to carry out soil investigations such as collection of samples and testing as per relevant BIS for water retaining structures PS, STP, SPS, MHPS, IPS etc
Publish date: November 7, 2025
End Date: November 21, 2025
Implementing Agency: Saraipali Urban Local Body
Segment: Water Supply
Work: The scope of work involves survey, engineering, procurement, construction, testing, commissioning of intake well cum pump house, raw water pumping main of 48.63 km length, raw water pumping machinery, 7 mld WTP, clear water pumping machinery, clear water pumping main of 9.56 km length, 5 RCC OHSR, distribution network of 114.67 km total length, 4058 functional house service connections with AMR meters and billing softwares with all allied works, accessories and equipment, 20 electro magnetic bulk flow meters including operation and maintenance (O&M) for a period of five years
Publish Date: November 7, 2025
End Date: December 12, 2025*
Implementing Agency: Nagpur Municipal Corporation
Segment: Wastewater
Work: The scope of work involves Laying tertiary sewers, sub-mains, and trunk mains, including precast and cast-in-situ manholes, and house service connections; Replacing the existing sewer system including tertiary and connecting them to existing pipes with allied works; Laying new sewer lines; Road Restoration.
Publish Date: November 7, 2025
End Date: January 7, 2026
Implementing Agency: Sagar Cantonment Board
Segment: Wastewater
Work: The scope of the project includes providing, laying and jointing of sewer lines of 45.8 km length, construction of 1976 manholes, 5600 house sewerage connections and STP of 5 mld capacity on 0.3 ha land, providing house sewer chambers and laterals for connecting sewer of consumers to sewer line, providing pumping main and construction of sewerage pumping station, providing and laying of HT feeder connection, etc including 10 years of operation and maintenance (O&M)
Publish Date: November 7, 2025
End Date: December 26, 2025*
Implementing Agency: Jashpur Nagar Urban Local Body
Segment: Water Supply
Work: The scope of work involves survey, engineering, procurement, construction, testing, commissioning of raw water pumping main of 7.24 km length, raw water pumping machinery, 5.5 mld WTP, clear water pumping machinery, clear water pumping main of 10.33 km length, 5 RCC OHSR, distribution network of 84.39 km total length, functional house service connections with AMR meters and billing softwares with all allied works, accessories and equipment 5208 job additionally 2457 AMR meters and 26 Electro magnetic Bulk Flow Meters including operation and maintenance (O&M) for a period of five years
Publish Date: November 6, 2025
End Date: December 8, 2025*
Implementing Agency: Hyderabad Metropolitan Water Supply And Sewerage Board (HMWSSB)
Segment: Water Supply
Work: The scope of work involves formulation of proposals and DPRs for the water supply master plan systems and comprehensive water supply master plan for HMWSSB water supply service area up to Telangana Core Urban Region (TCUR).
Publish Date: November 4, 2025
End Date: November 19, 2025
Implementing Agency: Bengaluru Water Supply and Sewerage Board (BWSSB)
Segment: Wastewater
Work: The scope of work includes:
20 mld Kadugodi STP Project: It includes design, construction, and commissioning of 20 mld STP based on integrated fixed film activated sludge (ifas-process) with bnr, tertiary sewage pumping station of capacity 50 mld and odour control units at Kadugodi including 7 years of Operation & Maintenance (O&M) (turnkey contract).
The estimated cost of the project is Rs 538 million.
The work is to be completed in 30 months.
60 mld Bellandur STP Project: It includes design, construction, and commissioning of 60 mld STP based on A20 with BNR, tertiary sewage pumping station of capacity 60 mld, power generation of 4 mw & odour control units at Bellandur.
The estimated cost of the project is Rs 1,334 million.
The work is to be completed in 36 months.
50 mld Kadabeesanahalli STP Project: It includes design construction, commissioning of 50 mld STP with additional secondary sludge from existing 50 mld STP based on SBR with BNR, tertiary treatment and power generation of 4 mw & odour control units at Kadabeesanahalli.
The estimated cost of the project is Rs 980.49 million.
The work is to be completed in 36 months.
75 mld Madiwala STP Project: It includes design, construction, and commissioning of 75 mld stp based on SBR with BNR, tertiary sewage pumping station of capacity 75 mld, power generation of 4 mw & odour control units at Madiwala.
The estimated cost of the project is Rs 1,253.96 million.
The work is to be completed in 36 months.
100 mld Mailsandra STP Project: It includes design and construction Of 100 mld Sewage Treatment Plant (STP) based On ASP process with BNR system and power generation of 4 mw at Mailsandra, Bangalore including Operation And Maintenance (O&M) of constructed facilities for seven years.
The estimated cost of the project is Rs 1,948.24 million.
The work is to be completed in 36 months.
100 mld Doddabele STP Project: It includes design and construction of a 100 mld sewage treatment plant (STP) based on ASP process with BNR system and power generation of 4 mw at Doddabele, Bangalore including Operation and Maintenance (O&M) of constructed facilities for seven years.
The estimated cost of the project is Rs 1,775.42 million.
The work is to be completed in 36 months.
100 mld Byramangla STP Project: It includes design and construction of 100 mld sewage treatment plant (STP) and 25 mld tertiary treatment plant (uf) based on asp process with BNR system and power generation of 4 mw at bank of Byramangala.
The estimated cost of the project is Rs 3,032.6 million.
The work is to be completed in 36 months.
10 mld Basavanapura STP Project: It includes design construction, commissioning of 10 mld STP based on SBR with BNR, tertiary treatment and odour control units at Basavanapura.
The estimated cost of the project is Rs 459.2 million.
The work is to be completed in 30 months.
20 mld Koramangala STP Project: It includes design, construction, and commissioning of 20 mld stp based on integrated fixed film activated sludge (ifas-process) with BNR, tertiary treatment and odour control units at Koramangala.
The estimated cost of the project is Rs 736 million.
Publish Date: November 4, 2025; November 5, 2025
End Date: December 26, 2025*
Implementing Agency: Public Health and Engineering Department (PHED), Andhra Pradesh
Segment: Water Supply
Work: The scope of work involves Providing new clear water mains, and replacing of existing clear water pumping mains, construction of ELSRs, transmission mains, distribution network with HSCs, construction of Sewage Treatment Plant (STP) and Water Treatment Plant (WTP) including an Operation and Maintenance (O&M) period of 7 years and a Defect Liability Period (DLP) of 2 years.
Publish Date: November 3, 2025
End Date: November 19, 2025
Implementing Agency: Dewas Nagar Nigam
Segment: Wastewater
Work: The scope of work involves providing, laying, and jointing of sewer lines of 189.53 km length, 7124 manholes, 25215 house sewerage connections, construction of 2 sewage treatment plants (STPs); 1 mld at Palnagar and Nagda Ward No 44 & 45 and 0.50 mld at Binjana Nagar Ward No 16; providing pumping main and construction of 3 sewerage pumping station; providing and laying of HT feeder connection; pipeline and allied works for reuse of treated water from STPs including operation and maintenance (O&M) for 10 years
Publish Date: November 3, 2025
End date: December 1, 2025*
Implementing Agency: Public Health and Engineering Department, Haryana
Segment: Wastewater
Work: The scope of work includes laying of sewerage network in approved area, rising main from IPS to existing STP and laying of trunk sewer line from Panchwati Chowk to 8 MLD STP, construction of IPS and construction of intercepting chamber of various sizes, construction of brick masonry manhole chamber of various sizes in Palwal Town and all other works contingent under the main project of providing and laying of balance sewer line in the left out area Palwal Town and construction of 8.00 mld for additional capacity STP for Palwal Town.
It also includes construction of IPS, providing, laying, jointing, testing and commissioning of SW pipeline of length 47.48 km and including construction of manhole, providing, lowering, cutting, jointing and testing RCC pipe class NP3 of length 1.88 km including Rising Main from IPS to Existing STP of DI pipeline of length 2.1 km, construction of trunk Sewer Line from Panchwati Chowk to 8.00 mld STP, providing, lowering, cutting, jointing and testing RCC pipe class NP3 of length 2.45 km, providing household sewer connections complete to 13200 households and provision for restoration of water connecting damaged due to laying of sewerage network to 8000 households.
Publish Date: November 3, 2025.
End Date: November 24, 2025
Implementing Agency: Khamgaon Municipal Council
Segment: Wastewater
Work: The scope of work includes providing lowering,laying and jointing DI/K9 pipe pumping main, construction of 15.50 mld raw sewage pumping station and Sewage Treatment Plant (STP) based on SBR technology.
Publish Date: November 3, 2025
End Date: December 8, 2025*
Implementing Agency: Gujarat Industrial Development Corporation (GIDC)
Segment: Wastewater
Work: The scope of work involves conducting feasibility study, detailed survey, designing (collection network, collection sump, pumping machineries, ZLD-CETP, re-use of treated effluent), hydraulic design, preparation of draft tender papers, progress tracking, project monitoring, remedial measures for delayed works, cost tracking, cost monitoring and remedial measures for cost escalation
Publish Date: November 1, 2025
End Date: November 13, 2025
Implementing Agency: Public Health and Engineering Department, Andhra Pradesh (PHED)
Segment: Water Supply
Work: The scope of work includes implementation of water supply projects with 7 years Operation & Maintenance (O&M) including Defect Liability Period (DLP) of 2 years in Jaggaiahpeta, Guntur, Macherla & Piduguralla ULBs of Andhra Pradesh
Publish Date: October 31, 2025
End Date: November 17, 2025
Implementing Agency: Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited
Segment: Wastewater
Work: The scope of work involves providing, laying, jointing, testing and commissioning of sewerage system and all ancillary works along with design, construction, supply, installation, testing and commissioning (civil, Mechanical, electrical, instrumentation and other necessary works) of sewage pumping station/MPS (if any), three STPs; 3 mld STP near Forest Department Office for Zone 1 and Zone 2; 4 mld STP near Near Gaurav Beti Park (Near Sabji mandi) for Zone 3 and Zone 4 and 5 mld STP near Near Stadium for Zone 5 and Zone 11 based on SBR process including 1 year defect liability with provision of reuse of treated waste water with 10 years operation and maintenance (O&M).
Publish Date: October 31, 2025
End Date: December 1, 2025
Implementing Agency: Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited
Segment: Wastewater
Work: The scope of work involves design, construction, supply, installation, testing and commissioning (SITC) of rising main of DI pipeline for disposal of 34 mld treated waste water from STP Bhiwadi to final disposal point at Gwalada Village of length 22 kms including associated pumping arrangements, electrical and instrumentation works, and one year defect liability period with five years operation and maintenance (O&M).
Publish Date: October 31, 2025
End Date: December 1, 2025
Implementing Agency: Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited
Segment: Wastewater
Work: The scope of work involves providing, laying, jointing, testing and commissioning of sewerage system and all ancillary works along with design, construction, supply, installation, testing and commissioning (Civil, Mechanical, electrical, instrumentation & other necessary works) of sewage treatment plant based on SBR process of 5 mld capacity and two MWPS; 0.3 mld MWPS at Usmanabad Extension and 0.25 MWPS mld at Taranagar Road Junction including one year defect liability period with provision of reuse of treated waste water with 10 years operation and maintenance (O&M).
Publish Date: October 31, 2025
End Date: December 1, 2025
Implementing Agency: Nagar Palika Parishad, Betul
Segment: Wastewater
Work: The scope of work includes providing, laying, jointing, testing and commissioning of sewerage pipeline including construction of manholes and sewer appurtenances works, providing house sewer chambers and laterals for connecting sewer to consumer sewer lines, providing house Sewer Connection for approximately 17655 households including construction of collecting chamber, public toilets, and institutions etc, design, construction, testing and commissioning 3 Intermediate Sewage Pumping station; IPS-1 of capacity of 4.97 mld, IPS-2 of capacity 5.38 mld and IPS-3 of capacity 4.03 mld with pumping systems including all necessary civil, electromechanical and instrumentation works complete for successful completion of the project.
It also involves design, construction, testing and commissioning of 1 Sewage Treatment Plant (STP) of capacity 16.0 mld with main pumping station (MPS) including all necessary civil, electromechanical and instrumentation works complete for successful completion of the project, supply, installation, testing commissioning of complete Electromechanical system which includes but not limited to suitable rating of transformer, DG Set, substation, HT & LT transmission line, all pump motor set, all HT (VCB Panel), LT panels, all VFD’s & starter panels, APFC panels, EOT & mechanical cranes, all pipes and fittings, all valves (mechanical and motorized), earthing, cable tray arrangement etc.in line with CPHEEO requirement, complete in all respect for intermediate pumping station and sewage treatment plants.
It also involves preparation of maps of proposed sewerage network and property connection to be laid under the contract with GIS mapping, supply, installation, testing and commissioning of PLC- SCADA and OCEMS for monitoring and controlling of sewerage system as per requirement of NGT guideline and PCB norms, supply, installation, testing commissioning of complete instrumentation system applicable for STP area and IPS area as per CPHEEO manual and system requirement.
Publish Date: October 30, 2025
End Date: January 6, 2025*
Implementing Agency: Karnataka Industrial Areas Development Board (KIADB)
Segment: Wastewater
Work: The scope of work involves Providing consultancy services for preparation of detailed project report (DPR) economic analysis, survey, plan design, preparation of estimates, cost structure etc., for construction of common effluent treatment plant (CETP). The projects include Sompura Industrial Area (dobaspet 1st, 2nd, 3rd, 4th, 5th, 6th Phases And Machenahalli (7th Phase)), Badanaguppe-kellamballi Industrial Areas 1st & 2nd Phases In Chamarajanagara District and Kadakola, Thandya, Adakanahalli, Immavu Industrial Areas in Mysuru district
Publish Date: October 28, 2025
End Date: November 25, 2025*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: 4.5 mgd Tikri Kalan DSTP Project: The scope of work involves providing, laying, jointing of internal/peripheral sewer lines and house sewer connection along with construction of 4.5 mgd decentralized sewage treatment plant (DSTP) and sewage pumping station (SPS) at Tikri Kalan and 1.5 mgd capacity SPS at Gitanjali Encave along with other associated / allied appurtenant work on under Najafgarh drainage Zone with 15 years operation and maintenance (O&M) including two years defect liability period (DLP).
The work is likely to be completed in 27 months (21 months for sewer network and DSTP and 6 months for house service connections) at an estimated cost of Rs 2,270.917 million (Rs 718.33 million for DSTP and Rs 1,552.581 million for sewerage network).
1.5 mgd Sungerpur and 1 mgd Tajpur DSTP Project
The scope of work involves construction of DSTP of 1 mgd at Tajpur and 1.5 mgd at Sungerpur and SPS at Palla and p/l/j sewer lines in Palla GOC in Narela AC.
The work is likely to be completed in 21 months (18 months for sewer network and DSTP and 3 months for house service connections) at an estimated cost of Rs 1,033.65 million (only for sewerage network).
2 mgd Nizampur and Sawda DSTP Project
The scope of work involves providing and laying sewer line work in two unauthorised colonies and two villages in Nizampur and Sawda village in Mundka AC and construction of 2 mgd DSTP and SPS along with other associated/ allied appurtenant work on design, build and operate (DBO) basis at Nizampur village.
The work is likely to be completed in 27 months (24 months for sewer network and DSTP and 3 months for house service connections) at an estimated cost of Rs 660.51 million (for sewer network).
1.5 mgd Jaunti DSTP Project
The scope of work involves providing and laying sewer line work in one unauthorised colony and two villages in Jaunti and Tatesar village in Mundka AC and construction of 1.5 mgd DSTP and SPS in Jaunti along with other associated/ allied appurtenant work on design, build and operate (DBO) basis.
The work is likely to be completed in 21 months (18 months for sewer network and DSTP and 3 months for house service connections) at an estimated cost of Rs 341.58 million (for sewer network).
7 mgd Mohammadpur Majri DSTP Project
The scope of work involves providing and laying sewer line work in 11 colonies and two villages in Mohammadpur Majri and Karala village in Mundka AC and construction of 7 mgd DSTP and SPS in Mohammadpur Majri along with other associated/ allied appurtenant work on design, build and operate (DBO) basis at Mohammadpur Majri village.
The work is likely to be completed in 40 months (36 months for sewer network and DSTP and 4 months for house service connections) at an estimated cost of Rs 975.41 million (for sewer network).
10 mgd Kanjhawala DSTP Project
The scope of work involves providing and laying sewer line work in four unauthorised colonies and two villages in Kanjhawala and Ladpur village in Mundka AC and construction of 10 mgd DSTP and SPS in Kanjhawala along with other associated/ allied appurtenant work on design, build and operate (DBO) basis at Nizampur village.
The work is likely to be completed in 40 months (36 months for sewer network and DSTP and 4 months for house service connections) at an estimated cost of Rs 964.9 million (for sewer network).
0.5 mgd Garhi Rindhala and 1.5 mgd Ghewra DSTP Project
The scope of work involves providing and laying sewer line work in Garhi Rindhala village in Mundka AC and construction of 0.5 mgd at Garhi Rindhala and 1.5 mgd DSTP at Ghevra along with other associated/ allied appurtenant work on design, build and operate (DBO) basis including 15 year operation and maintenance (O&M ).
The work is likely to be completed in 27 months (24 months for sewer network and DSTP and 3 months for house service connections) at an estimated cost of Rs 91.52 million (for sewer network).
1.5 mgd Khera Khurd DSTP Project
The scope of work involves construction of 1.5 mgd of DSTP and SPS at Khera Khurd including providing and laying 300 mm to 560 mm dia internal/peripheral sewer line including house sewer connection in Narela AC.
The work is likely to be completed in 21 months at an estimated cost of Rs 448.53 million (for sewer network).
0.5 mgd Punjab Khor, 0.5 mgd Jatt Khor, 1 mgd Auchandi and 2 mgd Qutubgarh DSTP Project
The scope of work involves construction of DSTP and SPS at Punjab Khor of 0.5 mgd capacity, Jat Khor of 0.5 mgd capacity, Auchandi of 1 mgd capacity and Qutabgarh of 2 mgd capacity along with other associated / allied appurtenant work and providing, laying and jointing of internal / peripheral sewer lines under the command area of DSTP at Punjab khor, Jat Khor, Auchandi and Qutabgarh in Bawana AC including 15 years operation and maintenance (O&M) including two years defect liability period.
The work is likely to be completed in 24 months (21 months for sewer network and DSTP and 3 months for house service connections) at an estimated cost of Rs 1,354.17 million (for sewer network). Bids for the same were earlier invited in April 2023.
4 mgd Bajitpur Thakran DSTP Project
The scope of work involves construction of DSTP and SPS at Bajitpur Thakran of 4 mgd capacity and SPS at Salahpur Majra of 0.5 mgd capacity along with other associated / allied appurtenant work and providing, laying and jointing of internal / peripheral sewer lines under the command area of DSTP at Bajitpur Thakran and Salahpur Majra in Bawana AC including 15 years operation and maintenance (O&M) including two years defect liability period.
Publish date: October 27, 2025
End Date: December 4, 2025*; December 5, 2025*
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Water Supply
Work: Purnea Water Supply Scheme: The estimated cost of the project is Rs 2,778.30 million.
Motihari Water Supply Scheme: The estimated cost of the project is Rs 1,811.33 million.
Publish Date: October 7, 2025
End Date: February 13, 2026*
Implementing Agency: Kerala Water Authority (KWA)
Segment: Wastewater
Work: The scope of work includes design, laying, construction and commissioning of a 27.44 km sewage network inclusive of all civil, mechanical, electrical and instrumentation components.
Publish Date: October 25, 2025
End Date: December 31, 2025*
Implementing Agency: Drinking Water and Sanitation Department, Jharkhand
Segment: Water Supply
Work: The scope of work involves: Part 1: detailed survey, designing and drawing of left out work, construction of 10.0 M dia R.C.C. Intake well cum pump house, gangway of 0.075 km length and 3.95 m wide, pipe bridge 0.07 km length and 2.00 m wide, pipe bridge 0.050 km length and 2 m wide, pipe bridge 0.100 km length and 2 m wide, pipe bridge 0.060 km length and 2 m wide, 19.50 mld capacity water treatment plant (WTP), compound wall, supplying and laying raw/clear water rising main and laying distribution network, supplying and installation of vertical turbine and centrifugal pump motor including five years operation and maintenance (O&M).
Part 2 to Part 11 consist of Construction of RCC Elevated Service Reservoirs in three blocks namely Koderma, Domchanch and Jainagar
Part 12 involves Construction 2.5 mld Capacity water Treatment Plant, 3 RCC Elevated Service Reservoir in Jainagar
Publish Date: October 23, 2025
End Date: November 12, 2025
Implementing Agency: Navsari Municipal Corporation
Segment: Water Supply
Work: Eroo WSS: The scope of work includes working survey, soil investigation, design of water supply scheme including design and construction of intake structure, elevated service reservoir, clear water sump with booster house, providing, supplying, lowering, laying and jointing di pipeline for rising main of length 0.15 km and gravity distribution network of length 34.99 km, providing, supplying, erecting and testing of pumping machineries, headwork development at Eroo zone, construction of house connection and rcc road reinstatement and SITC work of instrumentation work and SCADA system at gravity distribution network location etc.including operation and maintenance (O&M) for 5 years. It includes construction of 22 mld WTP.
Eroo UGD: The scope of work involves working survey, soil investigation, design of underground drainage project including providing, supplying, lowering laying, jointing, testing and commissioning of rcc np3 pipes for sewer collecting system – gravity mains of length 33.69 km and di pipes for rising main of length 3.29 km, construction of sewage pumping station (sps), supplying, erecting, testing & commissioning of pumping machineries, supply of sewer cleaning equipment, construction house connection & inspection chamber, rcc road & compound wall & electrification work etc. including operation & maintenance for 5 years for Eroo village.
Publish Date: October 20, 2025
End Date: November 18, 2025*
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes design, construction and O & M of providing, supplying, lowering, laying and jointing various DI/PVC/GI Rising Main and Gravity Main Pipelines, RCC ESR, RCC Sump, WTP of capacity 22.5 mld, Pump House, supplying and erecting Pumping Machinery at Various HWs & SHWs to villages with 10 Years of Operation and Maintenance (O & M) including existing new structures with trial run of three months for supplying to all beneficed villages & town.
Publish Date: October 19, 2025
End Date: November 17, 2025
Implementing Agency: Surat Municipal Corporation (SMC)
Segment: Water Supply
Work: The scope of work involves to study the present water supply system, available / proposed water resources and prepare future plans for the year 2055, to study and identify the source of water supply reliability and its sustainability based on projected water demand and design period for various sectors and to ensure continuous water availability, formulate strategies for integrated water management which shall include source management, planning of new water supply system and augmentation of existing water supply system and prepare master plan for water supply conveyance, storage and distribution system for the project area.
It also includes preparation of a base map which includes but is not limited to the existing water zone boundaries, existing infrastructure viz. water source, Intake well, WTP, UGSR/WDS, ESR and pumping station etc, preparation of City Water balance Plan (CWBP) for ultimate year 2055, involves gap analysis in the current water supply system and the projected demand and identify potential projects based on gap analysis, phase wise planning of proposed projects depending on the projections of population growth & demand with inputs from town development department with preparation of block cost estimates.
Publish Date: October 18, 2025
End Date: November 20, 2025*
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Wastewater
Work: The scope of work involves designing, providing, supplying, lowering, laying and jointing sewer collecting system in Zone 1, 2, 3, 4, 5, A, B and C of total length 54.82 km including 7904 house connections, rising main network of length 13.49 km, pumping station of 47.38 mld capacity with all allied electro-mechanical works including operation and maintenance (O&M) for 2 years.
Publish Date: October 18, 2025
End Date: November 17, 2025
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Water Supply
Work: The scope of work includes replacement of 1300 mm i/d MS pipeline (towards Boosting Station Sector-16) to 1800 mm, 1600 mm and additional 800 mm i/d pipeline from WTP Basai to Sector 16 Boosting station and all other works contingent thereto. The total length of D.I. pipe will be 10.28 km.
Publish Date: October 17, 2025
End Date: November 25, 2025*
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Water Supply
Work: The scope of work includes laying of new 1600 mm to 600 mm i/d pipelines from WTP Basai Part-II to Sector 25A and 2 railway crossings through trenchless technology as per approved design and drawings (by Railways) and comprehensive maintenance of SCADA system for 5 years after 1 year Defect Liability Period (DLP) and all other works contingent thereto. The total length of D.I. pipe will be 22.91 km.
Publish Date: October 17, 2025
End Date: November 25, 2025*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work also includes design, supply, installation, rehabilitation/upgradation of civil and E&M equipment including testing and commissioning of Nehru Village Sewage Pumping Station, interim O&M of pump house during rehabilitation period i.e., 12 months, Operation and Maintenance (O&M) of the pump house including the existing facilities for a period of 10 years after completion of 2 years Defect Liability Period. It will be implemented on a Design Build Operate (DBO) basis.
Publish Date: October 17, 2025
End Date: December 17, 2025*
Implementing Agency: Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of work includes design, construction of providing, supplying, lowering, laying and jointing various DI/PVC Rising Main and Gravity Main Pipelines, WTP of capacity 8.83 mld, RCC ESR, RCC Sump, Pump House, Compound Wall, supplying and erecting Pumping Machinery at Various HWs & SHWs to villages with trial run of three months and 10 years of comprehensive Operation and Maintenance (O & M) of entire scope of work including existing & new components for supplying water to all beneficiary villages.
Publish Date: October 16, 2025
End Date: November 17, 2025
Implementing Agency: Tamil Nadu Water Supply and Drainage Board (TWAD)
Segment: Water Supply
Work: The scope of work includes water supply and fluorosis mitigation to 128 rural habitations in Pennagaram Union and 133 rural habitations in Eriyur Union of Dharmapuri District – Contract Package 2 A.
Publish Date: October 15, 2025
End Date: November 3, 2025
Implementing Agency: Nadiad Municipal Corporation
Segment: wastewater
Work: The scope of work involves construction of storm water drainage at Paras Circle to Kapadwanj road junction including various structures in district Kheda.
Publish Date: October 14, 2025
End date: November 3, 2025
Implementing Agency: Ahmedabad Urban Development Authority (AUDA)
Segment: Water Supply
Work: The scope of work includes construction of water supply network, sewerage network and storm water drainage (SWD) network including Operation and Maintenance (O&M) for five years. The storm water drainage network of 25.9 km, sewerage network of 83.70 km, sewage pumping stations at 4 locations along with total rising mains of 12.86 km has been proposed.
Published Date: October 14, 2025
End Date: December 18, 2025
Implementing Agency: Public Health and Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work includes retrofitting work for providing water supply through FHTCs in 411 villages & 418 OH of sub divisions Peeplu, Todaraisingh & Malpura in Tonk District with Operation and Maintenance (O&M) period for 10 years and Defect Liability period (DLP) of one year. It also includes provision for Clear Water Transmission Main- 58.181 km (150 mm & 200 mm DI Pipe), provision for 6 Clear Water Reservoir, replacement of clear water pumping machinery. It also includes provision for providing laying and joining of Clear Water Rising Mains line of 580.355 km of DI K-7 pipeline, provision of construction of 58 elevated service reservoirs at various locations, laying and jointing of Cluster Distribution system of HDPE PE-100 and DI K-7 of length 259.622 km and 36.284 km respectively, laying and jointing of Village Distribution system of HDPE PE-100 and DI K-7 of length 772.569 km and 2.620 km respectively and provision for 33870 Household Tap Connections.
Publish Date: October 13, 2025
End Date: October 30, 2025
Implementing Agency: Pune Municipal Corporation (PMC)
Segment: wastewater
Work: Part 1: The scope of work includes providing and laying sewer networks in Sus, Mhalunge, Khondwe-Dhawade, New Kopare, Nanded, Khadakwasla, Kirkitwadi, Nandoshi.
The estimated tender cost of the project is Rs 1116.25 million.
Part 2: The scope of work includes providing and laying sewer networks in Narhe, Mangadewadi, Jambhulwadi, Sanas Nagar, Gujar Nimbalkarwadi, Kolewadi, Bhilarewadi, Pisoli.
The estimated tender cost of the project is Rs 1590.46 million.
Publish Date: October 13, 2025
End Date: November 13, 2025
Implementing Agency: Rajkot Municipal Corporation
Segment: wastewater
Work: The scope of work includes providing, supplying, lowering, laying, joining, testing & commissioning Of DI Pipe Line (K-7 Class) distribution with house connection and road restoration at remaining area between Nanamava Road & Kalavad Road in ward number 8.
Publish Date: October 13, 2025
End Date: October 28, 2025
Implementing Agency: Cauvery Neeravari Nigama Limited (CNNL)
Segment: Water Supply
Work: The scope of work includes lifting water from Nagamangala branch canal under Hlbc near Mudanahally to fill D. Tumkur & other 18 tanks in Hirisave Hobli of Channarayapatna Taluk for drinking water.
Publish Date: October 13, 2025
End Date: November 3, 2025
Implementing Agency: Sewerage & Infrastructure Development Corporation of Goa
Segment: wastewater
Work: The scope of work involves revamping of 7.5 mld activated sludge process sewage treatment plant (STP) to 20 mld sewage treatment plant (STP) based on SBR technology. It also includes interconnection of Raw sewage Line (RCC) from 6.70 mld & 20 mld to new 20 mld plant, demolition of existing 7.5 mld Activated Sludge Process STP, Raw Sewage Pumping Station of 20 mld capacity and Sewage Treatment Plant of 20 mld capacity.
Publish Date: October 13, 2025
End Date: October 31, 2025
Implementing Agency: Pandharpur Municipal Corporation
Segment: wastewater
Work: The scope of work includes construction of raw sewage pumping stations at Akshat Bungalow, near 561A National Highway and near Padmavati Lake of 4.5 mld, 1.2 mld and 9.9 mld capacity, respectively, raw sewage pumping length of 12.13 km, sewage treatment plant of 13 mld capacity, connecting main of length 3.13 km, 3,756 property connections, retrofitting works for 13.2 mld new Vishnupad sewage pumping station (SPS) and 6.5 mld Old Vishnupad SPS etc.
Publish Date: October 9, 2025
End Date: October 27, 2025.
Implementing Agency: Gandhinagar Municipal Corporation
Segment: wastewater
Work: The scope of work includes augmentation of existing sewage pumping station, construction of new sewage pumping station at Adalaj, rising main from Adalaj Tsps to proposed 100 mld STP at Jaspur. It also includes construction of Tsps and 100 mld capacity STP at Jaspur including miscellaneous work (EPC basis) along with Operation and Maintenance (O&M) period of five years.
Publish Date: October 9, 2025
End Date: November 7, 2025*
Implementing Agency: Surat Municipal Corporation (SMC)
Segment: wastewater
Work: The scope of work includes construction of two sewage pumping stations of 69.88 mld and 102.16 mld in areas T.P. 86 (Kosad) and T.P. 84 (Kosad-Bharthana Kosad-Mota Varachha-Abrama) respectively. It also includes construction of two rising mains of 1219 mm dia. and 10 mm (3500 rmt) in T.P. 86 and 1422 mm dia. and 12.5 mm thickness (1800 rmt) in T.P. 84. The length of the sewerage network to be laid down is 51,000 rmt. The proposed sewage treatment plant (STP) capacity is 143 mld.
Publish Date: October 9, 2025
End Date: November 14, 2025*
Implementing Agency: State Urban Development Agency, Chhattisgarh
Segment: Wastewater
Work: The scope of work involves revision of design documents and vendor data, supervision of the construction, testing, and commissioning, project monitoring of sewage treatment plants (STPs) and allied infrastructure to ensure timely and quality execution of the projects across these cities. It also includes monitoring project progress, ensuring compliance with statutory requirements, and facilitating coordination among municipal corporations, state agencies, and other stakeholders for seamless implementation of the projects.
The projects include;
Durg Master Sewerage Plan
The scope of work includes construction of diversion weirs at Shankar Nala and at Pulgaon Nala, construction of inlet chamber, screen chamber and grit settlement chamber, interceptor sewer pipe line of length 0.85 metres, wet well with overhead pump house, two sewage treatment plants; a 47 mld STP at Shankar Nala and a 30 mld STP at Pulgaon Nala and a raw sewer rising main of length 0.3 km including 15 years operation and maintenance (O&M) and a three month trial run period.
Bhilai Sewage Master Plan
The scope of work includes investigation, design, construction of interception cum diversion chambers/weirs on Samudhanala along with manual screens, grit, diversion chambers, wet well with pump house and screens, sewage treatment plant (STP) having a capacity of 150 million litres per day (mld) on sequential batch reactor (SBR) technology for secondary treatment, supervisory control and data acquisition (SCADA) automation and other related works including three months trial run and Operation and Maintenance (O&M) for 15 years.
Korba Sewage Master Plan
The scope of work includes construction, testing, commissioning of all the components of Korba Sewage Master Plan which includes a diversion weir at Kosabadi Nall, 11 interception cum diversion chambers/weirs at various nallas along the bed of Hosdeo River, Kosabadi wet well with pump houses and screens, 33 million litres per day (mld) sewage treatment plant (STP) based on sequential batch reactor (SBR), raw sewage pumping machinery, 9.17 km long pumping main from Kosawadi wet well to STP at Pragati Nagar, interceptor sewer line from Gerva Nalla to Kosabadi, supervisory control and data acquisition (SCADA) automation and other related works including Operation and Maintenance (O&M) for 15 years. The work is likely to be completed in 27 months.
Rajnandgaon Sewage Master Plan
The scope of work includes investigation, design, construction of interception and diversion chambers, sewer pipelines, two sewage treatment plants (STPs) having capacities of 15 million litres per day (mld) and 26 mld at Parri Nala and Singdai Nala, supervisory control and data acquisition (SCADA) automation and other related works including 15 years of Operation and Maintenance (O&M). The work is likely to be completed in 27 months.
Ambikapur Sewage Master Plan
The scope of work includes investigation, survey, design and construction of all the components of project such as diversion weirs, interceptor chambers, screen Grit chambers, reinforced cement concrete (RCC) interceptor sewer, raw sewage pumps, raw sewage pumping main, supervisory control and data acquisition (SCADA) automation and all pipeline monitoring and control system covering all the proposed components of the entire scheme as per scope of work and the specifications attached in respective chapters of the NIT including replacement and warranty including three sewage treatment plants (STPs) having capacities of 16, 14 and 2 million litres per day (mld) including three months trial run and 15 years of Operation and Maintenance (O&M). The work is likely to be completed in 27 months.
Publish Date: October 9, 2025
End Date: November 10, 2025*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves survey and investigation by conducting topographic survey using total stations/DGPS and establishment of permanent benchmark; Conducting a comprehensive assessment of the existing sewerage infrastructure like sewer network, sewage pumping stations (SPSs) according to sewage treatment plants (STPs) in the city, including review of past reports and validation of system performance; Identifying infrastructure gaps and preparing Master plan for year 2043 and detailed project reports (DPRs) for augmentation of existing assets and development of new works; Preparing tender documents for implementation of proposed interventions, including works identified under the SIS, sewer works in unsewered areas and GAP areas and DPRs.
Publish Date: October 8, 2025
End Date: November 14, 2025*
Implementing Agency: Bharatpur Municipal Corporation
Segment: wastewater
Work: The scope of work involves providing technical manpower to manage or supervise the project. The services include project management including strategic advisory, planning and coordination, construction supervision and quality control of the stormwater drainage project, site coordination, reports, and staffing schedule.
Publish date: October 7, 2025
End Date: October 16, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Water Supply
Work: Bodhgaya Sewerage Network: The estimated cost of the project is Rs 1,165.20 million.
Publish Date: October 7, 2025
End Date: January 12, 2026*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: water supply
Work:The scope of the project includes construction, erection, completion, testing & commissioning of water supply works such as Intake well of 14.5 mld cum Pump House and approach Bridge and associated works, Water Treatment Plant (WTP) 9 mld capacity and its associated works, raw water rising main from Intake Well to Water Treatment Plant.
Publish date: October 6, 2025
End Date: November 13, 2025*
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: water supply
Work: The scope of the work includes designing, constructing, testing, commissioning, Operation and Maintenance for 5 years after 12 months defect liability period for providing, testing and commissioning of raw water pipeline of 1800 mm i/d MS pipe, silt removal clarifiers 2 nos., raw water channel from silt removal chambers to 2 No. sedimentation cum storage tanks each of 308887.5 kl storage capacity, raw water RCC- M30 DUCT from Storage tanks outlet to Common Raw Water Sump, lowering of sub-soil water table and construction of one unit of 100 mld automated Water Treatment Plant (WTP) , Clear Water Reservoir (CWR) for 100 mld capacity common clear water sump suitable for 2 Units of 100 mld each, common clear water & raw water pump house suitable for 2 Units Of 100 mld, Common Clear Water & Raw Water Pump House suitable for 2 Units Of 100 mld, clear water and raw water pumping machinery, mechanical dewatering of sludge, permanent dewatering system, HT & LT electrical works, SCADA and all other works.
Publish date: October 6, 2025
End Date: November 3, 2025*
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: wastewater
Work: The scope of work involves construction of main pumping station (MPS) of 400 mld capacity, sewage treatment plant (STP) of 100 mld capacity on 12 acres of land along with power generation and operations of maintenance (O & M) for a period of 10 years after completion of one year of defect liability period.
Publishing date: October 6, 2025
End Date: June 5, 2026*
Implementing Agency: Vapi Municipal Corporation
Segment: water supply
Work: Chhiri, Chharwada WSS (Phase-2)
The scope of work involves working survey, soil investigation, design of water supply scheme. work including design and construction, testing and commissioning of providing, supplying, lowering, laying and jointing di pipeline for rising main and gravity main, providing, supplying, erecting and testing of pumping machineries, electrification work, road restoration etc. construction of house connection, supply and fixing of pipeline and connection with household property etc completed, providing and fixing of scada system and actuator valves and instrumentation work connect with scada system for water works and water distribution network.
Publish date: October 3, 2025
End Date: November 3, 2025
Implementing Agency: Vapi Municipal Corporation
Segment: water supply
Work: Chanod WSS (Phase-2)
The scope of work involves working survey, soil investigation, design of water supply scheme. work including design and construction, testing and commissioning of providing, supplying, lowering, laying and jointing di pipeline for rising main and gravity main, providing, supplying, erecting and testing of pumping machineries, electrification work, road restoration etc. construction of house connection, supply and fixing of pipeline and connection with household property etc completed, providing and fixing of scada system and actuator valves and instrumentation work connect with scada system for water works and water distribution network.
Chanod UGD (Phase-2)
The scope of work involves working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering, laying, jointing, testing & commissioning of rcc np3 pipes for sewer collecting system – gravity mains, construction house connection & inspection chamber, rcc road reinstatement & SITC of scada & instrumentation work for gravity main etc.
Publish date: October 3, 2025
End Date: December 5, 2025*
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: The scope of work involves surveying, collection of hydrological data, design, detailed engineering, construction, supply, installation and commissioning of ground water based multi-village piped water supply scheme having 7.85 mld (million liter per day) capacity, 9 tube well (including 3 stand by tube well), one clean water MGSR (master ground storage reservoir), six GSR, seven zonal ESR, MS/DI/HDPE distribution pipeline network etc. in Panchaytat Sadki, Athan, Sarodag, Adhaura, Badwankala, Dumrawa and Chainpura under Adhaura block with minimum six months of trail run and operation and maintenance (O&M) period of seven years.
Publish Date: October 3, 2025
End Date: November 6, 2025
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves topographical and geotechnical survey, design, drawings, preparation of bid documents, selection of contractor) including geo technical survey, soil investigation GPRS survey, preparation of detailed project report (DPR), detailed estimate, preparation of bid documents, short listing of bidders, justification, suggesting suitable technology for laying of sewer rising mains.
Publish Date: October 3, 2025
End Date: November 14, 2025*
Implementing Agency: Navi Mumbai Municipal Corporation (NMMC)
Segment: Waster Supply
Work: The scope of work includes laying and installing M.S. Pipe 1500 mm finished diameter underground pipeline, 12 mm thick and about 14 km in length using Trenchless Technology (Microtunneling) at following places: Crossing of Road Junction near Apollo Hospital, LP Junction Road crossing, below Turbhe flyover, Turbhe railway station area, crossing of Thane Belapur road at Khairane Chowk and Mahape Junction.
Publihs Date: October 1, 2025
End Date: November 6, 2025*
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Waster Supply
Work: The scope of work includes construction of 9 overhead service reservoir (OHSR) of 4350 kl, 4 Clear Water Reservoir (CWR) of 3300 kl, 21.77 km rising mains and 211.43 km of distribution system, 16.8 mld (700 klh) rapid gravity filter Water Treatment Plant (WTP).
Publihs Date: September 29, 2025
End Date: November 10, 2025*
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segement: Water Supply
Work: The scope of work includes construction of raw water pumping mains of length 2.27 km, raw water main of length 2.27 km, transfer pumping mains of length 82.442 km, cluster pumping mains of length 337.328 km, cluster distribution mains of length 348.683 km, 3 transfer pumping stations and water treatment plant of 34.70 mld for 212 Villages (77 villages of Sabla Block & 135 villages of Sagwara Block) including their 255 other habitations and 1 town Sagwara of District Dungarpur from Beneshwar Anicut under JJM including defect liability period (DLP) of 1 year and operation and maintenance (O&M) for a period of 10 years.
Publish Date: September 27, 2025
End Date: November 6, 2025*
Implementing Agency: Housing And Urban Development Department
Segement: Wastewater
Work:The scope of work involves providing, laying, testing and commissioning of sewerage scheme including construction of intermediate pump station (IPS), sewage treatment plant (STP), laying of sewerage network all appurtenant works with 12 months trial run period and five years of operation and maintenance (O&M).
Publish Date: September 27, 2025
End Date: November 6, 2025*
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: water supply
Work: The scope of work includes construction of 13 pump houses, along with the construction of 13 clear water reservoirs with a total capacity of 22.35 million litre (ML), 15 additional reservoirs at booster stations with a combined capacity of 1.225 ML and 60 service reservoirs with a total capacity of 10 ML. The scope of work also includes Clear Water Transmission/Rising Mains line 600.144 km of DI K-7 and 60.556 km DI K-9 pipeline, Cluster Distribution system of DI K-7 & HDPE PE-100 PN-6 of length 692.841 km and Village Distribution system of HDPE PE-100 PN-6 & DI K-7 of length 2941.620 km with Functional Household Tap Connections of 54640 nos. The areas under the package are: Gangrar (2 villages), Chittorgarh (212 villages), Nimbahera (66 villages) and Bhadesar (45 villages) and Bulk water supply to Chittorgarh town.
Publihs Date: September 27, 2025
End Date: November 6, 2025*
Implementing Agency: Uttarakhand Peyjal Nigam
Segment: Wastewater
Work: The scope of work involves preparation of phase wise (Phase 1 and Phase 2) DPR of sewerage work including conducting topographical survey by total station, preparation of contour drawings, discharge measurement of existing drains/ Nallah, preparation of technical note, design of sewerage network, preparation of L-section layout drawing, household survey, cost estimate with STP & co-Treatment Facility for Herbertpur town.
Publish Date: September 27, 2025
End Date: October 30, 2025
Implementing Agency: Uttarakhand Peyjal Nigam
Segment: Wastewater
Work: The scope of work involves preparation of DPR of sewerage work including conducting topographical survey by total station, preparation of contour drawings, discharge measurement of existing drains/ Nallah, preparation of technical note, design of sewerage network, preparation of L-section layout drawing, household survey, cost estimate with STP & co-Treatment Facility for Herbertpur town.
Publish Date: September 26, 2025
End Date: October 30, 2025
Implementing Agency: Public Health & Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of work involves construction of head water works & providing transmission mains, source development, distribution network including house service connections, water meters and operation and maintenance (O&M) for a period of 5 years for water supply improvement scheme.
Publish Date: September 24, 2025.
End Date: October 27, 2025*
Implementing Agency: Public Health Circle, Visakhapatnam
Segment: Water Supply
Work: The scope of work involves construction and completion of Water supply Improvement Scheme in Municipal Towns of Ichapuram, Amadalavalasa in Srikakulam District, Palakonda, Salur in ParvathipuramManyam District, Nellimarla in Vizianagaram District and Yelamanchili in Visakhapatnam district. It includes construction of Infiltration wells, Infiltration galleries, Construction of Intake wells cum pump houses, providing raw water / clear water vt / centrifugal / submersible pumpsets, construction of clear water / raw water GLBR / sumps, laying of DI K9/K7 raw water and clear water pumping / gravity mains, construction of rapid gravity water treatment plants, construction of elevated level service reservoirs, providing electro mechanical and erection of dedicated feeders, distribution transformers substation at various locations in the town, providing SCADA with motorised butterfly valves with actuator, bulk flow meters, online water quality analysers etc., distribution network, HSCs, water meters including operation and maintenance for 7 years including 2 years defect liability period after completion and commissioning of the scheme.
Publish Date: September 17, 2025
End Date: October 23, 2025.
Implementing Agency: Public Work Department (PWD), Puducherry
Segment: Water Supply
Work: The scope of work involves preliminary planning, survey and investigation, functional & engineering design, estimation of quantities and project costs, economic and financial analysis, implementation plans and presentation of study and proof checking.
Publish Date: September 17, 2025
End Date: November 19, 2025*
Implementing Agency: Public Work Department (PWD), Puducherry
Segment: Wastewater
Work: The scope of work involves preliminary planning, survey and investigation, functional & engineering design, estimation of quantities and project costs, economic and financial analysis, implementation plans and presentation of study and proof checking.
Publish Date: September 16, 2025
End Date: November 18, 2025*
Implementing Agency: Ahmedabad Municipal Corporation
Segment: Wastewater
Work: The scope of work includes engineering, procuring, constructing, commissioning (EPC) of terminal sewage pumping station and 150 million litres per day (mld) capacity STP at Fatehwadi in Ahmedabad along with three months trial run and Operation and Maintenance (O&M) for ten years .
Publish Date: September 15, 2025
End Date: October 15, 2025*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: The scope of work involves implementation of Danapur Water Supply Scheme Project on September 26, 2025 under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Publish Date: September 26, 2025
End Date: October 17, 2025.
Implementing Agency: MECON Limited
Segment: Desalination
Work: The scope of work involves detailed characterization of the marine environment and completion of site studies, submission of draft and submission of final report.
Publish Date: September 25, 2025
End Date: October 11, 2025
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: water supply
Work: The scope of work involves provision of 9 new 9400 KL capacity clear water reservoirs has been proposed for the year 2055; construction of a new intake well at udaisagar; provision of one GLSR with a capacity of 700 KL ground level service reservoir has been proposed for the year 2040; provision of 4 new water treatment plants (WTPS) with capacities of 7.5 million litres per day (mld), 10 mld, 27 mld, and 32 mld has been proposed for the year 2040; provision of 10 new overhead service reservoirs (OHSRs) with a gross capacity of 8350 KL has been proposed; provision of 18 pumps is proposed; provision of 3.60 km raw water rising mains of 400 mm to 500 mm DI K-7 and 0.65 km of 400 mm DI K-9 has been proposed; provision of 45.202 km clear water rising mains of 100 mm to 600 mm DI K-7 has been proposed; augmentation work of pichola pump house; provision of a total 185.109 km distribution pipeline of 100 mm to 450 mm DI K-7 is proposed; provision of 12,505 replacement water connections; provision of power connection and supervisory control and data acquisition (SCADA) system; provision of civil works including pump house construction, renovation of WTP, repairing of OHSR, and boundary wall; provision of railway and highway crossings; proposal for reuse of treated water at UWSS Udaipur.
Publishing date: September 26, 2025
End Date: January 12, 2026*
Implementing Agency: Jalgaon City Municipal Corporation
Segment: Water Supply
Work: The scope of work includes construction of 7.35 km long raw water rising main, repairing to existing raw water rising main – l: 7.35 km (od- 1168 mm and 10 mm thk) MS pipe, designing providing, erecting, testing and commissioning of raw water pumping machinery with allied works electrical and mechanical equipments. (750 hp/ 560 kw) (2w+1s) for rising main 1 and rising main 2, ultrasonic water meter (90000 nos), solar power plant -407 kwp, express feeder work and water treatment plant (WTP) of 35 mld capacity.
Publish Date: September 26, 2025
End Date: October 16, 2025
Implementing Agency: Nashik Municipal Corporation (NMC)
Segment: Wastewater
Work: The scope of work involves providing, lowering and laying of underground rcc sewer pipe lines at Nashik West, Nashik Road and Satpur Administrative Zones.
Publihs Date: on September 26, 2025
End Date: October 15, 2025
Implementing Agency: Nashik Municipal Corporation (NMC)
Segment: Wastewater
Work: The scope of work involves providing, lowering and laying of underground rcc sewer pipe lines at Panchavati, New Nashik (CIDCO) and Nashik East Administrative Zones.
Publihs Date: September 26, 2025
End Date: October 15, 2025
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes design, construction, erection, testing and commissioning of 665.5 million litres per day (mld) capacity MPS comprising of coarse screens 6 nos. (4 nos. mechanical plus 2nos. manual) with sewage sumps 3 nos (1 no. for (50 plus 68) mld, 1 no. for 100 mld existing, 1 no. for 100 mld proposed sewage treatment plant (STP) with odour control unit, operating gallery for valves, transformers, d.g. sets etc. complete with 10 years for Operation and Maintenance (O&M) after one year defect liability period (DLP).
Publish Date: September 24, 2025
End Date: October 15, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: water supply
Work: The scope of work involves design, construction, supply, testing, commissioning of pipe water supply schemes for habitations left out under har ghar nal ka jal nischay yojna in areas having ground water quality issues, with electric driven pumps and iron removal treatment plant having technology (adsorption/ion exchange/membrane/nano technology etc.) of csir or any other institute of national reputed with 6 months trial run period and comprehensive operation and maintenance (O&M) of 5 years.
Barsoi, Azamnagar Multi Village Piped WSS (Group 1)
It includes 198 schemes.
The work is likely to be completed in 9 months at an estimated cost of Rs 817.65 million.
Barari, Korha Multi Village Piped WSS (Group 2)
It includes 167 schemes.
The work is likely to be completed in 9 months at an estimated cost of Rs 675.58 million.
Kadwa, Balrampur, Falka Multi Village Piped WSS (Group 3)
It includes 189 schemes.
The work is likely to be completed in 9 months at an estimated cost of Rs 804.85 million.
Amdabad, Manhari, Pranpur Multi Village Piped WSS (Group 4) – 115641
It includes 170 schemes.
Publish Date: September 24, 2025
End Date: October 4, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segmentt: Water Supply
Work: The scope of work involves design, construction, supply, testing, commissioning of pipe water supply schemes for habitations left out under har ghar nal ka jal nischay yojna in areas having ground water quality issues, with electric driven pumps and iron removal treatment plant having technology (adsorption/ion exchange/membrane/nano technology etc.) of csir or any other institute of national reputed with 6 months trial run period and comprehensive operation and maintenance (O&M) of 5 years.
Publish Date: September 24, 2025
End Date: October 6, 2025
Implementing Agency: Rural Water Supply and Sanitation Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of work includes implementation of 392 Habitations Tekkali (Srikakulam) Drinking Water Supply Project. The work is likely to be completed in 24 months at an estimated cost of Rs 676.76 million.
Publish Date: September 22, 2025
End Date: October 6, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work:The scope of work involves design, construction, supply of materials, testing and commissioning of Piped Water Supply Schemes (ward level schemes) for habitations left out under Har Ghar nal Ka Jal with electric driven pumps with 3 months trial run period.
Publish Date: September 20, 2025
End Date: September 30, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope of work involves rejuvenation of water body projects in 45 urban local bodies (ULBs) (50 projects) in the jurisdiction of Adilabad, Karimnagar and Warangal divisions.
Publish Date: September 19, 2025
End Date: October 7, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: The scope of work involves design, construction, supply, testing, commissioning of pipe water supply schemes for habitations left out under har ghar nal ka jal nischay yojna in areas having ground water quality issues, with electric driven pumps and iron removal treatment plant having technology (adsorption/ion exchange/membrane/nano technology etc.) of csir or any other institute of national reputed with 6 months trial run period and comprehensive operation and maintenance (O&M) of 5 years.
Publish Date: September 19, 2025
End Date: September 30, 2025
Implementing Agency: Greater Mohali Area Development Authority (GMADO)
Segment: wastewater
Work: The scope of work involves Design, drawings and consultancy services consisting of Detailed Project Report, Tender Documents, Evaluation of bids, proof checking of documents of construction and fortnightly supervision up to completion of construction and stabilization of STPs with tertiary treatment by UF and CETP with tertiary treatment by UF.
Publish Date: September 18, 2025
End Date: October 10, 2025*
Implementing Agency: Cauvery Neeravari Nigama Limited (CNNL)
Segment: Water Supply
Work: The scope of work involves survey, investigation, planning and design with drawing for all components, supply installation, testing and commissioning of the components such as supply, installation, testing and commissioning of pumping machinery & allied works for a discharge of 14.93 cusecs providing M.S/HDPE/DI Rising Main Pipes/ Gravity main pipes including Earthwork Excavation In all Classifications, Inner lining of MS pipes with Polyurethane (625Micron) paint and outer 25mm cement mortar gunniting as per is standards. thickness and diameter of all pipes shall not be lesser than the sizes mentioned in bid document in design parameters. construction of anchor blocks & thrust blocks, encasing of the pipes in road / halla crossings, providing rcc supports to rising main as per necessity, providing suitable dismantling joints, vent pipes, bleeders, conducting surge analysis and providing suitable surge protection system, conducting sump model analysis, providing & fixing all types of necessary valves of suitable capacity with valve chambers, providing and erecting delivery pipes to manifold, construction of delivery chamber, construction of delivery tank with chain link fencing etc., with suitable foundations, providing, erecting & commissioning of suitable pumps and motors, providing outdoor substation (2×1250 kva 11/6.6 kva) including providing metering cubicle, auxiliary transformer of 1×100 kva , excluding execution of express feeder line. construction of platform for cubicles and transformers, providing chain link fencing to outdoor substation and transformers, providing & fixing eot crane of suitable capacity, arranging power supply from sub station to pump house control room with necessary control cables, ht panels, soft starters, capacitor bank, breakers and allied components, battery and battery charger as per KPTCL / CESC norms and other connected electrical & electro-mechanical works, construction of intake structure and pump house, providing gates, trash racks and construction of staff quarters at headwork location – construction quantities as per sanctioned estimate. construction of chain-link fencing and gate for headwork location, electrical works at pump house, electrical works at staff quarters etc., complete supply of spare parts, tools, technical man power for operating and maintaining the scheme for a period of 5 years after successful commissioning of the scheme.
Publish Date: September 18, 2025
End Date: October 3, 2025
Implementing Agency: Cauvery Neeravari Nigama Limited (CNNL)
Segment: Water Supply
Work: The scope of work involves survey, investigation, planning and design with drawing for all components, supply installation, testing and commissioning of scheme for lifting water from Arkavathy river near Ganalu village to fill up 46 tanks in Ramanagara and Kanakapura taluk of Ramanagara district consisting of the components such as supply, installation, testing and commissioning of pumping machinery & allied works for a discharge of 18.95 cusecs, construction of jackwell cum pump house for housing 3 working + 1 stand-by vertical turbine pump including design supply, installation and commissioning of trash rack gate, stop-log gate, construction of intake canal, construction of approach road, construction of security quarters, construction of toilet rooms, supplying water and sanitary connections to above, drilling of bore well including connection of pipes. providing laying and jointing of m.s/hdpe raising main pipes provided with 2 coat of 60 micron thick zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of cm 1:3 proportion by volume (aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips) over 13 gauge 50 x 50 mm opening size weld mesh. distribution network and gravity network. thickness and diameter of ms pipes shall not be lesser than the sizes mentioned in the bid document in design parameters, providing and erecting delivery pipes to manifold etc., with suitable foundations. providing air valve, sluice valve, butterfly valve and chambers, thrust blocks, construction of surge protection system, construction of hard passage. encasing of the pipes in road / halla crossings, providing rcc supports to rising main as per necessity, providing suitable dismantling joints, vent pipes, bleeders, conducting sump model analysis, providing & fixing all types of necessary valves of suitable capacity with valve chambers. providing, erecting & commissioning of suitable pumps and motors, providing outdoor substation with two numbers 2500 kva capacity transformers (2×25 00 kva 11/6.6 kv) including including construction of terminal bay and erection of sc line for power supply line of around 7.00km from nearest existing kptcl. providing metering cubicle, auxiliary transformer of 100 kva including execution of express feeder along with payment of necessary supervision charges, platform for cubicles and transformers, providing chain link fencing to outdoor substation and transformers, providing & fixing eot cranes of suitable capacity, arranging power supply to pump house control room with necessary control cables, ht panels, soft starters, capacitor bank, breakers and allied components, battery and battery charger as per kptcl / cesc norms and other connected electrical & electro-mechanical works. complete supply of spare parts, tools, technical man power for operating and maintaining the scheme for a period of 5 years after successful commissioning of the scheme.
Publish Date: September 18, 2025
End Date: October 3, 2025
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Wastewater
Work: The scope of work involves construction of 2 Inlet channel of min width 1.5 m and min height 5m, construction of wet well type Sewerage Pumping station of dia 9 m and minimum depth of 8 m or as per ground level at site, providing 800mm dia DI K-9 rising main pipeline of length around 1.1 km, construction of 60 mld SBR based sewage treatment plant (STP) including operation and maintenance (O&M) for a period of five years.
Publish Date: September 18, 2025
End date: November 3, 2025*
Implementing Agency: Bhokar Municipal Council
Segment: Water Supply
Work: The scope of work involves providing consultancy services for preparation of detailed project report (DPR), carrying out topographical surveys for pipeline work, bid process management and supervision of the project.
Publish Date: September 18, 2025
End Date: September 26, 2025
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves rehabilitation of existing drainage line from Tapasavi Icon to Hathijan Circle (1800 mm dia) and Nikol Char Rasta to Barcelona Complex (1200 mm to 1400 mm dia.) and other area in East Zone of AMC area.
Publish Date: September 17, 2025
End Date: October 15, 2025
Implementing Agency: Rajkot Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of 75 mld water treatment plant (WTP), ground service reservoir, 1016 mm dia MS clear water pipeline, providing and laying 1016 mm dia. MS raw water pipeline upto the WTP and other miscellaneous work.
Publish Date: September 17, 2025
End Date: October 14, 2025*
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work:The scope of work involves surveying, collection of hydrological data, design, detailed engineering, construction, supply, installation and commissioning of ground water based multi-village piped water supply scheme having 7.85 mld (million liter per day) capacity, 9 tube well (including 3 stand by tube well), one clean water MGSR (master ground storage reservoir), six GSR, seven zonal ESR, MS/DI/HDPE distribution pipeline network etc. in Panchaytat Sadki, Athan, Sarodag, Adhaura, Badwankala, Dumrawa and Chainpura under Adhaura block with minimum six months of trail run and operation and maintenance (O&M) period of seven years.
Publish Date: September 16, 2025
End Date: September 22, 2025
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work involves rehabilitation of existing drainage line from Nagarvel Hanuman Temple to Guruji Bridge, Khokhara and other area in South Zone of AMC area including rehabilitation of all the Machineholes in the package by plastering the walls, filling of holes/voids with appropriate materials, and epoxy mortar plaster of areas prone to hydrogen sulphide attack, replacement of Machinehole frame and covers, step footers etc.
Publish Date: September 16, 2025
End Date: October 6, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: The scope pf the work includes implementation of Bhagalpur Water Supply Scheme (WSS) under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Publish Date: September 16, 2025
End Date: September 26, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Water Supply
Work: The scope of the project includes design, build, operate and maintain a complete and fully functioning 24×7 water supply system in the water supply area.
Water demand for the same has been considered as 135 litres per capita per day as per CPEEHO manual.
Publish Date: September 16, 2025
End Date: September 26, 2025
Implementing Agency: Public Work Department (PWD), Puducherry
Segment: Wastewater
Work: The scope of work involves preliminary planning, survey and investigation, functional & engineering design, estimation of quantities and project costs, economic and financial analysis, implementation plans and presentation of study and proof checking.
Publish Date: September 16, 2025*
End Date: October 29, 2025*
Implementing Agency: Cauvery Neeravari Nigama Limited (CNNL)
Segment: Water Supply
Work: The scope of work involves survey, investigation, planning and design with drawings for all components of the scheme for supply, installation, testing and commissioning to lift water from Kabini river near Gandhigrama village of Nanjangud taluk in two stages to fill 110 tanks and kattes in Gundlupet taluk for drinking water purpose in two stages with a discharge of 53.00 cusecs (stage-1, 53.00 cusecs & stage-2, 53.00 cusecs) to a total head of 365m (stage-1-170m & stage-2-195m), consisting of the components such as intake, fore bay, pump house, (plinth area must be not less than 216.00 sqmts) road around pump house, providing chain link fencing around pump house yard, gates, providing ms rising main up to delivery chamber (pipe diameter should be maximum 1150 mm & minimum 1100 mm) & providing ms (pipe diameter should be maximum 1100 mm & minimum 350 mm)and hdpe pipes (pipe diameter should be maximum 315 mm & minimum 110 mm)distribution gravity main for the complete network to fill 110 tanks (list enclosed) of required diameter including necessary shifting of water supply lines wherever necessary and civil works etc., earthwork excavation in all classifications to the required depth, construction of anchor blocks & thrust blocks for rising & gravity mains, encasing of the pipes in road /halla crossings. providing suitable dismantling joints, vent pipes, bleeders, surge protection system along with conducting surge analysis, providing & fixing all types of necessary valves of suitable capacity with valve chambers for rising main and gravity main, providing and erecting suction and delivery pipes, manifold, etc., with suitable foundations, providing, erecting & commissioning of suitable capacity of vertical turbine pumps and motors with suitable delivery system, providing outdoor substation including providing transformers / auxiliary transformer, express feeder line from Muddanahally village to stage-1 & begur substation to stage-2 pump houses, providing chain link fencing to outdoor substation and transformers, providing & fixing EOT cranes of suitable capacity, arranging power supply to pump house & control room with necessary control cables, SHT panels, soft starters, capacitor bank, breakers and allied components as per KPTCL / CESCOM norms and other connected electrical & electro-mechanical works, supply of spare parts, tools etc., complete including all clearances such as PTCC (railway/telecommunication), forest, nh and electrical inspectorate / supervision etc., for the scheme with required technical man power for operating and maintaining the scheme for a period of 5 years.
Publish Date: September 15, 2025
End Date: October 8, 2025
Implementing Agency: Amaravati Development Corporation Limited (ADCL)
Segment: water supply
Work: Package 43: The scope of the project includes survey, investigation, design, construction of balance works, testing, commissioning of water supply including headworks like intake well, approach bridge, raw water pumping main, water treatment plant of combined capacity of 190 mld, clear water reservoir, clear water pump house (civil works) and other ancillary works on Design, Build and Operation (DBO) basis at an estimated cost of Rs 3946.1 million.
Package 44: The scope of the project includes survey, investigation, design, construction of balance works, testing, commissioning of water supply works including clear water pump house (electro mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, SCADA, A.I based centralized water information management system (CWIMS) and computerised maintenance management system (CMMS) on Design, Build and Operate (DBO) basis at an estimated cost of Rs 3613.4 million.
Publish Date: September 15, 2025
End Date: October 17, 2025*
Implementing Agency: The Ahmedabad Municipal Corporation (AMC)
Segment: Wastewater
Work: The scope of work includes engineering, procuring, constructing, commissioning (EPC) of terminal sewage pumping station and 150 million litres per day (mld) capacity STP, providing and laying incoming raw sewage pipe line by micro-tunneling method from existing chamber near STP plot to Inlet Chamber of TSPS of 1800mm dia RCC NP4 pipe line (with socket and spigot joint) of length 0.2 km and treated sewage gravity disposal pipe line up to nearby Drain / River Sabarmati of min. 1800mm dia RCC NP3 (with socket and spigot joint), of 0.6 km length along with three months trial run and Operation and Maintenance (O&M) for ten years .
Publish Date: September 15, 2025
End Date: October 10, 2025
Implementing Agency: Kolkata Metropolitan Development Authority (KMDA)
Segment: Water Supply
Work: The scope of work involves supply, delivery, fabrication, modification,installation,testing and commissioning of electro mechanical equipment and instrumentation work at existing WTP for rejuvenation of 30 mgd water supply scheme under Kalyani Municipality.
Publish Date: September 15, 2025
End Date: November 7, 2025*
Implementing Agency: The Gandhinagar Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of Terminal Sewage Pumping Station (TSPS), providing and laying Trunkline of 1800 mm dia. By Micro tunneling from Existing Machinehole to Proposed TSPS at Sargasan of length 0.2 km, 1000 mm dia DI-K9 rising main from proposed TSPS to proposed 72 mld STP at Sargasan of length 0.1 km, construction of 72 mld STP at Sargasan, 1200 mm dia MS Treated sewage line from 72 mld STP at Sargasan to Treated SPS of length 0.05 km, 1200 mm dia RCC NP4 Disposal line from Treated SPS to Southern Drain of length 0.16 km, 900 mm dia DI K-9 Rising main from Treated SPS to thermal power plant at Pethapur with Pushing work for crossing NH-147, KH Road, State Highway, Railway, Construction of bridge for crossing Southern drain, Unava drain of length 14.5 km, 300 mm dia DI-K9 offtake line from 900 mm rising main to Swarnim Park of length 5 km and 900 mm dia RCC NP4 Disposal line from Thermal Power Plant to Sabarmati River of length 0.35 including operation and maintenance (O&M) for a period of 15 years.
Publish Date: September 15, 2025
End Date: November 18, 2025*
Implementing Agency: Nagar Palika Parishad, Lormi
Segment: Water Supply
Work: The scope of work involves providing combined raw water supply scheme (RWSS) based on Khudiya Dam (Package I) and Lormi 24×7 (DfT) water supply scheme (Package II), providing and installing floating pontoon in Khudiya dam and floating approach bridge 60 m length, providing and installing three raw water pumping machinery of quantity 547,273 lph, providing and laying DI K-9 Raw water pumping main of total length 3.73 km up to BPT at Karidongri, construction of 300 kl break pressure tank (Sump) at Karidongri, providing and laying DI K-7 Dia 600 mm, 500 mm & 400 mm & length 54.19 km & DI K-9 Dia 500 mm & 400 mm & Length 14.23 km & MS 600 mm dia length 0.51 km raw water gravity main (Dia 400 to 600 mm Total length – 68.94 km), conventional water treatment plant (WTP) of capacity 8.5 mld, providing and laying DI K-9 Clear Water Pumping Main (Dia 100 mm to 350 mm total length – 7.03 km) & MS 250 mm & 300 mm dia. Length 137 m from WTP Sump to Existing and Proposed OHTs, construction OHT at Old Garden (1000 KL & St. Ht. 22 m S.H.), at Mela Ground (1100 KL & 22 m St. Ht.) and at Hero Show Room (900 KL & St.Ht. 24 m) including booster pumps (2 Nos3 HP & 7.5 HP) at existing OHTs, 15 Sqm SCADA Rooms and Solar PV Modules of adequate capacity (for power supply to sensors in RTU panel & for lighting at each OHT site) at each of the 5 OHTs, distribution system with 24×7 (DfT) Water supply as per hydraulic modelling DI K-7 L= 68.07 km (Dia 100 mm to 300 mm.) including 3 months trial run, 12 months defects liability period and 5 years operation and maintenance (O&M).
Publish Date: September 11, 2025
End Date: November 21, 2025*
Implementing Agency: Public Work Department, Puducherry
Segment: Water Supply
Work: The scope of work involves construction of clear water sump in Kanuvapet and Uthiravahinipet of 500 kl capacity each, over head tank of 1,000 kl capacity each in Kanuvapet and Uthiravahinipet, transmission main of length 3.3 km in Kanuvapet and 1.57 km in Uthiravahinipet, distribution network of length 17.68 km in Kanuvapet and 17.13 km in Uthiravahinipet and 2837 and 1742 meters in Kanuvapet and Uthiravahinipet respectively.
Publish Date: September 11, 2025
End Date: November 11, 2025*
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work involves conducting total station survey for preparation of detailed project report (DPR) for the work of providing water supply and UGD scheme to Kalgi town and linking of water supply pipeline work to 1LL OHT in Kalgi Town under Nagrothan (Phase -4).
Publish Date: September 12, 2025
End Date: September 26, 2025
Implementing Agency: Surat Municipal Corporation
Segment: Wastewater
Work: The scope of work involves construction of 53 mld capacity sewage treatment plant (STP) at Kanakpur Kansad for newly added area of South Zone, 0.035 km disposal line from sewage treatment plant up to point of disposal including operation and maintenance (O&M) for a period of 10 years.
Publish Date: September 12, 2025
End Date: October 27, 2025*
Implementing Agency: Bhavnagar Municipal Corporation
Segment: Wastewater
Work: The scope of work involves construction of storm water pipeline network of length 38.69 km, storm water RCC box of length 3.33 km and sewer pipeline network of length 22.78 km.
Publish Date: September 11, 2025
End Date: December 5, 2025*
Implementing Agency: Jabalpur Municipal Corporation
Segment: Wastewater
Work: The scope of work involves providing, laying, jointing, testing, and commissioning of sewerage pipe lines integration with existing laid trunk sewer lines including construction of manholes and sewer appurtenances of total length 682.27 km, providing 165,999 house sewer chambers and laterals for connecting sewer to consumer sewer lines, providing sewer connection to new and existing house, public toilets, all institutions of zone-01, construction, supply, erection, and commissioning of sewage pumping station (SPS), pumping main, sewage treatment plant and rcc wet well along with providing and installation of pumps from wet well to STP of total capacity 124.95 mld (11 STPs), providing and laying of HT feeder connection up to sewage treatment plants, detail assessment of existing sewerage network for integration with proposed network, preparation of maps of existing and proposed sewerage network and property connection to be laid under the contract with GIS mapping, PLC- SCADA and OCEMS for monitoring and controlling of sewerage system including operation and maintenance (O&M) of the complete scheme (existing & proposed) of zone -01 for 10 years after completion of works.
Publish Date: September 10, 2025
End Date: December 2, 2025*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of the project include survey, collection of data, preparation of Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) and other allied works for Municipal Corporation / Development Authority Area in Lucknow.
Publish Date: September 10, 2025
End Date: September 26, 2025
Implementing Agency: Notified Area Council (NAC), Khallikote
Segment: Wastewater
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: September 10, 2025
End Date: September 26, 2025
Implementing Agency: Notified Area Council (NAC), Polasara
Segment: Wastewater
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: September 10, 2025
End Date: September 24, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: The scope of work involves design, construction,detailed engineering, surveying, collection of hydrological data, supply installation, testing and commissioning of surface water based arbanna chakla Multivillage Piped Water Supply (MVS) scheme having 29 mld capacity WTP with required intake well/jetty structure for clean water, MBR-1 nos. ESR-19 nos. UGSR-02 nos. with ms/di-k9 rising in, hdpe pn10 distribution pipeline network including scada, pump house, sitc electro mechanical work including solar system & other related EM work etc, area development and approach road, road resurfacing work in 19 panchayats having 247 wards in Block B Kothi including trail run for a period of minimum 6 months and operation and maintenance (O&M) for five years.
Publish Date: September 10, 2025
End Date: September 23, 2025*
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: Niwai:
The scope of work involves construction of rising main of length 20.56 km and distribution pipeline of length 125.1 km.
Diggi
The scope of work involves construction of rising main of length 22.98 km and distribution pipeline of length 38.77 km.
Lambaharisingh
The scope of work involves construction of rising main of length 30.22 km and distribution pipeline of length 22.47 km.
Jadmo ki Dhan
The scope of work involves construction of rising main of length 5.15 km and distribution pipeline of length 20.01 km.
Publish Date: September 9, 2025
End Date: October 9, 2025
Implementing Agency: Nashik Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of a 274 mld water treatment plant (WTP) at Viholi, laying of M.S. pipeline of 1800 mm and 1400mm dia, D.I. Pipeline of varying from 800 mm to 1200 mm dia from Viholi to Gandhinagar and Nilgiri Baug WTP for Sadhugram including three year operation and maintenance (O&M) period and two year defect liability period (DLP)
Publish Date: September 9, 2025
End Date: September 22, 2025*
Implementing Agency: Drinking Water and Sanitation Department, Jharkhand
Segment: Water Supply
Work: The scope of work involves:
Part 1: detailed survey, designing and drawing of left out work, construction of 10.0 M dia R.C.C. Intake well cum pump house, gangway of 0.075 km length and 3.95 m wide, pipe bridge 0.07 km length and 2.00 m wide, pipe bridge 0.050 km length and 2 m wide, pipe bridge 0.100 km length and 2 m wide, pipe bridge 0.060 km length and 2 m wide, 19.50 mld capacity water treatment plant (WTP), compound wall, supplying and laying raw/clear water rising main and laying distribution network, supplying and installation of vertical turbine and centrifugal pump motor including five years operation and maintenance (O&M).
Part 2 to Part 11 consist of Construction of RCC Elevated Service Reservoirs in three blocks namely Koderma, Domchanch and Jainagar
Part 12 involves Construction 2.5 mld Capacity water Treatment Plant, 3 RCC Elevated Service Reservoir in Jainagar
Publish Date: September 6, 2025.
End Date: September 28, 2025
Implementing Agenccy: Notified Area Council (NAC), Kesinga
Segment: Wastewater
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: September 6, 2025
End Date: October 6, 2025
Implementing Agency: The Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work involves construction of transmission/rising main of 46.2 km, one raw water sump, one clear water reservoir at Old Mallah works of 1800 kl capacity, 2 raw water pump houses including operation and maintenance (O&M) for 5 years and defect liability period (DLP) of one year.
Publish Date: September 5, 2025
End Date: October 9, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope involves implementation of the Ramagundam Water Supply Improvement Scheme in Telangana. The project is being funded by the Urban Infrastructure Development Fund (UIDF).
Publish Date: September 4, 2025
End Date: September 12, 2025
Implementing Agency: Jodhpur Development Authority (JDA)
Segment: Wastewater
Work: The scope of the project includes providing, laying, jointing, testing and commissioning of sewer system and all ancillary works, including construction of manholes, property connections, construction of sewage pumping station (SPS) of 13.39 mld capacity and restoration of roads and construction of a sewage treatment plant (STP) of 10 mld capacity in Jhalamand area of Jodhpur district, Rajasthan including operation and maintenance (O&M) period for STP of 10 years including three year defect liability period. The aim of the project is Pollution abatement of river Jojari at Jodhpur, Rajasthan under National River Conservation Plan
Publish Date: September 4, 2025
End Date: October 3, 2025
Implementing Agency: Amaravati Development Corporation Limited (ADCL)
Segment: Wastewater
Work: Zone-1, Zone-2, Zone-3, Zone-5 & Zone-6 STP Package I (Amaravati Capital City Development Program)
The scope of work involves construction of sewage treatment plants (STP) and tertiary treatment plants (TTP) across Zone-1B (for 1A & 1B) of 14 mld and 5 mld, Zone-2B (for 2A & 2B) of 12 mld and 4 mld, Zone-3B (for 3A & 3B) of 18 mld and 6 mld, Zone-5D (for 5A, 5B, 5C & 5D) of 33 mld and 10 mld, and Zone-6 of 13 mld and 4 mld, making a total STP capacity of 90 mld and TTP capacity of 29 mld including operation and maintenance (O&M) for 7 years including Testing & Commissioning and trail run period of 6 months.
The work is likely to be completed in 30 months at an estimated cost of Rs 2,624.8 million (construction cost Rs 2306.5 million and O&M cost Rs 318.3 million).
Zone-4, Zone-7, Zone-9 & Zone-10 STP Package II (Amaravati Capital City Development Program)
The scope of work involves construction of sewage treatment plants (STP) and tertiary treatment plants (TTP) across Zone-4 of 8 mld and 3 mld, Zone-7 of 50 mld and 15 mld, Zone-9 of 30 mld and 10 mld, and Zone-10 of 15 mld and 5 mld, making a total STP capacity of 103 mld and TTP capacity of 33 mld including operation and maintenance (O&M) for 7 years including Testing & Commissioning and trail run period of 6 months.
The work is likely to be completed in 30 months at an estimated cost of Rs 2,909.3 million (construction cost Rs 2619.8 million and O&M cost Rs 289.5 million).
Zone-12 & Zone-12 A STP Package III (Amaravati Capital City Development Program)
The scope of work involves construction of sewage treatment plants (STP) and tertiary treatment plants (TTP) across Zone-12 of 50 mld and 15 mld and Zone-12 A of 30 mld and 10 mld, making a total STP capacity of 80 mld and TTP capacity of 25 mld including operation and maintenance (O&M) for 7 years including Testing & Commissioning and trail run period of 6 months.
Publish Date: September 3, 2025
End Date: September 25, 2025
Implementing Agency: Rural Water Supply and Sanitation Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project involves implementation of 392 Habitations Tekkali (Srikakulam) Drinking Water Supply Project. The work is likely to be completed in 24 months at an estimated cost of Rs 676.76 million. The total project cost is Rs 966.39 million.
Publish Date: September 2, 2025
End Date: September 17, 2025
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Water Supply
Work: The scope of work involves rehabilitation and enhancement of 300 mld capacity water treatment plant (WTP) to 310 mld at Puzhal including comprehensive operation and maintenance (O&M) for 20 years on design, build, finance, operate and transfer (DBFOT) basis/Hybrid Annuity Model (HAM).
Publish Date: August 30, 2025
End Date: October 29, 2025*
Implementing Agency: Tirunelveli City Municipal Corporation
Segment: Wastewater
Work: The scope of work involves conducting detailed topographical survey, collecting and analyze relevant hydrological data including rainfall intensity, runoff coefficients, catchment characteristics, and drainage patterns, studying the existing roads, approaches, culverts, bridges, and utilities along the proposed drain alignment and conducting field survey and technical evaluation.
Publish Date: August 29, 2025
End Date: September 9, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Wastewater
Work: The scope of work involves implementation of Gopalganj SWD Project. The work is likely to be completed in 12 months at an estimated cost of Rs 538.02 million.
Publish Date: August 28, 2025
End Date: September 16, 2025
Implementing Agency: Bangalore Water Supply and Sewerage Board (BWSSB)
Segment: Water Supply
Work: The scope of work involves extending additional raw water pipeline of 3200mm dia from shiva balancing reservoir (SBR) to V Stage pipeline at SBR pipe intake of 2.5 km length.
Publish Date: August 28, 2025
End Date: October 3, 2025*
Implementing Agency: Public Works Department, Mahe
Segment: Water Supply
Work: The scope of work involves preparing an Environmental Impact Assessment (EIA)/Initial Environmental Examination (IEE) Report including EMP, Risk Assessment Report, and Disaster Management Plan, carry out Social Impact assessment (SIA), and Involuntary Resettlement Impact assessment at all project component locations, prepare Resettlement Plans (RPs) / Due Diligence Reports (DDRs), Gender Equality and Social Inclusion (GESI) and Grievance Redress Mechanism (GRM) frameworks, and ADB’s Rapid Environmental Assessment (REA).
Publish Date: August 26, 2025
End Date: September 26, 2025*
Implementing Agency: Karnataka Industrial Areas Development Board
Segment: Water Supply
Work: The scope of work involves survey, investigation, design, supply, installation, erection, laying, construction and commissioning of ms pipe gravity main from MBR to IPS-3 and construction of Intermediate Pumping Station-3 (IPS-3), pumping machineries and allied works inside the pump houses, 5 years of operation and maintenance (O&M) for providing and supplying fresh water to the industrial areas in districts around Bengaluru.
Publish Date: August 25, 2025.
End Date: November 3, 2025*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Water Supply
Work: The scope of the work includes implementation of Begusarai Water Supply Scheme (WSS) under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0
Publish Date: August 25, 2025
End Date: September 15, 2025
Implementing Agency: Himachal Pradesh State Industrial Development Corporation Limited (HPSIDC)
Segment: Wastewater
Work: The scope of the project includes construction of common effluent treatment plant (CETP) with a combined capacity of 5mld; Phase I – 2 mld (High Total Dissolved Solids (HTDS) : 0.5 mld, Low Total Dissolved Solids (LTDS) :1.5 mld) and Phase II – 3 mld (HTDS : 1 mld, LTDS :2 mld) and effluent conveyance network at the Bulk Drug Park including a 3 year defect liability period (DLP) followed by a 22 year operation and maintenance (O&M) period.
Publish Date: August 23, 2025
End Date: September 26, 2025*
Implementing Agency: Municipal Corporation for Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work involves rehabilitation and lowering of 1500 mm dia water main (60” dia. Chord Main) by laying 1500 mm dia MSWM from Saibaba Mandir, Parerawadi, Kurla (W) to Ghatkopar Cross connection, Ghatkopar (W) in ‘L’ and ‘N’ ward of Eastern Suburbs.
Publish Date: August 20, 2025
End Date: September 10, 2025
Implementing Agency: Local Self Government Department, Kerala
Segment: Wastewater
Work: The scope of work involves construction of a 7 mld sewerage treatment plant (STP) as per site condition capacity sewerage with co-treatment plant in Kannur Corporation, under the Design Built, Operate and Transfer (DBOT) model including operation and maintenance (O&M) for a period of 7 years.
Publish Date: August 19, 2025
End Date: August 30, 2025
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves construction of chamber for house sewer connections for Sant Nagar GOC falling under the coronation pillar catchment area.
Publish Date: August 21, 2025
End Date: September 22, 2025*
Implementing Agency: Karnataka Industrial Areas Development Board
Segment: Water Supply
Work: Package 4: The tender was invited on August 19, 2025 and the last date for bid submission is September 16, 2025.
The scope of work involves survey, investigation, design, supply, installation, erection, laying, construction and commissioning of MS Pipe Rising Main from IPS-03 to Malur and Other Industrial Areas, Land Acquisition, 5 years of operation and maintenance (O&M) for providing and supplying fresh water to the industrial areas in districts around Bengaluru.
The work is likely to be completed at an estimated cost of Rs 561.61 million.
The work is likely to be completed in 36 months.
Publish Date: August 20, 2025
End Date: September 19, 2025
Implementing Agency: Visvesvaraya Jala Nigam Limited (VJNL)
Segment: Water Supply
Work: The scope of work involves construction of gravity pipe network of length 20 km for filling up of tanks for drinking water purpose in Arasikere taluk under Yettinahole gravity main canal in the reach from ch.72.210 km to ch.91.840 km comprising of supply, installation, testing and commissioning of gravity ms/hdpe/opvc pipes including structures and improvements to 9 tanks.
Publish Date: August 20, 2025
End Date: September 19, 2025
Implementing Agency: Karnataka Industrial Areas Development Board
Segment: Water Supply
Work: Package 5: The tender was invited on August 19, 2025.
The scope of work involves survey, investigation, design, supply, installation, erection, laying, construction and commissioning of MS Pipe Rising Main from Doddaballapura junction to Gowribidanur and Other Industrial Areas, Land Acquisition, 5 years of operation and maintenance (O&M) for providing and supplying fresh water to the industrial areas in districts around Bengaluru.
The work is likely to be completed at an estimated cost of Rs 870.95 million.
Package 6: The tender was invited on August 20, 2025.
The scope of work involves survey, investigation, design, supply, installation, erection, laying, construction and commissioning of MS Pipe Rising Main from Yetinahole Gravity canal to MS Gravity pipe near KWIN City including Pumping Machineries and allied works inside the pump houses, SCADA, Land Acquisition, 5 years of operation and maintenance (O&M) for providing and supplying fresh water to the industrial areas in districts around Bengaluru.
The work is likely to be completed at an estimated cost of Rs 1,038.24 million.
The work is likely to be completed in 36 months.
Publish Date: August 19, 2025; August 20, 2025
End Date: September 22, 2025*; September 26, 2025*
Implementing Agency: Tamil Nadu Water Supply and Drainage Board (TWAD)
Segment: Water Supply
Work: The scope of work includes replacement of existing 1100 mm PSC pipes with MS pipe and replac ement of PSC pipes with various sizes of DI pipes under Attur Narasingapuram CWSS in Salem District at an estimated cost of Rs 573.1 million.
Publish Date: August 19, 2025
End Date: october 10, 2025*
Implementing Agency: The CBIC Tumakuru Industrial Township Limited
Segment: Water Supply
Work:The scope of work involves providing consultancy services for survey, investigation, design, estimate and preparation of detailed project report (DPR) for water supply scheme from Vanivilas Sagara Dam to Tumakuru Industrial Township (CBIC) via Metikurke Industrial Area and Sira Industrial Area.
Publish Date: August 18, 2025
End Date: September 1, 2025
Implementing Agency: Burhanpur Nagar Palika
Segment: Wastewater
Work: The scope of work involves providing, laying, jointing and commissioning of around 90.53 km of sewerage pipelines including construction of manholes and sewer appurtenances, providing house sewer chambers and laterals for connecting sewer of consumers to sewer lines, providing 9000 houses sewerage connections, construction of 18 million litres per day (mld) sewage treatment plant (STP) near existing STP, construction of four number of intermediate sewage pumping station including all electro-mechanical equipment and force mains, automation works like online continuous monitoring system (OCMS) as per CPCB latest guidelines, providing and laying of HT feeder connection of 5000 m, submission of plan for reuse of treated water and operation and maintenance (O&M) for the proposed works/entire sewerage system (existing and proposed) for a period of ten years after completion.
Publish Date: August 18, 2025
End Date: September 17, 2025*
Implementing Agency: Rourkela Municipal Corporation
Segment: Wastewater
Work:The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA. It involves Proving Consultancy Services for preparation of DPR including Topographical Survey, Design and Engineering and Project Management Consultancy Services for Improvement of Drainage System in Rourkela.
Publish Date: August 18, 2025
End Date: September 2, 2025
Implementing Agency: Seoni Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing, laying, jointing, testing and commissioning of sewer pipelines including construction of manholes and sewer appurtenances, provision of house sewer chambers and lateral connections 18683 no. to integrate consumer sewer lines with the main sewer network, design and construction of sewage treatment plants (STPs) with capacities of 5.9 million litres per day (mld), 5.2 mld and 3.6 mld, providing and laying of HT feeder line connection up to sewage treatment plants to supply power, laying of pipelines and installation of pumps for the reuse of treated water network, preparation of detailed maps showcasing the existing and proposed sewerage networks, installation of property connections in the maps for accurate integration into a geotechnical investigation survey (GIS) system, provision and installation of transformers and other electrical components for the sewerage system including comprehensive Operation and Maintenance (O&M) for 10 years.
Publish Date: August 18, 2025
End Date: September 19, 2025
Implementing Agency: Puri Municipality
Segment: Wastewater
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: August 16, 2025
End Date: September 4, 2025
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: The scope of work involves construction of gravity sewer network of length 78.29 km, pumping main of length 7.35 km, 6 sewage pumping stations, sewage treatment plant (STP) of capacity 20 mld and 4,921 sewer property connections etc., including operation and maintenance (O&M) for five years.
Publish date: August 16, 2025.
End Date: October 4, 2025*
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: The scope of work involves construction of gravity sewer network of length 78.29 km, pumping main of length 7.35 km, 6 sewage pumping stations, sewage treatment plant (STP) of capacity 20 mld and 4,921 sewer property connections etc., including operation and maintenance (O&M) for five years.
Publish date: August 16, 2025.
End Date: October 4, 2025*
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: The scope of the project includes construction of clear water gravity main of length 15.09 km, clear water transmission main, distribution network of length 170.74 km and 5,192 house meters etc., including operation and maintenance (O&M) for five years.
Publish date: August 16, 2025
End Date: October 4, 2025*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves construction of two sewage pumping stations (SPSs); 9 mgd capacity SPS at Hiranki including gravity main from boundary of campus to inlet of SPS, pump house and rising main of 700 mm diameter of length 6.5 km up to inlet of WWTP and 22 mgd capacity SPS at Zindpur including gravity main from boundary of campus to inlet of SPS, pump house and rising main of 1,000 mm diameter of length 0.5 km up to inlet of WWTP. It includes design, construction, installation, testing and commissioning of 15 mgd WWTP along with its appropriate sludge treatment and its ultimate reuse with power generation facility as per CPHHEO manual including operation and maintenance (O&M) for a period of 13 years and three month trial run period.
Publish Date: August 15, 2025
End Date: October 24, 2025*
Implementing Agency: Sonipat Metropolitan Development Authority
Segment: Wastewater
Work: The scope of work involves study and identification of the problematic area, bottlenecks in the existing drainage system and its permanent solution, study of the existing capacities of various existing drains and of drainage system in to Drain-6, study of total catchment area of SMDA Urban area i.e Ganaur-2278 Ha, Kharkhoda-5535 Ha, Sonipat-Kundli-20220 Ha with existing drainage system, study of various technical schemes available with various proposals of drainage system in hand/under implementation with SMDA, MCS, HSVP and HSIIDC, finalization of draft drainage plan for SMDA Urban area with Topographical survey of the area required for drafting the concept proposal incorporating the existing drainage system along with up gradation proposals if any for the final disposal up to Drain-6, Keeping in View the latest guideline and decisions taken by SMDA/MCS. The detailed planning should be prepared in different zones, as per site topography and existing drains and preparation of estimate for the complete concept, Inviting Public Objections on the proposed draft drainage plan Sonipat and after Incorporation of Proposed objections if found suitable.
Publish Date: August 14, 2025.
End Date: August 28, 2025.
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves:
Galibpur, Sarangpur and Shikarpur DSTP Project (Package 1)
The scope of work involves sewage treatment plants (STPs) and sewage pumping stations (SPSs) of 2.5 mgd at Galibpur, 5 mgd at Sarangpur and 1 mgd at Shikarpur and disposal pipeline of length 0.35 km, 0.2 km and 2.55 km at Galibpur, Sarangpur and Shikarpur respectively.
Hasanpur, Jaffarpur, Kazipur and Kheradabar DSTP Project (Package 2)
The scope of work involves sewage treatment plants (STPs) and sewage pumping stations (SPSs) of 2.5 mgd at Jaffarpur, 1 mgd at Kheradabar, 2.5 mgd at Hasanpur and 1 mgd at Kazipur and disposal pipeline of length 0.49 km, 2.20 km, 3.10 km and 5.70 km at Jaffarpur, Kheradabar, Hasanpur and Kazipur respectively.
The work is likely to be completed in 18 months on Design, Build and Operate (DBO) mode.
Publish Date: August 14, 2025
End Date: October 24, 2025*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work comprises the construction of four Decentralised Sewage Treatment Plants (DSTPs) along with corresponding Sewage Pumping Stations (SPSs). The project includes an SPS of 2.25 mgd capacity and a DSTP of 1 mgd capacity at Kair, an SPS of 12.38 mgd capacity and a DSTP of 5.5 mgd capacity at Kakrola, an SPS of 4.5 mgd capacity and a DSTP of 2.0 mgd capacity at Kanganheri, and an SPS of 12.38 mgd capacity and a DSTP of 5.5 mgd capacity at Dichaon Kalan.
Publish Date: August 14, 2025
End Date: October 15, 2025*
Implementing Agency: Department of Drinking Water and Sanitation, Uttarakhand
Segment: Water Supply
Work: The scope of work involves Review and verify the result of baseline survey, basic design, tender assistance, construction supervision, supervision during O&M period, facilitation of implementation of Environmental Management Plan (EMP), Environmental Monitoring Plan (EMoP) and Resettlement Action Plan (RAP), technology transfer, promotion of household connection, organizational strengthening in project management, gender mainstreaming assistance, assistance in obtaining permissions/clearance/approval/land acquisition/forest proposals and any other requirements to fulfill the project’s objective.
Publish Date: August 14, 2025
End Date: October 1, 2025
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves upgradation of the Keshopur STP Phase-I, from 12 MGD to 18 MGD on design, build and operate (DBO) basis.
Publish date: August 14, 2025
End Date: October 24, 2025*
Implementing Agency: Sonipat Metropolitan Development Authority
Segment: Wastewater
Work: The scope of the project includes design, construction, supply, installation, testing and commissioning of 30 mld sewage treatment plant (STP) based on sequential batch reactor (SBR) technology including 60 mld main pumping station (MPS) along with 18 mld capacity tertiary treatment plant (TTP) based on ultrafiltration including three month trial run period and a one year defect liability period followed by a five year operation and maintenance (O&M) period.
Publish Date: August 13, 2025
End Date: September 15, 2025*
Implementing Agency: Sonipat Metropolitan Development Authority
Segment: Wastewater
Work: The scope of the project includes design, construction, supply, installation, testing and commissioning of 30 mld sewage treatment plant (STP) based on sequential batch reactor (SBR) technology including 60 mld main pumping station (MPS) along with 18 mld capacity tertiary treatment plant (TTP) based on ultrafiltration including three month trial run period and a one year defect liability period followed by a five year operation and maintenance (O&M) period.
Publish Date: August 13, 2025
End Date: September 15, 2025*
Implementing Agency: Sonipat Metropolitan Development Authority
Segment: Wastewater
Work: The scope of the project includes design, construction, supply, installation, testing and commissioning of 30 mld sewage treatment plant (STP) based on sequential batch reactor (SBR) technology including 60 mld main pumping station (MPS) along with 18 mld capacity tertiary treatment plant (TTP) based on ultrafiltration including three month trial run period and a one year defect liability period followed by a five year operation and maintenance (O&M) period.
Publish Date: August 13, 2025
End Date: September 15, 2025*
Implementing Agency: New Delhi Municipal Council (NDMC)
Segment: Wastewater
Work: The scope of work involves:
C-Hexagon – Lodhi Road Sewer Line Rehabilitation Project (Package 1)
The scope of work involves de-silting and rehabilitation of old sewer Twin Barrel of 2100mm Dia NP-2 Class RCC pipe from C-Hexagon to Lodhi Road through Zakir Hussain Marg- Golf Course Subramanium Bharti Marg of sewer line of length 2.797 km. The last date of bid submission is September 1, 2025.
The work is likely to be completed in 18 months at an estimated cost of Rs 723.93 million.
C-Hexagon – Lodhi Road Sewer Line Rehabilitation Project (Package 2)
The scope of work involves de-silting and rehabilitation of old sewer Twin Barrel of 2100mm Dia NP-2 Class RCC pipe from C-Hexagon to Lodhi Road through Zakir Hussain Marg- Golf Course Subramanium Bharti Marg of sewer line of length 2.791 km. The last date of bid submission is September 2, 2025.
The work is likely to be completed in 18 months at an estimated cost of Rs 744.25 million.
Publish Date: August 12, 2025 ; August 13, 2025
End Date: September 10, 2025*
Implementing Agency: Karnataka Urban Water Supply and Drainage Board (KUWSDB)
Segment: Water Supply
Work: The scope of work includes detailed project report (DPR) preparation, detailed scheme report, drawings: cost of production of a set of documents and drawings, total station survey, soil investigations and all civil works including one year of defect liability period (DLP) and five years Operation and Maintenance (O&M).
Jigani, Anekal, Doddaballapura And Hoskote: Jigani: It includes laying of 47.96 km long distribution network and related work at capex cost of Rs 323.4 million and O&M cost of Rs 10.5 million; Anekal: It includes laying of 69.09 km long distribution network and related work at Rs 445.9 million capex cost and Rs 20.3 million O&M cost; Doddaballapura: It includes laying of about 1 km distribution, household connection and other related work at capex cost of Rs 96.2 million and O&M cost of Rs 7 million; Hoskote: It includes laying of about 10 km distribution network at capital expenditure (capex) cost of Rs 129.6 million and Rs 5.3 million. The work is likely to be completed in 18 months. (Rs 1,038.04 million)
Magadi, Channapatna, Kankapura And Harohalli: Magadi: It includes rejuvenation of 4.54 million litres per day (mld) water treatment plants (WTP), laying of about 9 km long distribution network and related works at capex cost of Rs 113.1 million and O&M cost of Rs 6.1 million; CHANNAPATNA: It includes laying of 61.63 km long distribution network and related works at capex cost of Rs 352.8 million and Rs 20.6 million O&M cost; Kanakapura: It includes laying of 173.5 km long distribution network and related works at capex cost of Rs 989 million and Rs 32 million O&M cost; Harohalli: It includes laying of 57.35 km long distribution network and related work for Rs 293.8 million capex cost and Rs Rs 9.8 million O&M cost. The work is likely to be completed in 24 months. (Rs 1,817.17 million)
Hosadurga, Holalkere and Jagalur: The project involves laying of 86.01 km long distribution network and related works at Rs 252.5 million capex cost and Rs 16 million O&M cost in Hosadurga; construction of a water treatment plant (WTP) and 63.56 km long distribution network at Rs 178.7 million capex cost and Rs 11 million O&M cost in Holalkere and laying of 33.42 km long distribution network and related works at Rs 137.4 million capex cost and Rs 10.6 million O&M cost in Jagaluru. (Rs 606.3 million).
Hosanagara, Thirthahalli, Shikaripura, Kargal, Hollehonnuru and Anavatti: Hosanagara, Thirthahalli, Shikaripura, Kargal, Hollehonnuru & Anavatti: Hosanagara: It includes laying of 11.3 km distribution network at capex cost of Rs 61.6 million and Rs 4.8 million O&M cost; Thirthahalli: it includes rehabilitation of 4.54 mild WTP at estimated capex cost of Rs 24.9 million and Rs 0.8 million )&M cost; Shikaripura: It includes upgradation of 3.63 mld and 3.8 mld STP at capex cost of Rs 84.8 million and Rs 4 million O&M cost; Kargal: It includes laying of 3.73 km long distribution network at capex cost of Rs 24.7 million and Rs2.4 million; Hollenhunuru: It includes construction of a 5 mld WTP and distribution network of 89.04 km at capex cost of Rs 339.8 million and Rs 12.5 million O&M cost; Anavatti: It includes laying of distribution network in Zone- 1,2, 3 and 4 at capex cost of Rs 382.2 million and Rs 17 million O&M cost.
Publish Date: August 12, 2024
End Date: August 26, 2024
Implementing Agency: Gorakhpur Municipal Corporation
Segment: Wastewater
Work: The scope of work involves preparation of Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) followed by detailed project report (DPR) for Storm Water Drainage duly integrating with existing drainage system including carrying out all required surveys, preparation of drainage basin maps, mapping of existing drains with width, depth, type and functioning status, making proposals duly integrating with upstream demands and downstream facilities, ground validation of proposals, making presentations to all concerned agencies to obtain approvals, preparation of estimations, working drawings, inundation points, prioritizing of projects, collection of data etc, mapping of existing roads/ street pathways ROW along with either existing or proposed adjoining drains and mapping of all existing outflows along with their cross-sectional details, Highest Flow/ Water Level, Average/ Mean Flow/ Water Level, and Lowest Flow/ Water Level.
Publish Date: August 12, 2025
End Date: September 5, 2025.
Implementing Agency: Visvesvaraya Jala Nigam Limited, Karnataka
Segment: Water Supply
Work: The scope of work involves construction of earthen dam across Ghantalamallamma Kanive in Pathakote village, Pathapalya Hobli of Bagepalli taluk, Chikkaballapur district including construction of gravity pipe network for filling up of Ghantalamallamma reservoir and other 15 MI tanks offtaking from Ch: 29+390/29+430 km comprising of supply, installation, testing and commissioning of gravity MS/HDPE/OPVC pipes including structures.
Publish date: August 12, 2025
End Date: September 15, 2025
Implementing Agency: Bhokar Municipal Council
Segment: Wastewater
Work: The scope of work involves providing consultancy services for preparation of detailed project report (DPR), carrying out topographical surveys for pipeline work, bid process management and supervision of the project.
Publish Date: August 11, 2025
End Date: August 25, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of work involves design and build sewage treatment plant (STPs) of installed capacity 17, 5 and 3 mld and all appurtenant structures and allied works along with facility for faecal sludge management (15 kld), survey, review the designs, redesign where necessary, and build new diversion works with allied works including survey, design, construction of 3 pumping stations and all appurtenant structures and allied works and operation and maintenance (O&M) of the complete works of sewage treatment plant, interception & diversion works, pumping stations and all allied works for a period of 15 years under design, build, operate and transfer (DBOT) mode.
Publish Date: August 11, 2025
End Date: October 9, 2025*
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves construction of RCC Over Head Tank (1200 kl – 2 no., 1500 kl and 1700 kl), pump house, MCS Room, booster pump room, boundary wall, staff quarter, gate, site development and repairing of existing Over Head Tank (600 kl and 1250 kl), laying and jointing of rising main, distribution system (90mm to 160mm HPDE pipe & 200mm to 400 mm dia DI pipe Class K-7) in length of about 284.968 km.
Publish Date: August 11, 2025
End Date: September 9, 2025
Implementing Agency: Drinking Water and Sanitation Division, Ranchi
Segment: Water supply
Work: The scope involves preparation of pre-feasibility report (PFR), detailed project report (DPR) and bid document under the Saram RWSS Re-organisation Project in Ranchi, Jharkhand.
Publish Date: August 11, 2025
End Date: August 26, 2025
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Wastewater
Work: The scope of work involves replacement of various sizes of damaged SWP/RCC, strengthening of sewer collection system in various SPS commanding areas in Area IV, V and VI.
Publish Date: August 9, 2025
End Date: September 2, 2025
Implementing Agency: Jalgaon City Municipal Corporation
Segment: Wastewater
Work: The scope of work involves construction of collection system of 282 km and 27,439 house service connections.
Publish Date: August 8, 2025
End Date: August 25, 2025
Implementing Agency: Jalgaon City Municipal Corporation
Segment: Wastewater
Work: The scope of work involves construction of collection system of length 383 km, rising main of length 2 km, prefabricated manhole pumping station and 21509 house service connection.
Publish Date: August 8, 2025
End Date: September 15, 2025*
Implementing Agency: Akola Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of a rectangular jack well with pump floor over head pump house, approach bridge, transformer yard and raw water rising main at Jigaon dam from jack well to 88 mld WTP of length 31.9 km.
Publish Date: August 8, 2025
End Date: September 8, 2025
Implementing Agency: Himachal Pradesh Irrigation and Public Health Department
Segment: Water Supply
Work: The scope of work involves; construction of nine water treatment plants (WTPs) in Manali adjoining areas:- Balsari, Siyal, Nasogi – 1.9 mld, Bhang in gram panchayat (G.P.) Shanag – 1.4 mld, Vashisht in G.P. Vashisht – 0.9 mld, Jagat Sukh in G.P. Jagat Sukh – 0.5 mld, Prini, Boon Pujan Galsai Tilgan and Shami Nallah – 2.0 mld, Barod Parsha in G.P. Shaleen – 0.8 mld, Dungri Kalingcha & Old Manali – 2.5 mld, Simsa Rangri & Gadherni – 1.5 mld and Kanyal & Chhiyal – 0.6 mld; two sewerage treatment plants (STPs) in Palampur:- Palampur Zone 1 – 0.5 mld and Palampur Zone 3 – 1.35 mld; one STP in Karsog of 1.93 mld and three STPs in Nahan of 2.87 mld, 3.5 mld & 2.42 mld.
Publish Date: August 7, 2025
End Date: October 24, 2025*
Implementing Agency: Kolhapur Municipal Corporation
Segment: Wastewater
Work: The scope of work involves construction and implementation of storm water works for urban flood mitigation in Kolhapur.
Publish Date: August 7, 2025
End Date: November 17, 2025*
Implementing Agency: Sangli-Miraj-Kupwad Municipal Corporation (SMKMC)
Segment: Wastewater
Work: The scope of work involves construction and implementation of storm water works for urban flood mitigation in Sangli-Miraj-Kupwad.
Publish Date: August 7, 2025
End Date: November 17, 2025*
Implementing Agency: MECON Limited
Segment: Desalination
Work: The scope of work involves carrying out CRZ survey and demarcation of CRZ for the project.
Publish Date: August 6, 2025
End Date: August 28, 2025
Implementing Agency: Binka NAC
Segment: Wastewater
Work: The scope of work involves study of the topography, hydrology of the site and surrounding areas, design and prepare the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019, Central Ground Water Board (CGWB) guidelines, River centric urban development planning guideline of Minister for Housing and Urban Affairs (MoHUA).
Publish Date: August 6, 2025
End Date: August 26, 2025
Implementing Agency: Poonamalle Municipality
Segment: Wastewater
Work: The scope of work includes construction of underground sewerage system of length 99.26 km, a collection system including house service connections, pumping stations, pumping mains, lift stations and other related infrastructure including five years Operation and Maintenance (O&M).
Publish Date: August 6, 2025
End Date: October 31, 2025*
Implementing Agency: Mangadu Municipality
Segment: Wastewater
Work: The scope of work includes construction of underground sewerage system of length 84.91 km, a collection system including house service connections, pumping stations, pumping mains, lift stations and other related infrastructure including five years Operation and Maintenance (O&M).
Publish Date: August 6, 2025
End Date: October 15, 2025*
Implementing Agency: Thiruverkadu Municipality
Segment: Wastewater
Work: The scope of work includes construction of underground sewerage system of length 193.76 km, a collection system including house service connections, pumping stations, pumping mains, lift stations and other related infrastructure including five years Operation and Maintenance (O&M).
Publish Date: August 6, 2025
End Date: October 31, 2025*
Implementing Agency: Faridabad Municipal Corporation
Segment: Water supply
Work:The scope of work involves survey, study, investigation, preparation of Detailed Project Report, DNIT and Supervision for the works relating to 24×7 Water supply, Sewerage, Septage Management, Sewage Treatment Plant, Reuse of treated waste water, Rejuvenation of water bodies and development of green spaces as per the operational guidelines of Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0 issued by MoHUA.
Publish Date: August 6, 2025
End Date: September 1, 2025
Implementing Agency: Kolkata Municipal Corporation (KMC)
Segment: Wastewater
Work: The scope of work involves construction of supply and laying of RCC / NP3 pipe of size 400 mm to 2000 mm dia including house connections of length 5.8 km, 295 manholes, uPVC pipe house connection, 160mm and 200mm of length 8.6 km and road restoration work of area 14,500 sq. m including construction of Keyatala Pumping Station.
Publish Date: August 5, 2025
End Date: September 16, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves: Intake Well 9.00 M DIA (20.39 MLD) Cum Pump House & Approach Bridge and associated works, Raw water rising Main from Intake Well to WTP, Water Treatment Plant – 15 MLD, RCC OHTs, CWR cum Pumping Station, Rising main, Feeder main, Distribution System, SCADA Room, Chlorination room, Meter Room, Panel Room, Boundary Wall & Site development works etc. and other appurtenant works including SCADA and Automation as per specifications in tender document, trial & run of 3 months & defect liability period of 12 months for Civil works.
Publish Date: August 5, 2025.
End Date: September 18, 2025*
Implementing Agency: Konkan Irrigation Development Corporation
Segment: Water Supply
Work: The scope of work involves construction of dam, spillway, water supply cum power outlet and ancillary works and obtaining the sanction for the diversion of the required forest land from the Government of India, Ministry of Environment, Forests and Climate Change (FC division) and preparation of private land acquisition proposal for the Shilar project. The capacity of the dam will be 6.61 TMC.
Publish Date: August 5, 2025
End Date: August 19, 2025
Implementing Agency: Konkan Irrigation Development Corporation
Segment: Water Supply
Work: The scope of work involves construction of dam, spillway, water supply cum power outlet and ancillary works and obtaining the sanction for the diversion of the required forest land from the Government of India, Ministry of Environment, Forests and Climate Change (FC division) and preparation of private land acquisition proposal for the project.
Publish date: August 5, 2025
End Date: August 19, 2025
Implementing Agency: Sonipat Metropolitan Development Authority
Segment: Wastewater
Work: Package 1 – The scope of work involves construction of 7.5 mld STP and 1 mld MPS comprising wet well sump, pump chamber, HT metering panel room, boundary wall, staff quarters, treated effluent carrier, D.G set, electric transformer and pumping machinery etc. and operation and maintenance (O&M) during defect liability period of 12 months after successful completion of 3 Months trial run and thereafter for 5 years.
Package 2 – The scope of work involves construction of 6.5 mld MPS and 2 IPS comprising collecting tank, pump chamber, HT metering panel room, boundary wall, staff quarters, Rising main lines, D.G set, electric transformer and pumping machinery etc. and operation and maintenance (O&M) during defect liability period of 12 months after successful completion of 3 Months trial run and thereafter for 5 years.
The consultancy work for Package 1 and Package 2 is likely to be completed in 24 months at estimated costs of Rs 124.13 million and Rs 69.91 million, respectively.
Publish Date: August 4, 2025
End Date: August 28, 2025
Implementing Agency: Karnataka Urban Infrastructure Development And Finance Corporation (KUIDFC)
Segment: Wastewater
Work: The scope of work involves Construction of Sewage Treatment Plant (STP) of capacity 10.64 MLD in Basavakalyana ULB of Bidar District with 5 years Operation and Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U) – 2.0 fund and Construction/Upgradation of sewerage system in Bidar City of Bidar District under Jalashuddi Mission NGT environment compensation fund through Design, Built, Operate and Transfer (DBOT) model [Package: SBM/KLB_Pkg-2].
Publish Date: August 2, 2025
End Date: September 12, 2025*
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Water Supply
Work: The scope of work involves design, build and construction of new 3000 mm diameter M S water main from tunnel shaft location at Gundavali (Bhiwandi) to Dome near WYE Junction (Modaksagar):
Package 1 – From shaft location at Gundavali (Bhiwandi) to Jambhivali Anchor Block. The length is 30.735 km.
Package 2 – From Jambhivali Anchor Block to dome near Wye Junction (Modaksagar). The length is 20.703 km.
Publish Date: August 2, 2025
End Date: August 29, 2025
Implementing Agency: Ujjain Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and construction of 1 no intake well of 14 m dia.(to draw 100mld water), 2 floor (discharge and motor floor) including 30m minimum height at downstream of Ujjaini NVDA Pipeline Discharge point at Nagfani and 5.5 m wide reinforced cement concrete (RCC) approach bridge of 50m length and 5.5 meter wide bridge of minimum 200m length to cross pipe from NVDA Multipurpose line to Hariyakheri water treatment plant (WTP) and 1 no. Intake well of 14 m dia. (to draw 70mld water), 2 floor (Discharge and Motor floor) and 25m height at Gambhir Dam including 5.5 m. wide RCC approach bridge with minimum length of 70 m. b) Providing, laying, testing, commissioning and installation of raw water pumps for pumping water upto WTPs. The work shall include construction of substation with transformers, 33 KV HT feeder line of required Length complete; providing, laying, jointing, testing and commissioning of raw water pumping main having length of 39750 m. of dia 900mm, 1000mm and of DI K-7 , K-9 and dia 1300 and of MS pipe from intake well at different location to WTPs including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. d) Construction of 5 nos WTPs. of combined capacity of 250 million litres per day (mld) and clear water pump house, allied works and renovation of old WTPs; Installation of clear water pumps for pumping water up to ESRs The work shall include construction of substation with transformers, 33KV HT Feeder line of required length complete; Providing, laying, jointing, testing, commissioning of clear water pumping main having length of 136394 m. of dia 150-350 mm and of DI k-7 & dia 400-1000 mm and of DI k-9 pipe from WTPs to different locations of elevated service reservoirs (ESRs) including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete; Construction of 17 nos. overhead reservoirs having combined capacities of 38000 KL and staging height of 20m at different locations. h)Providing, laying, jointing, testing, commissioning of distribution network having length of 533796 m. of dia 110 -315mm and of HDPE PN 6 pipe & 300- 500mm and of DI k-7 from ESRs to distribution zones including excavation, refilling, road cutting/dismantling, restoration, providing valves, specials and fittings all complete; Providing house service connections complete job 49087 nos. j) Programmable Logic Controller (PLC)- supervisory control and data acquisition (SCADA) ] for monitoring and controlling of water supply system. k) NH, railway and river crossings including operation and maintenance (O&M) for 10 years.
Publish Date: August 2, 2025
End Date: August 18, 2025
Implementing Agency: Karnataka Urban Infrastructure Development And Finance Corporation (KUIDFC)
Segment: Wastewater
Work: The scope of work involves construction of sewage treatment plants (STP) of varying capacities of 3.51 to 8.01 mld In Kurugodu, Tekkalakote, Sandur & Siraguppa Ulbs Of Ballari District And Kamalapuram & Kottur ULBs Of Vijayanagara District With 5 Years Operation And Maintenance (including 1-year Defect Liability Period) Under Swachh Bharat Mission (u)-2.0 Fund And Construction/upgradation Of Sewerage System In Kampli Town Of Ballari District Under Ngt Environment Compensation Fund and Swachh Bharat Mission (U) – 2.0 through Design, Built, Operate And Transfer (DBOT) Model [SBM/KLB_Pkg-3].
Publish Date: August 2, 2025
End Date: August 22, 2025
Implementing Agency: Balligadu NAC
Segment: Water Supply
Work: The scope of work includes study of the topography, hydrology of the site and surrounding areas, design and prepare the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019, Central Ground Water Board (CGWB) guidelines, River centric urban development planning guideline of Minister for Housing and Urban Affairs (MoHUA).
Publish Date: August 1, 2025
End Date: August 8, 2025
Implementing Agency: Hutti Gold Mines Company Limited
Segment: Water Supply
Work: The scope of work involves preparation of site evaluation, detailed project report (DPR) and feasibility study report and planning, preparation of Architectural/ Engineering drawings, designing and preparing structural drawings, plan approval from concerned authorities (if required), preparation of preliminary & detailed estimates based on certified designs and drawings, tendering, supervision of execution of works by the contractor, verification and certification of bills, coordinating with the Hutti Gold Mines Company Limited, and contractors etc.
Publish Date: August 1, 2025
End Date: August 21, 2025
Implementing Agency: Karnataka Urban Water Supply And Drainage Board (KUWSDB)
Segment: Wastewater
Work: The scope of work involves total station survey for Internal sewer network, outfall sewer network, rising main pipeline, STP land and preparation of hydraulic design of internal sewer network, rising main, wetwell, sewage pumps, STP and Conducting Topograpical GIS Survey for proposed Water Supply / UGD Scheme to the city/ town with latest total station survey equipments. The work shall include collection of field data local body, conducting detailed survey showing the all important land marks, existing water supply lines, all roads, levels, nature of roads. L-Section Survey for rising main from jackwell to WTP and WTP to OHT’s and Distribution network including clearing the obstructions, with all survey staff required covering all the developed & newly developed layouts or L section survey for sub main/Mains/Trunk Sewer/Rising main from wetwell to STP including clearing the obstructions, with all survey staff required covering all the developed & newly developed layouts with submission of soft copy of drawings along with source file and Hard copy in 3 sets for the sewer work main pipe, Conducting block level survey work for proposed WTP, STP etc, with latest total station survey equipment. The work shall include collection of field data from local body, conducting detailed survey showing the all importment land marks, existing water supply lines, sewer lines with submission of soft copy of drawings along with source file and hard in 3 sets, Preparation of detailed hydraulic design, report including analysis design for internal and outfall sewer pipeline. The job involves analysis and hydraulic design using Sewer gem. Incorporating requirements as per CPHEEO norms. The design report should include population projection, design creiteria , design sheet such as node numbers,length of pipe, material & class of pipe, RL of the ground and pipe numbers and all relevant data. Showing statement of pipe diameter & other required details. Length of network including the rising main(Ecomain), designing of wetwell, Sewage pumps, designing of SBR type STP etc if any complete as per direction of engineer incharge and Preparation of estimate of the all components for the UGD System,ppt, and attending observation until finalisation of detailed project report (DPR).
Publish Date: August 1, 2025
End Date: August 15, 2025
Implementing Agency: Karnataka Industrial Areas Development Board
Segment: Water Supply
Work: (Package 1) : The scope of work involves implementation (Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction, testing and Commissioning, SCADA, Land Acquisition and including 5 years of O&M) of Water Supply Scheme to established / proposed Industrial areain and around Bengaluru, includes Geo-technical investigations, Hydrualic Designs, Structural Designs & drawings of all the components, Construction of Jackwell with pump houses at Cauvery river and Agara Tank, Construction of earthen Impounding Reservoirs at Agara and Maddur tanks at Yellandur taluk, Chamrajanagara District, Supplying, providing, laying, testing & commissioning of MS pipe Raising main with allied works from Cauvery river to Impounding Reservoirs, Gravity Main with allied works from Maddur Tank to Agara Tank and Raising main from Agara tank to proposed Intermediate Pumping Station-1 (IPS-1) near Channapatna town, Pumping machineries and allied works for Jackwells at Cauvery river & Agara tank, Construction of structures for pipe crossing of rivers, irrigation canals, valleys, Nalas, Providing, installation, testing and commissioning of air valves, sluice valves, scour valves, Construction of Valve chambers, Construction of Anchor Blocks & Thrust Blocks, Pressure relief valves, providing RCC encasements, providing, installation, testing and commissioning of surge protection works, Restoration of roads both flexible & rigid pavement, Design, supply, installation, testing and commissioning of Metallic Volute Pumps, Vertical Turbine pumps and internal electrification works up to the proposed station within the premises of acquired land for Jackwell at River, Jackwell at Agara Tank, supplying, installation, integration, testing & commissioning of SCADA software system, including necessary permissions from concerned departments, successful commissioning of the project as per the satisfaction of Engineer-in-charge, including operation and maintenance (O&M) for 5 years.
The work is likely to be completed in 36 months at an estimated cost of Rs 14,292.1 million.
(Package 2): The scope of work involves implementation (Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning, SCADA, Land Acquisition and including 5 years of O&M) of Water Supply Scheme to established, proposed Industrial area in and around Bengaluru from Cauvery river Package-2, includes, Geo-technical investigations, Hydrualic Designs, Structural Designs & drawings of all the components, Construction of Jackwell/RCC Storage Reservior with pump houses at proposed Intermediate Pumping Station-1 (IPS-1) & proposed Intermediate Pumping Station-2 (IPS-2), Supplying, providing, laying, testing & commissioning of MS pipe Raising main with allied works from Intermediate Pumping Station-1 (IPS-1) to Intermediate Pumping Station-2 (IPS-2 )and Raising main from Intermediate Pumping Station-2 (IPS-2) to proposed Master Balancing Reservoir (MBR), Pumping machineries and allied works for Jackwells/ RCC Storage Reservior with pump houses at IPS-1 & IPS-2, Construction of Master Balancing Reservoir at Dobaspet Industrial Area, Construction of RCC / Steel structures for pipe crossing of rivers, irrigation canals, valleys, Nalas, Providing, installation, testing and commissioning of air valves, sluice valves, scour valves, Pressure relief valves, Construction of Valve chambers, Construction of Anchor Blocks & Thrust Blocks, providing RCC encasements, providing, installation, testing and commissioning of surge protection works, Restoration of roads both flexible & rigid pavement, Design, supply, installation and commissioning of Vertical Turbine pumps and internal electrification works upto the proposed station within the premises of acquired land for intermideiate pumping station 1 & 2, supplying, installation, integration & commissioning of SCADA software system, including necessary permissions from concerned departments, successful commissioning of the project as per the satisfaction of Engineer-in-charge, including operation and maintenance (O&M) for 5 years.
The overall project covers a total of 18 Industrial areas (both established and proposed) with Cauvery River as the source for fresh water supply.
The work is likely to be completed in 36 months at an estimated cost of Rs 7,698.7 million.
Publish Date: August 1, 2025
End Date: September 1, 2025
Implementing Agency: Vapi Green Enviro Limited (VGEL)
Segment: Water Supply
Work: The scope of work involves engineering, procurement, construction and commissioning including testing, trial run and performance guarantee test run for setting up of common effluent treatment plant (CETP) of 15 mld capacity for expanding current 55 mld CETP plant at VGEL.
Publish Date: August 1, 2025.
End Date: September 22, 2025*
Implementing Agency; Delhi Jal Board
Segment: Wastewater
Work: The scope of work involves interim operation of the existing and partly rehabilitated WWTP during construction and rehabilitation period, construction, rehabilitation and up-gradation of existing 25 mgd WWTP to 40 mgd WWTP, construction of new 15 mgd STP/WWTP, management of sludge for total 55 mgd WWTP, integration of rehabilitated WWTP and trial run and operation and maintenance of the plant for a period of 10 years after successful completion of DLP.
Publish Date: August 1, 2025
End Date: October 31, 2025*
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: Andhrathadhi, Babubarhi, Ladaniya, Laukahi and Khutauna Piped WSS
The scope of work involves design, construction, supply of materials, testing and commissioning of piped water supply schemes (ward level schemes) for habitations left out under “Har Ghar Nal Ka Jal” Nischay Yojna in Panchayats; Shiva, Rakhbari, Nanur, Marukiya, Harna, Harari, Gangdwar, Madna, Karnpur, Jaisain, Harna, Marukiya, Mailam, Andhra Gaur, Tirhuta, Teghra, Sonmati, Satghara, Sarra Sanpatathi, Pirhi, Pachrukhi, Murhadi, Misraulia, Mahesh Wara, Kulharia, Chhaurahi, Bhatchaura, Bela, Basaha, BardahiBarhara, Sidhapa, Sidhapa Kala, Piprahi, Pathrahi, Padama, Laxminiya, Kumarkhat West, Kumarkhat East, Khoja, Gidhwas, Gajhara, Ekhari, Belahi, Narhiya South, Narhiya North, Narendrapur, Mahadeo Math, Laukahi, Kukurdaura, Kariyaut, Jiroga, Jhauri, Dharhara, Dhanchhiha, BelhiBhawanipur, Baruar, Bangama South, Bangama North, Atari, Sikitiyahi, Piprahi Chaturbhuj, Parsahi West, Parsahi East, Narhi, Majhaura, Madhopur, Lamaniya, Karmegh West, Karmegh North, Karmegh Middle, Jhanphipatti Asha, Eakhatra, Durgipatti, Birpur, Basudeopur, Bagha Kusmar.
The estimated cost of the project is Rs 1,232.29 million.
The work is likely to be completed in 18 months.
Jhanjharpur, Lakhnaur, Madhepur, Phulparas and Ghoghardiha Piped WSS
The scope of work involves design, construction, supply of materials, testing and commissioning of piped water supply schemes (ward level schemes) for habitations left out under “Har Ghar Nal Ka Jal” Nischay Yojna in Panchayats; Kako, Mahinathpur, Raiyam West, Raiyam East, Simra, Sant Nagar, Lohna South, Lohana North, Piprauliya, Kothiya, Sukhet, Chanauraganj, Parsa, Berma, Kachhuvi, Tamoriya, Kachhua, Maivi, Gangapur, Baliya, Belaucha, Laubha, Madanpur, Kaithiniya, Deep East, Deep West, Lakhnaur East Madanpur, Gangapur, Dwalakh, Bheja, Matrash, Mahpatiya, BhithBhagwanpur, SundirBirajit, Darah, Mahisham, Gadgaw, Barsama, Banki, Bath, Bhakhrain, Madhepuer East, Karhara, Nawada, Prasad, Tardhia, Pachahi, Bakua, Shaini, Kalapatti, Sugapatti, Godiyari, Ramnagar, Dhanauja, Bathnaha, Mahthaur Khurd, Shishwar, Mahindwar, Gehua Bairiya, Dharmdhiha, Parsa North, NawuabBakhar, Chhajana, Pirojgarhi, Basuari, Kiyotana, Inarba, Sarauti, BrahampurUttari, Brahampur Dakshin, Amhi, SaudiaRatauli, BrahampurBathnaha, Chikna, Basuari, Bisnapur, Sangi.
The estimated cost of the project is Rs 859.68 million.
The work is likely to be completed in 18 months.
Saran District Piped WSS (548 Schemes)
The scope of work involves design, construction, supply of materials, testing and commissioning of piped water supply schemes (ward level schemes) for habitations left out under “Har Ghar Nal Ka Jal” Nischay Yojna in 103 Panchayats. The block names are Amnour, Panapur, Taraiya, Mashrakh, Marhourah, Ishuapur, Lahladpur, Baniyapur, Manjhi, Nagra, Jalalpur, Rivilganj, Ekma, Chapra Sadar, Sonpur, Dighwara and Dariyapur.
The estimated cost of the project is Rs 1,057.77 million.
The work is likely to be completed in 15 months
Publish Date: July 31, 2025
End Date: August 18, 2025
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes construction of 200 mld MPS, 100 mld STP based on SBR technology along with Bio-CBG Plant including operation and maintenance (O&M) for 10 years after completion of 1 year Defect Liability Period (DLP).
Pulish Date: July 31, 2025
End Date: October 16, 2025*
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work:The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank in South Zone including KVP (23 works).
Publish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: WAPOS Limited
Segment: Water Supply
Work: The scope of work involves conducting topographical survey and hydraulic design for 81 newly approved colonies and 25 villages; Tilpat, Tikawali, Riwajpur, Badsahpur, Nacholi, Bhopani, Palwali, Bindapur, Kheri Khurd, Kheri Kalan, Budena, Mortazpur, Bhatola, Baroli, Parlhadpur- Majra, Faridapur Malerna, Sahupura, Sotai, Machhagarh, Chandawali, Faizupur Majra, Nawada- Tigaon Neeemka and Mujeri. The project will cover approximately 210 sq km.
Publish Date: July 31, 2025
End Date: August 22, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: The scope of work involves design, construction, supply of materials, testing and commissioning of piped water supply schemes (ward level schemes) for habitations left out under “Har Ghar Nal Ka Jal” Nischay Yojna in Panchayats; Shiva, Rakhbari, Nanur, Marukiya, Harna, Harari, Gangdwar, Madna, Karnpur, Jaisain, Harna, Marukiya, Mailam, Andhra Gaur, Tirhuta, Teghra, Sonmati, Satghara, Sarra Sanpatathi, Pirhi, Pachrukhi, Murhadi, Misraulia, Mahesh Wara, Kulharia, Chhaurahi, Bhatchaura, Bela, Basaha, BardahiBarhara, Sidhapa, Sidhapa Kala, Piprahi, Pathrahi, Padama, Laxminiya, Kumarkhat West, Kumarkhat East, Khoja, Gidhwas, Gajhara, Ekhari, Belahi, Narhiya South, Narhiya North, Narendrapur, Mahadeo Math, Laukahi, Kukurdaura, Kariyaut, Jiroga, Jhauri, Dharhara, Dhanchhiha, BelhiBhawanipur, Baruar, Bangama South, Bangama North, Atari, Sikitiyahi, Piprahi Chaturbhuj, Parsahi West, Parsahi East, Narhi, Majhaura, Madhopur, Lamaniya, Karmegh West, Karmegh North, Karmegh Middle, Jhanphipatti Asha, Eakhatra, Durgipatti, Birpur, Basudeopur, Bagha Kusmar.
Publish Date: July 31, 2025
End Date: August 18, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work: The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank of Rajarajeshwarinagara Zone.
Publish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work: The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank of Bommanahalli Zone.
Publish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work: The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank of Dasarahalli Zone.
Publish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work: The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank in K R Puram (Package – 7) and Mahadevapura (Package – 1-5) Constituency of Mahadevapura Zone.
Pulish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work: The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank in East Zone.
Publish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work:The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank in South Zone including KVP (23 works).
Publish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work: The scope of the work involves construction of flood protection structures to storm water drain including RCC retaining walls, water retention structures, nature based solutions structures, culverts and bridges under Karnataka Water Security and Resilience Program (KWSRP) with externally funded project World Bank of Yelahanka Zone.
Publish Date: July 31, 2025
End Date: September 1, 2025
Implementing Agency: Kallakurichi Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of underground sewerage system of length 117.25 km, a collection system including house service connections, pumping stations, pumping mains, lift stations and other related infrastructure including five years Operation and Maintenance (O&M).
Publish Date: July 31, 2025
End Date: August 29, 2025
Implementing Agency: Bhararpur Municipal Corporation
Segment: Water Supply
Work: The scope of work involves providing technical manpower to manage or supervise the project. The services include project management including strategic advisory, planning and coordination, construction supervision and quality control of the stormwater drainage project, site coordination, reports, and staffing schedule.The work is expected to be completed in 24 months at an estimated cost of Rs 8 million.
Publish Date: July 30, 2025
End Date: August 11, 2025
Implementing Agency: Nashik Municipal Corporation
Segment: Water Supply
Work: The scope of work involves construction of a 274 mld water treatment plant (WTP) at Viholi, laying of M.S. pipeline of 1800 mm & 1400mm dia, D.I. Pipeline of varying from 800 mm to 1200 mm dia from Viholi to Gandhinagar and Nilgiri Baug WTP for Sadhugram including three year operation and maintenance (O&M) period and two year defect liability period (DLP)
Publish Date: July 30, 2025
End Date: August 25, 2025*
Implementing Agency: Faridabad Metropolitan Development Authority (FMDA)
Segment: Wastewater
Work: The scope of work involves designing, construction and commissioning of 20 mld capacity sewage treatment plant (STP) on SBR technology with tertiary treatment to achieve the required parameters with 3 months trial run, 10 years of operation and maintenance (O&M) after completion of 1 year defect liability period (DLP) in Mirzapur zone.
Publish Date: July 19, 2025
End Date: August 25, 2025
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Desalination
Work: The scope of work involves conducting feasibility studies and environmental impact assessments, detailed engineering and design of the plant, procurement and construction of the desalination facility, installation of intake, pre-treatment, reverse osmosis (RO) system, post-treatment, and brine disposal systems.
Publishd Date: July 28, 2025
End Date: November 11, 2025*
Implementing Agency: Gujarat Industrial Development Corporation
Segment: Water Supply
Work: The scope of work involves conducting survey and submitting feasibility report, hydraulic design of pipeline and pumping machinery, detailed estimate, detailed project report (DPR) and DTP to GIDC within a time period, finalise the design of proposed 15 mld water pipeline infrastructure for Petrochemical complex at Dahej and 255 kld water pipeline infrastructure for ARHC complex at Eksala and PMC during construction, erection and commissioning work.
Publish Date: July 28, 2025
End Date: August 21, 2025
Implementing Agency: Himachal Pradesh Irrigation and Public Health Department
Segment: Water supply
Work: The scope of work involves construction of 195 km water supply pipeline in Manali adjoining areas, 61 km sewerage pipeline in Palampur, 35 km sewerage pipeline in Karsog and 61 km sewerage pipeline in Nahan.
Publish Date: July 28, 2025
End Date: October 24, 2025*
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope of work involves rejuvenation of water body projects in 45 urban local bodies (ULBs) (50 projects) in the jurisdiction of Adilabad, Karimnagar and Warangal divisions.
Publish Date: July 26, 2025
End Date: August 11, 2025
Implementing Agency: Madhya Pradesh Jal Nigam (MPJN)
Segment: Water Supply
Work: The scope of work involves field investigations and site surveys, geotechnical surveys, conditional assessment, topographical survey and preparation of detailed project report (DPR). The work is likely to be completed in two months at an estimated cost of Rs 2.16 million.
Publish Date: July 22, 2025
End Date: August 5, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: Danapur Water Supply Scheme (WSS) under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
The work is likely to be completed in 12 months at an estimated cost of Rs 935.63 million.
Publish Date: July 27, 2025
End Date: August 29, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: Danapur Water Supply Scheme (WSS) under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
The work is likely to be completed in 12 months at an estimated cost of Rs 935.63 million.
Publish Date: July 27, 2025
End Date: August 29, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work involves providing, laying jointing, testing and commissioning of trunk main pipe line of length 54.1 km, rising main of length 3.65 km and gravity main of length 33.4 km including seven year operation and maintenance (O&M) period for execution of works to meet drinking water requirement of Ajmer city.
Publishd Date: July 25, 2025
End Date: September 18, 2025*
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Wastewater
Work: The sope of work includes constcution work of Kodad Underground Drainage Scheme Package IV under Urban Infrastructure Development Funding (UIDF). The work is likely to be completed in 24 months with a defect liability period of 60 months at an estimated cost of Rs 1,742.07 million.
Publish Date: July 24, 2025
End Date: September 8, 2025*
Implementing Agency: Uttar Pradesh Jal Nigam
Segment:Wastewater
Work: The scope of work involves survey, review of the designs, redesign wherever necessary and construction of complete civil works with screens and other associated works for interception of 45 drains; Poiya Ghat-I Drain, Poiya Ghat-II Drain, Manoharpur Drain, Bahadurpur Gaon Drain, Jaswant Singh Ki Chatri-1 Drain, Jaswant Singh Ki Chatri-2 Drain, Jaswant Singh Ki Chatri-3 Drain, Lohiya Nagar Drain, Rathor Wali Gali Drain, Banke Bihari Bagchichi Drain, Radha Nagar Drain, Bhalla Ji Ke Makan Wali Drain, Khemchand Toffee Factory Drain, Almari Factory Drain, Seksaria Drain, Belanganj Police Chowki Drain, Belanganj Bridge Drain, Belanganj Kali Mandir Drain, New Radha Nagar Drain, Ambedkar Park Drain, Khairati Tola Drain, Dayanand Ashram Drain, Gokul Nagar Drain, Ganesh Nagar Drain, Rambagh Drain-III, Shambhunath Junior High School Drain, Katra Wazir Khan Drain-I, Katra Wazir Khan Drain-II, Cheeni Roja Drain-I, Cheeni Roja Drain-II, Gali Anantram Bagichi Drain-I, Gali Anantram Bagichi Drain-II, Gali Subedar Nagar Drain, Shyam Lal Vidhya Mandir Drain, Nursery Mandir Drain-I, Nursery Mandir Drain-II, Prakash Nagar, Gadi Chand, Kachpura Drain-I, Kachpura Drain-II, Bhairoghat Drain (Partially Tapped), Water Works Drain (Partially Tapped), Etmaduddula (Partially Tapped), Industrial Area Drain (Partially Tapped) and Nairaich Drain (Partially Tapped), eight sewage pumping stations (SPS); Bhairo Nala, Water Works, Manoharpur, Rajwah (Rehab), Balkeshwar (Rehab), Naraich, Prakashnagar/Kachhpura and Etmad ud Daula (Rehab), rising main of length 15.52 km and Environmental and Social Assessment, Management Plan and implementation including operation and maintenance (O&M) for one year.
Publish Date: July 22, 2025
End Date: September 26, 2025*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: The work is likely to be completed in 18 months at an estimated cost of Rs 620.59 million. The total cost of the project is Rs 2.15 billion out of which Rs 657.98 million will be funded by the state government.
Publish Date: July 21, 2025
End Date: August 11, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Water Supply
Work: Bodhgaya Water Supply Scheme – The scope of the project includes implementation of the Bodhgaya Water Supply Scheme at an estimated cost of Rs 1,424.68 million.
Ara Water Supply Scheme – The scope of the project includes implementation of the Ara Water Supply Scheme at an estimated cost of Rs 1,327.49 million.
Sasaram Water Supply Scheme – The scope of the project includes implementation of the Sasaram Water Supply Scheme at an estimated cost of Rs 726.34 million.
Darbhanga Water Supply Scheme – The scope of the project includes implementation of the Darbhanga Water Supply Scheme at an estimated cost of Rs 1,801.66 million
The work is likely to be completed in 12 months.
Publish Date: July 17, 2025
End Date: October 24, 2025*
Implementing Agency: Sewage and Infrastructure Development Corporation of Goa
Segment: Wastewater
Work: The scope of work involves revamping of 7.5 mld activated sludge process sewage treatment plant (STP) to 20 mld sewage treatment plant (STP) based on SBR technology including operation and maintenance (O&M) for 2 years. The work is likely to be completed in 12 months at an estimated cost of Rs 755.79 million
Publish Date: July 17, 2025
End Date: August 8, 2025
Implementing Agency: Public Health Engineering Department,
Segment: Water Supply
Work: The scope of work involves surveying, collection of hydrogeological data, design, detailed engineering, construction, supply, installation, testing and commissioning of surface water based multi-village piped water supply scheme having 27 mld and 4 mld intake well with approach bridge capacity, 27 mld and 4 mld water treatment plant (WTP) capacity, one clean water MGSR (master ground service reservoir), three underground reservoir (UGR ), 23 zonal ESR, MS, DI-K9 pipe rising main network, HDPE PN 10 distribution pipeline network, pump house, SITC electro mechanical work including SCADA, solar system and other related work etc., area development and approach road, road resurfacing work in 19 +4 panchayat with minimum six months of trail run and thereafter operation and maintenance (O&M) of the entire system for the next five years.
Publish Date: July 14, 2025
End Date: August 18, 2025*
Implementing Agency: Gandhinagar Municipal Corporation
Segment: Wastewater
Work: The scope of the project includes construction of TSPS & 100 mld capacity sewage treatment plant (STP) at Jaspur including miscellaneous work along with augmentation of existing sewage pumping station, construction of new sewage pumping station at Adalaj and rising main from Adalaj TSPS to proposed 100 mld STP at Jaspur including operation and maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 1895.86 million.
Publish Date: July 9, 2025
End Date: September 25, 2025*
Implementing Agency: Gandhinagar Municipal Corporation
Segment: Wastewater
Work: The scope of the project includes construction of TSPS & 100 mld capacity sewage treatment plant (STP) at Jaspur including miscellaneous work along with augmentation of existing sewage pumping station, construction of new sewage pumping station at Adalaj and rising main from Adalaj TSPS to proposed 100 mld STP at Jaspur including operation and maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 1895.86 million.
Publish Date: July 9, 2025
End Date: August 11, 2025
Implementing Agency: Rajkot Municipal Corporation
Segment: Water Supply
Work: The scope of work involves providing and laying rising main from intake well to WTP, construction of 150 mld water treatment plant (WTP), ground service reservoir, ESR, zero liquid discharge units and other works including operation and maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 1,172.44 million.
Publish Date: July 9, 2025
End Date: August 11, 2025
Implementing Agency: Gandhinagar Municipal Corporation
Segment: Wastewater
Work: The scope of project includes providing & laying 1800 mm sewerage trunk main by open excavation method of length 2.42 km and microtunneling method of length 3.18 km from National Highway near TP-29 to Adalaj TSPS at an estimated cost of Rs 973.41 million. The work is likely to be completed in 18 months.
Publish Date: July 8, 2025
End Date: August 18, 2025
Implementing Agency: Engineers India Limited
Segment: Wastewater
Work: The scope of work includes development of oil water separator (OWS) treatment system with 260 m3/h capacity, contaminated rain water (CRW) treatment with 150 m3/h capacity, spent caustic treatment with 5 m3/h capacity, spent caustic treatment for wet air oxidation (WAO) treated spent caustic with 20 m3/hr capacity and 6.25 m3/h capacity sewage treatment, sludge handling & dewatering facilities, chemicals handling and dosing facilities, voc collection and treatment section, intermediate storage and pumping facilities, chemical house, substation, control room & other buildings/structures/works, all geo-tech, civil and structural, architectural, electrical, instrumentation, mechanical, process, hazard and operability (HAZOP) studies, 3D modeling, development of all p&ids in smart plant system and other works required for ETP.
Publish Date: March 21, 2025
End Date: June13, 2025
Implementing Agency: Drinking Water and Sanitation Department, Jharkhand
Segment: Water Supply
Work: The scope of work involves detailed survey, designing and drawing of left out work, construction of 10.0 M dia R.C.C. Intake well cum pump house, gangway of 0.075 km length and 3.95 m wide, pipe bridge 0.07 km length and 2.00 m wide, pipe bridge 0.050 km length and 2 m wide, pipe bridge 0.100 km length and 2 m wide, pipe bridge 0.060 km length and 2 m wide, 19.50 mld capacity water treatment plant (WTP), compound wall, supplying and laying raw/clear water rising main and laying distribution network, supplying and installation of vertical turbine and centrifugal pump motor including five years operation and maintenance (O&M).
Publish Date: July 19, 2025
End Date: August 5, 2025
Implementing Agency: Eastern Rajasthan Canal Project Corporation Limited
Segment: Wastewater
Work: The scope of the work includes:
Brahmani Barrage (ERCP)
Forest Clearance – The scope of work involves preparation of Forest Diversion proposal as per MoEF&CC updated guidelines and Forest Conservation Act 1980 based on pre-application activity by consultant and provision of requisite documents by the client for 185 ha land.
The work is likely to be completed in 6 months at an estimated cost of Rs 1.21 million.
Wildlife Clearance – The scope of work involves carrying out the preliminary environmental screening to assess the direct and induced impacts due to the project and will require wildlife clearance of 63 ha of Bhainsrodgarh Wild Life Sanctuary and 230 ha of Mukandra Tiger Reserve.
The work is likely to be completed in 6 months at an estimated cost of Rs 1.34 million.
Mor Sagar Artificial Reservoir and Bisalpur-Mor Sagar Artificial Reservoir Feeder (ERCP) (Package ERCP-11-09-TF-5)
Forest Clearance – The scope of work involves Preparation of Forest Diversion proposal as per MoEF&CC updated guidelines and Forest Conservation Act 1980 based on pre-application activity by consultant and provision of requisite documents by the client for 500 ha land.
The work is likely to be completed in 6 months at an estimated cost of Rs 3.17 million.
Mej Barrage Project (ERCP)
Forest Clearance – The scope of work involves preparation of Forest Diversion proposal as per MoEF&CC updated guidelines and Forest Conservation Act 1980 based on pre-application activity by consultant and provision of requisite documents by the client for 430 ha land.
The work is likely to be completed in 6 months at an estimated cost of Rs 2.29 million.
Wildlife Clearance – The scope of work involves carrying out the preliminary environmental screening to assess the direct and induced impacts due to the project and will require wildlife clearance for nearly 300 ha Area.
The work is likely to be completed in 3 months at an estimated cost of Rs 1.36 million.
Publish Date: July 18, 2025
End Date: July 28, 2025.
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Water Supply
Work: Aurungabad Water Supply Scheme – The scope of the project includes implementation of the Aurungabad Water Supply Scheme at an estimated cost of Rs 688.29 million.
Siwan Water Supply Scheme – The scope of the project includes implementation of the Siwan Water Supply Scheme at an estimated cost of Rs 1,080.44 million.
The work is likely to be completed in 12 months.
Publish Date: July 17, 2025
End Date: September 22, 2025*
Implementing Agency: The Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Water Supply
Work: The scope of the project includes procurement, testing, installation, commissioning, operation and maintenance of 1.0 lakh smart water meters with associated communication and billing system in Chennai including operation and maintenance (O&M) under Hybrid Annuity Model (HAM).
Publish Date: July 15, 2025*
End Date: August 21, 2025*
Implementing Agency: Haryana State Industrial and Infrastructure Development Corporation Limited (HSIIDC)
Segment: Water Supply
Work: The scope of the project includes planning, design, engineering, procurement, construction, installation testing, commissioning of 21 mld Common Effluent Treatment Plant (CETP) for textile dying waste water having 63 mld main pumping station (MPS) capacity based on extended aeration technology comprising of the coarse screen, raw effluent sump, pumping machinery, dry pit pump house, rising main from common header to CETP, comprising of fine screen, oil and grease Trap cum grit chamber, equalization tank, equalized flow lifting pumps, 21 mld equalized effluent lifting pump house, thickened sump and pump, chemical house, chemical solution tanks with metering pumps, flash mixer, clariflocculator, chemical sludge sump, distribution cum collection sump, aeration tanks, secondary clarifier, receiving chamber suitable for 63 mld (including 2 CETPs of 21 mld capacity each existing CETPs), automatically operated rapid gravity filters, filtered water storage tank and pump house for pumping filtered water to activated carbon filters or disposal, automatically controlled chlorination for sterilization, biological sludge sump, sludge lifting pump house for chemical sludge and biological sludge, centrifuge/ screw filter press, dry sludge storage platform, electrotechnical works, DG set, transformer, connections, statutory approvals, campus development etc. complete in all respect achieving tertiary treatment with connection to exiting disposal line including operation and maintenance (O&M) for 10 years and three months of trial run period .
Publish Date: July 15, 2025
End Date: September 15, 2025*
Implementing Agency: Karnataka Neeravari Nigam Limited
Segment: Water Supply
Work: The scope of work involves survey, investigation, design, supply, installation, testing and commissioning of Hangaraga tank filling scheme consisting of installation of vertical turbine pumps coupled to HT motors, delivery pipe, manifold system, necessary valves, rising main of length 7.6 km, pressure distribution network and construction of impounding reservoir near Hangaraga village for providing drinking water supply (bulk supply) for 17 villages and filling of existing 7 MI ZP tanks in Uchagaon Hobli, Belagavi Taluk district by lifting water from existing Kallehol barrage across Markandeya river including operation and maintenance (O&M) for a period of 5 years.
Publish Date: July 13, 2025
End Date: July 31, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope of work involves rejuvenation of water body projects in 45 urban local bodies (ULBs) (50 projects) in the jurisdiction of Adilabad, Karimnagar and Warangal divisions. The work is likely to be completed in 18 months at an estimated cost of Rs 933.24 million. The defect liability period for the project is 24 months.
Publish Date: July 11, 2025
End Date: July 18, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of the projects include survey, collection of data, preparation of Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) and other allied works for Municipal Corporation / Development Authority Area in 13 districts namely Aligarh, Ayodhya, Prayagraj, Firozabad, Agra, Mathura, Lucknow, Shahjahnpur, Bareilly, Kanpur, Meerut, Ghaziabad and Moradabad. The work is likely to be completed in 4 months.
Publish Date: July 9, 2025
End Date: July 25, 2025
Implementing Agency: Rajkot Municipal Corporation
Segment: Water Supply
Work: The scope of work involves providing and laying rising main from intake well to WTP, construction of 150 mld water treatment plant (WTP), ground service reservoir, ESR, zero liquid discharge units and other works including operation and maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 1,172.44 million.
Publish Date: July 9, 2025
End Date: August 21, 2025
Implementing Agency: Mahabubnagar Municipal Corporation
Segment: Water Supply
Work: The project is being funded by the Urban Infrastructure Development Fund (UIDF). The work is likely to be completed in 18 months at an estimated cost of Rs 1572.61 million.
Publish Date: July 7, 2025
End Date: July 25, 2025
Implementing Agency: Tamil Nadu Water Supply and Drainage Board (TWAD)
Segment: Water Supply
Work: The scope of work includes replacement of existing 1100 mm PSC pipes with MS pipe and replacement of PSC pipes with various sizes of DI pipes under Attur Narasingapuram CWSS in Salem District at an estimated cost of Rs 568.9 million. The work is likely to be completed in 12 months followed by a 2 month trial run period.
Publish Date: July 7, 2025
End Date: July 18, 2025
Implementing Agency: The Durg Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of diversion weirs at Shankar Nala and at Pulgaon Nala, construction of inlet chamber, screen chamber and grit settlement chamber, interceptor sewer pipe line of length 0.85 metres, wet well with overhead pump house, two sewage treatment plants; a 47 mld STP at Shankar Nala and a 30 mld STP at Pulgaon Nala and a raw sewer rising main of length 0.3 km including 15 years operation and maintenance (O&M) and a three month trial run period. The work is likely to be completed in 27 months at an estimated cost of Rs 1,445.2 million.
Publish Date: July 7, 2025
End Date: July 17, 2025
Implementing Agency: Water Resources Department
Segment: Wastwater
Work: The scope of the project includes providing consultancy works for survey, preparing design, plans, maps, estimate and D.T.P. for cross drainage structure on Khari river near village Ravalapura at an estimated cost of Rs 0.7 million. The work is likely to be completed in three months
Publish Date: July 5, 2025
End Date: July 22, 2025
Implementing Agency: The Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of the project includes design, construction, providing, supplying, lowering, laying and jointing M.S. rising main pipeline, RCC sump, pump house, staff quarters, rcc road, compound wall, supplying and erecting pumping machinery at various HWs & SHWs followed by 10 years of operation and maintenance (O&M) period with trial run period of three months in Taluka: Keshod, Bhesan, Junagadh, Maliya, Mangrol of District Junagadh. The estimated cost of the project is Rs 796.89 million.
Publish Date: July 5, 2025
End Date: August 11, 2025
Implementing Agency: Jal Shakti (PHE) Division Udhampur
Segment: Water Supply
Work: The scope of the project includes construction of supply channel and repair/renovation of the existing supply channel, diversion bund and channelization of River Tawi, ground service reservoirs (GSRs), sump tanks, R/Mains and G/Mains, distribution system, pump rooms, operator/staff quarters, anchor blocks for rising main, boundary walls and chain link fencing, RCC protection and retaining walls, civil protection works, facelift/repair/renovation of existing GSRs, sump tanks and OHTs, installation of lighting systems (flood lights), provision of water connections to 2200 new households, and procurement, installation, testing and commissioning of pumping machinery for water supply augmentation to Udhampur Town at an estimated cost of Rs 725.35 million. The project includes an operation and maintenance (O&M) period of 10 years.
Publish Date: July 5, 2025
End Date: August 11, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of the projects include survey, collection of data, preparation of Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) and other allied works for Municipal Corporation / Development Authority Area in 13 districts namely Aligarh, Ayodhya, Prayagraj, Firozabad, Agra, Mathura, Lucknow, Shahjahnpur, Bareilly, Kanpur, Meerut, Ghaziabad and Moradabad. The work is likely to be completed in 4 months.
Publish Date: July 4, 2025
End Date: July 19, 2025
Implementing Agency: The Morena Municipal Corporation
Segment: Wastewater
Work: The scope of work includes survey, soil investigation, design, construction, providing, laying, jointing, testing, commissioning of sewerage pipelines including the construction of manholes and sewer appurtenances with road restoration works complete, providing house sewer chambers and laterals for connecting sewer to consumer sewer lines, 10 and 11 million litres per day (mld) sewage treatment plant (STP) and pumps from wet well, HT feeder connection up to Sewage treatment plants, supervisory control and data acquisition (SCADA) automation and 10 years Operation and Maintenance (O&M). The work is likely to be completed in 36 months at an estimated cost of Rs 1,490.3 million.
Publish Date: July 3, 2025
End Date: August 4, 2025
Implementing Agency: Chennai Metro Water Supply and Sewerage Board (CMWSSB)
Segment: Desalination
Work: The scope of the project includes conducting conditional assessment and preparation of detailed project report (DPR). The work is likely to be completed in three months. The project involves rehabilitation of Minjur desalination plant implemented by Chennai Water Desalination Limited, the special purpose vehicle (SPV) of IVRCL Infrastructure and Projects Limited in consortium with Befesa Construccion y Tecnologia Ambiential in 2010. As of September 2024, the contract has been terminated.
Publish Date: July 3, 2025
End Date: July 8, 2025
Implementing Agency: Irrigation & Water Resources Department, Haryana
Segment: Wastewater
Work: The scope of the project includes Consultancy for design, drawing surveying and detailed estimate and preparation of detailed project report (DPR) providing storm water drainage system along with installation of 7 Nos pump houses and associated works for Maharaja Agrasen International Airport, Hisar to Sink Lake storage tank to Hisar Drain.
Publish Date: July 3, 2025
End Date: july 14, 2025
Implementing Agency: The Public Health Engineering Department, Haryana
Segment: Wastewater
Work: The scope of work includes upgradation of existing 40 mld upflow anaerobic sludge blanket (UASB) based STP to 60 mld capacity STP and post-treatment by biological nutrient removal process (BNR) with addition of primary clarifiers, UASB effluent tank, BNR tanks, secondary clarifiers, tertiary treatment by disc filtration and disinfection by chlorination complete in all respect and other related works including Operation and Maintenance (O&M) for five years and one year defect liability period (DLP) at Sunariya, Rohtak, Haryana. The work is likely to be completed in 24 months at an estimated cost of Rs 570.45 million.
Publish Date: July 2, 2025
End Date: July 23, 2025
Implementing Agency: The Public Health Engineering Department, Jammu and Kashmir (J&K)
Segment: Water Supply
Work: The scope of work involves a) Construction of intake structure (Stage-I) at Ningli Ghat. b) Providing, laying and fixing of raw water mains from Intake at Ningli up to Plant Baghi Islam. c) Providing, laying and fixing of clear water mains from clear water sumps (CWS) up to zonal over head tanks (OHTs). d) Providing, laying and fixing of supply mains and distribution network. e) Providing, laying and fixing of pipeline for connecting of existing storage OHTs. f) Construction of 3.2 million gallons per day (mgd) rapid sand filtration plant with allied works viz, filter house, PST, clarifloculator, flash mixer, backwash tank, aerator and clear water sump, etc. g) Construction of three 1 lac gallons OHTs and two 1.5 lac gallons OHTs. h) Construction of intake chamber (lifting station) at Watlab. i) Construction of clear water sump cum pump house 2 lac gallons capacity at Watlab. j) Construction of water channel for existing lifting station at Watlab and other allied works. k) Electro-mechanical works for (Stage-I) at Ningli lifting station and for (Stage-II) lifting station at Baghi Islam. l) Electro-mechanical works for (Stage-I) lifting station at Wulak lake and for (Stage-II) lifting station at Watlab filtration plant. m) Operation and maintenance (O&M) for five years. The work is expected to be completed in 18 months at an estimated cost of Rs 695.74 million.
Publish Date: July 2, 2025
End Date: July 22, 2025
Implementing Agency: Jharkhand Urban Infrastructure Development Corporation Limited (JUIDCO)
Segment: Water Supply
Work: The scope of work involves survey, geographic information system (GIS) based consumer mapping, design, supply and construction of intake well, pump house, infiltration pipe gallery, vertical turbine pumps, centrifugal pump, RCC approach bridge/gangway, 21 million litres per day (mld) water treatment plant (WTP), raw water transmission main of length 6.82 km, clear water transmission main of length 15.72 km, distribution network of length 130.67 km and other allied infrastructure with five years of Operation and Maintenance (O&M). The work is likely to be completed in 24 months followed by a 3 month trial run period at an estimated cost of Rs 1,037.36 million.
Publish Date: July 2, 2025
End Date: July 28, 2205
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Wastewater
Work: The scope of the project includes construction of major storm water drains including road crossing culverts on Pandenavagu in Manikonda Municipality. It is likely to be completed in 18 months at an estimated cost of Rs 760.76 million.
Publish Date: July 1, 2025
End Date: July 19, 2025
Implementing Agency: Nayagarh Municipality
Segment: Wastewater
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: July 1, 2025
End Date: July 25, 2025
Implementing Agency: Assam Urban Infrastructure Development And Finance Corporation (AUIDFC)
Segment: Water Supply
Work: The scope of the project includes construction of a water treatment plant (WTP) of 6.7 mld capacity, raw water pumping main of length 2.04 km, clear water pumping main of length 4.42 km, distribution network of length 109.33 km and 11,153 metered house connections. The project is funded by Asian Development Bank (ADB) under Assam Urban Sectoral Development Program. The work is likely to be completed in 30 months and includes a 10 year operation and maintenance (O&M) period.
Publish Date: July 1, 2025
End Date: July 15, 2025
Implementing Agency: Andaman Public Works Department (APWD)
Segment: Wastewater
Work: Scope of work involves conducting EIA study and obtaining forest clearance for implementation of Source No. 3 – Sabari WTP DI Pipeline Project in Andaman and Nicobar Island. The work is likely to be completed in six months at an estimated cost of Rs 1.46 million. The length of the project is 8 km.
Publish Date: June 30, 2025
End Date: July 30, 2025
Implementation Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Wastewater
Work: Siwan Sewerage Network Scheme – The work is likely to be completed in 12 months at an estimated cost of Rs 3592.67 million.
Aurangabad Sewerage Network Scheme – The work is likely to be completed in 12 months at an estimated cost of Rs 4886.01 million.
Buxar Sewerage Network Scheme – The work is likely to be completed in 12 months at an estimated cost of Rs 2492.08 million.
Sasaram Sewerage Network Scheme – The work is likely to be completed in 12 months at an estimated cost of Rs 4469.75 million.
Publish Date: June 17, 2025
End Date: August 18, 2025
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Water Supply
Work: Pallipattu WDS and Thiruvanmiyur WDS Continuous Water Supply Project of Chennai city in Tamil Nadu. The total capacity of the project is 400 MLD. The project is to be executed on Hybrid Annuity Model (HAM) basis through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT Annuity or Hybrid Annuity) basis . The work on the project is likely to be completed in 24 months. The project includes 15 years of operation and maintenance (O&M).
Publish Date: April 7, 2025
End Date: August 7, 2025*
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation & maintenance in 25 ULBs within purview of SE (PH) Q.C. Circle, Guntur based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 10,926.03 million.
Publish Date: June 30, 2025
End Date: August 7, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation & maintenance in 23 Urban Local Bodies of Prakasam, Nellore Tirupati and Chittoor districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 10,859.18 million.
Publish Date: June 30, 2025
End Date: August 7, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: Package 1: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation and maintenance in 11 Urban Local Bodies Of Ananthapuramu, Sri Satya Sai And Annamayya districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4545.02 million. It also includes construction of 8 mld water treatment plant (WTP) in Rayadurg Municipality, 10 mld WTP in Dharmavaram Municipality, 25 mld STP based on Sequential Batch Reactor (SBR) technology in Ananthapuramu Municipal Corporation Municipality and 28 mld STP in Hindupur Municipality.
Package 2: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation and maintenance in 5 Urban Local Bodies Of Kurnool And Nandyal districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4318.39 million. It also includes construction of 30 mld WTP at Jagannathagattu, 35 mld STP in Kurnool, 0.2 mld STP at Mamidapadu village, 0.4 mld STP at Munagalapadu village, 11 mld STP at Kallubavi in Adoni town, 14.5 mld STP at Aptidco housing in Adoni town and 32 mld STP at Kundu river near Chamakaluva.
Package 3: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation works including operation and maintenance in 5 Urban Local Bodies Of YSR Kadapa district based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 6639.14 million. It also includes construction of 95 mld WTP near Bandikanuma Hilllock, 15 mld STP at Palempalli in Kadapa Town, 3 mld STP in Devuni Kadapa Cheruvu, 2 mld STP in Budayapalle Cheruvu and 2 mld STP in Putlampalli Cheruvu.
Publish Date: June 27, 2025
End Date: August 7, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Wastewater
Work: The scope of the project includes construction of a sewage treatment plant (stp) of capacity 60 mld, one interception and diversion structure, main pumping station of 60 mld (75 mld civil capacity), rising main of length 0.120 km and effluent line of length 0.1 km at an estimated cost of Rs 1088.8 million on hybrid annuity model (HAM). The work is likely to be completed in 24 months which includes a three months trial run period followed by a 15 year operation and maintenance (O&M) period. The O&M cost (non-power) is Rs 285.7 million and power cost is Rs 975 million.
Publish Date: June 27, 2025
End Date: October 7, 2025*
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation & maintenance in 10 Urban Local Bodies of Visakhapatnam, Vizianagaram Srikakulam, Parvathipuram Manyam and Anakapalli districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4013.47 million.
Publish Date: June 27, 2025
End Date: August 7, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: Package 1: The scope of work includes execution of 18 water supply, sewage & septage management and water body rejuvenation works including operations and maintenance in 7 Urban Local Bodies of East Godavari, West Godavari Districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 5580.34 million.
Package 2: The scope of work includes execution of 18 water supply, sewerage & water body rejuvenation scheme works including operation and maintenance in 11 Urban Local Bodies of Dr. B.R. Ambedkar Konseema & Kakinada Districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4224.34 million.
Package 3: The scope of work includes execution of 17 water supply, sewerage & septage management and water body rejuvenation works including operation and maintenance in 4 Urban Local Bodies of East Godavari, & Eluru Districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4185.96 million.
Publish Date: June 27, 2025
End Date: August 7, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The consultancy work involves analysing the existing and proposed UGD system by conducting detailed survey, preparation of hydraulic design, structural designs and drawings for sewer network, wetwell with allied accessories, STP & other civil structures of the UGD system components & preparation of DPR for providing 2nd stage UGD system to Chamarajanagara city.
Publish Date: June 26, 2025
End Date: July 3, 2025
Implementing Agency: Tirumala Tirupati Devasthanams
Segment: Wastewater
Work: The scope of the project includes; Stormwater Drainage: Study existing drains available and its capacities, and suggest delinking with underground lines, providing new / additional drains and their disposal anticipating influx of moderate to heavy rains, forecasting & recommendations on regulation of storm water drains and shall access the sites, design detailed plans & overseeing the construction of drainage system.
Solid Waste Management: Assessment of existing & proposed infrastructure of TTD for the implementation of SW RULES 2016 & NGT directives, identifying gaps in the existing infrastructure in compliance with NGT/Central/State pollution control board regarding waste and propose interventions for consideration to the TTD and conduct a detailed survey, site investigations, waste characterizations & composition studies, waste quantification study, topographical survey for integrated waste processing and disposal facility and study and recommend the introduction of advanced technologies.
Publish Date: June 26, 2025
End Date: July 10, 2025
Implementing Agency: Balligadu NAC
Segment: Water Supply
Work: The scope of work includes study of the topography, hydrology of the site and surrounding areas, design and prepare the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019, Central Ground Water Board (CGWB) guidelines, River centric urban development planning guideline of Minister for Housing and Urban Affairs (MoHUA).
Publish Date: August 1, 2025
End Date: August 8, 2025
Implementing Agency: Bhararpur Municipal Corporation
Segment: Water Supply
Work: The scope of work involves providing technical manpower to manage or supervise the project. The services include project management including strategic advisory, planning and coordination, construction supervision and quality control of the stormwater drainage project, site coordination, reports, and staffing schedule.The work is expected to be completed in 24 months at an estimated cost of Rs 8 million.
Publish Date: July 30, 2025
End Date: August 11, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: The scope of work involves surveying, collection of hydrological data, design, detailed engineering, construction, supply, installation and commissioning of ground water based multi-village piped water supply scheme having 7.85 mld (million liter per day) capacity, 9 tube well (including 3 stand by tube well), one clean water MGSR (master ground storage reservoir), six GSR, seven zonal ESR, MS/DI/HDPE distribution pipeline network etc. in Panchaytat Sadki, Athan, Sarodag, Adhaura, Badwankala, Dumrawa and Chainpura under Adhaura block with minimum six months of trail run and operation and maintenance (O&M) period of seven years.
Publish Date: July 30, 2025
End Date: August 14, 2025
Implementing Agency: Rural Water Supply and Sanitation Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes 392 Habitations Tekkali (Srikakulam) Drinking Water Supply Project. The work is likely to be completed in 24 months at an estimated cost of Rs 685.23 million. The total project cost is Rs 966.39 million.
Publish Date: July 23, 2024
End Date: August 14, 2025
Implementing Agency: Madhya Pradesh Jal Nigam (MPJN)
Segment: Water Supply
Work: The scope of work involves field investigations and site surveys, geotechnical surveys, conditional assessment, topographical survey and preparation of detailed project report (DPR). The work is likely to be completed in two months at an estimated cost of Rs 2.16 million.
Publish Date: July 22, 2025
End Date: August 5, 2025
Implementing Agency: Sonipat Municipal Corporation
Segment: Wastewater
Work:The scope of work involves survey, firms / study, investigation, detailed project report (DPR), DNIT, for the works relating to Water, Sewerage & Storm Water System. The work is likely to be completed in three months
Publish Date: July 21, 2025
End Date: August 12, 2025
Imlementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Suupy
Work: The scope of the work includes implementation of the Ramagundam Water Supply Improvement Scheme in Telangana. The project is being funded by the Urban Infrastructure Development Fund (UIDF). The work is likely to be completed in 18 months at an estimated cost of Rs 622.49 million.
Publish Date: July 15, 2025
End Date: August 12, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: Water Supply
Work: The work is likely to be completed in 18 months at an estimated cost of Rs 620.59 million. The total cost of the project is Rs 2.15 billion out of which Rs 657.98 million will be funded by the state government.
Publish Date: July 21, 2025
End Date: August 11, 2025
Implementing Agency: Sewage and Infrastructure Development Corporation of Goa
Segment: Wastewater
Work: The scope of work involves revamping of 7.5 mld activated sludge process sewage treatment plant (STP) to 20 mld sewage treatment plant (STP) based on SBR technology including operation and maintenance (O&M) for 2 years. The work is likely to be completed in 12 months at an estimated cost of Rs 755.79 million
Publish Date: July 17, 2025
End Date: August 8, 2025
Implementing Agency: Gandhinagar Municipal Corporation
Segment: Wastewater
Work: The scope of project includes providing & laying 1800 mm sewerage trunk main by open excavation method of length 2.42 km and microtunneling method of length 3.18 km from National Highway near TP-29 to Adalaj TSPS at an estimated cost of Rs 973.41 million. The work is likely to be completed in 18 months.
Publish Date: July 8, 2025
End Date: August 11, 2025
Implementing Agency: Engineers India Limited
Segment: Wastewater
Work: The scope of work includes development of oil water separator (OWS) treatment system with 260 m3/h capacity, contaminated rain water (CRW) treatment with 150 m3/h capacity, spent caustic treatment with 5 m3/h capacity, spent caustic treatment for wet air oxidation (WAO) treated spent caustic with 20 m3/hr capacity and 6.25 m3/h capacity sewage treatment, sludge handling & dewatering facilities, chemicals handling and dosing facilities, voc collection and treatment section, intermediate storage and pumping facilities, chemical house, substation, control room & other buildings/structures/works, all geo-tech, civil and structural, architectural, electrical, instrumentation, mechanical, process, hazard and operability (HAZOP) studies, 3D modeling, development of all p&ids in smart plant system and other works required for ETP.
Publish Date: March 21, 2025
End Date: June13, 2025
Implementing Agency: Drinking Water and Sanitation Department, Jharkhand
Segment: Water Supply
Work: The scope of work involves detailed survey, designing and drawing of left out work, construction of 10.0 M dia R.C.C. Intake well cum pump house, gangway of 0.075 km length and 3.95 m wide, pipe bridge 0.07 km length and 2.00 m wide, pipe bridge 0.050 km length and 2 m wide, pipe bridge 0.100 km length and 2 m wide, pipe bridge 0.060 km length and 2 m wide, 19.50 mld capacity water treatment plant (WTP), compound wall, supplying and laying raw/clear water rising main and laying distribution network, supplying and installation of vertical turbine and centrifugal pump motor including five years operation and maintenance (O&M).
Publish Date: July 19, 2025
End Date: August 5, 2025
Implementing Agency: Madhya Pradesh Jal Nigam (MPJN)
Segment: Water Supply
Work: Karanjiya: The scope of work involves construction of 19.17 mld water treatment plant (WTP) providing, laying and jointing of raw water pumping main having length 1.93 km (pipeline only supplied but balance works to be done including laying) and 4.27 km (pipeline not supplied and all works to be done including supply); clear water pumping main having length 38.05 km (pipeline not supplied and all works to be done including supply); gravity main having length 5.31 km (pipeline not supplied and all works to be done including supply); HDPE, PE100 PN6 (minimum) pipelines having length 67.46 km (pipeline already laid but balance works to be done), 51.99 km (pipeline only supplied but balance works to be done including laying) and 130.62 km (pipeline not supplied and all works to be done including supply) and 34,608 house connections. The cost of work is Rs 2491.6 million.
Shahpura – Mehandwani: The scope of work involves construction of 25.83 mld water treatment plant (WTP) providing, laying and jointing of raw water pumping main having length 0.3 km (pipeline already laid but balance works to be done), 0.22 km (pipeline only supplied but balance works to be done including laying) and 0.67 km (pipeline not supplied and all works to be done including supplying); clear water pumping main having length 37.39 km (pipeline not supplied and all works to be done including supply); gravity main having length 12.42 km (pipeline only supplied but balance works to be done including laying) and 703.69 km (pipeline not supplied and all works to be done including supply); HDPE, PE100 PN6 (minimum) pipelines having length 131.42 km (pipeline already laid but balance works to be done), 140.71 km (pipeline only supplied but balance works to be done including laying) and 501.06 km (pipeline not supplied and all works to be done including supply) and 17,398 house connections. The cost of work is Rs 3,172.8 million. The work is likely to be completed in 24 months at an estimated combined cost of Rs 5,664.4 million.
Publish Date: July 15, 2025
End Date: September 6, 2025*
Implementing Agency: Madhya Pradesh Jal Nigam (MPJN)
Segment: Water Supply
Work: The scope of work involves construction of 11.67 mld water treatment plant (WTP) providing, laying and jointing of raw water pumping main having length 3.16 km (pipeline already laid but balance works to be done) and 0.63 km (pipeline only supplied but balance works to be done including laying); clear water pumping main having length 26.19 km (pipeline already laid but balance works to be done), 2.24 km (pipeline only supplied but balance works to be done including laying) and 8.67 km (pipeline not supplied and all works to be done including supply); gravity main having length 122.12 km (pipeline already laid but balance works to be done), 0.24 km (pipeline only supplied but balance works to be done including laying) and 53.42 km (pipeline not supplied and all works to be done including supply); HDPE, PE100 PN6 (minimum) pipelines having length 92.46 km (pipeline already laid but balance works to be done), 34.73 km (pipeline only supplied but balance works to be done including laying) and 6.55 km (pipeline not supplied and all works to be done including supply) and 19,430 house connections.
Publish Date: July 15, 2025
End Date: September 6, 2025*
Implementing Agency: Madhya Pradesh Jal Nigam (MPJN)
Segment: Water Supply
Work: The scope of work involves construction of 24.78 mld water treatment plant (WTP), providing, laying and jointing of raw water pumping main having length 12.61 km (pipeline already laid but balance works to be done), 4.5 km (pipeline only supplied but balance works to be done including laying) and 0.11 km (pipeline not supplied and all works to be done including supply); clear water pumping main having length 6.44 km (pipeline already laid but balance works to be done), 1.32 km (pipeline only supplied but balance works to be done including laying) and 2.09 km (pipeline not supplied and all works to be done including supply); gravity main having length 56.22 km (pipeline already laid but balance works to be done), 77.04 km (pipeline only supplied but balance works to be done including laying) and 170.2 km (pipeline not supplied and all works to be done including supply); HDPE, PE100 PN6 (minimum) pipelines having length 377.51 km (pipeline already laid but balance works to be done), 369.13 km (pipeline only supplied but balance works to be done including laying) and 4.88 km (pipeline not supplied and all works to be done including supply) and 44,764 house connections.
Publish Date: July 15, 2025
End Date: September 6, 2025*
Implementing Agency: Karnataka Neeravari Nigam Limited
Segment: Water Supply
Work: The scope of work involves survey, investigation, design, supply, installation, testing and commissioning of Hangaraga tank filling scheme consisting of installation of vertical turbine pumps coupled to HT motors, delivery pipe, manifold system, necessary valves, rising main of length 7.6 km, pressure distribution network and construction of impounding reservoir near Hangaraga village for providing drinking water supply (bulk supply) for 17 villages and filling of existing 7 MI ZP tanks in Uchagaon Hobli, Belagavi Taluk district by lifting water from existing Kallehol barrage across Markandeya river including operation and maintenance (O&M) for a period of 5 years.
Publish Date: July 13, 2025
End Date: July 31, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope of work involves rejuvenation of water body projects in 45 urban local bodies (ULBs) (50 projects) in the jurisdiction of Adilabad, Karimnagar and Warangal divisions. The work is likely to be completed in 18 months at an estimated cost of Rs 933.24 million. The defect liability period for the project is 24 months.
Publish Date: July 11, 2025
End Date: July 18, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of the projects include survey, collection of data, preparation of Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) and other allied works for Municipal Corporation / Development Authority Area in 13 districts namely Aligarh, Ayodhya, Prayagraj, Firozabad, Agra, Mathura, Lucknow, Shahjahnpur, Bareilly, Kanpur, Meerut, Ghaziabad and Moradabad. The work is likely to be completed in 4 months.
Publish Date:July 9, 2025
End Date: July 25, 2025
Implementing Agency: Mahabubnagar Municipal Corporation
Segment: Water Supply
Work: The project is being funded by the Urban Infrastructure Development Fund (UIDF). The work is likely to be completed in 18 months at an estimated cost of Rs 1572.61 million.
Publish Date: July 7, 2025
End Date: July 25, 2025
Implementing Agency: Tamil Nadu Water Supply and Drainage Board (TWAD)
Segment: Water Supply
Work: The scope of work includes replacement of existing 1100 mm PSC pipes with MS pipe and replacement of PSC pipes with various sizes of DI pipes under Attur Narasingapuram CWSS in Salem District at an estimated cost of Rs 568.9 million. The work is likely to be completed in 12 months followed by a 2 month trial run period.
Publish Date: July 7, 2025
End Date: July 18, 2025
Implementing Agency: The Durg Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of diversion weirs at Shankar Nala and at Pulgaon Nala, construction of inlet chamber, screen chamber and grit settlement chamber, interceptor sewer pipe line of length 0.85 metres, wet well with overhead pump house, two sewage treatment plants; a 47 mld STP at Shankar Nala and a 30 mld STP at Pulgaon Nala and a raw sewer rising main of length 0.3 km including 15 years operation and maintenance (O&M) and a three month trial run period. The work is likely to be completed in 27 months at an estimated cost of Rs 1,445.2 million.
Publish Date: July 7, 2025
End Date: July 17, 2025
Implementing Agency: Water Resources Department
Segment: Wastwater
Work: The scope of the project includes providing consultancy works for survey, preparing design, plans, maps, estimate and D.T.P. for cross drainage structure on Khari river near village Ravalapura at an estimated cost of Rs 0.7 million. The work is likely to be completed in three months
Publish Date: July 5, 2025
End Date: July 22, 2025
Implementing Agency: The Gujarat Water Supply and Sewerage Board (GWSSB)
Segment: Water Supply
Work: The scope of the project includes design, construction, providing, supplying, lowering, laying and jointing M.S. rising main pipeline, RCC sump, pump house, staff quarters, rcc road, compound wall, supplying and erecting pumping machinery at various HWs & SHWs followed by 10 years of operation and maintenance (O&M) period with trial run period of three months in Taluka: Keshod, Bhesan, Junagadh, Maliya, Mangrol of District Junagadh. The estimated cost of the project is Rs 796.89 million.
Publish Date: July 5, 2025
End Date: August 11, 2025
Implementing Agency: Jal Shakti (PHE) Division Udhampur
Segment: Water Supply
Work: The scope of the project includes construction of supply channel and repair/renovation of the existing supply channel, diversion bund and channelization of River Tawi, ground service reservoirs (GSRs), sump tanks, R/Mains and G/Mains, distribution system, pump rooms, operator/staff quarters, anchor blocks for rising main, boundary walls and chain link fencing, RCC protection and retaining walls, civil protection works, facelift/repair/renovation of existing GSRs, sump tanks and OHTs, installation of lighting systems (flood lights), provision of water connections to 2200 new households, and procurement, installation, testing and commissioning of pumping machinery for water supply augmentation to Udhampur Town at an estimated cost of Rs 725.35 million. The project includes an operation and maintenance (O&M) period of 10 years.
Publish Date: July 5, 2025
End Date: August 18, 2025
Implementing Agency: Jodhpur Municipal Corporation
Segment: Wastewater
Work: The scope of the project includes sewer rehabilitation of old and deteriorated pipes by Trenchless CIPP Technology for main trunk sewer lines heading towards Nandari and Salawas STPs with three year defect liability period at an estimated cost of Rs 519.9 million. The work is likely to be completed in 12 months.
Publish Date: July 4, 2025
End Date: August 12, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of the projects include survey, collection of data, preparation of Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) and other allied works for Municipal Corporation / Development Authority Area in 13 districts namely Aligarh, Ayodhya, Prayagraj, Firozabad, Agra, Mathura, Lucknow, Shahjahnpur, Bareilly, Kanpur, Meerut, Ghaziabad and Moradabad. The work is likely to be completed in 4 months.
Publish Date: July 4, 2025
End Date: July 19, 2025
Implementing Agency: The Morena Municipal Corporation
Segment: Wastewater
Work: The scope of work includes survey, soil investigation, design, construction, providing, laying, jointing, testing, commissioning of sewerage pipelines including the construction of manholes and sewer appurtenances with road restoration works complete, providing house sewer chambers and laterals for connecting sewer to consumer sewer lines, 10 and 11 million litres per day (mld) sewage treatment plant (STP) and pumps from wet well, HT feeder connection up to Sewage treatment plants, supervisory control and data acquisition (SCADA) automation and 10 years Operation and Maintenance (O&M). The work is likely to be completed in 36 months at an estimated cost of Rs 1,490.3 million.
Publish Date: July 3, 2025
End Date: August 4, 2025
Implementing Agency: Irrigation & Water Resources Department, Haryana
Segment: Wastewater
Work: The scope of the project includes Consultancy for design, drawing surveying and detailed estimate and preparation of detailed project report (DPR) providing storm water drainage system along with installation of 7 Nos pump houses and associated works for Maharaja Agrasen International Airport, Hisar to Sink Lake storage tank to Hisar Drain.
Publish Date: July 3, 2025
End Date: july 14, 2025
Implementing Agency: Chennai Metro Water Supply and Sewerage Board (CMWSSB)
Segment: Desalination
Work: The scope of the project includes conducting conditional assessment and preparation of detailed project report (DPR). The work is likely to be completed in three months. The project involves rehabilitation of Minjur desalination plant implemented by Chennai Water Desalination Limited, the special purpose vehicle (SPV) of IVRCL Infrastructure and Projects Limited in consortium with Befesa Construccion y Tecnologia Ambiential in 2010. As of September 2024, the contract has been terminated.
Publish Date: July 3, 2025
End Date: October 8, 2025*
Implementing Agency: The Public Health Engineering Department, Haryana
Segment: Wastewater
Work: The scope of work includes upgradation of existing 40 mld upflow anaerobic sludge blanket (UASB) based STP to 60 mld capacity STP and post-treatment by biological nutrient removal process (BNR) with addition of primary clarifiers, UASB effluent tank, BNR tanks, secondary clarifiers, tertiary treatment by disc filtration and disinfection by chlorination complete in all respect and other related works including Operation and Maintenance (O&M) for five years and one year defect liability period (DLP) at Sunariya, Rohtak, Haryana. The work is likely to be completed in 24 months at an estimated cost of Rs 570.45 million.
Publish Date: July 2, 2025
End Date: July 23, 2025
Implementing Agency: The Public Health Engineering Department, Jammu and Kashmir (J&K)
Segment: Water Supply
Work: The scope of work involves a) Construction of intake structure (Stage-I) at Ningli Ghat. b) Providing, laying and fixing of raw water mains from Intake at Ningli up to Plant Baghi Islam. c) Providing, laying and fixing of clear water mains from clear water sumps (CWS) up to zonal over head tanks (OHTs). d) Providing, laying and fixing of supply mains and distribution network. e) Providing, laying and fixing of pipeline for connecting of existing storage OHTs. f) Construction of 3.2 million gallons per day (mgd) rapid sand filtration plant with allied works viz, filter house, PST, clarifloculator, flash mixer, backwash tank, aerator and clear water sump, etc. g) Construction of three 1 lac gallons OHTs and two 1.5 lac gallons OHTs. h) Construction of intake chamber (lifting station) at Watlab. i) Construction of clear water sump cum pump house 2 lac gallons capacity at Watlab. j) Construction of water channel for existing lifting station at Watlab and other allied works. k) Electro-mechanical works for (Stage-I) at Ningli lifting station and for (Stage-II) lifting station at Baghi Islam. l) Electro-mechanical works for (Stage-I) lifting station at Wulak lake and for (Stage-II) lifting station at Watlab filtration plant. m) Operation and maintenance (O&M) for five years. The work is expected to be completed in 18 months at an estimated cost of Rs 695.74 million.
Publish Date: July 2, 2025
End Date: July 22, 2025
Implementing Agency: Jharkhand Urban Infrastructure Development Corporation Limited (JUIDCO)
Segment: Water Supply
Work: The scope of work involves survey, geographic information system (GIS) based consumer mapping, design, supply and construction of intake well, pump house, infiltration pipe gallery, vertical turbine pumps, centrifugal pump, RCC approach bridge/gangway, 21 million litres per day (mld) water treatment plant (WTP), raw water transmission main of length 6.82 km, clear water transmission main of length 15.72 km, distribution network of length 130.67 km and other allied infrastructure with five years of Operation and Maintenance (O&M). The work is likely to be completed in 24 months followed by a 3 month trial run period at an estimated cost of Rs 1,037.36 million.
Publish Date: July 2, 2025
End Date: July 28, 2205
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Wastewater
Work: The scope of the project includes construction of major storm water drains including road crossing culverts on Pandenavagu in Manikonda Municipality. It is likely to be completed in 18 months at an estimated cost of Rs 760.76 million.
Publish Date: July 1, 2025
End Date: July 19, 2025
Implementing Agency: Nayagarh Municipality
Segment: Wastewater
Work: The scope of work includes studying the topography, hydrology of the site and surrounding areas, designing and preparation of the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: July 1, 2025
End Date: July 25, 2025
Implementing Agency: Assam Urban Infrastructure Development And Finance Corporation (AUIDFC)
Segment: Water Supply
Work: The scope of the project includes construction of a water treatment plant (WTP) of 6.7 mld capacity, raw water pumping main of length 2.04 km, clear water pumping main of length 4.42 km, distribution network of length 109.33 km and 11,153 metered house connections. The project is funded by Asian Development Bank (ADB) under Assam Urban Sectoral Development Program. The work is likely to be completed in 30 months and includes a 10 year operation and maintenance (O&M) period.
Publish Date: July 1, 2025
End Date: July 15, 2025
Implementing Agency: Andaman Public Works Department (APWD)
Segment: Wastewater
Work: Scope of work involves conducting EIA study and obtaining forest clearance for implementation of Source No. 3 – Sabari WTP DI Pipeline Project in Andaman and Nicobar Island. The work is likely to be completed in six months at an estimated cost of Rs 1.46 million. The length of the project is 8 km.
Publish Date: June 30, 2025
End Date: July 30, 2025
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Water Supply
Work: Pallipattu WDS and Thiruvanmiyur WDS Continuous Water Supply Project of Chennai city in Tamil Nadu. The total capacity of the project is 400 MLD. The project is to be executed on Hybrid Annuity Model (HAM) basis through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT Annuity or Hybrid Annuity) basis . The work on the project is likely to be completed in 24 months. The project includes 15 years of operation and maintenance (O&M).
Publish Date: April 7, 2025
End Date: August 7, 2025*
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation & maintenance in 25 ULBs within purview of SE (PH) Q.C. Circle, Guntur based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 10,926.03 million.
Publish Date: June 30, 2025
End Date: August 7, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation & maintenance in 23 Urban Local Bodies of Prakasam, Nellore Tirupati and Chittoor districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 10,859.18 million.
Publish Date: June 30, 2025
End Date: August 7, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: Package 1: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation and maintenance in 11 Urban Local Bodies Of Ananthapuramu, Sri Satya Sai And Annamayya districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4545.02 million. It also includes construction of 8 mld water treatment plant (WTP) in Rayadurg Municipality, 10 mld WTP in Dharmavaram Municipality, 25 mld STP based on Sequential Batch Reactor (SBR) technology in Ananthapuramu Municipal Corporation Municipality and 28 mld STP in Hindupur Municipality.
Package 2: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation and maintenance in 5 Urban Local Bodies Of Kurnool And Nandyal districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4318.39 million. It also includes construction of 30 mld WTP at Jagannathagattu, 35 mld STP in Kurnool, 0.2 mld STP at Mamidapadu village, 0.4 mld STP at Munagalapadu village, 11 mld STP at Kallubavi in Adoni town, 14.5 mld STP at Aptidco housing in Adoni town and 32 mld STP at Kundu river near Chamakaluva.
Package 3: The scope of work includes execution of water supply, sewerage & septage management and water body rejuvenation works including operation and maintenance in 5 Urban Local Bodies Of YSR Kadapa district based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 6639.14 million. It also includes construction of 95 mld WTP near Bandikanuma Hilllock, 15 mld STP at Palempalli in Kadapa Town, 3 mld STP in Devuni Kadapa Cheruvu, 2 mld STP in Budayapalle Cheruvu and 2 mld STP in Putlampalli Cheruvu.
Publish Date: June 27, 2025
End Date: August 7, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: The scope of the project includes execution of water supply, sewerage & septage management and water body rejuvenation scheme works including operation & maintenance in 10 Urban Local Bodies of Visakhapatnam, Vizianagaram Srikakulam, Parvathipuram Manyam and Anakapalli districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4013.47 million.
Publish Date: June 27, 2025
End Date: August 7, 2025
Implementing Agency: Public Health And Municipal Engineering Department, Andhra Pradesh
Segment: Water Supply
Work: Package 1: The scope of work includes execution of 18 water supply, sewage & septage management and water body rejuvenation works including operations and maintenance in 7 Urban Local Bodies of East Godavari, West Godavari Districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 5580.34 million.
Package 2: The scope of work includes execution of 18 water supply, sewerage & water body rejuvenation scheme works including operation and maintenance in 11 Urban Local Bodies of Dr. B.R. Ambedkar Konseema & Kakinada Districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4224.34 million.
Package 3: The scope of work includes execution of 17 water supply, sewerage & septage management and water body rejuvenation works including operation and maintenance in 4 Urban Local Bodies of East Godavari, & Eluru Districts based on Hybrid Annuity Model (HAM) at an estimated cost of Rs 4185.96 million.
Publish Date: June 27, 2025
End Date: August 7, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The consultancy work involves analysing the existing and proposed UGD system by conducting detailed survey, preparation of hydraulic design, structural designs and drawings for sewer network, wetwell with allied accessories, STP & other civil structures of the UGD system components & preparation of DPR for providing 2nd stage UGD system to Chamarajanagara city.
Publish Date: June 26, 2025
End Date: July 3, 2025
Implementing Agency: Tirumala Tirupati Devasthanams
Segment: Wastewater
Work: The scope of the project includes; Stormwater Drainage: Study existing drains available and its capacities, and suggest delinking with underground lines, providing new / additional drains and their disposal anticipating influx of moderate to heavy rains, forecasting & recommendations on regulation of storm water drains and shall access the sites, design detailed plans & overseeing the construction of drainage system.
Solid Waste Management: Assessment of existing & proposed infrastructure of TTD for the implementation of SW RULES 2016 & NGT directives, identifying gaps in the existing infrastructure in compliance with NGT/Central/State pollution control board regarding waste and propose interventions for consideration to the TTD and conduct a detailed survey, site investigations, waste characterizations & composition studies, waste quantification study, topographical survey for integrated waste processing and disposal facility and study and recommend the introduction of advanced technologies.
Publish Date: June 26, 2025
End Date: July 10, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJNM)
Segment: Water Supply
Work: The scope of the project includes survey, soil investigation, design, supply of all materials, labour, etc. required for construction, erection, completion, testing and commissioning of water supply works such as RCC over head tank, CWR cum pump house, rising main, distribution system, pump house, boundary wall, gate, site development, renovation of existing facilities and construction of tube wells including PLC SCADA automation and other appurtenant works of water supply at an estimated cost of Rs 1585.85 million.
Publish Date: June 21, 2025
End Date: July 7, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (Urban)
Segment: Water Supply
Work: The scope of the project includes construction of 19 pump house cum chlorination room, two RCC over head tanks, one clear water reservoir of 300 kl capacity, supply and laying of rising main of length 20.46 km and DI/HDPE distribution system of length 123.34 km and providing 14355 house connections at an estimated cost of Rs 572.3 million under.
Publish Date: June 21, 2025
End Date: July 7, 2025
Implementing Agency: Jodhpur Development Authority (JDA)
Segment: Wastewater
Work: The scope of the project includes providing, laying, jointing, testing and commissioning of sewer system and all ancillary works, including construction of manholes, property connections, construction of sewage pumping station (SPS) of 13.39 mld capacity and restoration of roads and construction of a sewage treatment plant (STP) of 10 mld capacity in Jhalamand area of Jodhpur district, Rajasthan including operation and maintenance (O&M) period for STP of 10 years including three year defect liability period.
Publish Date: June 25, 2025
End Date: August 11, 2025
Implementing Agency: Public Works Department (PWD), Goa
Segment: Water Supply
Work: The scope of the project includes upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld. The capacity of the plant is 80 mld.The work is likely to be completed in 36 months
Publish Date: June 17, 2025
End Date: August 11, 2025
Implementing Agency: Uttar Pradesh Jal Nigam Gramin
Segment: Wastewater
Work: The scope of work includes includes I&D for 14 untapped drains namely (i) Rameshwar Ghat drain, (ii) Rani Ghat drain, (iii) Gola Ghat drain, (iv) Satti Chaura Ghat drain, (v) Maiskar Ghat drain, (vi) Dabka drain, (vii) Makkoo Sayeed Ka Bhatta drain, (viii) UPA Compound drain, (ix) Bangali Ghat drain, (x) Ganda Nala, (xi) Transport Nagar drain, (xii) Arra drain, (xiii) Sagarpuri drain and (xiv) Halwakhanda drain; improvement/rehabilitation of two existing drains namely (i) Sheetla Bazar drain and (ii) Budhiya Ghat drain; diversion of 14 drains to proposed SPS / common manholes – 2.51 km (trenchless – 1.1 k m; open excavation – 1.4 km);diversion of 15 mld sewage through 800 mm dia MS pipe (Trenchless) from Sewage Catchment District – I (2200 mm brick barrel gumti no.5) to District – II (1200/1400 mm reinforced cement concrete (RCC) line at Zarib Chaowki) – 890 m; Development of 6 sewage pumping stations (PS) (6.09 mld, 2.13 mld, 2.93 mld, 49.5 mld, 4.16 mld & 1.65 mld) and a lift Station (2.46 MLD capacity) and laying of rising mains from SPS / LS to manholes of existing SPSs / STPs – 11,253 m (trenchless – 3,210 m; open excavation – 8,043 m) including one year O&M and 15 days trial run period on Design, Build, Operate and Transfer (DBOT) basis.
Publish Date: June 20, 2025
End Date: July 14, 2025
Implementing Agency: Public Health Engineering Department, Haryana
Segment: Water Supply
Work: Package 2: The scope of work includes construction of two Ranney Wells of 10 mld capacity each and Rising main from the two Ranney wells to MBS Thanthri and Sub Rising Main from MBS Kithwari to various Boosting Station of length 70.7 km including defect liability period of 12 months after successful completion of 3 Months trial run at an estimated cost of Rs 1010.78 million. The last date of bid submission is July 11, 2025. The work is likely to be completed in 24 months.
Package 3: The scope of work includes construction of boosting stations at Ferozpur, Alahpur, Lohagarh, Kithwari, Govind Nagar, Mohan Nagar, Fazalpur, Dholagarh, Kuslipur, Sohna Road, Raipur, Dher Mohalla, Sanjay Park, ITI, New Colony and Mini Secretariat and augmentation of other boosting stations and internal distribution system of length 75.35 km including defect liability period of 12 months after successful completion of 3 Months trial run at an estimated cost of Rs 1033.78 million.
Publish Date: June 20, 2025 (PKG-2) ; June 21, 2025 (PKG-3)
End Date: July 14, 2025
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Wastewater
Work: The scope of work includes designing, providing, constructing and commissioning modernised and fully automated STP of 8 mld capacity on design, build, operate (DBO) basis along with 6 years of operation and maintenance (O&M) at Powai abandoned sewage pumping station in S Ward at an estimated cost of Rs 688.88 million.
Publish Date: June 20, 2025
End Date: June 27, 2025
Implementing Agency: Parlakhemundi Municipal Council
Segment: Wastewater
Work: The scope of work includes studying the Topography, Hydrology of the site and surrounding areas, Designing and preparation of the Surface runoff Water Drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: June 20, 2025
End Date: July 10, 2025
Implementing Agency: Andaman Public Works Department (APWD)
Segment: Water Supply
Work: The scope of the project includes construction of 2ml capacity raw water storage tanks and pump house, laying of 8.24 km HDPE pipe line and construction of two 1ml capacity clear water storage tanks at Govind Nagar Treatment Plant and Low Point Treatment Plant at Campbell Bay.
Publish Date: June 24, 2025
End Date: July 15, 2025
Implementing Agency: The New Delhi Municipal Corporation (NDMC)
Segment: Water Supply
Work: The scope of work includes holistic study of the water supply network of entire NDMC area for furnishing Master Plan for another 25 years and consultancy services for study & preparation of DPR for improvement and revamping the existing water supply system including hydraulic modelling, water audit and balancing, consumers survey, GIS mapping, measures to reduce NRW / UFW, achievement of service level benchmark and upgrading the system for continuous (24×7) water supply with predefined key performance indicators to the command area of NDMC with design period for consideration of time frame of 25 years and enhancement of storage capacity of water and upgradation of GIS for integration of water supply arrangements and other services.
Publish Date: June 19, 2025
End Date: July 15, 2025
Implementing Agency: Bareta Municipal Council
Segment: Water Supply
Work: The scope of work includes construction of intercepting drain around the water body area to carry the storm water to the natural treatment with stone pitching and dewatering, cleaning and removal of silt/sludge removal at an estimated cost of Rs 1618.34 million.
Publish Date: June 19, 2025
End Date: July 15, 2025
Implementing Agency: The Durg Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of diversion weirs at Shankar Nala and at Pulgaon Nala, construction of inlet chamber, screen chamber & grit settlement chamber, interceptor sewer pipe line of length 0.85 metres, wet well with overhead pump house, two sewage treatment plants; a 47 mld STP at Shankar Nala and a 30 mld STP at Pulgaon Nala and a raw sewer rising main of length 0.3 km at an estimated cost of Rs 1,445.2 million including 15 years operation & maintenance (O&M).
Publish Date: June 18, 2025
End Date: June 28, 2025
Implementing Agency: The Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of 100 mld WTP near Shivaji Park, raw water gravity main of 9.09 km length, clear water rising main of length 10.66 km, distribution system of length 126.31 km, three OHSRs, a clear water reservoir of capacity 1500 kl and installation of supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: June 18, 2025
End Date: July 21, 2025
Implementing Agency: Directorate of Local Bodies, Rajasthan
Segment: Wastewater
Work: The scope of work includes construction of 10 kld, 15 kld, 20 kld, 25 kld and 35 kld FSTPs towards Faecal Sludge & Septage Management (FSSM) including supply, testing of vehicle mounted suction machine for faecal sludge desludging at 65 newly constituted ULBs in Rajasthan with 10 years operation and maintenance at an estimated cost of Rs 5605.2 million.
Publish Date: June 18, 2025
End Date: August 4, 2025
Implementing Agency: Public Health and Engineering Department,
Segment: Water Supply
Work: The scope of work includes construction of main boosting station (MBS) Thanthri, MBS Kithwari, four Ranney Wells of capacity 10 mld each, rising main from Ranney wells to MBS Thanthri and MBS Kithwari, pre-stressed concrete cylinder pipe (PCCP) of length 16 km at an estimated cost of Rs 2107.2 million.
Publish Date: June 18, 2025
End Date: July 08, 2025
Implementing Agency: Karnataka Urban Water Supply & Drainage Board
Segment: Water Supply
Work: The scope of the work includes construction of RCC Intake well, providing, laying and jointing of raw water rising main of length 22.25 Kms, construction of 15.14 mld capacity rapid sand type water treatment plant, 10.0ll pure water sump, providing & laying water rising main of total length 11.683 km, providing & laying DI Pure water Feeder mains of length 3.06 km and HDPE water supply distribution network of length 88.46 km with at an estimated cost of Rs 1102.448 million on design, build, operation and transfer (DBOT) mode
Publish Date: June 18, 2025
End Date: July 18, 2025
Implementing Agency: The Water Corporation of Odisha (WATCO)
Segment: wastewater
Work: The scope of work involves construction of gravity sewer network of length 90.28 km, pumping main of length 10.65 km, 10 sewage pumping stations, two sewage treatment plants (STPs) of capacity 20 mld and 5.5 mld and 5666 sewer property connections etc., including operation and maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 2664.9 million. The project involves construction of underground sewerage system for town planning scheme (TPS) no. 1, 2, 3 and 4 under jurisdiction of Bhubaneswar Development Authority (BDA) on engineering, procurement and construction (EPC) mode.
Publish Date: June 4, 2025
End Date: August 18, 2025*
Implementing Agency: The Bhopal Municipal Corporation
Segment: Wastewater
Work: Package 1: The scope of work includes survey, design, and construction of 161.37 km long sewerage network, 5 million litres per day (mld) sewage treatment plant (STP) along with sewage pumping station at Laukhedi, house service connection, supervisory control and data acquisition (SCADA) automation and other related infrastructure including Operation and Maintenance (O&M) for five years at an estimated cost of Rs 1,305.15 million.
Package 2: The scope of work includes survey, design, and construction of 140.18 km long sewerage network, 10 and 20 mld STPs along with sewage pumping station at Arhedi and Khajuri Kalan, house service connection, SCADA automation and other related infrastructure including O&M for five years at an estimated cost of Rs 1,627.16 million.
Package 4: The scope of work includes survey, design, and construction of 273.36 km long sewerage network, 60 mld STP along with sewage pumping station at Devalkhed, house service connection, SCADA automation and other related infrastructure including O&M for five years at an estimated cost of Rs 2,553.51 million
Publish Date: June 17, 2025
End Date: July 9, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope of work involves rejuvenation of water body projects in 45 urban local bodies (ULBs) (50 projects) in the jurisdiction of Adilabad, Karimnagar and Warangal divisions.
Publish Date: June 16, 2025
End Date: July 4, 2025
Imlementing Agency: The Pandharpur Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of raw sewage pumping stations at Akshat Bungalow, near 561A National Highway and near Padmavati Lake of 4.5 mld, 1.2 mld and 9.9 mld capacity, respectively, raw sewage pumping main of length 23.71 km (micro tunneling method to be used for 13.08 km), sewage treatment plant of 13 mld capacity, connecting main of length 3.13 km, 3,756 property connections, retrofitting works for 13.2 mld new Vishnupad sewage pumping station (SPS) and 6.5 mld Old Vishnupad SPS etc.
Publish Date: June 14, 2025
End Date: August 4, 2025
Implementing Agency: Urban Environmental Engineering Department, Jammu and Kashmir
Segment: Wastewater
Work: The scope of work includes survey, design and execution of 10 mld STP for daily dry weather flow discharging into Doodh- ganga nallah on turnkey basis including operation and maintenance (O&M) for 5 years after free trial run of six months.
Publish Date: June 11, 2025
End Date: July 15, 2025
Implementing Agency: Himachal Pradesh State Industrial Development Corporation Limited (HPSIDC)
Segment: Waste water
Work: The scope of the project includes construction of common effluent treatment plant (CETP) with a combined capacity of 5mld; Phase I – 2 mld (HTDS : 0.5 mld, LTDS :1.5 mld) and Phase II – 3 mld (HTDS : 1 mld, LTDS :2 mld) and effluent conveyance network at the Bulk Drug Park including a 3 year defect liability period (DLP) followed by a 22 year operation and maintenance (O&M) period.
Publish Date: June 6, 2025
End Date: August 18, 2025
Implementing Agency: The Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: The scope of the project includes construction of gravity main of length 15.09 km, clear water rising main of 2.56 km, distribution network of length 170.74 km and 5666 house meters etc., including operation and maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 1536.6 million. The project involves implementation of 24×7 water supply project for town planning scheme (TPS) no. 1, 2, 3 and 4 under jurisdiction of Bhubaneswar Development Authority (BDA) on engineering, procurement & construction (EPC) mode
Publish Date: June 5, 2025
End Date: August 18, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: The scope of the project includes design, construction, supply, testing and commissioning of piped water supply schemes for habitations having ground water quality issues, with Electric driven pumps and iron removal treatment plant having CSIR technology with 6 months of trial run followed by a 5 years of operation and maintenance (O&M) period under the Mukhyamantri Gramin Peyjal Nishchay Yojna.
Publish Date: June 10, 2025
End Date: July 19, 2025
Implementing Agency: Sonipat Metropolitan Development Authority
Segment: Wastewater
Work: The scope of the project includes design, construction, supply, installation, testing and commissioning of 30 mld sewage treatment plant (STP) based on sequential batch reactor (SBR) technology including 60 mld main pumping station (MPS) along with 18 mld capacity tertiary treatment plant (TTP) based on ultrafiltration including three month trial run period and a one year defect liability period followed by a five year operation and maintenance (O&M) period.
Publish Date: June 9, 2025
End Date: August 12, 2025
Implementing Agency: Department of Water Supply and Sanitation, Punjab
Segment: Water Supply
Work: The scope of the project includes:
Part 1 (Augmentation and Rehabilitation of Water Supply) – laying of distribution network of length 25.09 km, rising main of length 0.97 km, 9666 house service connections and 2 OHSR of capacity of 1 lakh gallon each.
Part 2 (Extension and Augmentation of Sewerage Network System) – laying of lateral and trunk sewer of length 26.73 km, construction of 1432 manholes and 2673 house service connections.
Publish Date: June 10, 2025
End Date: July 18, 2025
Implementing Agency: Municipal Administration And Water Supply Department, Tamil Nadu
Segment: Water Supply
Work: The scope of the project includes construction of eight infiltration wells, sump of capacity 0.3 ml, pumping main of length 39.1 km, seven service reservoir with a combined capacity of 3.1 ml; two service reservoirs of 0.1 ml capacity each, one of 0.2 ml, three of 0.5 ml each and one of 1.2 ml capacity, HDPE main of length 0.7 km and DI K7 and HDPE pipes of length 10.2 km.
Publish Date: June 9, 2025
End Date: June 12, 2025
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply
Work: The scope of the project includes providing & laying storm water disposal trunkmain of 1800 mm diameter RCC pipe by microtunneling method from Manekbaug Cross Road to Anjali Cross Road.
Publish Date: June 9, 2025
End Date: July 10, 2025
Implementing Agency: Ahmedabad Municipal Corporation (AMC)
Segment: Water Supply
Work: The scope of the project includes providing and laying storm water disposal trunkmain of 1800 mm diameter RCC pipe by microtunneling method from Anjali Cross Road to Sabarmati River.
Publish Date: June 9, 2025
End Date: July 10, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope of work involves rejuvenation of water body projects in 68 urban local bodies (ULBs) in the jurisdiction of Mahabubnagar, Nizamabad, Sangareddy and Ranga Reddy.
Publish Date: June 6, 2025
End Date: June 24, 2025
Implementing Agency: Sagar Cantonment Board
Segment: Wastewater
Work: The scope of the project includes Providing, laying and jointing of sewer lines of 45.8 km length, construction of 1976 manholes, 5600 house sewerage connections and Sewage Treatment Plant of 5 mld capacity on 0.3 ha land, providing house sewer chambers and laterals for connecting sewer of consumers to sewer line, providing pumping main and construction of sewerage pumping station, providing and laying of HT feeder connection, etc including 10 years of Operation and Maintenance (O&M).
Publish Date: June 6, 2025
End Date: July 25, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of the project includes providing, laying, joining, testing and commissioning of the rising/transfer main main pipeline of length 26.9 km, DI K-7 pipe line of length 362.28 km and HDPE pipeline of 1534.46 km, providing and installation of valves, construction of RCC rectangular (Flat slab) partially underground clear water reservoirs and pump houses, etc including one year defect liability period (DLP) and 5 years Operation and Maintenance (O&M)
Publish Date: June 5, 2025
End Date: December 15, 2025*
Implementing Agency: Eastern Rajasthan Canal Project Corporation Limited
Segment: Water Supply
Work: The scope of the project includes construction of Mor Sagar Artificial Reservoir and feeder system with head regulator from Bisalpur dam submergence to Tordi Sagar, pump house in submergence of Tordi Sagar and rising main from Tordi Sagar pump house to Lamba Harisingh dam and thereafter pump house in submergence of Lamba Harisingh and rising main from Lamba Harisingh to intermediate pumping station near Bhimsagar Tihari and rising main up to proposed new Mor Sagar Artificial reservoir operation and maintenance (O&M) for a period of 20 years based on Hybrid Annuity Model (HAM).
Publish Date: June 5, 2025
End Date: July 7, 2025
Implementing Agency: Public Health Engineering Department, Bihar
Segment: Water Supply
Work: The scope of the project includes design, construction, supply, testing and commissioning of piped water supply schemes for habitations having ground water quality issues, with electric/solar driven pumps and iron removal treatment plant having CSIR technology with 6 months of trial run followed by a 5 years of operation and maintenance (O&M) period under the Mukhyamantri Gramin Peyjal Nishchay Yojna.
Publish Date: June 4, 2025
End Date: June 30, 2025
Implementing Agency: Gwalior Municipal Corporation
Segment: Water Supply
Work: The scope of the project includes construction of gravity main of length 0.9 km, raw water pumping main of length 6 km, four water treatment plants (75 mld at Motijheel, 45 mld at Ramua Dam, 40 mld at Tighra Dam and 32 mld Jalalpur), clear water pumping main of length 88.93 km, water supply distribution network of 555.5 km and 2015 water meters at an estimated cost of Rs 3509.5 million.
Publish Date: June 4, 2025
End Date: July 4, 2025
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design & construction of RCC clear water sump, elevated service reservoir, providing, supplying, lowering, laying and jointing DI pipeline for raw & clear water rising main, gravity main distribution network, providing, supplying, erecting and testing of pumping machineries, pumping stations pump house cum panel room, road restoration, compound wall, house connection, electrification work etc. for Chhaya Nagarpalika including 3 years defect liability period (DLP) followed by operations and maintenance (O&M) for 5 years. The work on the project is likely to be completed in 30 months at an estimated cost of Rs 1088.79 million
Publish Date: June 4, 2025
End Date: July 25, 2025
Implementing Agency: Amaravati Development Corporation Limited (ADCL)
Segment: Waste Supply
Work: Package 43: The scope of the project includes survey, investigation, design, construction of balance works, testing, commissioning of water supply including headworks like intake well, approach bridge, raw water pumping main, water treatment plant of combined capacity of 190 mld, clear water reservoir, clear water pump house (civil works) and other ancillary works on Design, Build and Operation (DBO) basis at an estimated cost of Rs 3946.1 million. Package 44: The scope of the project includes survey, investigation, design, construction of balance works, testing, commissioning of water supply works including clear water pump house (electro mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, SCADA, A.I based centralized water information management system (CWIMS) and computerised maintenance management system (CMMS) on Design, Build and Operate (DBO) basis at an estimated cost of Rs 3613.4 million. The project is being funded by the World Bank and Asian Development Bank. The work is likely to be completed in 24 months.
Publish Date: July 4, 2025
End Date: July 25, 2025
Implementing Agency: Jaipur Development Authority
Segment: Wastewater
Work: The scope of the project includes design, construction, supplying, erection, testing and commissioning of STP of 40 mld capacity based on sequential batch reactor (SBR) technology, raw sewage pumping comprising connection of incoming sewer to receiving chamber, well along with pumping main at STP area, inlet chamber, storm water drains, RCC overhead tank of 0.5 million litres capacity with 22 m staging height, etc including three months trial run and one year operation and maintenance (O&M).
Publish Date: June 4, 2025
End Date: July 9, 2025
Implementing Agency: Sundargarh Municipal Council
Segment: Wastewater
Work: The scope of work includes studying the Topography, Hydrology of the site and surrounding areas, Designing and preparation of the Surface runoff Water Drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019 / Central Ground Water Board (CGWB) guidelines / River centric urban development planning guideline of MoHUA.
Publish Date: June 4, 2025
End Date: July 1, 2025
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: The scope of work includes providing consultancy services for improvement of the 24X7 drinking water supply system on an engineering procurement and construction (EPC) basis, including five years of Operation and Maintenance (O&M).
Publish Date: June 4, 2025
End Date: July 10, 2025*
Implementing Agency: Sonipat Metropolitan Development Authority
Segment: Wastewater
Work: The scope of the project includes study and identification of the problematic area, study of the existing capacities of various drains, study of the total catchment area of Development Plan 2031, and finalization of the draft drainage plan for Sonipat Development Plan 2031.
Publish Date: June 3, 2025
End Date: July 21, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Wastewater
Work: The project scope involves implementation of the Mothiari Sewerage Network Scheme under the Atal Mission for Rejuvenation and urban Transformation 2.0 (AMRUT 2.0)
Publish Date: June 3, 2025
End Date: September 15, 2025*
Implementing Agency: Urban Environmental Engineering Department, Government of Jammu and Kashmir
Segment: Wastewater
Work: The scope of work includes providing, laying, testing and commissioning of sewer lines, rising main, construction of manholes, Sewage Treatment Plants (STP) of 38.5 mld capacity and Integrated Pumping Stations (IPS), etc including a 6 month trial run period followed by a 5 year operation and maintenance (O&M) period.
Publish Date: June 2, 2025
End Date: June 24, 2025
Implementing Agency: Chhatarpur Nagar Palika
Segment: Wastewater
Work: The scope of work includes providing, laying and joining of sewer lines of length 186.65 km, 6,809 manholes, 29,748 house sewerage connections and construction of two sewage treatment plants of 18.6 mld and 4.8 mld capacity on 0.615 ha and 0.8 ha of land respectively, including 10 years of operation and maintenance (O&M) period.
Publish Date: June 2, 2025
End Date: July 7, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Wastewater
Work: The scope of the project includes construction of major storm water drains including road crossing culverts on Pandenavagu in Manikonda Municipality.
Publish Date: May 31, 2025
End Date: June 21, 2025
Implementing Agency: Bikaner Municipal Corporation
Segment: Wastewater
Work: The scope of the project includes construction of sewage pumping station (SPS) of 20 mld capacity with 700 mm diameter rising main and a STP of 12 mld capacity based on sequential batch reactor (SBR) technology including construction of a gravity drain and repair, de-silting and miscellaneous works of drains in Bikaner including includes a five year defect liability period followed by a 10 year operation and maintenance (O&M) period.
Publish Date: May 31, 2025
End Date: June 30, 2025
165,999 house sewer chambers Download PDF
Implementing Agency: Guwahati Jal Board
Segment: Water Supply
Work: The scope of the project includes design, construction, supply, installation, testing, commissioning of a water treatment plant (WTP) of 98 mld capacity (Phase-I), raw water rising mains of length 2.4 km and transmission main of length 27.94 km, three reservoirs viz. Hengerabari (13 mld), Naba Jyoti Nagar (3.2 mld) and Basistha (5 mld) and distribution system of length 553 km.
Publish Date: May 30,2025
End Date: October 7, 2025*
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Desalination
Work: The scope of work includes construction of a desalination plant having a capacity of 200 million litres per day (mld) further expandable to 400 mld based on sea water reverse osmosis technology including Operation and Maintenance (O&M) for 20 years.
Publish Date: May 28, 2025
End Date: August 19, 2025*
Implementing Agency: The Water Resources Department, Mumbai
Segment: Water Supply
Work: The scope of work includes preparing a detailed proposal for forest land acquisition, involving surveys, forest boundary demarcation, mapping in coordination with relevant officials, site visits, and obtaining necessary certifCMWSSBicates from concerned departments. It further covers arranging and printing required maps and documents, compiling the proposal, and submitting it with necessary follow-up and compliance at each stage. The process concludes with completing all documentation for final clearance and handing over the land as required.
Publish Date: May 26, 2025
End Date: June 6, 2025
Implementing Agency: Hyderabad Metropolitan Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of work includes manufacturing, supplying, Lowering, laying, joining, testing and commissioning of gravity main and pumping main and construction of a 45 mld capacity sewage treatment plant with associated components of interception weirs I&D structures and laying of trunk sewer main at Neopolis.
Publish Date: May 24, 2025
End Date: June 18, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Water Supply
Work: The scope of work involves rejuvenation of water body projects in 45 urban local bodies (ULBs) (50 projects) in the jurisdiction of Adilabad, Karimnagar and Warangal divisions.
Publish Date: May 23, 2025
End Date: June 11, 2025
Implementing Agency: Urban Development Department, Assam
Segment: water Supply
Work: The scope of the project includes construction of Water Treatment Plant (WTP) for uncovered Zone 5 & 6 of 4.5 mld capacity, Raw Water Transmission Main of length 0.69 km, Clear Water Transmission Main of length 3.56 km and total distribution pipeline of length 77.49 km, etc including a five year operation and maintenance (O&M) period.
Publish Date: May 22, 2025
End Date: June 17, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of 13 pump houses, along with the construction of 13 clear water reservoirs with a total capacity of 22.35 million litre (ML), 15 additional reservoirs at booster stations with a combined capacity of 1.225 ML and 60 service reservoirs with a total capacity of 10 ML. The scope of work also includes the laying and jointing of clear water transmission and rising mains of length 660.7 km. The areas under the package are: Gangrar (2 villages), Chittorgarh (212 villages), Nimbahera (66 villages) and Bhadesar (45 villages) and Bulk water supply to Chittorgarh town
Publish Date: May 19, 2025
End Date: June 18, 2025
Implementation Agency: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)
Segment: wastewater
Work: The scope of work includes designing and building two sewage treatment plant of installed capacity 50 mld (SBR technology) and 1 mld (nature based solution), three sewage pumping station of 2.17 mld, 8.6 mld and 11.62 mld capacity, alongwith all appurtenant structures and allied works, including survey, designs, and build interception drain tapping of nineteen drains, 8.68 km sewer network including screens and manually/mechanically operated gates facilitating including rising mains of 2.7 km and disposal of treated effluent through pipeline.
Publish Date: May 16, 2025
End Date: October 30, 2025*
Implementing Agency: Water Resources Department, Rajasthan
Segment: Water Supply
Work: The project involves construction of 1000 mld Intake Pump House for Jaipur and Ajmer Drinking water Supply Project Phase-II at Bisalpur Dam at estimated cost of Rs 1,226.7 million.
Publish Date: May 8, 2025
End Date: June 11, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The scope of work involves estimate for construction of 10 x 12 m housing chamber with foot bridge along with coffer dam at Ramasamudra, providing laying, jointing, testing and commissioning of 400 mm diameter DI K9 class raw water rising main from Ramasamudra tank to proposed water treatment plant (WTP) at Shidlaghatta (Length 17.312 km), construction of 10 million litres per day (MLD) WTP at Ajjakadrenahalli village in Shidlaghatta town; Providing and laying of various diameter DI K9 feeder line from proposed pure water sump at WTP to existing & Proposed OHT’s. 14.88 km; Providing and laying of various diameter HDPE feeder line from proposed pure water sump at different locations to existing & Proposed OHT’s. 5.386 km; Providing and laying of various diameter Distribution pipeline for 9 Zones Total Length – 99.18 km HDPE PE-100, PN-8 (96.114 Kms, DI – K7 Class – 3.065Kms) etc. including operation and maintenance (O&M) for a period of five years including one year defect liability period (DLP) on design, build, operation and transfer (DBOT) basis through public private partnership (PPP) model.
Publish Date: May 7, 2025
End Date: June 9, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation (BUIDCo)
Segment: Water Supply
Work: The scope of the project includes design, build, operate and maintain a complete and fully functioning 24×7 water supply system in the water supply area.
Publish Date: May 7, 2025
End Date: June 9, 2025*
Implementing Agency: Vadodara Municipal Corporation
Segment: Water Supply
Work: The scope of work includes providing and laying water supply MS transmission line from proposed water treatment plant (WTP) at Rayka to existing 1,354 mm diameter pipe and from Poicha french well feederline to airport circle.
Publish Date: May 21, 2025
End Date: June 9, 2025
Implementing Agency: The Gandhinagar Municipal Corporation (GMC)
Segment: wastewater
Work: The scope of work includes survey works along the alignment of the pipeline, manufacturing, testing and delivery of reinforced cement concrete (RCC) pipes, excavation work, construction of manholes, RCC drain box and all other related works. The work is likely to be completed in 30 months at an estimated cost of Rs 687.7 million.
Publish Date: May 20, 2025
End Date: June 3, 2025
Implementing Agency: Pune Municipal Corporation
Segment: Water Supply
Work: The scope of work incljudes designing, providing, contructing, erecting, testing and commissioning of 125 mld water treatment plat (WTO) at Vadgaon (Phase 3) under the Atal Mission for Rejuvenation and Urban Transformantion 2.0 (AMRUT 2.0). The scope of work includes an Operation and Maintenance (O&M) period of 7 years.
Publish Date: May 20, 2025
End Date: June 24, 2025
Implementing Agency: Pune Municipal Corporation (PMC)
Segment: wastewater
Work: The scope of work includes demolition of existing 130 mld STP at Bhairoba and construction of new 200 mld STP based on SBR technology and new SPS near existing Kalyani Nagar Pumping Station; demolition of existing 17 mld STP and construction of new 26 mld STP based on SBR technology at Tanajiwadi; upgradation, enhancement and rehabilitation of the existing STP of capacity 115 mld at New Naidu; upgradation, enhancement and rehabilitation of the STP of capacity 50 mld at Erandwane; upgradation and enhancement of existing 18 mld STP to 28 mld STP at Bopodi and upgradation, enhancement and rehabilitation of the STP of capacity 32 mld at Vitthalwadi.
Publish Date: May 19, 2025
End Date: June 23, 2025
Implementing Agency: Jodhpur (North) Municipal Corporation
Segment: Wastewater
Work: The scope of the project includes design, construction, supplying, erection, testing and commissioning of STP of 30 mld capacity at Nandari for pollution abatement of river Jojari, raw sewage pumping station of 30 mld capacity comprising connection of two existing manhole and laying of gravity sewer of 1,600 mm dia. RCC NP4 pipe from this to the receiving chamber, wet well along with pumping main at STP area, inlet chamber, sludge sump, storm water drains, underground treated water sump of 250 kl, etc including 15 year operation and maintenance (O&M) and one year defect liability period.
Publish Date: May 28, 2025
End Date: July 18, 2025
Implementing Agency: Indian Oil Corporation Limited (IOCL)
Segment: Water Supply
work: The scope of work includes construction of a new drinking WTP as part of Panipat Refinery Expansion Project (P-25) under a lumpsum turnkey (LSTK) contract. The plant will cater to the drinking water requirements of the refinery, petrochemical complex and existing township of IOCL and will treat incoming raw water to the desired drinking water specifications including five years Operation and Maintenance (O&M).
Publish Date: March 27, 2025
End Date: May 30, 2025
Implementing Agency: City and Industrial Development Corporation of Maharashtra Limited
Segment: Wastewater
Work: The work will be carried out under two phases:
Phase 1: Milestone 1-Construction of a 50 million litres per day (mld) Kalamboli sewage treatment plant (STP), refurbishment with additional works, 20 mld tertiary treatment plant, 20 mld tertiary treated sewage pumping station with rising main and elevated service reservoir. The work is expected to be completed in 24 Months (including monsoon) from the date of award of contract.
Milestone 2-Construction of 70 mld Kharghar STP refurbishment with additional works and 20 mld secondary sewage pumping station with rising main. The work is expected to be completed in 36 Months (including monsoon) from the date of award of contract.
Phase 2: Milestone 3-Construction of 20 mld secondary sewage pumping station, 20 mld tertiary treatment plant and 20 mld tertiary treated sewage pumping station. The work is expected to be completed in 24 Months (including monsoon). Work to commence after one year from the completion of Milestone-1.
Publish Date: March 27, 2025
End Date: June 17, 2025
Implementing Agency: Pithampur Nagar Palika
Segment: Wastewater
Work: The scope of work includes providing, laying, jointing, testing and commissioning of sewerage pipelines including construction of manholes and sewer appurtenances spanning over a network of 169.10 km. It also includes construction, supply, erection, and commissioning of sewerage pumping station (SPS), pumping main of length 10.95 km and 3 sewage treatment plants having capacity 9, 9 & 13 mld.
Publish Date: May 14, 2025
End Date: May 30, 2025
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes design, construction, erection, testing and commissioning of 665.5 million litres per day (mld) capacity MPS comprising of coarse screens 6 nos. (4 nos. mechanical plus 2nos. manual) with sewage sumps 3 nos (1 no. for (50 plus 68) mld, 1 no. for 100 mld existing, 1 no. for 100 mld proposed sewage treatment plant (STP) with odour control unit, operating gallery for valves, transformers, d.g. sets etc. complete with 10 years for Operation and Maintenance (O&M) after one year defect liability period (DLP) at Dhanwapur, gurugram and all other works contingent thereto.
Publish Date: May 8, 2025
End Date: September 1, 2025*
Implementing Agency: Khamgaon Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of 209.25 km long trunk main and collections system, pumping station, wet well, rising main, 15.5 million litres per day (mld) sewage treatment plant (STP) and other related infrastructure.
Publish Date: May 9, 2025
End Date: June 6, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The project aims to ensure reliable water delivery with a 12-metre terminal head at each household and includes phased development of distribution networks with provisions for future expansion and smart monitoring systems.
Publish Date: May 5, 2025
End Date: May 22, 2025
Implementing Agency: Engineers India Limited
Segment: Water Supply
Work: The scope of work shall include construction of Water Block Package including raw water treatment plant (RWTP) having capacity of 3800 m. cube per hour for treatment of raw water, reverse osmosis based DM plant (RODMP) having pretreatment and RO section capacity of 1440 m. cube per hour and DM water capacity of 250 m cube per hour for production of demineralised water and zero liquid discharge plant (ZLDP) having capacity of 1728 kilo litres per day (KLD) for meeting the zero liquid discharge from the complex under the Bina Petchem and Refinery Expansion Project (BPREP) in Madhya Pradesh, project management; residual process design and detailed engineering; procurement; fabrication; inspection; supply; manufacture; transportation of all equipment/materials to the work site and storage at site; assembly, erection and installation; construction and erection of civil and structural, mechanical, electrical, instrumentation and piping works; acid /alkali proof tiling; painting; testing; pre-commissioning, trial run for 30 days before commissioning; commissioning; training of Bharat Petroleum Corporation Limited (BPCL)’s personnel; performance guarantee test run for 72 hours continuous operation in presence of BPCL’s and EIL’s representatives; guaranteeing and handing over of raw water treatment plant (RWTP), Reverse Osmosis based DM Plant (RODMP) and Zero Liquid Discharge Plant (ZLDP) to BPCL on Lump Sum Turnkey Basis as per design basis, equipment list, standards, PFDs, PandIDs, data sheets, drawings, etc., all complete within Contractor’s specified battery limits including supply of spares, chemicals and consumables.
Publish Date: May 2, 2025
End Date: July 17, 2025
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board
Segment: Wastewater
Work: The scope of work includes replacement of various sizes of damaged PSC/submersible water pump (SWP), Enlargement / Improvement / Extension of sewage pumping main and Strengthening of the existing collection system in various sewage pumping stations commanding areas in Area I, III and IV.
Publish Date: May 2, 2025
End Date: May 22, 2025
Implementing Agency: Delhi Jal Board
Segment: Wastewater
Work: The scope of work includes construction of 49.5 MLD wastewater treatment plant and 111.40 MLD waste water Pumping Station (WWPS) along with construction of pumping mains of length 400m and providing laying effluent line of 2500 m.
Publish Date: May 1, 2025
End Date: June 30, 2025
Implementing Agency: Datia Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing, laying, jointing, testing and commissioning of sewerage pipelines, construction of manholes and sewer appurtenances with road restoration works complete, providing house sewer chambers and laterals for connecting sewer to consumer sewer lines, providing new and existing house, all institutions of sewer connections, design, construction, testing and commissioning of intermediate sewerage pumping station (ISPS), pumping main, main pumping station (MPS), wet well along with providing and installation of pumps in wet well, 5.2 million litres per day (mld) sewage treatment plant (STP) with rapid sand filter and 1 no. 300 kld STP, providing and laying of HT feeder connection upto Sewage treatment plants, condition assessment of existing sewerage network, preparation of maps of existing and proposed sewerage network and property connection to be laid under the contract, supervisory control and data acquisition (SCADA) automation and Operation and Maintenance (O&M) for 10 years.
Publish Date: April 28, 2025
End Date: May 20, 2025
Implementing Agency: Korba Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing, laying, and jointing of underground sewerage (UGS) network for Wards 22 and 24 of Korba town with three three-month trial run
Publish Date: April 28, 2025
End Date: May 13, 2025
Implementing Agency: Ujjain Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and construction of 1 no intake well of 14 m dia.(to draw 100mld water), 2 floor (discharge and motor floor) including 30m minimum height at downstream of Ujjaini NVDA Pipeline Discharge point at Nagfani and 5.5 m wide reinforced cement concrete (RCC) approach bridge of 50m length and 5.5 meter wide bridge of minimum 200m length to cross pipe from NVDA Multipurpose line to Hariyakheri water treatment plant (WTP) and 1 no. Intake well of 14 m dia. (to draw 70mld water), 2 floor (Discharge and Motor floor) and 25m height at Gambhir Dam including 5.5 m. wide RCC approach bridge with minimum length of 70 m. b) Providing, laying, testing, commissioning and installation of raw water pumps for pumping water upto WTPs. The work shall include construction of substation with transformers, 33 KV HT feeder line of required Length complete; providing, laying, jointing, testing and commissioning of raw water pumping main having length of 39750 m. of dia 900mm, 1000mm and of DI K-7 , K-9 and dia 1300 and of MS pipe from intake well at different location to WTPs including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. d) Construction of 5 nos WTPs. of combined capacity of 250 million litres per day (mld) and clear water pump house, allied works and renovation of old WTPs; Installation of clear water pumps for pumping water up to ESRs The work shall include construction of substation with transformers, 33KV HT Feeder line of required length complete; Providing, laying, jointing, testing, commissioning of clear water pumping main having length of 136394 m. of dia 150-350 mm and of DI k-7 & dia 400-1000 mm and of DI k-9 pipe from WTPs to different locations of elevated service reservoirs (ESRs) including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete; Construction of 17 nos. overhead reservoirs having combined capacities of 38000 KL and staging height of 20m at different locations. h)Providing, laying, jointing, testing, commissioning of distribution network having length of 533796 m. of dia 110 -315mm and of HDPE PN 6 pipe & 300- 500mm and of DI k-7 from ESRs to distribution zones including excavation, refilling, road cutting/dismantling, restoration, providing valves, specials and fittings all complete; Providing house service connections complete job 49087 nos. j) Programmable Logic Controller (PLC)- supervisory control and data acquisition (SCADA) ] for monitoring and controlling of water supply system. k) NH, railway and river crossings.
Publish Date: April 25, 2025
End Date: June 9, 2025
Implementing Agency: Gujarat Urban Development Company
Segment: Wastewater
Work: The scope of work includes: Ranavav WSS under the Atal Mission for Rejuvenation and Urban Transformation 2.0 (AMRUT 2.0): The scope of work includes working survey, soil investigation, design, construction, testing, commissioning of reinforced cement concrete (RCC), elevated service reservoir (ESR), providing, supplying, lowering, laying and jointing di/pvc pipeline network, repairing of existing pipeline, providing house connection work etc. with Operation and Maintenance (O&M) of five years and three years defect liability period(DLP).
Ranavav UGD-II under Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY). : The scope of work includes working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing & commissioning of RCC NP3 pipes for sewer collecting system – gravity mains and di pipes for rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, construction of house connections, road restoration, electrical work etc. with two years O&M and three years DLP.
Ranavav Sewage Treatment Plant (STP)-I and II under SJMMSVY: The scope of work includes designing and construction of sewage treatment plant of 6 and 4 million litres per day (mld) along with all allied works, designing, providing, supplying, lowering, laying & jointing rising main network, including seven years O&M and three years DLP.
Publish Date: May 23, 2025
End Date: June 6, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes augumentation of existing Old Pump House; augmentation/ Retrofitting of existing RUIDP Pump House at Akelgarh,augmentation/Retrofitting of existing CWPH and Construction of New CWPHat Akelgarh, Raw Water Gravity Main of 1200 mm dia.; MS Pipe for the length of 5505 Mtrs. from old pump house Akelgarh to BPT& RWR-PH; raw water pumping main of 700 mm dia. DI K-9 Pipe for the length of 11280 Mtrs. From RWR-PH near Kota University to Ranpur water treatment plant (WTP); construction of RWR Capacity 8.15 ML and PH near Kota University; Construction of 40 million litres per day (mld) WTP at Ranpur; Clear Water Rising (CWR) main of total length of 19870 mtrs of DI K-7 from Dia. 200 mm to 800 mm; construction of CWRs (2 Nos. of Total 2250 KL capacity); construction of overhead service reservoirs (OHSRs) (10 Nos. for total capacity 15900kl); Distribution system in uncovered area of Shivaji Park WTP zone in Kota South Nagar Nigam area, Talab Gaon, Haditi Colony and replacement of existing water supply Pipelines in Balakund, Vigyan nagar, Subhash nagar, Mahaveer Nagar-I, III and Chawani Korti area.Total length of 2,14,393 Mtrs of DI K-7 from Dia. 100 mm to 600 mm and Shifting of House Service Connections 8000 Nos.
Publish Date: April 15, 2025
End Date: September 11, 2025*
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes laying and jointing of a cluster distribution system over a total length of 189.281km and village distribution system spanning over 3,149.392 km. Additionally, the scope of work includes providing 48,119 functional household tap connections.
Publish Date: May 22, 2025
End Date: July 15, 2025*
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work includes:
Ranavav WSS under the Atal Mission for Rejuvenation and Urban Transformation 2.0 (AMRUT 2.0): The scope of work includes working survey, soil investigation, design, construction, testing, commissioning of reinforced cement concrete (RCC), elevated service reservoir (ESR), providing, supplying, lowering, laying and jointing di/pvc pipeline network, repairing of existing pipeline, providing house connection work etc. with Operation and Maintenance (O&M) of five years and three years defect liability period(DLP).
Ranavav UGD-II under Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY). : The scope of work includes working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing & commissioning of RCC NP3 pipes for sewer collecting system – gravity mains and di pipes for rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, construction of house connections, road restoration, electrical work etc. with two years O&M and three years DLP.
Ranavav Sewage Treatment Plant (STP)-I and II under SJMMSVY: The scope of work includes designing and construction of sewage treatment plant of 6 and 4 million litres per day (mld) along with all allied works, designing, providing, supplying, lowering, laying & jointing rising main network, including seven years O&M and three years DLP.
Publish Date: May 2, 2025
End Date: March 26, 2025
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes design, construction, erection, testing and commissioning of 665.5 million litres per day (mld) capacity MPS comprising of coarse screens 6 nos. (4 nos. mechanical plus 2nos. manual) with sewage sumps 3 nos (1 no. for (50 plus 68) mld, 1 no. for 100 mld existing, 1 no. for 100 mld proposed sewage treatment plant (STP) with odour control unit, operating gallery for valves, transformers, d.g. sets etc. complete with 10 years for Operation and Maintenance (O&M) after one year defect liability period (DLP) at Dhanwapur, gurugram and all other works contingent thereto.
Publish Date: May 8, 2025
End Date: July 22,, 2025*
Implementing Agency: Delhi Jal Board
Segment: Wastewater
Work: The scope of work includes construction of 7 new DSTPs (Decentralised Sewage Treatment Plants) and SPSs (Sewage Pumping Stations) in Jaffarpur with a capacity of 3 MLD for DSTP and 6.75 for SPS, Galibpur with a capacity of 1.5 MLD for DSTP and 3.75 for SPS, Kheradabar with a capacity of 2.5 MLD for DSTP and 6.25 for SPS, Hasanpur with a capacity of 3 MLD for DSTP and 6.75 for SPS, Kazipur with a capacity of 2.5 MLD for DSTP and 6.25 for SPS, Shikarpur with a capacity of 3 MLD for DSTP and 6.75 for SPS and Sarangpur with a capacity of 3 MLD for DSTP and 6.75 for SPS.
Publish Date: April 30, 2025
End Date: July 15, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of the project includes construction of intake well inside Chambal river including approach bridge, construction of raw water reservoirs (RWR) including all works required for inlet inside RWR , outlet system from RWR to outlet chamber, water treatment plant (WTP), clean water reservoir (CWR), raw water pump house (RWPH) and allied works under Jal Jeevan Mission(JJM).
Publish Date: April 28, 2025
End Date: February 16, 2026*
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Wastewater
Work: The scope of work includes construction of two STPs having capacity of 7 and 17 million litres per day (mld) at an estimated cost of Rs 3,192.04 million.
Publish Date: April 24, 2025
End Date: May 14, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Wastewater
Work: The scope of work includes construction of a 35 million litres per day (mld) STP at Rojitpur (four drain tapping facilities, 6.75 km long sewer diversion network, one sewage pumping station (SPS), rising main, treatment effluent line, 30 kld septage management) and 20.5 mld STP at Sharifganj with five drain tapping facilities, 8.9 km long I&D network, rising main, treated effluent line, 20 kld septage treatment) including 15 years Operation and Maintenance (O&M).
Publish Date: April 25, 2025
End Date: August 12, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The project involves design and construction of a new 15.2712 MLD water treatment plant (WTP) of required output capacity and subsequent operation and maintenance (O&M) of the plant for a period of 10 years after the design build period (construction). The water source for this Part (Dhannasar Feeder) is Choudhary Kumbharam Lift canal near Dhannasar village
Publish Date: April 25, 2025
End Date: May 26, 2025
Implementing Agency: Nayagarh Storm Water Drainage Project
Segment: Wastewater
Work: The scope of work includes study of the topography, hydrology of the site and surrounding areas, design and prepare the surface runoff water drainage as per the Central Public Health & Environmental Engineering Organization (CPHEEO) – Manual for Storm Water Management 2019, Central Ground Water Board (CGWB) guidelines, River centric urban development planning guideline of Minister for Housing and Urban Affairs (MoHUA).
Publish Date: April 25, 2025
End Date: May 20, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Water Supply
Work: The scope of work includes implementation of Bhagalpur Water Supply Scheme (WSS) in Bihar.
Publish Date: April 24, 2025
End Date: August 11, 2025
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Wastewater
Work: The scope of work includes preparation of IUSWDMP for Bareilly, duly preparing drainage basin maps (duly considering upstream and downstream catchment areas even beyond municipal limits), carrying out all topographic surveys in the project influence area, hydraulic analysis, zoning/ catchments/ sub catchments, simulation model addressing worst scenario of rainfall intensity, mechanism at ultimate disposal point, proposing early warning system to reduce/minimise human and property loss and disturbance to traffic on arterial and sub arterial roads including preparation of hydraulic designs, drawings, estimations, conducting stakeholders meetings, obtaining data for inundation points/areas, prioritisation of projects, collection of data (DPR preparation and certain identified works where DPR is not mandatory) etc.
Publish Date: April 19, 2025
End Date: June 20, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work involves provision of 9 new 9400 KL capacity clear water reservoirs has been proposed for the year 2055; construction of a new intake well at udaisagar; provision of one GLSR with a capacity of 700 KL ground level service reservoir has been proposed for the year 2040; provision of 4 new water treatment plants (WTPS) with capacities of 7.5 million litres per day (mld), 10 mld, 27 mld, and 32 mld has been proposed for the year 2040; provision of 10 new overhead service reservoirs (OHSRs) with a gross capacity of 8350 KL has been proposed; provision of 18 pumps is proposed; provision of 3.60 km raw water rising mains of 400 mm to 500 mm DI K-7 and 0.65 km of 400 mm DI K-9 has been proposed; provision of 45.202 km clear water rising mains of 100 mm to 600 mm DI K-7 has been proposed; augmentation work of pichola pump house; provision of a total 185.109 km distribution pipeline of 100 mm to 450 mm DI K-7 is proposed; provision of 12,505 replacement water connections; provision of power connection and supervisory control and data acquisition (SCADA) system; provision of civil works including pump house construction, renovation of WTP, repairing of OHSR, and boundary wall; provision of railway and highway crossings; proposal for reuse of treated water at UWSS Udaipur.
Publish Date: April 17, 2025
End Date: June 9, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of the project includes construction of a raw water pumping main of length 2.2 km, transfer pumping main of length 82.4 km, cluster pumping main of length 337.32 km, primary distribution main of length 348.6 km, raw water pumps, rapid gravity filtration (RGF) plant with a capacity of 34.7 MLD and a water treatment plant (WTP) with a capacity of 41.64 MLD. It will cover 212 Villages (77 villages of Sabla Block & 135 villages of Sagwara Block) including their 255 other habitations and 1 town Sagwara of District Dungarpur from Beneshwar Anicut under JJM.
Publish Date: April 9, 2025
End Date: May 26, 2025*
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: April 7, 2025
End Date: June 3, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of 13 pump houses, along with the construction of 13 clear water reservoirs with a total capacity of 22.35 million litre (ML), 15 additional reservoirs at booster stations with a combined capacity of 1.225 ML and 60 service reservoirs with a total capacity of 10 ML. The scope of work also includes the laying and jointing of clear water transmission and rising mains of length 660.7 km. The areas under the package are: Gangrar (2 villages), Chittorgarh (212 villages), Nimbahera (66 villages) and Bhadesar (45 villages) and Bulk water supply to Chittorgarh town.
Publish Date: April 9, 2025
End Date: May 26, 2025*
Implementing Agency: Gurugram Metropolitan Development Authority
Segment: Water Supply
Work: The scope of work designing, constructing, testing, commissioning, Operation and Maintenance (O&M) for five years after 12 months defect liability period (DLP) for construction of Unit-VI at existing water works comprising 100 million litres per day (mld) automated water treatment plant (WTP), clear water reservoir for 100 mld, raw water and clear water pumping machinery, mechanical dewatering of sludge, pre and post chlorination, lowering of sub soil water table, supervisory control and data acquisition (SCADA) and all other works.
Publish Date: April 21, 2025
End Date: May 16, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Wastewater
Work: The scope of work includes construction of a 35 million litres per day (mld) STP at Rojitpur (four drain tapping facilities, 6.75 km long sewer diversion network, one sewage pumping station (SPS), rising main, treatment effluent line, 30 kld septage management) and 20.5 mld STP at Sharifganj with five drain tapping facilities, 8.9 km long I&D network, rising main, treated effluent line, 20 kld septage treatment) including 15 years Operation and Maintenance (O&M).
Publish Date: April 25, 2025
End Date: July 21, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of the project includes construction of a raw water main of length 160 m, raw water channel of length 100 to 150 m, transfer mains of length 75 km, rising mains of length 167 km, pipelines with the combined of 1700 km, a raw water reservoir (RWR) having a storage capacity of 0.214 MCM, a water treatment plant (WTP) with a capacity of 9 MLD, five clear water reservoirs with a total capacity of 3300 KL and 4025 Functional Household Tap Connections (FHTCs). It will cover 79 villages and their 325 other habitations for 9821 FHTCs of Block Dechu and Lohawat of District Phalodi under the Jal Jeevan Mission (JJM).
Publish Date: April 24, 2025
End Date: May 26, 2025
Implementing Agency: Brahmapur Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing consultancy services for preparation of comprehensive drainage master plan and DPR for SWD system for Brahmapur.
Publish Date: April 21, 2025
End Date: May 13, 2025
Implementing Agency: Nava Raipur Atal Nagar Vikas Pradhikaran
Segment: Water Supply
Work: The scope of work includes water supply from Kodapar To Thanaud Village through a pipeline along the alignment of the Mahandadi Main Canal (mmc) to Nava Raipur Atal Nagar.
Publish Date: April 17, 2025
End Date: May 22, 2025
Implementing Agency: Gurugram Metropolitan Development Authority
Segment: Wastewater
Work: The scope of work includes preparation of detailed project report (DPR) for construction of 100 million litres per day (mld) sewage treatment plant (STP) at Sector 107 in Gurugram, Haryana
Publish Date: April 16, 2025
End Date: May 19, 2025
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of clear water gravity main having diameter 2235 mm from prop break pressure tank (BPT) to Rau interconnection point of length 39.18 km including excavation, refilling, road cutting/dismantling, restoration, providing valves, surge protection system and specials and fittings, tunnel construction of total 2.87 km at different 3 different locations, the works include entry exit pit and pushing M.S pipe of diameter 2235mm diameter pipe from its include, soil testing, geological study and testing, design and required all material & labour to complete the work in all respect, interconnection proposed gravity pipeline with existing 1900 mm dia, 1700 mm dia & 1200 mm diameter pipeline at rau circle, design and construction of pipeline reinforced cement concrete (RCC) bridge for river crossing , nallah crossing , canal crossing, box culvert for railway line crossing at mhow as per the norms of railway department , the works include all supply and pipe laying from box culvert, Development of security check post for pipeline at 4 location i.e on every 10 km. checking daily pipeline condition and safety, installation of flow meter on gravity main, installation of instrument and operation by Programmable Logic Controller (PLC)- supervisory control and data acquisition (SCADA) for monitoring and controlling of gravity man, Laying of pipe line of 1800 mm dia . M.S. pipe in tunnels of phase-3 to stop leakages of RCC tunnel construction of chlorine system and chlorine building at Rau with operation and maintenance (O&M) 10 years operation and maintenance.
Publish Date: April 17, 2025
End Date: May 17, 2025
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, engineering, design, supply of all material labour required for construction, completion and commissioning of water supply reorganisation scheme in Etah Nagar Palika Parishad including trial run of three months and defect liability period (DLP) for 12 months for civil works and 24 months for electrical and mechanical work.
Publish Date: April 12, 2025
End Date: April 29, 2025
Implementing Agency: Malegaon Budruk Nagar Panchayat
Segment: Water Supply
Work: The scope of work includes construction of jackwell with overhead pumphouse, raw water rising main BT to water treatment plant (WTP), pure water gravity main, 4 million litres per day (mld) WTP, six elevated service reservoirs (ESRs), 72.14 km long distribution network, pumping machinery, supervisory control and data acquisition (SCADA) automation, balancing tank and other allied infrastructure.
Publish Date: April 11, 2025
End Date: May 1, 2025
Implementing Agency: Angul Municipal Corporation
Segment: Wastewater
Work: The scope of work includes providing consultancy services for preparation of comprehensive drainage master plan and DPR for SWD system for Angul.
Publish Date: April 9, 2025
End Date: April 22, 2025
Implementing Agency: Kerala Water Authority
Segment: Wastewater
Work: The scope of work includes design, construction, commissioning, operation and maintenance (O&M) of a 27 million litres per day (mld) STP with co-treatment at Sarovaram and network in Kozhikode Corporation.
Publish Date: April 7, 2025
End Date: April 21, 2025
Implementing Agency: Chennai Metropolitan Water Supply and Sewerage Board
Segment: Water Supply
Work: The project is to be executed on Hybrid Annuity Model (HAM) basis through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT Annuity or Hybrid Annuity) basis. The total capacity of the project is 400 MLD.
Publish Date: April 7, 2025
End Date: July 3, 2025
Implementing Agency: Nuclear Power Corporation Limited
Segment: Wastewater
Work: The scope of work includes construction of lining, retaining wall, hydraulic structures and allied works for water drainage arrangement at Kaiga-5 and 6 under Kaiga Atomic Power Project in Karnataka
Publish Date: April 7, 2025
End Date: April 28, 2025
Implementing Agency: Ludhiana Urban Water and Waste Water Management Limited
Segment: Water Supply
Work: The scope of work includes designing and providing 24×7 drinking water supply in selected demonstrated zones including formation of district metered areas (DMAs), water loss reduction (WLR), rehabilitation of existing distribution lines and house connections, providing consumer water meters, instrumentation, supervisory control and data acquisition (SCADA) and its allied works including Operation and Maintenance (O&M) for two years.
Publish Date: April 7, 2025
End Date: May 9, 2025
Implementing Agency: Sonepur Municipal Corporation
Segment: Wastewater
Work: The scope of work inc;udes providing consultancy services for preparation of comprehensive drainage master plan and detailed project report (DPR) for SWD system for Sonepur.
Publish Date: April 5, 2025
End Date: April 22, 2025
Implementing Agency: Gujarat Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of work includes design and construction of reinforced cement concrete (RCC) sumps and pump house incl. providing, supplying, lowering laying and jointing of MS pipeline for rising main/ gravity distribution pipeline network including providing, supplying, erecting and testing pumping machineries at HW, RCC road, compound wall, electrification work and other headwork development works at HW and Operation and Maintenance (O&M) for ten years.
Publish Date: April 4, 2025
End Date: May 22, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including a one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: April 3, 2025
End Date: june 17, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The scope of work includes implementation of 24×7 Water Supply Scheme in balance 15 zones of Ballari City under the Karnataka Mining Environmental Restoration Corporation (KMERC).
Publish Date: April 3, 2025
End Date: April 19, 2025
Implementing Agency: V.O. Chidambaranar Port Authority
Segment: Desalination
Work: The scope of work comprises design, construction, testing, commissioning of a 3 mld desalination plant based on sea water reverse osmosis. The project is to be executed on a Design, Build, Operate (DBO) basis. The project is to be executed on a Design, Build, Operate (DBO) basis .The construction work on the project is likely to be completed in 12 months in addition to 6 months for trial commissioning period. The project includes 5 years of operation and maintenance (O&M). The estimated cost of the project is Rs 674.409 million.
Publish Date: April 3, 2025
End Date: August 20, 2025*
Implementing Agency: Latur City Municipal Corporation
Segment: Wastewater
Work: The scope of work includes road restoration in Zone 1 and 2, raising main, sewage pumping station of 53 million litres per day (mld), wet wall with overhead pump house, pumping machinery with supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: April 2, 2025
End Date: May 2, 2025
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes construction of RCC box type master SWD in new sectors 76-80 and NH-48 in Gurugram, including one year defect liability period (DLP).
Publish Date: April 2, 2025
End Date: May 13, 2025
Implementing Agency: Karnataka Urban Infrastructure Development and Finance Corporation Limited (KUIDFC)
Segment: Wastewater
Work: The scope of work includes:
Hubballi: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer Pipeline for construction of main trunk line, reinforced cement concrete (RCC) for minimum length of 5.1 km, hydraulic tests, including restoration works in flexible and rigid pavements, providing, laying, jointing sewer line with dia varying from 250 mm to 1000 for sub trunk main works with RCC NP3, for a minimum length 2.50 km confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test, including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.5m, 1.8m and 2.4m dia cast-in situ/pre-cast with heavy-duty steel fiber reinforced concrete (SFRC) cover and frame, for varying depths (the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and stair case arrangement for the maintenance in screen chamber for the wet well of capacity 80 million litres per day (mld) at Gabbur Village, providing, laying, jointing, testing and commissioning of required diameter of DI K-9 class rising main from wet well to sewage pumping station (STP) minimum of Length: 1.1 km including necessary pipe ancillary works, including restoration works in flexible and rigid pavements, supply, erection, electrification, testing and commissioning of non-clog sewage pump sets of required capacity including panel bords etc along with all accessories at wet well including allied works such as DG room, Chain link fencing etc, providing 11 KV – 3 Phase power supply line from Sub-station to wet well from sub-station at Hubballi road with necessary transformers including approval, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, Construction of internal developments such as roads, street light etc.,
Dharwad: It includes excavation in all kind of strata at varying depths, providing, laying and jointing Sewer pipeline by using 250 mm to 500 mm dia RCC, NP3 class confirming to IS:458-1988 and jointing of pipes with rubber rings along confirming to IS:5382 along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 6.35 km including restoration works in flexible and rigid pavements, providing, laying and jointing HDPE sewer pipeline by using 150 mm to 200 mm dia HDPE SN8 pipes IS:16098 and jointing of pipes, cutting of pipes etc along with hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 10 km including restoration works in flexible and rigid pavements, providing, laying and jointing PVC Sewer Pipeline by using 200 mm dia as per IS:16098 and jointing of pipes, cutting of pipes etc along with Hydraulic test for wards 4,5,6,7,8,9,21,22,23 minimum length of 3.7 km including restoration works in flexible and rigid pavements, providing and construction of RCC machine hole chambers, of 1.2 and 1.5 dia cast-insitu/pre-cast with heavy-duty SFRC cover and frame, for varying depths ( the depth may vary as per the site condition), diversion of water course if required, and road restoration as per site requirement, providing house service connections (HSC) :3641 Nos. (which shall be laid from inside the customer property to the machine hole as per site condition) , construction of RCC Wet well cum pump house to house pumps of required capacity and pre-treatment units, bar screen of manual type, with provision of inspection chamber, grit chamber, with silt trap arrangement and staircase arrangement for the maintenance in screen chamber for the wet well of capacity 12 mld and 12 mld viz Wet well -1 near Madihal STP, Wet well 2 near Agriculture Research Center), Construction of rising Main for wet well 1 from wet well -1 to STP and wet well 2 from Agriculture Research centre to proposed wet well -1 at Madihal, with DI K-9 pipe having diameters varies from 300 mm to 350 mm, minimum length of 2.85 km, supply, erection, electrification, testing and commissioning of required capacity of non-clog sewage pump sets along with all accessories at Wet well – 1 and Wet well -2 including allied works such as DG room, chain link fencing etc, providing 11 KV – 3 phase power supply Line from sub-station to wet well from nearest substation with necessary transformers for Wet well -1 and Wet well -2, providing DG room, Green belt/ land scaping in buffer zone of proposed STP, construction of internal developments such as roads, street light etc
Publish Date: April 1, 2025
End Date: April 16, 2025
Implementing Agency: Karnataka Urban Infrastructure Development and Finance Corporation Limited
Segment: Wastewater
Work: The scope of work includes laying of 14.446 km long sewerage network, 23.5 million litres per day (mld) sewage treatment plant (STP), construction of earth filling and counterfort retaining wall at STP site as protection from flooding at Gadde Kannur village road in Kolar city and other related infrastructure including one-year defect liability period and five years Operation and Maintenance (O&M) on design, build, operate and transfer (DBOT) basis.
Publish Date: February 18, 2025
End Date: March 11, 2025
Implementing Agency: V.O.Chidambaranar Port Authority
Segment: Water Supply
Work: The scope of work includes construction of a 3 million litres per day (mld) desalination plant based on seawater reverse osmosis (SWRO) including six months trial run and Operation and Maintenance (O&M) on engineering, procurement and construction (EPC) basis.
Publish Date: December 16, 2024
End Date: March 22, 2025*
Implementing Agency: Gurugram Metropolitan Development Authority (GMDA)
Segment: Wastewater
Work: The scope of work includes up–gradation of existing 100 million litres per day (mld) STP including designing, construction, supply, erection, testing, commissioning of ir sump, over flow sump, sluice valve, mixer, M.S. pipe, diffusers, blower, pumps, repair and maintenance of 2 no. bio gas engine and bio gas scrubber unit including one year defect liability period and designing, construction, supply, erection, testing and commissioning of 75 mld capacity tertiary treatment plant comprising of treated water equalization tank, waste water sump, inlet chamber, inlet channel, flash mixer, flocculator, inclined tube settlers, filters, outlet channel, filter bed, filter house, chlorine clear water tank, chemical solution etc. complete in all respect including transformer, electrical, mechanical, piping and instrumentation works, reinforced cement concrete (RCC) platform, construction of road and pavements including all related contingent work there to with Operation and Maintenance (O&M) for 5 years after 12 months defect liability period.
Publish Date: March 29, 2025
End Date: April 23, 2025
Implementing Agency: Nashik Municipal Corporation
Segment: Water Supply
Work: The scope of work includes providing, supplying and repair work at three water treatment plants (WTPs) at Shivaji Nagar in Satpur division having total capacity of 48.5 million litres per day (mld), development of sludge disposal arrangement, repair work at Gandhi Nagar WTP premises in Nashik East Division having capacity of 52 mld, construction of reinforced cement concrete (RCC) sump for additional capacity with tube settler, jointing Raw Water Rising Mains from Chehadi Pumping Station to Nashik Road WTP, jointing transmission mains from Carbon Naka to Ramrajya elevated storage reservoir (ESR), providing, lowering, laying, jointing 1200 mm Dia D.I. pipeline from Shivajinagar to Carbon Naka up to Papaya Nursery Corner, 1.39 km of 1200 mm Dia D.I. raw water pipeline from Bara Bungalow to Gandhinagar, 1.23 km of 500 mm Dia D.I.K-9 Pipeline from Ramrajya to Nahush ESR by replacing of existing 500 mm dia PSC pipes, jointing transmission mains from Panchavati WTP to Shakti Nagar ESR, distribution networks for various areas and other related works.
Publish Date: March 28, 2025
End Date: April 21, 2025
Implementing Agency: Urban Development Department, Assam
Segment: Water Supply
Work: Tezpur town WSS Phase-II: The scope of work involves components such as a floating pontoon, raw water pumping machinery with a transmission main from the pontoon to the water treatment plant (WTP), an additional WTP of capacity 8.80 million litres per day (MLD), 11.34 LL membrane bio reactor (MBR), clear water pumping machinery, rising main, gravity main, and additional elevated service reservoirs (ESR) of 11.60 LL and 18.60 LL in Zone-2, Zone-4 and balance distribution of Zone-1 along with operation & maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 710.42 million.
North Lakhimpur town WSS Phase-II: The scope of work involves 11.11 km pipeline, intake barge, raw water pumping machinery, rising main, 8.7 million litres per day (mld) water treatment plant (WTP), pure water rising main and pumping machineries, elevated service reservoir (ESR), distribution network and household connection specifically for Zone-3 (Ward-10 (39%), 11, 12A, 12B, 13), Zone-4 (Ward-8, 9, 14A, 14B, 14C, 14D), and the only distribution network for part of Zone-2 (Ward-7(100%) and Ward-10 (61%) which is uncovered in Phase-I along with operation & maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 649.92 million.
Dibrugarh Town WSS Phase-II: The scope of work involves 42.7 mld WTP, construction of a pure water rising main from the tapping points, two new ESRs, distribution network, household connections, implementation of SCADA systems, strengthening of the existing rising main, and provision of filter media to support future expansion in Zone-6 and 7 along with operation & maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 497.7 million.
Sivasagar Town WSS Phase-II: The scope of work involves raw water pumping machinery, rising main, 4.5 mld WTP, pure water rising main and pumping machinery, ESR, distribution network, and 6,566 household connections. These components are designed for Zone-4 (Wards- 1 and 2), Zone-5 (Ward-9 and 50% of Ward-10), and Zone-6 (50% of Ward-10 and Ward-14) along with operation & maintenance (O&M) for five years. The work is likely to be completed in 24 months at an estimated cost of Rs 548.69 million.
Publish Date: March 26, 2025
End Date: April 22, 2025
Implementing Agency: Public Health and Municipal Engineering Department, Telangana
Segment: Wastewater
Work: Package 1: It includes rejuvenation of water body projects in 45 ULBs (50 projects) in the jurisdiction of Adilabad, Karimnagar and Warangal divisions at an estimated cost of Rs 933.24 million.
Package 3: It includes rejuvenation of water body projects in 68 ULBs (72 projects) in the jurisdiction of Sangareddy, Rangareddy, Nizamabad and Mahabubnagar divisions at an estimated cost of Rs 1,377.58 million.
Publish Date: March 26, 2025
End Date: April 16, 2025
Implementing Agency: Bangalore Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of work includes providing water supply feeder main, construction of ground level reservoirs, over head tank and allied works.
Publish Date: March 26, 2025
End Date: April 9, 2025
Implementing Agency: Urban Environmental Engineering Department, Jammu and Kashmir
Segment: Wastewater
Work: The scope of work includes survey, design and execution of Samba sewerage scheme followed by six months trial run and five years of Operation and Maintenance (O&M).
Publish Date: March 24, 2025
End Date: June 27, 2025
Implementing Agency: Sewerage and Drainage Division, West
Segment: Wastewater
Work: The scope of work includes survey, design and execution of Sewerage Scheme Katra Town on engineering, procurement and construction (EPC) basis, including a six-month trial run, two years defect liability period (DLP) and five year Operation and Maintenance (O&M).
Publish Date: March 22, 2025
End Date: June 27, 2025
Implementing Agency: Pandharpur Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of collection system, interception and diversion (I&D), prefab pumping station, rising main, sewage pumping station, transmission line using micro tunnelling with supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: March 4, 2025
End Date: March 18, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: March 28, 2025
End Date: April 29, 2025
Implementing Agency: Department of Drinking Water and Sanitation, Government of Uttarakhand
Segment: Wastewater
Work: The scope of work includes supplying, laying, jointing, testing and commissioning of 76.73 km long sewer collection network, 7214 house connections , three new sewerage pumping station (rangis g from 1.3 to 10 million litres per day (mld)) and micro tunnelling 0.12 km at Haridwar.
Publish Date: March 24, 2025
End Date: May 13, 2025
Implementing Agency: Assam Public Works Department (APWD)
Segment: Wastewater
Work: The scope of work includes construction of drainage in North Guwahati for area bounded by LPGNB road on the East Side, Gauripur-Rudreshwar Road on North Side, Ghoramara-Kolbari-GNRC road on West Side and Brahmaputra Road on South, Guwahati under State Owned Priority Development (SOPD-G) for the year 2024-25.
Publish Date: March 22, 2025
End Date: May 30, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Water Supply
Work: The scope of work includes implementation of water supply scheme (WSS) at Katihar and Begusarai under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Publish Date: March 21, 2025
End Date: April 2, 2025
Implementing Agency: Panvel Municipal Corporation
Segment: Wastewater
Work: The scope of work includes design, supply, installation, testing and commissioning of TTP at Kamothe STP, 5.21 km long distribution network for providing water to gardens, gravity main, rising main pipeline, ground service reservoir (GSR) and other related infrastructure.
Publish Date: March 20, 2025
End Date: April 3, 2025
Implementation Agency: The Municipal Engineering Directorate, West Bengal
Segment: Water Supply
Work: The scope of work includes augmentation and strengthening of WSS which includes sinking of tube wells with electro-mechanical works (for existing and proposed) , supplying and laying of DI-K9 rising main, with temporary road restoration for vehicular movement, national highway/ rail crossing by horizontal directional drilling (HDD) method, construction of overhead reservoirs (OHRs) with geotechnical investigation and design of OHR including solar panel to cover the scheme area, pump houses, boundary wall, guard room, land development, approach road and masonry Drain and all other allied works. The work is likely to be completed in nine months with operation & maintenance (O&M) for five years.
Publish Date: March 20, 2025
End Date: April 12, 2025
Implementing Agency: Erandol Municipal Council
Segment: Wastewater
Work: The scope of work includes working survey, 58 km long collection system, sewage pumping station, rising main 1 (200 m long – 350 mm dia.), mechanical works of pumping station – o1, express feeder (3.5 km), solar power plant (300kw), sewage treatment plant (STP) having a capacity of 6 million litres per day (mld) based on sequential batch reactor (SBR) technology, compound wall ( length – 500 m), house service connection (6558 nos hh), road restoration (length -49 km a), push through for crossing line under major road and other related works.
Publish Date: March 19, 2025
End Date: April 3, 2025
Implementing Agency: Manmad Municipal Council
Segment: Wastewater
Work: The scope of work includes working survey (length – 163 km), collection system (length- 162.17km), house service connection ( 18399 nos), road restoration, push through for crossing line under major road/ railway crossing, rising main for outfall 0-1 to wet well Dia-600 mm DI K-9, L-100 m , one sewage pumping station, sewage treatment plant (STP) having a Capacity of 14.5 million litres per day (mld) based on sequential batch reactor (SBR) technology, STP of capacity 0.2 mld – 1 WT For Zone 2, non clog pumping machinery & allied works for including three months trial run.
Publish Date: March 18, 2025
End Date: April 8, 2025
Implementation Agency: The Karnataka Water Supply and Drainage Board (KUWSDB
Segment: Water supply
Work: The project involves implementation of 30 million litres per day (mld) external WSS to Raichur growth area, Deosugur phase-II housing layout, Yeramaras, Raichur industrial area from Krishna river in Raichur district and implementation of 20 mld external WSS to Nandur industrial area phase-I, phase-II, phase-III, Kapnoor industrial area phase-I, phase-II, phase-III in Gulbarga district from Bheema river/ Bennethora reservoir or any other perennial nearby source on total turnkey basis.
Publish Date: March 18, 2025
End Date: March 27, 2025
Implementing Agency: Tamil Nadu Urban Infrastructure Financial Services Limited
Segment: Wastewater
Work: The scope of work include preparation of feasibility report for establishing tertiary treatment reverse osmosis (TTRO) / tertiary treated ultra filtration (TTUF) Plants for recycle and reuse of treated effluents from STPs in Cuddalore, Dharmapuri and Aruppukottai; DPR for all towns, bid process management for three towns yet to be decided and other related works.
Publish Date: March 17, 2025
End Date: May 23, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The scope of work involves estimate for construction of 10 x 12 m housing chamber with foot bridge along with coffer dam at Ramasamudra, providing laying, jointing, testing and commissioning of 400 mm diameter DI K9 class raw water rising main from Ramasamudra tank to proposed water treatment plant (WTP) at Shidlaghatta (Length 17.312 km), construction of 10 million litres per day (MLD) WTP at Ajjakadrenahalli village in Shidlaghatta town; Providing and laying of various diameter DI K9 feeder line from proposed pure water sump at WTP to existing & Proposed OHT’s. 14.88 km; Providing and laying of various diameter HDPE feeder line from proposed pure water sump at different locations to existing & Proposed OHT’s. 5.386 km; Providing and laying of various diameter Distribution pipeline for 9 Zones Total Length – 99.18 km HDPE PE-100, PN-8 (96.114 Kms, DI – K7 Class – 3.065Kms) etc. including operation and maintenance (O&M) for a period of five years including one year defect liability period (DLP) on design, build, operation and transfer (DBOT) basis through public private partnership (PPP) model.
Publish Date: March 14, 2025
End Date: April 16, 2025
Implementing Agency: Rajasthan Rajya Vidyut Utpadan Nigam Limited
Segment: Wastewater
Work: The scope of work includes supply and installation of 300 cubic m per hour capacity RO plant for treatment of plant effluent water for plant reuse to comply with zero liquid discharge (ZLD) requirement at 2×660 MW Units 5 and 6 supercritical thermal power plant ( TPP), Chhabra Super Critical Thermal Power Plant (CSCTPP).
Publish Date: March 12, 2025
End Date: April 21, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palika (BBMP)
Segment: Wastewater
Work: The scope of work includes construction of flood protection structures to SWD including reinforced cement concrete (RCC) retaining walls, water retention structures, nature-based solution structures/bridges and culverts.
Package 1: The estimated cost is Rs 1,802.71 million.
Package 2: The estimated cost is Rs 1,853.22 million.
Publish Date: March 12, 2025
End Date: April 15, 2025
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design, construction of 22 million litres per day (mld) water treatment plant (WTP) at Lal Buag main head water work area, elevated service reservoir, clear water sump, rising main, supply, installation, testing and commissioning (SITC) of pumping machineries works, electrification work, distribution pipeline network, compound wall, road resurfacing, house connection, reinforced cement concrete (RCC) approach road, renovation works like existing pump room, existing elevated service reservoir (ESR), existing sump at various headworks, staff quarter, etc. including operation and maintenance (O&M) for one year and three years defect liability period in Anand district of Gujarat.
Publish Date: March 12, 2025
End Date: April 15, 2025
Implementation Agency: Gujarat Urban Development Company Limited
Segment: Water Supply
Work: The scope of work involves working survey, soil investigation, design, construction of 22 million litres per day (mld) water treatment plant (WTP) at Lal Buag main head water work area, elevated service reservoir, clear water sump, rising main, supply, installation, testing and commissioning (SITC) of pumping machineries works, electrification work, distribution pipeline network, compound wall, road resurfacing, house connection, reinforced cement concrete (RCC) approach road, renovation works like existing pump room, existing elevated service reservoir (ESR), existing sump at various headworks, staff quarter, etc. including operation and maintenance (O&M) for one year and three years defect liability period in Anand district of Gujarat.
The work is expected to be completed in 24 months at an estimated cost of Rs 529.18 million.
Publish Date: March 12, 2025
End Date: April 15, 2025
Implementing Agency: Bruhat Bengaluru Mahanagara Palike (BBMP)
Segment: Wastewater
Work: The scope of work includes:
Dasarahalli Zone Package 1: Construction of flood protection structures to storm water drainage (SWD) including reinforced cement concrete (RCC) retaining walls, water retention structures, nature based solution structures/ bridges and culverts under the KWSRDP in Dasarahalli Zone at an estimated cost of Rs 1,663.8 million.
Bommanahalli Zone Package-1: Construction of flood protection structures to storm water drainage (SWD) including reinforced cement concrete (RCC) retaining walls, water retention structures, nature based solution structures/ bridges and culverts under the KWSRDP in Bommanahalli Zone at an estimated cost of Rs 1,635.03 million.
Publish Date: March 11, 2025
End Date: April 15, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work involves surveying, soil investigation, engineering, design, supply of all materials, labour, T&P etc. required for construction, completion, testing and commissioning of intake well cum pump house and approach bridge and associated works, raw water rising main (1100 mm diameter) from intake to water treatment plant (WTP), WTP (with advanced treatment process)- 55 million litres per day (mld). The scope of work includes commissioning, testing, trial run of three months and defect liability period (dlp) of 12 months for civil works and 24 months for E/M works after completion of successful trial run.
Publish Date: March 11, 2025
End Date: April 16, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Wastewater
Work: These include development of Khurjee Nala from Rajeev Nagar DPS to Shakuntal Market to Atal Path to Kurjee Nala at an estimated cost of Rs 1,668.2 million; Construction of SWD for Saharsha Nagar Nigam Phase -II at an estimated cost of Rs 1,241.88 million; construction of drainage at Anandpuri Nala (Baba Chowk to Atal Path- A. N. College Indra Sinha Path-Rajapur Pul) at an estimated cost of Rs 867.4 million; Construction of SWD for Hajipur Phase-I at an estimated cost of Rs 627.02 million and Construction of SWD for Hajipur – Phase II at an estimated cost of Rs 581.22 million.
Publish Date: March 8, 2025
End Date: April 8, 2025
Implementing Agency: Bihar Urban Infrastructure Development Corporation Limited
Segment: Water Supply
Work: The scope of work includes implementation of water supply scheme (WSS) at Nawada, Bettiah and Biharsharif under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Bettiah: The estimated cost of the project is Rs 648.83 million.
Nawada: The estimated cost of the project is Rs 1,931.29 million.
Biharsharif: The estimated cost of the project is Rs 1,381.36 million.
Publish Date: March 8, 2025
End Date: April 11, 2025
Implementing Agency: Uttar Pradesh Jal Nigam (UPJN)
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, engineering, design, supply of all materials, labour etc. required for construction completion, testing and commissioning of water supply works such as reinforced cement concrete (RCC) overhead tanks (OHTs), pumping station, rising main, feeder main, distribution system, supervisory control and data acquisition (SCADA) room, chlorination room, meter room, panel room, staff quarter, boundary wall and site development works etc. and other appurtenant works including trial run of 3 months and defect liability period (DLP) of 12 months for civil works and 24 months for electrical and mechanical works.
Publish Date: March 7, 2025
End Date: April 16, 2025
Implementing Agency: Kulgaon-Badlapur Municipal Council
Segment: Wastewater
Work: The scope of work includes working surveys and construction work for nalla Channelisation from Chikhloli Dam (M.C. Boundary Gayatri Garden) – Janvhi lawns – Railway underpass – Gite Nagar – Mamta Hospital – Railway Bridge – Gandhinagar – Shaninagar – Hendrepada – Gauri Mangal Karyalaya to Ulhas River having total length of 10.07 km and all other related works thereof.
Publish Date: March 7, 2025
End Date: March 28, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The scope of work includes construction of feeder mains / gravity mains/ distribution mains with all specials / fittings, control valves, bulk meters, including house service connection with meters, instruments and other appurtenances, reservoirs (overhead tanks – both existing and proposed) with all installations, pumping stations with all electrical / mechanical components including five years Operation and Maintenance (O&M) and one year defect liability period (DLP).
Publish Date: March 6, 2025
End Date: April 7, 2025
Implementing Agency: Public Health Engineering Department, Telangana
Segment: Water Supply; Wastewater
Work: The scope of work includes development of water supply, underground sewerage, storm water drainage, rejuvenation of water bodies, road infrastructure, junction improvement and welcome arches and others in Kosgi
Publish Date: March 6, 2025
End Date: April 2, 2025
Implementing Agency: Water Corporation of Odisha (WATCO)
Segment: Water Supply
Work: The scope of work includes improvement of 24X7 drinking water supply system on engineering procurement and construction (EPC) basis, including five years of Operation and Maintenance (O&M).
Publish Date: March 4, 2025
End Date: April 17, 2025
Implementing Agency: Kalna Municipal Corporation
Segment: Wastewater
Work: The scope of work includes site survey, reconnaissance of the proposed site, collection of necessary data from concerned authorities, identification of existing problems and their solutions and other related works.
Publish Date: March 4, 2025
End Date: March 26, 2025
Implementing Agency: Khamgaon Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of 209.25 km long trunk main and collections system, pumping station, wet well, rising main, 15.5 million litres per day (mld) sewage treatment plant (STP) and other related infrastructure.
Publish Date: February 27, 2025
End Date: March 28, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of two reinforced cement concrete (RCC) intake well of 15 m diameter with approach bridge on either bank or river (civil work only) and transmission main, water treatment plant (WTP), supervisory control and data acquisition (SCADA), road Crossings, forest clearance, power line, land acquisitions, intake pumping machinery, wtp pump house and intermediate pumping station (IPS) and 10 years Operation and Maintenance (O&M) including physical contingencies, price escalations of Jhalawar and Kota district.
Publish Date: February 26, 2025
End Date: April 15, 2025*
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: Shri Bansidharnagar: The scope of work includes development survey, design and construction of reinforced cement concrete (RCC) component, infiltration well, intake well cum jack well, approach bridge, water treatment plant (WTP) having capacity of 11.56 million litres per day (mld), raw water transmission line, distribution network of 97.965 km with supervisory control and data acquisition (SCADA) automation including three months trial and run and Operation and Maintenance (O&M) of five years at an estimated capital cost of Rs 1,145.69 million and O&M cost of Rs 73.02 million.
Publish Date: February 25, 2025
End Date: March 25, 2025
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply; Wastewater
Work: The scope of work includes:
Ranavav WSS under the Atal Mission for Rejuvenation and Urban Transformation 2.0 (AMRUT 2.0): The scope of work includes working survey, soil investigation, design, construction, testing, commissioning of reinforced cement concrete (RCC), elevated service reservoir (ESR), providing, supplying, lowering, laying and jointing di/pvc pipeline network, repairing of existing pipeline, providing house connection work etc. with Operation and Maintenance (O&M) of five years and three years defect liability period(DLP).
Ranavav UGD-II under Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY). : The scope of work includes working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing & commissioning of RCC NP3 pipes for sewer collecting system – gravity mains and di pipes for rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, construction of house connections, road restoration, electrical work etc. with two years O&M and three years DLP.
Ranavav Sewage Treatment Plant (STP)-I and II under SJMMSVY: The scope of work includes designing and construction of sewage treatment plant of 6 and 4 million litres per day (mld) along with all allied works, designing, providing, supplying, lowering, laying & jointing rising main network, including seven years O&M and three years DLP.
Publish Date: February 24 2025
End Date: May 16, 2025*
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: February 14, 2025
End Date: January 20, 2025
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Wastewater; Water Supply
Work: The scope of work includes:
Chhotaudepur UGD-II: It includes a working survey, soil investigation, and the design of an underground drainage project. work including providing, supplying, lowering laying, jointing, testing and commissioning of reinforced cement concrete (RCC) pipes for sewer collecting system – gravity mains and rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, construction of house connections, road restoration, office building and head work development, electrical work etc. with Operation and Maintenance with all allied works for two years including three years defect liability period (DLP) for Chhotaudepur Nagar Palika underground drainage project.
Dabhoi UGD-II: It includes designing, constructing, testing and commissioning of RCC clear water sump, RCC ESR, rising main, providing supplying lowering, laying and jointing di/pvc/distribution pipeline and providing supplying and erecting pumping machineries, design and construction of pump room, road restoration, transformer, electrification work, water connection etc, including O&M for five years.
Padra UGD II: The scope of designing and construction of sewage treatment plant (STP) of 4 million litres per day (mld) along with working survey, soil investigation, design of underground drainage project. work including providing, supplying, lowering laying, jointing, testing and commissioning of rcc pipes for sewer collecting system – gravity mains and rising main pipeline, construction of sewage pumping station (SPS), supplying, erecting, testing and commissioning of pumping machineries, house connections, road restoration, providing and electrical work etc. including Operation and Maintenance (O&M) of two years for Sewage Network with allied works and O&M for seven years including three years defect liability period (DLP) for Padra Nagarpalika UGD project with STP.
Publish Date: March 3, 2025
End Date: April 2, 2025
Implementing Agency: Hyderabad Metropolitan Water Supply And Sewerage Board (HMWSSB)
Segment: Water Supply
Work: Package I: The scope of work includes manufacture, supply, lowering, laying, jointing, testing and commissioning of 3000mm dia ms pumping main in two rows (10 tmc each) from Mallannasagar to Ghanpur, construction of pump house, electro mechanical equipment, transformers, substation at Mallannasagar and construction of 1170 million litres per day (mld) capacity water treatment plant (WTP), 40 ml clear water reservoir cum pump house, electro mechanical equipment, transformers, at Ghanpur including manning, Operation and Maintenance (O&M) of Project for 10 years at an estimated cost of Rs 19,922. 22 million.
Package II: The scope of work includes manufacture, supply, lowering, laying, jointing, testing and commissioning of 2200mm ms pumping main from Ghanpur to Osmansagar, 2400mm ms pumping main from Ghanpur to Muthangi, 3000mm dia ms pipeline from Kokapet to Osmansagar conduit along outer ring road (ORR) and 2200 mm dia MS pipeline for interconnection of Osmansagar and Himayathsagar reservoirs, 3000mm dia MS pumping main from WTP to membrane bio reactor (MBR) at Ghanpur, construction of 80 ML MBR, 18ML raw water reservoir & pump house and electro mechanical equipment, transformers, substation at Ghanpur and manufacture, supply, lowering, laying, jointing, testing and commissioning of 1500mm dia ms main, construction of 120 mld WTP, 18 ml clear water reservoir (CWR), pump house with electro mechanical equipment, sub station, 1200mm dia ms clear water pumping main at Osmansagar, 22.50ML MBR at Golden Mile and 800/600/400mm dia distribution mains from mbr under Osmansagar reservoir and manufacture, supply, lowering, laying, jointing, testing and commissioning of 1200mm dia ms main, construction of 70 mld WTP, 18ML CWR, pump house with electro mechanical equipment, sub station at Himayathsagar, 1000 mm dia MS pumping main to Budvel reservoir under Himayathsagar Reservoir including 10 years O&M at an estimated cost of Rs 32,254.71 million.
Publish Date: March 12, 2025
End Date: March 27, 2025
Implementing Agency: Tamil Nadu Urban Infrastructure Financial Services Limited
Segment: Water Supply
Work: The scope of work includes conducting reconnaissance surveys of the study area and project specific facilities and preparing environmental, climate change and social impact assessment reports. The project is being funded by the World Bank (WB).
Publish Date: March 1, 2025
End Date: May 29, 2025*
Implementing Agency: Bruhat Bengaluru Mahangara Palike (BBMP)
Segment: Wastewater
Work: The scope of work includes construction of flood protection structures to SWD including reinforced cement concrete (RCC) retaining walls, Water retention structures, nature based solution structures / bridges and culverts.
Publish Date: March 12, 2025
End Date: April 21, 2025
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: The scope of work includes:
Package 3: The scope of work includes survey, soil investigation, design and execution of various works for procurement, laying, jointing, testing & commissioning of distribution network of 20 new overhead tanks (OHT’s) and 29 existing overhead tanks & replacement of 685 km long old distribution network, laying of 32 km lonng water feeder main with 1,08,087 house service connections and monitoring system and achieving continuous (24 x 7) pressurised water supply plus 10 years Operation and Maintenance (O&M) for Indore City at an estimated cost of Rs 3,871.8 million.
Package 4: The scope of work includes survey, soil investigation, design and execution of various works for procurement, laying, jointing, testing & commissioning of distribution network of 20 new overhead tanks (OHT’s) and 46 existing overhead tanks & replacement of 719 km long old distribution network, laying of 25.2 km long water feeder main with 1,62,091 house service connections and monitoring system and achieving continuous (24 x 7) pressurised water supply plus 10 years Operation and Maintenance (O&M) for Indore City at an estimated cost of Rs 4,287.6 million.
Publish Date: April 24, 2025
End Date: May 28, 2025
Implementing Agency: Bangalore Water Supply and Sewerage Board
Segment: Water Supply
Work: The scope of works includes detailed surveys, establishment of district metered areas (DMAs), conduction pressure zero tests, hydraulic discretion, replacement of existing 100mm dia, 100mm to 300mm dia C.I. lead joint pipeline/PVC/PSC pipelines completely by D.I. Pipeline/ M.S. Pipeline, Laying of D.I. feeder mains in place of existing C.I. Lead joint pipeline, Replacement of consumer service connections(store supply) associated with pipeline to be replaced, replacement of defective and seven years aged water meters, procurement and installation of electro magnetic field (EMF) bulk flow meters to measure the incoming and outgoing water, Monitoring of UFW levels, determination of UFW for all DMA on monthly basis and submission of the UFW report, leak detection and repairs for reduction of UFW to 10 percent, determination of cost-benefit analysis and submitting the final report.
Publish Date: March 5, 2025
End Date: March 19, 2025
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Wastewater
Work: The scope of work includes surveying, soil investigation, design and supply of all materials, labour, commissioning, testing, trial and run, defect liability period on turn- key basis.
Package 1: The estimated cost of the package is Rs 1,327.39 million.
Package 2: The estimated cost of the package is Rs 1,391.5 million.
Publish Date: March 17, 2025
End Date: April 23, 2025
Implementation Agency: Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB)
Segment: Water Supply
Work: The scope of work includes development of 47 million litres per day (mld) WTP on design, build, operate and transfer (DBOT) basis including comprehensive operation & maintenance (O&M) period of 10 years.
The period of completion of work is 21 months.
Publish Date: March 17, 2025
End Date: April 29, 2025
Implementation Agency: The Karnataka Urban Water Supply and Drainage Board
Segment: Water supply
Work: The scope of work involves estimate for construction of 10 x 12 m housing chamber with foot bridge along with coffer dam at Ramasamudra, providing laying, jointing, testing and commissioning of 400 mm diameter DI K9 class raw water rising main from Ramasamudra tank to proposed water treatment plant (WTP) at Shidlaghatta (Length 17.312 km), construction of 10 million litres per day (MLD) WTP at Ajjakadrenahalli village in Shidlaghatta town; Providing and laying of various diameter DI K9 feeder line from proposed pure water sump at WTP to existing & Proposed OHT’s. 14.88 km; Providing and laying of various diameter HDPE feeder line from proposed pure water sump at different locations to existing & Proposed OHT’s. 5.386 km; Providing and laying of various diameter Distribution pipeline for 9 Zones Total Length – 99.18 km HDPE PE-100, PN-8 (96.114 Kms, DI – K7 Class – 3.065Kms) etc. including operation and maintenance (O&M) for a period of five years including one year defect liability period (DLP) on design, build, operation and transfer (DBOT) basis through public private partnership (PPP) model.
The work is expected to be completed in 24 months at an estimated cost of Rs 717.6 million.
Publish Date: March 14, 2025
End Date: April 23, 2025
Implementing Agency: Durg Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction, testing and commissioning of all the components of the Durg Sewage Master Plan including five years of Operation and Maintenance (O&M).
Publish Date: March 13, 2025
End Date: April 11, 2025
Implementing Agency: Jharkhand Urban Infrastructure Development Company Limited
Segment: Water Supply
Work: Chhatarpur & Hariharganj: The scope of work includes development survey, design and construction of reinforced cement concrete (RCC) component, infiltration well, intake well cum jack well, approach bridge, WTP having capacity of 21.2 mld, raw water transmission line, distribution network of 97.965 km with SCADA automation including three months trial and run and O&M of five years at an estimated capital cost of Rs 1,895.73 million and O&M cost of Rs 116.96 million.
Publish Date: February 25, 2025
End Date: March 18, 2025
Implementing Agency: Panvel Municipal Corporation
Segment: Wastewater
Work: The scope of work includes design, supply, installation, testing and commissioning of TTP at Kamothe STP, 5.21 km long distribution network for providing water to gardens, gravity main, rising main pipeline, ground service reservoir (GSR) and other related infrastructure.
Publish Date: February 21, 2025
End Date: March 7, 2025
Implementing Agency: Rajasthan Urban Drinking Water Sewerage and Infrastructure Corporation Limited
Segment: Wastewater
Work: The scope of work includes providing, laying, jointing, testing and commissioning of sewerage system and all ancillary works along with design, construction, supply, installation, testing and commissioning (civil, mechanical, electrical, instrumentation and other necessary works) of 2.6 million litres per day (mld) sewage treatment plant (STP) including one year defect liability period (DLP) with 10 years of Operation and Maintenance (O&M).
Publish Date: February 17, 2025
End Date: March 18, 2025
Implementing Agency: Indore Municipal Corporation
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design and execution of various works for augmentation of water supply system which includes construction of an intake of 1650 million litres per day (mld) capacity with raw water pump house, water treatment plant having capacity of 400 mld with clear water booster pumping stations, pumping main and Electric substation including Operation and Maintenance (O&M) for 10 years.
Publish Date: February 13, 2025
End Date: March 18, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: February 14, 2025
End Date: March 18, 2025
Implementing Agency: Municipal Corporation of Greater Mumbai (MCGM)
Segment: Wastewater
Work: The scope of work includes construction of tidal dry weather flow interception facilities (DWFIF), transfer sewer networks along with one associated sewage pumping station, training of river (retaining wall and service road), beautification including promenades and allied civil works from CST Bridge Kurla to Mahim Causeway including Vakola River including Operation and Maintenance (O &M) for ten years on design, build and operate (DBO) basis.
Publish Date: February 14, 2025
End Date: March 25, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Water Supply
Work: The scope of work includes design, construction, survey, soil investigation, construction of coffer dam, draught canal, jackwell with pump house, foot bridge, providing and laying of 559mm dia 5.6mm thick MS raw water rising main from Gulbal jackwell to water treatment plant ( WTP) Mudhol (27 Kms), 16 million litres per day (mld) WTP and other related infrastructure and Operation and Maintenance (O&M) for five years and defect liability period (DLP).
Publish Date: February 14, 2025
End Date: March 17, 2025
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes surveying, soil investigation, design, supply of all materials, labour etc. required for construction, erection, completion, testing and commissioning of water supply works such as overhead reservoirs (OHRs), clear water reservoirs, pump house, staff quarters, supervisory control and data acquisition (SCADA) room, rising main, feeder main, distribution network, house connection, boundary wall, ms gate, site development work, renovation of OHT boundary wall and pump house, dismantling of existing old OHT and construction of tube wells and other appurtenant works including three months of defect liability period (DLP) for civil works and one-year for electrical and mechanical (E&M) work .
Publish Date: February 11, 2025
End Date: February 27, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one-year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: February 14, 2025
End Date: March 24, 2025
Implementing Agency: Karnataka Urban Water Supply and Drainage Board
Segment: Wastewater
Work: The scope of work includes detailed topographical survey, design and drawings (hydraulic and Structural), providing sewer network with house service connections, construction, supply, installation, testing and commissioning of wet well cum pump houses along with pre-treatment unit, DI rising main, DG room, pumping machinery, 11KV express feeder main, sewage treatment plant (STP), Deodourisation for wet well and STP’s and allied works which are essential for successful commissioning of the project including five years Operation and Maintenance (O&M) on design, build, operate and transfer (DBOT) basis.
Publish Date: February 11, 2025
End Date: March 21, 2025*
Implementing Agency: Public Works Department, Puducherry (PWD)
Segment: Wastewater
Work: The scope of work involves verification of detailed engineering design, construction, testing and commissioning of underground sewerage infrastructure in Zones 12-1 and 12-2 and an in-line sewage pumping station (SPS-12-2-1 of the Puducherry Urban Agglomeration Area (PUAA). It includes laying of 47 km DWC Sewer Pipe and 7 km HDPE Sewer Pipes using Trenchless methods.
Published Date: February 25, 2026
End Date: April 22, 2026*
Implementing Agency: Delhi Jal Board (DJB)
Segment: Wastewater
Work: The scope of work involves interim operation of the existing and partly rehabilitated WWTP during construction and rehabilitation period, construction, rehabilitation and up-gradation of existing 25 mgd WWTP to 40 mgd WWTP, construction of new 15 mgd STP/WWTP, management of sludge for total 55 mgd WWTP, integration of rehabilitated WWTP and trial run and operation and maintenance of the plant for a period of 10 years after successful completion of DLP.
Publishing Date: February 7, 2026
End Date: April 20, 2026*
Implementing Agency: Bhilai Municipal Corporation
Segment: Wastewater
Work: The scope of work includes investigation, design, construction of interception cum diversion chambers/weirs on Samudhanala along with manual screens, grit, diversion chambers, wet well with pump house and screens, sewage treatment plant (STP) having a capacity of 150 million litres per day (mld) on sequential batch reactor (SBR) technology for secondary treatment, supervisory control and data acquisition (SCADA) automation and other related works including three months trial run and Operation and Maintenance (O&M) for 15 years.
Publish Date: February 7, 2025
End Date: February 24, 2025
Implementing Agency: Bhavnagar Municipal Corporation
Segment: Wastewater
Work: The scope of work includes engineering, procuring, constructing, commissioning (EPC) upgradation of an existing 30 million litres per day (mld) STP to 45 mld based on sequential batch reactor (SBR) technology at Kumbharwada, Bhavnagar along with all related mechanical, electrical equipment, accessories and instrumentation including Operation and maintenance (O&M) for five years.
Publish Date: January 23, 2025
End Date: May 26, 2025*
Implementing Agency: Greater Noida Industrial Development Authority (GNIDA)
Segment: Water Supply; Wastewater
Work: The scope of work includes study of GNIDA master plan-2021, existing infrastructure study, hydraulic modelling, survey and verification/updating of peripheral and distribution network, forecasting, automation, environmental study, prepare strengthening/rehabilitation and project estimates and bill of quantities (along with rate analysis and quotations wherever required etc.), operation and maintenance (O&M) strategy, plan and most efficient estimates with real-time solutions by proposing water maintenance vehicle equipped with all solutions for every network and all other related works.
Publish Date: January 23, 2025
End Date: February 3, 2025
Implementing Agency: Gujarat Industrial Development Corporation
Segment: Wastewater
Work: The scope of work includes engineering, procurement & construction (EPC), design, erection, testing, commissioning of 70 mld offshore & onshore effluent disposal pipeline from Vapi CETP into deep sea at selected disposal location, including pumping station & all electro mechanical work along with all allied infrastructure work. The work is likely to be completed in 18 months including three months trial run. The project includes an Operation and Maintenance (O&M) period of 5 years.
Publish Date: January 8, 2025
End Date: September 10, 2025
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes implementation of water supply reorganisation in Etah Nagar Palika Parishad.
Publish Date: January 22, 2025
End Date: February 11, 2025
Implementing Agency: Dabra Municipal Corporation
Segment: Wastewater
Work: The scope of project includes survey, soil investigation, providing, laying and jointing of sewerage network, construction of 20 million litres per day (mld) sewage treatment plant (STP), supervisory control and data acquisition (SCADA) automation and other related infrastructure including Operation and Maintenance (O&M) for 10 years.
Publish Date: January 21, 2025
End Date: February 21, 2025
Implementing Agency: Gujarat Industrial Development Corporation
Segment: Wastewater
Work: The scope of work involves Engineering, Procurement & Construction (EPC), Design, Erection, Testing, Commissioning of 60 mld offshore and onshore Effluent disposal pipeline from Bulk Drug Park pumping station to Deep Sea Disposal Point at Dahej covering all the Civil structure and allied works. The work is likely to be completed in 18 months. The project includes an Operation and Maintenance (O&M) period of 5 years. The estimated cost of the project is Rs 7915.32 million
Publish Date: January 21, 2025
End Date: June 23, 2025*
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply; Wastewater
Work: Water Supply: It includes design, build and operate (DBO) contract for providing, lowering, laying, jointing, supply of pipeline network (gravity, rising main and distribution network) and supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipments, instruments and accessories with construction of 19 million litres per day (mld) water treatment plant (WTP), compound wall, house connection with Operation and Maintenance (O&M) for one year of all type civil structures and mechanical instruments. It will be carried out under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Sewage: It includes design and construction of sewer collecting system, house service connection, pumping station, pumping machinery, electrical work, pumping main, 10.91 mld sewage treatment plant (STP) and compound wall with seven years O&M of STP and two years O&M for underground sewerage system. It will be carried out under the Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY).
Publish Date: January 20, 2025
End Date: February 3, 2025
Implementing Agency: Kallakurichi Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of a collection system including house service connections, pumping stations, pumping mains, lift stations and other related infrastructure including five years Operation and Maintenance (O&M).
Publish Date: January 20, 2025
End Date: March 20, 2025
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes laying of I&D structures including provision of pumping stations and pumping main /gravity main up to sewage treatment plant (STP)/treatment facility with and establishment of setting up of STPs/community soak pits etc including one year defect liability period (DLP) and five years of Operation and Maintenance (O&M) for the package-05 covering 10 ULBs of Bharatpur Division.
Publish Date: January 19, 2025
End Date: March 17, 2025
Implementing Agency: Pandharpur Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of collection system, interception and diversion (I&D), prefab pumping station, rising main, sewage pumping station, transmission line using micro tunnelling with supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: January 16, 2025
End Date: February 10, 2025
Implementing Agency: Gujarat Industrial Development Corporation
Segment: Water Supply
Work: The scope of work includes appointment of a consultant for setting up adequate capacity or 400 million litres per day (mld) of WSS for Dahej PCPIR based on source of Bhadbhut weir along with the comparative study for additional source from treated wastewater or desalination plant.
Publish Date: January 16, 2025
End Date: February 6, 2025
Implementing Agency: Ujjain Municipal Corporation
Segment: Wastewater
Work: The scope of work includes survey, design, construction of sewage treatment plants (STPs) having capacities of 2.38 million litres per day (mld) for Bhairavgarh drain and 22 mld for Piliyakhal drain, I&D work with construction of two drain tapping for Piliykhal drain and Bhairavgarh drain, approach sewer (1.42 km), construction of two sewage pumping station (SPS) (10 m dia 6 m depth for Piliyakhal drain and 3 m dia- 6 m depth for Bhairavgarh drain) with allied works including sewer rising mains (1420 m) and 2 nos. effluent pumping station at both proposed STPs campus with all allied works including effluent rising main (3500 m) and all appurtenant structures and allied works including 15 years Operation and Maintenance (O&M).
Publish Date: January 16, 2025
End Date: January 31, 2025
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes survey, soil investigation, design, supply of all materials, labour for construction, erection, testing and commissioning of water supply works including four reinforced cement concrete (RCC) overhead tanks (OHTs), rising main, distribution system, tube wells, pump house, boundary wall, supervisory control and data acquisition (SCADA) automation and all other related infrastructure including three months trail run, defect liability period (DLP) of 12 months and 24 months for civil and electrical-mechanical work.
Part 1: The estimated cost of the works is Rs 574.57 million.
Part 2: The estimated cost of the works is Rs 1,198.04 million.
Publish Date: January 15, 2025
End Date: February 14, 2025
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work includes strengthening of intake well inside Chambal River, construction of approach bridge, construction of raw water reservoir (RWR) including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, water treatment plant (WTP), construction of clear water reservoir (CWR) and allied works under Chambal Sawai Madhopur Water Supply Project of district Karauli and Sawai Madhopur Package-1 with 10 years Operation and Maintenance (O&M).
Publish Date: January 15, 2025
End Date: March 10, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: January 15, 2025
End Date: February 14, 2025
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of intermediate clear water pumping house (CWPH) at all intermediate pumping stations (IPSs) and clearwater pumping stations (CPSs), laying of clear water transmission main from Mandrail water treatment plant (WTP) to block CPS/IPS all pumping stations up to Sawai Madhopur, construction of clear water reservoirs (CWRs) and intermediate pump houses and off takes. construction of terminal CWRs at different locations of CPSs including all allied works under Chambal Sawai Madhopur Water Supply Project of District Karauli and Sawai Madhopur package-2 with 10 years Operation and Maintenance (O&M).
Publish Date: January 15, 2025
End Date: March 10, 2025
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work includes strengthening of intake well inside Chambal River, construction of approach bridge, construction of raw water reservoir (RWR) including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, water treatment plant (WTP), construction of clear water reservoir (CWR) and allied works under Chambal Sawai Madhopur Water Supply Project of district Karauli and Sawai Madhopur Package-1 with 10 years Operation and Maintenance (O&M).
Publish Date: January 15, 2025
End Date: March 10, 2025
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of intermediate clear water pumping house (CWPH) at all intermediate pumping stations (IPSs) and clearwater pumping stations (CPSs), laying of clear water transmission main from Mandrail water treatment plant (WTP) to block CPS/IPS all pumping stations up to Sawai Madhopur, construction of clear water reservoirs (CWRs) and intermediate pump houses and off takes. construction of terminal CWRs at different locations of CPSs including all allied works under Chambal Sawai Madhopur Water Supply Project of District Karauli and Sawai Madhopur package-2 with 10 years Operation and Maintenance (O&M).
Publish Date: January 15, 2025
End Date: March 10, 2025
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work includes strengthening of intake well inside Chambal River, construction of approach bridge, construction of raw water reservoir (RWR) including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, water treatment plant (WTP), construction of clear water reservoir (CWR) and allied works under Chambal Sawai Madhopur Water Supply Project of district Karauli and Sawai Madhopur Package-1 with 10 years Operation and Maintenance (O&M).
Publish Date: January 15, 2025
End Date: March 10, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of intake structures, all types of drinking water treatment plant, pumping machinery, raw water reservoir, pipeline work, ground level service reservoir (GLSR), ground water reservoir, overhead reservoir (OHSR) and other related infrastructure including one year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Jodhpur North: The estimated cost of the project is Rs 1,591.83 million.
Jodhpur South: The estimated cost of the project is Rs 1,974.47 million.
Publish Date: January 15, 2025
End Date: March 18, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes construction of intake structures, all types of drinking water treatment plant, pumping machinery, raw water reservoir, pipeline work, ground level service reservoir (GLSR), ground water reservoir, overhead reservoir (OHSR) and other related infrastructure including one year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Jodhpur North: The estimated cost of the project is Rs 1,591.83 million.
Jodhpur South: The estimated cost of the project is Rs 1,974.47 million.
Publish Date: January 15, 2025
End Date: February 24, 2025
Implementing Agency: Public Health Engineering Department (PHED), Rajasthan
Segment: Water Supply
Work: The scope of work includes strengthening of intake well inside Chambal River, construction of approach bridge, construction of raw water reservoir (RWR) including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, water treatment plant (WTP), construction of clear water reservoir (CWR) and allied works under Chambal Sawai Madhopur Water Supply Project of district Karauli and Sawai Madhopur Package-1 with 10 years Operation and Maintenance (O&M).
Publish Date: January 15, 2025
End Date: March 10, 2025
Implementing Agency: Public Health Engineering Department, Rajasthan
Segment: Water Supply
Work: The scope of work includes repair of existing infrastructure, construction of raw water and clear water pump house including sump well, pumping machinery, valves, supervisory control and data acquisition (SCADA) automation and related infrastructure including one year defect liability period (DLP) and 5 years Operation and Maintenance (O&M).
Publish Date: January 13, 2025
End Date: February 13, 2025
Implementing Agency: State Industries Promotion Corporation Of Tamil Nadu Limited (SIPCOT)
Segment: Water Supply
Work: The scope of work includes construction of an intake and outfall system including onshore pump house, 60 mld sea water desalination plant including civil, mechanical, electrical and instrumentation works, all chemical dosing arrangements, 10 million litres storage reservoir and conveyance main for conveyance of product water to the industries including industries in SIPCOT Industrial Park including 6 months trial and run and 15 years of Operation and Maintenance (O&M).
Publish Date: June 19, 2024
End Date: December 12, 2024*
Implementing Agency: Greater Noida Industrial Development Authority (GNIDA)
Segment: Water Supply; Wastewater
Work: The scope of work includes study of GNIDA master plan-2021, existing infrastructure study, hydraulic modelling, survey and verification/updating of peripheral and distribution network, forecasting, automation, environmental study, prepare strengthening/rehabilitation and project estimates and bill of quantities (along with rate analysis and quotations wherever required etc.), operation and maintenance (O&M) strategy, plan and most efficient estimates with real-time solutions by proposing water maintenance vehicle equipped with all solutions for every network and all other related works.
Publish Date: January 23, 2025
End Date: February 3, 2025
Implementing Agency: Bhavnagar Municipal Corporation
Segment: Wastewater
Work: The scope of work includes engineering, procuring, constructing, commissioning (EPC) upgradation of an existing 30 million litres per day (mld) STP to 45 mld based on sequential batch reactor (SBR) technology at Kumbharwada, Bhavnagar along with all related mechanical, electrical equipment, accessories and instrumentation including Operation and maintenance (O&M) for five years.
Publish Date: January 23, 2025
End Date: February 21, 2025
Implementing Agency: Uttar Pradesh Jal Nigam
Segment: Water Supply
Work: The scope of work includes implementation of water supply reorganisation in Etah Nagar Palika Parishad.
Publish Date: January 22, 2025
End Date: February 11, 2025
Implementing Agency: Dabra Municipal Corporation
Segment: Wastewater
Work: The scope of project includes survey, soil investigation, providing, laying and jointing of sewerage network, construction of 20 million litres per day (mld) sewage treatment plant (STP), supervisory control and data acquisition (SCADA) automation and other related infrastructure including Operation and Maintenance (O&M) for 10 years.
Publish Date: January 21, 2025
End Date: February 21, 2025
Implementing Agency: Gujarat Urban Development Company Limited
Segment: Water Supply; Wastewater
Work: Water Supply: It includes design, build and operate (DBO) contract for providing, lowering, laying, jointing, supply of pipeline network (gravity, rising main and distribution network) and supply, installation, testing and commissioning of pumps with associated mechanical and electrical equipments, instruments and accessories with construction of 19 million litres per day (mld) water treatment plant (WTP), compound wall, house connection with Operation and Maintenance (O&M) for one year of all type civil structures and mechanical instruments. It will be carried out under the Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0.
Sewage: It includes design and construction of sewer collecting system, house service connection, pumping station, pumping machinery, electrical work, pumping main, 10.91 mld sewage treatment plant (STP) and compound wall with seven years O&M of STP and two years O&M for underground sewerage system. It will be carried out under the Swarnim Jayanti Mukhya Mantri Shaheri Vikas Yojana (SJMMSVY).
Publish Date: January 20, 2025
End Date: February 3, 2025
Implementing Agency: Kallakurichi Municipal Corporation
Segment: Wastewater
Work: The scope of work includes construction of a collection system including house service connections, pumping stations, pumping mains, lift stations and other related infrastructure including five years Operation and Maintenance (O&M).
Publish Date: January 20, 2025
End Date: February 13, 2025
Implementing Agency: Local Self Government Department, Rajasthan
Segment: Wastewater
Work: The scope of work includes laying of I&D structures including provision of pumping stations and pumping main /gravity main up to sewage treatment plant (STP)/treatment facility with and establishment of setting up of STPs/community soak pits etc including one year defect liability period (DLP) and five years of Operation and Maintenance (O&M) for the package-05 covering 10 ULBs of Bharatpur Division.
Publish Date: January 19, 2025
End Date: February 19, 2025
Implementing Agency: Pandharpur Municipal Council
Segment: Wastewater
Work: The scope of work includes construction of collection system, interception and diversion (I&D), prefab pumping station, rising main, sewage pumping station, transmission line using micro tunnelling with supervisory control and data acquisition (SCADA) automation and other related works.
Publish Date: January 16, 2025
End Date: February 10, 2025
Implementing Agency: Ujjain Municipal Corporation
Segment: Wastewater
Work: The scope of work includes survey, design, construction of sewage treatment plants (STPs) having capacities of 2.38 million litres per day (mld) for Bhairavgarh drain and 22 mld for Piliyakhal drain, I&D work with construction of two drain tapping for Piliykhal drain and Bhairavgarh drain, approach sewer (1.42 km), construction of two sewage pumping station (SPS) (10 m dia 6 m depth for Piliyakhal drain and 3 m dia- 6 m depth for Bhairavgarh drain) with allied works including sewer rising mains (1420 m) and 2 nos. effluent pumping station at both proposed STPs campus with all allied works including effluent rising main (3500 m) and all appurtenant structures and allied works including 15 years Operation and Maintenance (O&M).
Publish Date: January 16, 2025
End Date: January 31, 2025
Implementing Agency: Delhi Jal Board (DJB)
Segment: Water Supply
Work: The scope of work involves design, construction, installation, testing and commissioning of 17 mgd wastewater treatment plant (WWTP), 38.25 mgd (Peak Flow) waste water pumping station (WWPS) with pumping mains and gravity main of 0.20 km along with its appropriate sludge treatment and its ultimate reuse with power generation facility as per CPHHEO manual including operation and maintenance (O&M) for a period of 15 years and three month trial run period on design, build and operate (DBO) basis.
Publish Date: January 7, 2025
End Date: May 28, 2026*